CN221682202U - Connecting device for curtain wall construction - Google Patents

Connecting device for curtain wall construction Download PDF

Info

Publication number
CN221682202U
CN221682202U CN202323480026.4U CN202323480026U CN221682202U CN 221682202 U CN221682202 U CN 221682202U CN 202323480026 U CN202323480026 U CN 202323480026U CN 221682202 U CN221682202 U CN 221682202U
Authority
CN
China
Prior art keywords
curtain wall
fixed
fixing
groove
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202323480026.4U
Other languages
Chinese (zh)
Inventor
万国澳
杨举龙
李明
李中金
刘勐
鲁程元
李子涵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202323480026.4U priority Critical patent/CN221682202U/en
Application granted granted Critical
Publication of CN221682202U publication Critical patent/CN221682202U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Curtains And Furnishings For Windows Or Doors (AREA)

Abstract

The utility model discloses a connecting device for curtain wall construction, which relates to the technical field of building decoration and aims to solve the problems of inconvenient disassembly and connection of damaged curtain wall boards, a first curtain wall board and a second curtain wall board are connected through a connecting device, two connecting keels are arranged, extend along the length direction of a first curtain wall board and a second curtain wall board which are coplanar and adjacently arranged and are arranged at the top and the bottom of the same side of the first curtain wall board and the second curtain wall board, the fossil fragments fixed subassembly is located the top of the connection fossil fragments of first curtain wallboard and second curtain wallboard bottom perpendicularly, fossil fragments fixed subassembly is equipped with two, two fossil fragments fixed subassembly detachable fixed first curtain wallboard, second curtain wallboard and connection fossil fragments, fossil fragments fixed subassembly is equipped with two including promoting the handle, two fixed surface subassemblies are located first wallboard and second curtain wallboard along the direction of height level of first wallboard and second curtain wallboard, fixed surface subassembly detachable connects first wallboard and second curtain wallboard.

Description

Connecting device for curtain wall construction
Technical Field
The utility model relates to the technical field of building decoration, in particular to a connecting device for curtain wall construction.
Background
The curtain wall is a light wall body with decorative effect, which is formed from panel and supporting structure system, and can be used for building peripheral structure or decorative structure which can have a certain displacement capacity or self-deformation capacity relative to main structure, and does not bear the action of main structure.
The curtain board is used in current curtain construction, and mostly through the bolt screwing, and after the curtain board damages, through a plurality of bolt fastening's mode, hardly connect the change again to the curtain board fast convenient, and change the operation and generally be outdoor, and then increased workman's operation danger again, the change connection installation of very inconvenient curtain.
Therefore, how to solve the problem of inconvenient disassembly and connection of the damaged curtain wall board is a problem to be solved by those skilled in the art.
Disclosure of utility model
Therefore, the present utility model provides a connection device for curtain wall construction, which is used for connecting a first curtain wall board and a second curtain wall board, when a worker needs to replace a damaged curtain wall board, the first curtain wall board and the second curtain wall board can be quickly disassembled by moving a pushing handle of a keel fixing assembly, and an auxiliary tool is not needed to be operated in the disassembling process, so that the operation process of the worker is very simple, the complicated connection process is avoided, the connection of the damaged curtain wall boards is faster, and the replacement connection safety of the curtain wall boards is greatly improved.
In order to achieve the above object, the present utility model provides the following technical solutions:
A connecting device for curtain construction for connect first curtain wallboard and second curtain wallboard, connecting device includes:
The two connecting keels extend along the length direction of the first curtain wall board and the second curtain wall board which are coplanar and are adjacently arranged, and are arranged at the top and the bottom of the same side of the first curtain wall board and the second curtain wall board;
The keel fixing assembly is vertically arranged at the top of the connecting keels at the bottoms of the first curtain wall board and the second curtain wall board, two keel fixing assemblies are arranged, the first curtain wall board, the second curtain wall board and the connecting keels are detachably fixed by the two keel fixing assemblies, and the keel fixing assembly comprises a pushing handle for detaching the first curtain wall board and the second curtain wall board;
The surface fixing assembly is provided with two, and the two surface fixing assemblies are horizontally arranged on the first wallboard and the second curtain wallboard along the height direction of the first wallboard and the second curtain wallboard, and the surface fixing assembly is detachably connected with the first wallboard and the second curtain wallboard.
Preferably, the keel fixing component comprises:
The fixed connecting rod is vertically arranged at the top of the connecting keel, a fixed movable cavity is arranged in the middle of the fixed connecting rod, a side movable groove is arranged on one side of the fixed movable cavity, and the side movable groove extends along the height direction of the fixed connecting rod;
The fixed inserting rod is connected with the fixed movable cavity in a sliding manner along the height direction of the fixed movable cavity, the top of the fixed inserting rod penetrates through the top of the fixed movable cavity, and a pushing handle is fixed at the bottom of one side of the fixed inserting rod;
And the reset spring is arranged in the fixed movable cavity and is used for connecting the inner wall of the fixed movable cavity and the bottom of the fixed inserted link.
Preferably, the pushing handle is arranged in parallel with the connecting keels and extends out of the side movable grooves to the outer sides of the fixed connecting rods, and the pushing handle is arranged along the side movable grooves in a moving mode.
Preferably, the keel fixing component further comprises:
The connecting and fixing bins are provided with two connecting and fixing bins which are fixed on the corresponding first curtain wall plate and second curtain wall plate, the connecting and fixing bins are of hollow structures, and the bottoms of the connecting and fixing bins are provided with through holes matched with the connecting and fixing inserted bars;
The limiting plug block is arranged in the inner cavity of the connecting and fixing bin, the top of the limiting plug block is connected with the inner top wall of the connecting and fixing bin, and a limiting hole matched with the connecting and fixing plug rod is formed in the bottom of the limiting plug block.
Preferably, the bottom of connecting fixed storehouse is equipped with the bottom movable groove, and bottom movable groove and connection fossil fragments parallel arrangement just extend to the lateral surface of connecting fixed storehouse, are equipped with the through-hole on the bottom movable groove.
Preferably, the bottom movable groove is internally provided with a bottom closing plate, the bottom closing plate is arranged in parallel with the connecting keels and extends out of the bottom movable groove to extend to the outer side of the connecting fixed bin, and the bottom closing plate is arranged along the bottom movable groove.
Preferably, the surface fixing assembly includes:
The first surface fixing block is fixed on the second curtain wall plate, is arranged in parallel with the connecting keels, is internally provided with sliding grooves, is arranged in parallel with the connecting keels and extends to the outer side face of the first surface fixing block;
the connecting plug block is arranged on the sliding groove, the head part of the connecting plug block extends out of the sliding groove, and the connecting plug block is arranged along the sliding groove in a moving way;
The fixed spring is arranged on the sliding groove and used for connecting the inner wall of the sliding groove with the tail part of the connecting plug block so as to fixedly connect the plug block with the first surface fixing block.
Preferably, the surface fixing assembly further comprises:
The second surface fixing block is fixed on the first curtain wall plate, the side end of the second surface fixing block is abutted with the side end of the first surface fixing block, a sliding slot is formed in the second surface fixing block, and the sliding slot is communicated with the sliding groove;
The inner moving groove is arranged on the side wall of the sliding slot and is arranged at the end part far away from the sliding groove;
The fixed clamping block is arranged in the inner moving groove and is arranged along the inner moving groove in a sliding manner, and extends out of the top end face of the inner moving groove along the depth direction of the inner moving groove;
And the abutting spring is arranged in the inner moving groove and moves along the inner moving groove, and is connected with the bottom of the fixed clamping block and the inner wall of the inner moving groove so as to fix the fixed clamping block and the second surface fixed block.
Preferably, the side surface of the connecting plug block is provided with a clamping groove, and the clamping groove is matched with the fixed clamping block.
Preferably, the end part of the first surface fixing block, which is abutted against the second surface fixing block, is provided with an edge connecting rod, the second surface fixing block is provided with an edge connecting groove matched with the edge connecting rod, and the edge connecting rod is arranged along the edge connecting groove in a moving way.
The utility model provides a connecting device for curtain wall construction, which is used for connecting a first curtain wall plate and a second curtain wall plate, and comprises two connecting keels, a keel fixing component and a surface fixing component, wherein the two connecting keels are arranged, extend along the length direction of the first curtain wall plate and the second curtain wall plate which are coplanar and are adjacently arranged, are arranged at the top and the bottom of the same side of the first curtain wall plate and the second curtain wall plate, the keel fixing component is vertically arranged at the top of the connecting keels at the bottom of the first curtain wall plate and the second curtain wall plate, the two keel fixing components are arranged, the two keel fixing components are detachably used for fixing the first curtain wall plate, the second curtain wall plate and the connecting keels, the first curtain wall plate and the second curtain wall plate are fixed on the connecting keels through the keel fixing component, the keel fixing component comprises a pushing handle, the first curtain wall plate and the second curtain wall plate can be detached through the pushing handle, the two surface fixing components are horizontally arranged at the top and the bottom of the same side of the first curtain wall plate and the second curtain wall plate, the surface fixing component is detachably connected with the first curtain wall plate and the second curtain wall plate through the first curtain wall plate and the second curtain wall plate.
The connecting device for curtain construction that adopts the mode to set up sets up this connecting device on first curtain wallboard and second curtain wallboard, when the workman need change the curtain wallboard of damage, through the promotion handle of removing fossil fragments fixed subassembly, can dismantle first curtain wallboard and second curtain board fast, and need not operate with the help of appurtenance at the in-process of dismantling, thereby make workman's operation process very simple, avoided loaded down with trivial details connection process, make the connection of damaged curtain wallboard more quick, improved the change connection security of curtain wallboard greatly.
Drawings
In order to more clearly illustrate the embodiments of the present utility model or the technical solutions in the prior art, the drawings that are required to be used in the embodiments or the description of the prior art will be briefly described below, and it is obvious that the drawings in the following description are only embodiments of the present utility model, and that other drawings can be obtained according to the provided drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic structural view of a connecting device for curtain wall construction provided by the utility model;
FIG. 2 is a cross-sectional view of the connecting device for curtain wall construction provided by the utility model;
Fig. 3 is a cross-sectional view of a keel fixing component provided by the utility model;
Fig. 4 is a cross-sectional view of a surface mount assembly provided by the present utility model.
In fig. 1 to 4, reference numerals include:
100-first curtain wall board, 200-second curtain wall board and 300-connecting device;
1-connecting keels;
The device comprises a 2-keel fixing component, a 201-pushing handle, a 202-fixing connecting rod, a 203-fixing movable cavity, a 204-side movable groove, a 205-connecting fixing inserting rod, a 206-reset spring, a 207-connecting fixing bin, a 208-limiting inserting block, a 209-bottom movable groove and a 210-bottom closing plate;
The device comprises a 3-surface fixing assembly, a 301-first surface fixing block, a 302-sliding groove, a 303-connecting plug block, a 304-fixing spring, a 305-second surface fixing block, a 306-sliding slot, a 307-internal moving groove, a 308-fixing clamping block, a 309-abutting spring, a 310-clamping groove, a 311-side connecting rod and a 312-side connecting groove.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
The terms "upper" and "lower" are defined below based on the drawings of the specification.
The core of the utility model is to provide a connecting device for curtain wall construction, wherein the connecting device 300 is arranged on a first curtain wall plate 100 and a second curtain wall plate 200, when a worker needs to replace a damaged curtain wall plate, the first curtain wall plate 100 and the second curtain wall plate 200 can be quickly disassembled by moving a pushing handle 201 of a keel fixing component 2, and auxiliary tools are not needed to operate in the disassembling process, so that the operation process of the worker is very simple, the complicated connecting process is avoided, the connection of the damaged curtain wall plates is faster, and the replacement and connection safety of the curtain wall plates is greatly improved.
Referring to fig. 1, 2 and 3, a connection device for curtain wall construction is used for connecting a first curtain wall board 100 and a second curtain wall board 200, and the connection device 300 comprises a connection keel 1, a keel fixing component 2 and a surface fixing component 3.
Specifically, the connection keel 1 is provided with two connection keels 1, the length direction of the first curtain wall board 100 and the second curtain wall board 200 that coplanarity and adjacent setting are extended along two connection keels 1, and locate the top and the bottom of the same side of first curtain wall board 100 and second curtain wall board 200, the top of the connection keel 1 of first curtain wall board 100 and second curtain wall board 200 bottom is located perpendicularly to fossil fragments fixed subassembly 2, fossil fragments fixed subassembly 2 detachable fixed first curtain wall board 100, second curtain wall board 200 and connection fossil fragments 1, through setting up fossil fragments fixed subassembly 2, with fixed first curtain wall board 100 and second curtain wall board 200 on connection fossil fragments 1, fossil fragments fixed subassembly 2 includes promotion handle 201, can dismantle first curtain wall board 100 and second curtain wall board 200 through promoting handle 201, surface fixation subassembly 3 is provided with two, first curtain wall board 100 and second curtain wall board 200 are located along the direction of height of first curtain wall board 100 and second curtain wall board 200 level, surface fixation subassembly 3 detachable connects first curtain wall board 100 and second curtain wall board 200 with first curtain wall board 200 through setting up fossil fragments fixed subassembly 3.
It should be noted that, in order to make the connection of workman to curtain wall board more quick and convenient, set up connecting device 300 on first curtain wall board 100 and second curtain wall board 200, through connecting device 300's connection effect, carry out fixed connection between first curtain wall board 100 and the second curtain wall board 200 at first, carry out fixed connection again between first curtain wall board 100 and the second curtain wall board 200 respectively and connect fossil fragments 1, and connect fossil fragments 1 and link to each other with the wall body in advance, and then make the quick installation of first curtain wall board 100 and second curtain wall board 200 on connecting fossil fragments 1.
The connecting device for curtain wall construction that adopts the mode to set up sets up this connecting device 300 on first curtain wallboard 100 and second curtain wallboard 200, when the workman need change the curtain wallboard of damage, through the promotion handle 201 that removes fossil fragments fixed subassembly 2, can dismantle first curtain wallboard 100 and second curtain wallboard 200 fast, and need not operate with the help of appurtenance at the in-process of dismantling, thereby make workman's operation process very simple, avoided loaded down with trivial details connection process, make the connection of damaged curtain wallboard more quick, improved the change connection security of curtain wallboard greatly.
Referring to fig. 3, the keel fixing assembly 2 includes a fixing connecting rod 202, a connecting fixing insert rod 205 and a return spring 206, the fixing connecting rod 202 is vertically disposed at the top of the connecting keel 1, a fixing movable cavity 203 is disposed in the middle of the fixing connecting rod 202, a side movable groove 204 is disposed at one side of the fixing movable cavity 203, the side movable groove 204 extends along the height direction of the fixing connecting rod 202, the connecting fixing insert rod 205 is slidably connected with the fixing movable cavity 203 along the height direction of the fixing movable cavity 203, the top of the connecting fixing insert rod 205 penetrates through the top of the fixing movable cavity 203, a pushing handle 201 is fixed at the bottom of one side of the connecting fixing insert rod 205, the return spring 206 is disposed in the fixing movable cavity 203, and the return spring 206 is used for connecting the inner wall of the fixing movable cavity 203 and the bottom of the connecting fixing insert rod 205.
It should be noted that, the fixed connecting rod 202 is vertically disposed at the top of the connection keel 1, the fixed connecting rod 202 is fixedly connected with the connection keel 1, and when the keel fixing component 2 is used, the connection fixed insert rod 205 moves up and down along the fixed movable cavity 203 of the fixed connecting rod 202, so as to drive the reset spring 206 to move up and down along the fixed movable cavity 203.
In the above case, the push handle 201 is disposed in parallel with the connection keel 1 and extends out of the side movable groove 204 to the outside of the fixed connection bar 202, and the push handle 201 is disposed to move along the side movable groove 204.
It can be understood that the pushing handle 201 drives the connecting fixed insert rod 205 to move up and down along the fixed movable cavity 203 of the fixed connecting rod 202, so as to drive the return spring 206 to move up and down along the fixed movable cavity 203, and the pushing handle 201 moves up and down along the side movable groove 204, and the side movable groove 204 has a certain limitation on the moving range of the pushing handle 201.
In the initial state, the return spring 206 pushes the handle 201 to be located at the top of the side movable groove 204, and applies a downward pressure to the push handle 201 to drive the connecting fixed plunger 205 to move downward along the fixed movable cavity 203. When the downward pressure applied to the push handle 201 is released, the return spring 206 springs back to the original state.
Further, the keel fixing assembly 2 further comprises a connecting fixing bin 207 and limiting inserting blocks 208, the connecting fixing bin 207 is provided with two connecting fixing bins 207, the two connecting fixing bins 207 are fixed on the corresponding first curtain wall board 100 and second curtain wall board 200, the connecting fixing bins 207 are of hollow structures, the bottoms of the connecting fixing bins 207 are provided with through holes matched with the connecting fixing inserting rods 205, the limiting inserting blocks 208 are arranged in the inner cavities of the connecting fixing bins 207, the tops of the limiting inserting blocks 208 are connected with the inner top wall of the connecting fixing bins 207, and limiting holes matched with the connecting fixing inserting rods 205 are formed in the bottoms of the limiting inserting blocks 208.
It should be noted that, by pushing the handle 201 downward to drive the connection fixed insert 205 to slide downward in the fixed movable cavity 203, and simultaneously, when the connection fixed insert 205 slides downward, the return spring 206 in the fixed movable cavity 203 is pressed downward, so that an upward resilience force acting on the connection fixed insert 205 is generated in the return spring 206 due to pressure, and the connection fixed insert 205 is separated from the inner cavity of the limit insert 208 and is separated from the connection fixed bin 207.
When the pressure applied to the pushing handle 201 is removed, the return spring 206 slides upwards along the inside of the fixed movable cavity 203 under the action of the resilience force, and drives the connecting fixed insert rod 205 to slide upwards, so that the top of the connecting fixed insert rod 205 sequentially passes through the limiting hole and the through hole to enter the limiting insert block 208.
In the above embodiment, the bottom of the connection fixing bin 207 is provided with the bottom movable groove 209, the bottom movable groove 209 is arranged in parallel with the connection keel 1 and extends to the outer side surface of the connection fixing bin 207, and the bottom movable groove 209 is provided with a through hole.
It will be appreciated that the bottom of the connection fixing bin 207 is provided with a bottom movable slot 209 disposed parallel to the connection keel 1, and the through hole is disposed through the bottom movable slot 209, so that the connection fixing insert rod 205 can extend into the limit insert block 208 through the bottom movable slot 209.
On the basis of the above embodiment, the bottom end movable groove 209 is provided with the bottom end closing plate 210, the bottom end closing plate 210 is arranged in parallel with the connection keel 1 and extends out of the bottom end movable groove 209 to the outside of the connection fixed bin 207, and the bottom end closing plate 210 is movably arranged along the bottom end movable groove 209.
By pushing the bottom closing plate 210, the bottom closing plate 210 slides into the bottom movable groove 209, and the through hole formed in the bottom movable groove 209 is closed, so that the bottom end of the connection fixing plunger 205 does not enter the connection fixing bin 207.
Referring to fig. 4, the surface fixing assembly 3 includes a first surface fixing block 301, a connecting plug block 303 and a fixing spring 304, the first surface fixing block 301 is fixed on the second curtain wall board 200, the first surface fixing block 301 is parallel to the connecting keel 1, a sliding groove 302 is disposed in the first surface fixing block 301, the sliding groove 302 is parallel to the connecting keel 1 and extends to an outer side surface of the first surface fixing block 301, the connecting plug block 303 and the fixing spring 304 are disposed in the sliding groove 302, a head of the connecting plug block 303 extends out of the sliding groove 302, the connecting plug block 303 is movably disposed along the sliding groove 302, and the fixing spring 304 is used for connecting an inner wall of the sliding groove 302 and a tail of the connecting plug block 303 so as to fixedly connect the plug block 303 with the first surface fixing block 301.
It will be appreciated that when it is desired to secure the first and second curtain wall panels 100, 200 together, the connecting plug 303 is fixedly connected to the second curtain wall panel 200 by applying a horizontal pressure to the second curtain wall panel 200, and the fixing spring 304 is in a compressed state, when it is desired to disassemble the first and second curtain wall panels 100, 200, a horizontal pulling force is applied to the second curtain wall panel 200, so that the fixing spring 304 drives the connecting plug 303 to disengage from the second curtain wall panel 200.
Further, the surface fixing assembly 3 further includes a second surface fixing block 305, an inner moving slot 307, a fixing clamping block 308 and a collision spring 309, the second surface fixing block 305 is fixed on the first curtain wall board 100, a side end of the second surface fixing block 305 is abutted to a side end of the first surface fixing block 301, a sliding slot 306 communicated with the sliding slot 302 is disposed in the second surface fixing block 305, the inner moving slot 307 is disposed on a side wall of the sliding slot 306 and is disposed at an end far away from the sliding slot 302, the fixing clamping block 308 is disposed in the inner moving slot 307 and is slidingly disposed along the inner moving slot 307, the fixing clamping block 308 extends out of a top end face of the inner moving slot 307 along a depth direction of the inner moving slot 307, the collision spring 309 is disposed in the inner moving slot 307 and is movably disposed along the inner moving slot 307, and the collision spring 309 is connected with a bottom of the fixing clamping block 308 and an inner wall of the inner moving slot 307 to fix the fixing clamping block 308 and the second surface fixing block 305.
It should be noted that, when the worker finishes the detachment of the first curtain wall board 100 and the second curtain wall board 200 from the connection keel 1, the worker needs to detach the first curtain wall board 100 from the second curtain wall board 200, and the worker pulls the first curtain wall board 100 and the second curtain wall board 200 by force, so that the connection plug 303 is separated from the sliding slot 306 inside the second surface fixing block 305.
In the above case, the side surface of the connection plug 303 is provided with a clamping groove 310, and the clamping groove 310 is matched with the fixing clamping block 308.
It will be appreciated that when the connection plug 303 is pulled out from the sliding slot 306 under the action of the pulling force of the worker and the pulling force of the fixing spring 304, the fixing block 308 inside the clamping slot 310 provided on the side surface of the connection plug 303 will be abutted against due to the sliding of the connection plug 303, and the bottom end of the fixing block 308 is inclined, and will move upwards again under the abutting action of the inner wall of the clamping slot 310, so as to squeeze the abutting spring 309 inside the inner moving slot 307, so that the abutting force of the abutting spring 309 will also act on the fixing block 308 in the opposite direction.
When the connection plug 303 is inserted into the sliding slot 306 again, the clamping groove 310 moves to the vertical position of the fixed clamping block 308, and the fixed clamping block 308 is inserted into the clamping groove 310 again by the resilience force of the abutting spring 309, so that the connection plug 303 is fixedly connected with the second surface fixing block 305.
On the basis of the above embodiment, the edge connecting rod 311 is disposed at the end of the first surface fixing block 301 abutting against the second surface fixing block 305, the edge connecting groove 312 matching with the edge connecting rod 311 is disposed on the second surface fixing block 305, and the edge connecting rod 311 is disposed along the edge connecting groove 312.
It should be noted that, under the action of the pulling force, the edge connecting rod 311 is also separated from the inside of the edge connecting slot 312, so that the first surface fixing block 301 and the second surface fixing block 305 are separated, and the edge connecting rod 311 is inserted into the inside of the edge connecting slot 312 by the action of the pushing force, so as to fix the first surface fixing block 301 and the second surface fixing block 305.
In summary, when the curtain wall plate is damaged and needs to be replaced, a worker only needs to carry the curtain wall plate to be replaced, then the worker pulls the push handle 201 to drive the connecting fixed insert rod 205 to slide downwards in the fixed movable cavity 203, meanwhile, the reset spring 206 in the fixed movable cavity 203 is extruded, so that the reset spring 206 generates an upward resilience force acting on the connecting fixed insert rod 205 due to extrusion, and the connecting fixed insert rod 205 is separated from the inner cavity of the limiting insert block 208 and is separated from the connecting fixed bin 207; then, the worker slides the bottom closing plate 210 into the bottom movable groove 209 by pushing the bottom closing plate 210, closing the through hole in the middle of the bottom movable groove 209, so that the top of the connection fixing plunger 205 does not enter the connection fixing bin 207 again, and the worker releases the push handle 201 at this time. At this time, the first curtain wall board 100 and the second curtain wall board 200 are not inserted into the connection fixing bin 207 through the connection fixing inserting rod 205, so that the first curtain wall board 100 and the second curtain wall board 200 can be detached from the connection keel 1 more quickly, and the first curtain wall board 100 and the second curtain wall board 200 can be replaced quickly without tools, thereby facilitating the operation of workers and improving the connection efficiency of the first curtain wall board 100 and the second curtain wall board 200.
When the worker dismantles the first curtain wall board 100 and the second curtain wall board 200 from the connection keel 1, the worker is required to dismount the first curtain wall board 100 and the second curtain wall board 200 by forcefully pulling the first curtain wall board 100 and the second curtain wall board 200, so that the connection plug 303 is separated from the sliding slot 306 in the second surface fixing block 305, when the connection plug 303 is pulled out from the sliding slot 306 under the action of the pulling force of the worker and the pulling force of the fixing spring 304, the fixing clamping block 308 in the clamping slot 310 arranged on the side surface of the connection plug 303 is collided due to the sliding of the connection plug 303, the bottom end of the fixing clamping block 308 is inclined, the interference spring 309 in the inner wall of the clamping slot 310 is extruded, the interference force in the opposite direction is generated by the interference spring 309 to act on the fixing clamping block 308, when the connection plug 303 is inserted into the sliding slot 306 again, the fixing clamping block 308 is pulled out of the vertical position through the resilience force of the interference spring 309, the fixing clamping block 308 is inserted into the fixing clamping block 308 again, and the connection plug 305 is not connected with the second surface fixing plug 305 by the connection plug 305 again, and the connection plug 305 is not connected with the inner surface of the connection keel 301. Separate between first curtain wallboard 100 and second curtain wallboard 200, make things convenient for the workman to change the curtain wallboard of damage, after dismantling, only need be close to each other through promoting two curtain boards for connect plug 303 inserts again and establishes in the slip slot 306 through fixed fixture block 308 is fixed, just can fix between two curtain boards again, alleviateed the operation step that the workman changed to the curtain board greatly, made things convenient for workman's use.
It should be noted that in this specification relational terms such as first and second are used solely to distinguish one entity from another entity without necessarily requiring or implying any actual such relationship or order between such entities.
In the present specification, each embodiment is described in a progressive manner, and each embodiment is mainly described in a different point from other embodiments, and identical and similar parts between the embodiments are all enough to refer to each other.
The connecting device for curtain wall construction provided by the utility model is described in detail above. The principles and embodiments of the present utility model have been described herein with reference to specific examples, the description of which is intended only to facilitate an understanding of the method of the present utility model and its core ideas. It should be noted that it will be apparent to those skilled in the art that various modifications and adaptations of the utility model can be made without departing from the principles of the utility model and these modifications and adaptations are intended to be within the scope of the utility model as defined in the following claims.

Claims (10)

1. A connecting device for curtain wall construction, characterized by being used for connecting a first curtain wall board (100) and a second curtain wall board (200), the connecting device (300) comprising:
The two connecting keels (1) are arranged, the two connecting keels (1) extend along the length direction of the first curtain wall board (100) and the second curtain wall board (200) which are coplanar and adjacently arranged, and are arranged at the top and the bottom of the same side of the first curtain wall board (100) and the second curtain wall board (200);
The keel fixing components (2) are vertically arranged at the tops of the connecting keels (1) at the bottoms of the first curtain wall boards (100) and the second curtain wall boards (200), two keel fixing components (2) are arranged, the first curtain wall boards (100) and the second curtain wall boards (200) are detachably fixed by the keel fixing components (2), and the keel fixing components (2) comprise pushing handles (201) to detach the first curtain wall boards (100) and the second curtain wall boards (200);
The surface fixing assembly (3) is provided with two, the two surface fixing assemblies (3) are horizontally arranged on the first curtain wall plate (100) and the second curtain wall plate (200) along the height direction of the first curtain wall plate (100) and the second curtain wall plate (200), and the surface fixing assemblies (3) are detachably connected with the first curtain wall plate (100) and the second curtain wall plate (200).
2. The connection device for curtain wall construction according to claim 1, wherein the keel fixing component (2) comprises:
The fixed connecting rod (202) is vertically arranged at the top of the connecting keel (1), a fixed movable cavity (203) is arranged in the middle of the fixed connecting rod (202), a side movable groove (204) is arranged on one side of the fixed movable cavity (203), and the side movable groove (204) extends along the height direction of the fixed connecting rod (202);
the fixed inserting rod (205) is connected with the fixed movable cavity (203) in a sliding manner along the height direction of the fixed movable cavity (203), the top of the fixed inserting rod (205) penetrates through the top of the fixed movable cavity (203), and the pushing handle (201) is fixed at the bottom of one side of the fixed inserting rod (205);
And the return spring (206) is arranged in the fixed movable cavity (203), and the return spring (206) is used for connecting the inner wall of the fixed movable cavity (203) with the bottom of the connecting fixed inserted link (205).
3. The connection device for curtain wall construction according to claim 2, wherein the pushing handle (201) is arranged in parallel with the connection keel (1) and extends out of the side movable groove (204) to the outer side of the fixed connection rod (202), and the pushing handle (201) is arranged to move along the side movable groove (204).
4. A connection device for curtain wall construction according to claim 3, characterized in that the keel fixing assembly (2) further comprises:
The two connecting and fixing bins (207) are arranged, the two connecting and fixing bins (207) are fixed on the corresponding first curtain wall plate (100) and second curtain wall plate (200), the connecting and fixing bins (207) are of hollow structures, and through holes matched with the connecting and fixing inserting rods (205) are formed in the bottoms of the connecting and fixing bins (207);
The limiting plug block (208) is arranged in the inner cavity of the connecting and fixing bin (207), the top of the limiting plug block (208) is connected with the inner top wall of the connecting and fixing bin (207), and a limiting hole matched with the connecting and fixing plug rod (205) is formed in the bottom of the limiting plug block (208).
5. The connecting device for curtain wall construction according to claim 4, wherein a bottom movable groove (209) is arranged at the bottom of the connecting and fixing bin (207), the bottom movable groove (209) is arranged in parallel with the connecting keel (1) and extends to the outer side surface of the connecting and fixing bin (207), and the through hole is arranged on the bottom movable groove (209).
6. The connection device for curtain wall construction according to claim 5, wherein a bottom end closing plate (210) is arranged in the bottom end movable groove (209), the bottom end closing plate (210) is arranged in parallel with the connection keel (1) and extends out of the bottom end movable groove (209) to extend to the outer side of the connection fixing bin (207), and the bottom end closing plate (210) is arranged along the bottom end movable groove (209) in a moving manner.
7. The connection device for curtain wall construction according to any one of claims 1 to 6, wherein the surface fixing assembly (3) comprises:
The first surface fixing block (301) is fixed on the second curtain wall plate (200), the first surface fixing block (301) is arranged in parallel with the connecting keel (1), a sliding groove (302) is formed in the first surface fixing block (301), and the sliding groove (302) is arranged in parallel with the connecting keel (1) and extends to the outer side face of the first surface fixing block (301);
The connecting plug block (303) is arranged on the sliding groove (302), the head part of the connecting plug block (303) extends out of the sliding groove (302), and the connecting plug block (303) is arranged along the sliding groove (302) in a moving way;
the fixed spring (304) is arranged on the sliding groove (302), and the fixed spring (304) is used for connecting the inner wall of the sliding groove (302) with the tail part of the connecting plug block (303) so as to fix the connecting plug block (303) with the first surface fixed block (301).
8. The connection device for curtain wall construction according to claim 7, wherein the surface fixing assembly (3) further comprises:
The second surface fixing block (305) is fixed on the first curtain wall plate (100), the side end of the second surface fixing block (305) is abutted with the side end of the first surface fixing block (301), a sliding slot (306) is formed in the second surface fixing block (305), and the sliding slot (306) is communicated with the sliding groove (302);
An inner moving groove (307) provided on a side wall of the sliding slot (306), the inner moving groove (307) being provided at an end portion remote from the sliding groove (302);
A fixed block (308) provided in the inner moving groove (307) and slidably provided along the inner moving groove (307), the fixed block (308) extending out of a top end surface of the inner moving groove (307) in a depth direction of the inner moving groove (307);
The abutting spring (309) is arranged in the inner moving groove (307) and is arranged along the inner moving groove (307), and the abutting spring (309) is connected with the bottom of the fixed clamping block (308) and the inner wall of the inner moving groove (307) so as to fix the fixed clamping block (308) and the second surface fixed block (305).
9. The connection device for curtain wall construction according to claim 8, wherein a clamping groove (310) is provided on a side surface of the connection plug (303), and the clamping groove (310) is matched with the fixing clamping block (308).
10. The connection device for curtain wall construction according to claim 9, wherein an edge connection rod (311) is provided at an end portion of the first surface fixing block (301) abutting against the second surface fixing block (305), an edge connection groove (312) is provided on the second surface fixing block (305) to be engaged with the edge connection rod (311), and the edge connection rod (311) is provided to be movable along the edge connection groove (312).
CN202323480026.4U 2023-12-20 2023-12-20 Connecting device for curtain wall construction Expired - Fee Related CN221682202U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202323480026.4U CN221682202U (en) 2023-12-20 2023-12-20 Connecting device for curtain wall construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202323480026.4U CN221682202U (en) 2023-12-20 2023-12-20 Connecting device for curtain wall construction

Publications (1)

Publication Number Publication Date
CN221682202U true CN221682202U (en) 2024-09-10

Family

ID=92624022

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202323480026.4U Expired - Fee Related CN221682202U (en) 2023-12-20 2023-12-20 Connecting device for curtain wall construction

Country Status (1)

Country Link
CN (1) CN221682202U (en)

Similar Documents

Publication Publication Date Title
CN113931396A (en) Wall mounting structure is maked somebody a mere figurehead to ready-package that wallboard reutilization can
CN210976858U (en) Building site isolated column
CN218814569U (en) A curtain wall structure for architectural decoration
CN206477444U (en) A kind of green wood SIP plates interior wall and steel column butt joint attachment structure
CN214995923U (en) A kind of aluminum alloy formwork which is easy to demold
CN104923706B (en) Disassembly tool and method for pulling rivet of interior wall board of railway box car
CN215907069U (en) A package assembly for fire-retardant board equipment
CN221298360U (en) Metal grid furred ceiling mounting structure
CN115787856B (en) Energy-saving building connecting node
CN219820059U (en) Wall building block frame
CN217906831U (en) Wall hanging system
CN219569444U (en) All-steel borderless antistatic floor
CN214531392U (en) Building decoration curtain wall
CN218205346U (en) Aluminum veneer convenient to disassemble and assemble
CN116044044A (en) A prefabricated building wall
CN215054140U (en) Wall surface installation structure of mineral wool sound-absorbing board
CN221321580U (en) Wall decoration board convenient to splice
CN219386964U (en) Building decorative plate
CN221823273U (en) Energy-saving environment-friendly building wallboard structure
CN222924039U (en) Precast concrete assembled stair riser connecting piece
CN216618173U (en) Easy-to-install blind rivet
CN222275918U (en) A new type of ceiling structure
CN220504275U (en) Node connection structure of steel joist
CN223992135U (en) Protective beam sheet metal part convenient to detach
CN115573499B (en) High-precision control installation mechanism for special-shaped aluminum veneer and construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20240910

CF01 Termination of patent right due to non-payment of annual fee