CN221627586U - A kind of building aluminum alloy scaffolding which is easy to disassemble and install - Google Patents

A kind of building aluminum alloy scaffolding which is easy to disassemble and install Download PDF

Info

Publication number
CN221627586U
CN221627586U CN202322694392.3U CN202322694392U CN221627586U CN 221627586 U CN221627586 U CN 221627586U CN 202322694392 U CN202322694392 U CN 202322694392U CN 221627586 U CN221627586 U CN 221627586U
Authority
CN
China
Prior art keywords
frame
main
framework
fixing
aluminum alloy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322694392.3U
Other languages
Chinese (zh)
Inventor
油松华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Hengmao Installation Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202322694392.3U priority Critical patent/CN221627586U/en
Application granted granted Critical
Publication of CN221627586U publication Critical patent/CN221627586U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a building aluminum alloy scaffold convenient to detach and install, which comprises a main part, a connecting part and a secondary part, wherein the main part comprises a main framework, a cross rod, a ladder stand and an inclined rod, the connecting part comprises a fixing buckle, a connecting ring and a fixing seat, the secondary part comprises a secondary framework, a guide rail plate, a pulley, a support frame, a storage table, a steel wire rope, a fixing block, a rotating shaft and a handle, and two ends of the cross rod are respectively connected with the main framework and the secondary framework through the fixing buckle and the connecting ring. This building aluminum alloy scaffold convenient to dismantlement installation only need with horizontal pole and the diagonal bar of main framework on installation be connected with secondary framework through connecting piece can for the installation dismantlement speed is faster like this to install elevating system, can avoid the staff repeated a plurality of cat ladder from top to bottom, carry heavy instrument when the cat ladder.

Description

一种便于拆卸安装的建筑铝合金脚手架A kind of building aluminum alloy scaffolding which is easy to disassemble and install

技术领域Technical Field

本实用新型涉及建筑施工器械技术领域,具体为一种便于拆卸安装的建筑铝合金脚手架。The utility model relates to the technical field of building construction equipment, in particular to a building aluminum alloy scaffold which is easy to disassemble and install.

背景技术Background Art

在建筑施工的过程中,通常需要使用到脚手架,方便工人攀爬在脚手架上,对建筑物表面较高的位置进行施工,而脚手架一般分为整体搭建的框架式固定脚手架,和一些小型可移动式的小型脚手架;In the process of building construction, scaffolding is usually needed to facilitate workers to climb on the scaffolding and carry out construction at higher positions on the surface of the building. Scaffolding is generally divided into frame-type fixed scaffolding built as a whole, and some small movable scaffolding;

现有小型可移动式的脚手架通常由多个横杆和竖杆搭建而成,需要用到多种零件组合,搭接、拆卸速度慢,结合刚度低,稳定性差,零配件容易丢失损坏,并且脚手架位置较高,拿取工具需要经常上下,非常不便。Existing small movable scaffolding is usually built with multiple horizontal bars and vertical bars, which requires a combination of multiple parts. The lap and disassembly speed is slow, the joint stiffness is low, the stability is poor, the spare parts are easily lost and damaged, and the scaffolding is located at a high position, so it is very inconvenient to frequently go up and down to get tools.

实用新型内容Utility Model Content

本实用新型的目的在于提供一种便于拆卸安装的建筑铝合金脚手架,以解决上述背景技术中提出的搭接、拆卸速度慢,拿取工具不变问题。The utility model aims to provide a building aluminum alloy scaffold which is easy to disassemble and install, so as to solve the problems of slow lap joint and disassembly speed and unchanged tools for taking proposed in the above-mentioned background technology.

为实现上述目的,本实用新型提供如下技术方案:一种便于拆卸安装的建筑铝合金脚手架,包括主要部件、连接零件和次要部件,所述主要部件的构成包括主构架、横杆、爬梯和斜杆,所述连接零件的构成包括固定扣、连接环和固定座,所述次要部件的构成包括次构架、导轨板、滑轮、支撑架、置物台、钢丝绳、固定块、转轴和把手;To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an aluminum alloy building scaffold that is easy to disassemble and install, comprising main components, connecting parts and secondary components, wherein the main components include a main frame, a crossbar, a ladder and an inclined rod, the connecting parts include a fixing buckle, a connecting ring and a fixing seat, and the secondary components include a secondary frame, a guide plate, a pulley, a support frame, a storage table, a wire rope, a fixing block, a rotating shaft and a handle;

所述横杆的两端通过固定扣和连接环分别与主构架和次构架连接,所述斜杆的两端通过固定扣和连接环分别与2个横梁连接,其中一个所述横梁安装于2个主构架之间,另一个所述横梁安装于2个次构架之间;The two ends of the cross bar are connected to the main frame and the secondary frame respectively through fixing buckles and connecting rings, and the two ends of the diagonal bar are connected to two cross beams respectively through fixing buckles and connecting rings, one of the cross beams is installed between the two main frames, and the other cross beam is installed between the two secondary frames;

所述主构架的下端安装有万向轮,所述万向轮上安装有脚刹,所述主构架的中间设置有2个横梁,且该横梁的外表面与爬梯固定连接,所述主构架的横梁上安装有固定扣,且固定扣与斜杆的一端固定连接,所述斜杆的另一端安装有连接环;A universal wheel is installed at the lower end of the main frame, and a foot brake is installed on the universal wheel. Two cross beams are arranged in the middle of the main frame, and the outer surfaces of the cross beams are fixedly connected to the ladder. A fixing buckle is installed on the cross beam of the main frame, and the fixing buckle is fixedly connected to one end of the inclined rod, and a connecting ring is installed on the other end of the inclined rod;

所述次构架的中间设置有横梁,且该横梁的外侧表面固定安装有升降机构;A crossbeam is arranged in the middle of the secondary frame, and a lifting mechanism is fixedly installed on the outer surface of the crossbeam;

所述踏板的两端分别通过连接环安装于主构架和次构架上方的横梁上表面,所述踏板的上表面开设有旋转门,所述主构架和次构架的上端均设置有固定座,所述固定座的前表面垂直排列设置有2个开孔,所述主构架和次构架的下端前表面也设置开孔,该开孔形态与固定座的开孔相对应,所述主构架和次构架的上端外表面均安装有加固架。The two ends of the pedal are respectively installed on the upper surface of the beam above the main frame and the secondary frame through connecting rings. A revolving door is provided on the upper surface of the pedal. The upper ends of the main frame and the secondary frame are provided with fixing seats. The front surface of the fixing seat is vertically arranged with two openings. The front surfaces of the lower ends of the main frame and the secondary frame are also provided with openings, and the shape of the openings corresponds to the openings of the fixing seats. The upper outer surfaces of the main frame and the secondary frame are installed with reinforcement frames.

优选的,所述固定扣为转动件。Preferably, the fixing buckle is a rotating part.

采用上述技术方案,可以使横杆和斜杆旋转展开。By adopting the above technical solution, the cross bar and the diagonal bar can be rotated and unfolded.

优选的,所述连接环设置为夹合式的连接方式,所述连接环的一侧内部安装有弹簧,且连接环的另一侧设置有开口,该开口通过螺栓连接。Preferably, the connecting ring is configured as a clamping connection, a spring is installed inside one side of the connecting ring, and an opening is provided on the other side of the connecting ring, and the opening is connected by bolts.

采用上述技术方案,使用该连接环可以使横杆和斜杆等与次构架的连接更加稳固。By adopting the above technical solution and using the connecting ring, the connection between the cross bar, the diagonal bar and the secondary frame can be more stable.

优选的,所述横杆共设置有2个,所述横杆与主构架通过固定扣旋转连接,所述横杆通过连接环与次构架卡合连接。Preferably, two cross bars are provided in total, the cross bars are rotationally connected to the main frame via fixing buckles, and the cross bars are snap-connected to the secondary frame via connecting rings.

采用上述技术方案,横杆的设置可以使脚手架底部更加稳固,横杆与主构架旋转连接更加方便收纳,与次构架卡合连接可以式拆卸快捷方便。By adopting the above technical solution, the setting of the cross bar can make the bottom of the scaffold more stable, the rotation connection between the cross bar and the main frame is more convenient for storage, and the snap connection with the secondary frame can be quickly and conveniently disassembled.

优选的,所述斜杆共设置有4个,所述斜杆位于横杆的上方,同侧的2个斜杆呈X结构。Preferably, a total of four diagonal bars are provided, and the diagonal bars are located above the cross bars, and two diagonal bars on the same side form an X structure.

采用上述技术方案,斜杆的设置可以使中部更加稳定,并且只需要一端连接零件拆卸安装,使得其拆卸安装更加快捷。By adopting the above technical solution, the setting of the diagonal rod can make the middle part more stable, and only one end of the connecting parts needs to be disassembled and installed, making its disassembly and installation faster.

优选的,所述升降机构包括导轨板、滑轮、支撑架、置物台、钢丝绳、固定块、转轴和把手;Preferably, the lifting mechanism includes a guide rail plate, a pulley, a support frame, a storage platform, a wire rope, a fixing block, a rotating shaft and a handle;

所述导轨板的外表面设置有滑槽,且该滑槽与滑轮滑动连接,所述滑轮的中心贯穿设置有支撑架,且支撑架的上表面固定安装有置物台,所述滑轮设置有2个,且2个滑轮的中心转动连接有轴,2个所述滑轮的轴安装有2个钢丝绳,且2个钢丝绳的上端与转轴连接,所述转轴从固定块的中心转动贯穿,且固定块的下端安装于导轨板的上端,所述转轴的一侧固定安装有把手。The outer surface of the guide rail plate is provided with a slide groove, and the slide groove is slidably connected to the pulley, a support frame is provided through the center of the pulley, and a storage table is fixedly installed on the upper surface of the support frame, two pulleys are provided, and the centers of the two pulleys are rotatably connected with shafts, two steel wire ropes are installed on the shafts of the two pulleys, and the upper ends of the two steel wire ropes are connected to the rotating shaft, the rotating shaft rotates through the center of the fixed block, and the lower end of the fixed block is installed on the upper end of the guide rail plate, and a handle is fixedly installed on one side of the rotating shaft.

采用上述技术方案,可以使工作人员上下爬梯时不用携带繁重的工具,通过升降机构就可拿取工具,避免多次上下爬梯。By adopting the above technical solution, workers do not need to carry heavy tools when climbing up and down the ladder. They can take the tools through the lifting mechanism and avoid climbing up and down the ladder many times.

与现有技术相比,本实用新型的有益效果是:该便于拆卸安装的建筑铝合金脚手架:Compared with the prior art, the utility model has the following beneficial effects: the building aluminum alloy scaffolding which is easy to disassemble and install has the following advantages:

1.将脚手架整体分为主要构架和次要构架,再安装使用时只需要将主要构架上安装的横杆和斜杆打开,然后通过连接零件与次要构架相连接即可,这样使得安装拆卸的速度更快,并且操作更加简单;1. Divide the scaffolding into the main frame and the secondary frame. When installing and using it, you only need to open the crossbars and diagonal bars installed on the main frame, and then connect them to the secondary frame through connecting parts. This makes installation and disassembly faster and easier to operate;

2.该脚手架的连接零件主要使用固定扣和连接环,固定扣设置为可旋转形态,将横杆和斜杆与主构架固定连接,可以使横杆和斜杆再拆卸后旋转回收,收纳方便,避免零件拆分过多容易丢失;2. The connecting parts of the scaffold mainly use fixing buckles and connecting rings. The fixing buckles are set to a rotatable form to fix the crossbars and diagonal bars to the main frame, so that the crossbars and diagonal bars can be disassembled and rotated for recycling, which is convenient for storage and avoids the loss of too many parts.

3.该脚手架的次构架的侧面安装有升降机构,工作人员在爬梯时携带工具十分不便,所以安装升降机构可以使工作人员在踏板上通过升降机构将所需工具运送到上方,可以避免工作人员重复多次上下爬梯。3. A lifting mechanism is installed on the side of the secondary frame of the scaffold. It is very inconvenient for workers to carry tools when climbing the ladder, so installing a lifting mechanism allows workers to transport the required tools to the top through the lifting mechanism on the pedal, which can avoid workers repeatedly climbing up and down the ladder.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

图1为本实用新型整体正面结构示意图;FIG1 is a schematic diagram of the overall front structure of the utility model;

图2为本实用新型升降结构侧面结构示意图;Figure 2 is a schematic diagram of the side structure of the lifting structure of the utility model;

图3为本实用新型主要部件正面结构示意图;Figure 3 is a schematic diagram of the front structure of the main components of the utility model;

图4为本实用新型主要部件侧面结构示意图;Figure 4 is a schematic diagram of the side structure of the main components of the utility model;

图5为本实用新型横杆俯视结构示意图。FIG. 5 is a schematic diagram of the top view of the cross bar structure of the utility model.

图中:1、主构架;2、固定扣;3、横杆;4、连接环;5、万向轮;6、爬梯;7、斜杆;8、次构架;9、导轨板;10、滑轮;11、支撑架;12、置物台;13、钢丝绳;14、固定块;15、转轴;16、把手;17、踏板;18、旋转门;19、固定座;20、加固架;21、横梁。In the figure: 1. main frame; 2. fixing buckle; 3. cross bar; 4. connecting ring; 5. universal wheel; 6. ladder; 7. diagonal bar; 8. secondary frame; 9. guide plate; 10. pulley; 11. support frame; 12. storage table; 13. wire rope; 14. fixing block; 15. rotating shaft; 16. handle; 17. pedal; 18. revolving door; 19. fixing seat; 20. reinforcement frame; 21. cross beam.

具体实施方式DETAILED DESCRIPTION

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

请参阅图1-5,本实用新型提供一种技术方案:一种便于拆卸安装的建筑铝合金脚手架,包括主构架1、固定扣2、横杆3、连接环4、万向轮5、爬梯6、斜杆7、次构架8、导轨板9、滑轮10、支撑架11、置物台12、钢丝绳13、固定块14、转轴15、把手16、踏板17、旋转门18、固定座19、加固架20、横梁21。Please refer to Figures 1-5. The utility model provides a technical solution: an aluminum alloy building scaffold that is easy to disassemble and install, including a main frame 1, a fixing buckle 2, a cross bar 3, a connecting ring 4, a universal wheel 5, a ladder 6, a diagonal rod 7, a secondary frame 8, a guide plate 9, a pulley 10, a support frame 11, a storage table 12, a wire rope 13, a fixing block 14, a rotating shaft 15, a handle 16, a pedal 17, a revolving door 18, a fixing seat 19, a reinforcement frame 20, and a cross beam 21.

该建筑铝合金脚手架整体只分为三部分,便于拆卸安装,避免零件丢失,具体为:The building aluminum alloy scaffolding is divided into only three parts, which is convenient for disassembly and installation to avoid loss of parts. Specifically:

主要部件的构成包括主构架1、横杆3、爬梯6和斜杆7,连接零件的构成包括固定扣2、连接环4和固定座19,次要部件的构成包括次构架8、导轨板9、滑轮10、支撑架11、置物台12、钢丝绳13、固定块14、转轴15和把手16,横杆3的两端通过固定扣2和连接环4分别与主构架1和次构架8连接,斜杆7的两端通过固定扣2和连接环4分别与2个横梁21连接,其中一个横梁21安装于2个主构架1之间,另一个横梁21安装于2个次构架8之间;The main components include a main frame 1, a crossbar 3, a ladder 6 and an inclined rod 7, the connecting parts include a fixing buckle 2, a connecting ring 4 and a fixing seat 19, the secondary components include a secondary frame 8, a guide plate 9, a pulley 10, a support frame 11, a storage table 12, a wire rope 13, a fixing block 14, a rotating shaft 15 and a handle 16, the two ends of the crossbar 3 are respectively connected to the main frame 1 and the secondary frame 8 through the fixing buckle 2 and the connecting ring 4, the two ends of the inclined rod 7 are respectively connected to two crossbeams 21 through the fixing buckle 2 and the connecting ring 4, one of the crossbeams 21 is installed between the two main frames 1, and the other crossbeam 21 is installed between the two secondary frames 8;

主构架1的下端安装有万向轮5,万向轮5上安装有脚刹,主构架1的中间设置有2个横梁21,且该横梁21的外表面与爬梯6固定连接,主构架1的横梁21上安装有固定扣2,且固定扣2与斜杆7的一端固定连接,斜杆7的另一端安装有连接环4,踏板17的两端分别通过连接环4安装于主构架1和次构架8上方的横梁21上表面,踏板17的上表面开设有旋转门18,主构架1和次构架8的上端均设置有固定座19,固定座19的前表面垂直排列设置有2个开孔,主构架1和次构架8的下端前表面也设置开孔,该开孔形态与固定座19的开孔相对应,主构架1和次构架8的上端外表面均安装有加固架20,固定扣2为转动件,连接环4设置为夹合式的连接方式,连接环4的一侧内部安装有弹簧,且连接环4的另一侧设置有开口,该开口通过螺栓连接,横杆3共设置有2个,横杆3与主构架1通过固定扣2旋转连接,横杆3通过连接环4与次构架8卡合连接,斜杆7共设置有4个,斜杆7位于横杆3的上方,同侧的2个斜杆7呈X结构,A universal wheel 5 is installed at the lower end of the main frame 1, and a foot brake is installed on the universal wheel 5. Two cross beams 21 are arranged in the middle of the main frame 1, and the outer surface of the cross beam 21 is fixedly connected to the ladder 6. A fixing buckle 2 is installed on the cross beam 21 of the main frame 1, and the fixing buckle 2 is fixedly connected to one end of the diagonal rod 7. A connecting ring 4 is installed at the other end of the diagonal rod 7. The two ends of the pedal 17 are respectively installed on the upper surface of the cross beam 21 above the main frame 1 and the secondary frame 8 through the connecting ring 4. A revolving door 18 is opened on the upper surface of the pedal 17. A fixing seat 19 is arranged at the upper end of the main frame 1 and the secondary frame 8. Two openings are arranged vertically on the front surface of the fixing seat 19. The front surfaces of the lower ends of the frame 1 and the secondary frame 8 are also provided with openings, and the shapes of the openings correspond to the openings of the fixing seat 19. The upper outer surfaces of the main frame 1 and the secondary frame 8 are both installed with reinforcement frames 20. The fixing buckle 2 is a rotating part. The connecting ring 4 is provided with a clamping connection mode. A spring is installed inside one side of the connecting ring 4, and an opening is provided on the other side of the connecting ring 4. The opening is connected by bolts. There are two cross bars 3 in total. The cross bar 3 is rotatably connected to the main frame 1 through the fixing buckle 2. The cross bar 3 is snap-connected with the secondary frame 8 through the connecting ring 4. There are four diagonal bars 7 in total. The diagonal bars 7 are located above the cross bar 3, and the two diagonal bars 7 on the same side are in an X structure.

该建筑铝合金脚手架用于建筑物较高位置的施工,首先将主构架1和次构架8取出,如图3所示,此时的主构架1上安装的横杆3和斜杆7为旋转闭合状态,如图4所示,主构架1上固定安装有多个固定扣2,且主构架1通过固定扣2转动安装有2个横杆3和4个斜杆7,2个横杆3和4个斜杆7的另一端均固定安装有连接环4,如图5所示,横杆3的两端分别安装有固定扣2和连接环4,所以首先将横杆3旋转,使2个横杆3通过连接环4与次构架8的竖向杆垂直连接,然后旋转主构架1的横梁21上通过固定扣2所连接的斜杆7,使斜杆7通过连接环4与次构架8的横梁21相接,然后将踏板17的两侧通过连接环4与主构架1和次构架8上方的横梁21连接,此时主构架1和次构架8完成连接,然后在主构架1和次构架8的下端安装万向轮5,万向轮5上端预设有2个螺钮开孔,主构架1和次构架8的下端都设置有固定座19,只需要将螺钮开孔用螺钮连接即可,然后将4个加固架20上端通过连接环4分别与主构架1和次构架8的上端连接,使得脚手架整体更加稳定,此时整体形态如图1所示,工作人员可以通过爬梯6向上攀爬,然后打开旋转门18,到达踏板17上方,当需要继续向上搭建时,再取主构架1和次构架8,将该主构架1和次构架8的下端与下方已搭建好的主构架1和次构架8的上端通过固定座19连接,然后重复上述连接工作即可加高,最后完成工作需要拆卸时,只需要将先前连接的连接环4打开,然后收纳即可。The aluminum alloy scaffolding is used for the construction of higher positions of buildings. First, the main frame 1 and the secondary frame 8 are taken out, as shown in Figure 3. At this time, the cross bars 3 and the diagonal bars 7 installed on the main frame 1 are in a rotated closed state. As shown in Figure 4, a plurality of fixing buckles 2 are fixedly installed on the main frame 1, and two cross bars 3 and four diagonal bars 7 are rotatably installed on the main frame 1 through the fixing buckles 2. The other ends of the two cross bars 3 and the four diagonal bars 7 are fixedly installed with connecting rings 4. As shown in Figure 5, the two ends of the cross bars 3 are respectively installed with fixing buckles 2 and connecting rings 4. Therefore, the cross bars 3 are first rotated so that the two cross bars 3 are vertically connected to the vertical bars of the secondary frame 8 through the connecting rings 4, and then the diagonal bars 7 connected to the cross beams 21 of the main frame 1 through the fixing buckles 2 are rotated so that the diagonal bars 7 are connected to the cross beams 21 of the secondary frame 8 through the connecting rings 4. Then the two sides of the pedal 17 are connected to the cross beams 21 above the main frame 1 and the secondary frame 8 through the connecting rings 4. At this time, the main After the frame 1 and the secondary frame 8 are connected, the universal wheel 5 is installed at the lower end of the main frame 1 and the secondary frame 8. The upper end of the universal wheel 5 is preset with two screw button openings. The lower ends of the main frame 1 and the secondary frame 8 are provided with fixing seats 19. It is only necessary to connect the screw button openings with screw buttons, and then the upper ends of the four reinforcement frames 20 are respectively connected to the upper ends of the main frame 1 and the secondary frame 8 through the connecting ring 4, so that the scaffolding as a whole is more stable. At this time, the overall shape is shown in Figure 1. The staff can climb up through the ladder 6, and then open the revolving door 18 to reach above the pedal 17. When it is necessary to continue to build upwards, the main frame 1 and the secondary frame 8 are taken again, and the lower ends of the main frame 1 and the secondary frame 8 are connected to the upper ends of the main frame 1 and the secondary frame 8 that have been built below through the fixing seat 19, and then the above connection work is repeated to increase the height. When the work is completed and needs to be disassembled, it is only necessary to open the previously connected connecting ring 4 and then store it.

该建筑铝合金脚手架设置有升降机构,便于工作人员拿取工具,具体为:The building aluminum alloy scaffolding is equipped with a lifting mechanism to facilitate the staff to take tools, specifically:

次构架8的中间设置有横梁21,且该横梁21的外侧表面固定安装有升降机构,升降机构包括导轨板9、滑轮10、支撑架11、置物台12、钢丝绳13、固定块14、转轴15和把手16;A crossbeam 21 is provided in the middle of the secondary frame 8, and a lifting mechanism is fixedly installed on the outer surface of the crossbeam 21, and the lifting mechanism includes a guide plate 9, a pulley 10, a support frame 11, a storage platform 12, a wire rope 13, a fixing block 14, a rotating shaft 15 and a handle 16;

导轨板9的外表面设置有滑槽,且该滑槽与滑轮10滑动连接,滑轮10的中心贯穿设置有支撑架11,且支撑架11的上表面固定安装有置物台12,滑轮10设置有2个,且2个滑轮10的中心转动连接有轴,2个滑轮10的轴安装有2个钢丝绳13,且2个钢丝绳13的上端与转轴15连接,转轴15从固定块14的中心转动贯穿,且固定块14的下端安装于导轨板9的上端,转轴15的一侧固定安装有把手16The outer surface of the guide plate 9 is provided with a slide groove, and the slide groove is slidably connected with the pulley 10. The center of the pulley 10 is penetrated by a support frame 11, and a storage table 12 is fixedly installed on the upper surface of the support frame 11. There are two pulleys 10, and the centers of the two pulleys 10 are rotatably connected with shafts. The shafts of the two pulleys 10 are installed with two steel wire ropes 13, and the upper ends of the two steel wire ropes 13 are connected to the rotating shaft 15. The rotating shaft 15 rotates through the center of the fixed block 14, and the lower end of the fixed block 14 is installed on the upper end of the guide plate 9. A handle 16 is fixedly installed on one side of the rotating shaft 15.

工作人员在攀爬前将工具放置到置物台12上,然后当工作人员到达踏板17上方后,需要拿取工作工具,如图2所示,转动把手16,把手16与转轴15固定连接,所以带动转轴15转动,转轴15的连接有钢丝绳13,钢丝绳13在转动下开始缠绕缩短,使得钢丝绳13下端连接的滑轮10向上移动,滑轮10的中心转动连接有支撑架11,支撑架11的上表面固定连接置物台12,置物台12的一侧与导轨板9的滑槽卡和滑动连接,所以置物台12承接这工具一同上升,然后工作人员可以拿到工具,在需要加高一层时,将导轨板9上端安装的固定块14取下,上方次构架8上安装的导轨板9与下方的导轨板9上端将会对接,然后将固定块14安装于上方次构架8的导轨板9上端即可。The staff puts the tool on the storage platform 12 before climbing. Then, when the staff reaches above the pedal 17, they need to take the work tool, as shown in Figure 2, and turn the handle 16. The handle 16 is fixedly connected to the rotating shaft 15, so the rotating shaft 15 is driven to rotate. The rotating shaft 15 is connected with a wire rope 13. The wire rope 13 begins to wind and shorten under rotation, so that the pulley 10 connected to the lower end of the wire rope 13 moves upward. The center rotation of the pulley 10 is connected to the support frame 11. The upper surface of the support frame 11 is fixedly connected to the storage platform 12. One side of the storage platform 12 is connected to the slide groove of the guide plate 9 and slidingly connected, so the storage platform 12 carries the tool and rises together. Then the staff can get the tool. When it is necessary to raise it by one layer, the fixed block 14 installed on the upper end of the guide plate 9 is removed, and the guide plate 9 installed on the upper secondary frame 8 will be connected with the upper end of the guide plate 9 below, and then the fixed block 14 is installed on the upper end of the guide plate 9 of the upper secondary frame 8.

工作原理:在使用该便于拆卸安装的建筑铝合金脚手架时,只需要将主要构架打开,然后通过连接零件与次要构架相连接即可,安装拆卸的速度更快,操作更加简单,收回时,将横杆3和斜杆7拆卸后旋转,收纳方便,增加了整体的实用性。Working principle: When using the architectural aluminum alloy scaffolding that is easy to disassemble and install, you only need to open the main frame and then connect it to the secondary frame through connecting parts. The installation and disassembly speed is faster and the operation is simpler. When retracting, the cross bar 3 and the diagonal bar 7 are disassembled and rotated, which is convenient for storage and increases the overall practicality.

尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims (6)

1. Building aluminum alloy scaffold convenient to dismantlement installation, including major part, connecting part and minor part, its characterized in that: the main components comprise a main framework (1), a cross rod (3), a ladder stand (6) and an inclined rod (7), the connecting parts comprise a fixing buckle (2), a connecting ring (4) and a fixing seat (19), and the secondary components comprise a secondary framework (8), a guide rail plate (9), pulleys (10), a support frame (11), a storage table (12), a steel wire rope (13), a fixing block (14), a rotating shaft (15) and a handle (16);
The two ends of the cross rod (3) are respectively connected with the main framework (1) and the secondary framework (8) through the fixing buckles (2) and the connecting rings (4), the two ends of the diagonal rods (7) are respectively connected with the 2 cross beams (21) through the fixing buckles (2) and the connecting rings (4), one cross beam (21) is arranged between the 2 main frameworks (1), and the other cross beam (21) is arranged between the 2 secondary frameworks (8);
The foot brake device is characterized in that a universal wheel (5) is arranged at the lower end of the main framework (1), a foot brake is arranged on the universal wheel (5), 2 cross beams (21) are arranged in the middle of the main framework (1), the outer surfaces of the cross beams (21) are fixedly connected with a cat ladder (6), a fixing buckle (2) is arranged on the cross beams (21) of the main framework (1), the fixing buckle (2) is fixedly connected with one end of an inclined rod (7), and a connecting ring (4) is arranged at the other end of the inclined rod (7);
a cross beam (21) is arranged in the middle of the secondary framework (8), and a lifting mechanism is fixedly arranged on the outer side surface of the cross beam (21);
The utility model discloses a novel structure of pedal structure, including main frame (1) and sub-frame (8), crossbeam (21) upper surface of main frame (1) and sub-frame (8) top is installed through go-between (4) respectively at the both ends of footboard (17), revolving door (18) have been seted up to the upper surface of footboard (17), the upper end of main frame (1) and sub-frame (8) all is provided with fixing base (19), the front surface vertical arrangement of fixing base (19) is provided with 2 trompils, the lower extreme front surface of main frame (1) and sub-frame (8) also sets up the trompil, and this trompil form is corresponding with the trompil of fixing base (19), reinforcement frame (20) are all installed to the upper end surface of main frame (1) and sub-frame (8).
2. The building aluminum alloy scaffold convenient to detach and install according to claim 1, wherein: the fixing buckle (2) is a rotating piece.
3. The building aluminum alloy scaffold convenient to detach and install according to claim 1, wherein: the connecting ring (4) is arranged in a clamping type connecting mode, a spring is arranged in one side of the connecting ring (4), an opening is formed in the other side of the connecting ring (4), and the opening is connected through a bolt.
4. The building aluminum alloy scaffold convenient to detach and install according to claim 1, wherein: the cross bars (3) are arranged in number, the cross bars (3) are rotationally connected with the main framework (1) through fixing buckles (2), and the cross bars (3) are connected with the secondary framework (8) in a clamping mode through connecting rings (4).
5. The building aluminum alloy scaffold convenient to detach and install according to claim 1, wherein: the number of the inclined rods (7) is 4, the inclined rods (7) are located above the cross rods (3), and the 2 inclined rods (7) on the same side are of an X structure.
6. The building aluminum alloy scaffold convenient to detach and install according to claim 1, wherein: the lifting mechanism comprises a guide rail plate (9), a pulley (10), a supporting frame (11), a storage table (12), a steel wire rope (13), a fixed block (14), a rotating shaft (15) and a handle (16);
The outer surface of guide rail board (9) is provided with the spout, and this spout and pulley (10) sliding connection, the center of pulley (10) runs through and is provided with support frame (11), and the upper surface fixed mounting of support frame (11) has thing platform (12), pulley (10) are provided with 2, and the center rotation of 2 pulleys (10) is connected with the axle, 2 the axle of pulley (10) is installed 2 wire rope (13), and the upper end and the pivot (15) of 2 wire rope (13) are connected, pivot (15) are rotated from the center of fixed block (14) and are run through, and the lower extreme of fixed block (14) is installed in the upper end of guide rail board (9), one side fixed mounting of pivot (15) has handle (16).
CN202322694392.3U 2023-10-09 2023-10-09 A kind of building aluminum alloy scaffolding which is easy to disassemble and install Active CN221627586U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322694392.3U CN221627586U (en) 2023-10-09 2023-10-09 A kind of building aluminum alloy scaffolding which is easy to disassemble and install

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322694392.3U CN221627586U (en) 2023-10-09 2023-10-09 A kind of building aluminum alloy scaffolding which is easy to disassemble and install

Publications (1)

Publication Number Publication Date
CN221627586U true CN221627586U (en) 2024-08-30

Family

ID=92487341

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322694392.3U Active CN221627586U (en) 2023-10-09 2023-10-09 A kind of building aluminum alloy scaffolding which is easy to disassemble and install

Country Status (1)

Country Link
CN (1) CN221627586U (en)

Similar Documents

Publication Publication Date Title
CN212957538U (en) Roof flower frame beam and outer wall decoration construction movable operation platform
CN221627586U (en) A kind of building aluminum alloy scaffolding which is easy to disassemble and install
CN211164702U (en) Beam slab bar planting drilling tool
CN216239615U (en) Assembled scaffold for building construction
CN215803040U (en) Steel structure scaffold
CN213418415U (en) Multifunctional building scaffold
CN214360123U (en) Small-size lift is used in engineering construction
CN212773634U (en) Adjustable building supporting device
CN220469341U (en) A highly safe building construction frame
CN210767825U (en) Turnover formwork construction system
CN210370017U (en) A kind of scaffolding for construction engineering
CN222500979U (en) A convenient construction frame
CN217871679U (en) A mobile and stable lifting scaffold
CN221703072U (en) Portable building construction frame
CN221119113U (en) Telescopic movable building scaffold
CN219570008U (en) Step device for mobile hydraulic lifting platform
CN222434108U (en) Maintenance platform with lifting structure
CN220395125U (en) Scaffold for building construction
CN214658643U (en) Mobile platform for multi-use architecture construction
CN220080920U (en) Large-span steel structure beam unloading device
CN222042522U (en) A construction lifting platform
CN207314786U (en) One kind is moved easily Liftable scaffolding
CN220889401U (en) Elevator shaft lifting platform for building construction
CN212802433U (en) Firm scaffold frame for engineering construction
CN223119460U (en) Fixed bolster that building engineering used

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20250403

Address after: No. 69, North Street, Xuewa Village, Sima Town, Jinxiang County, Jining City, Shandong Province, China 272000

Patentee after: Shang Qingfei

Country or region after: China

Patentee after: Cui Lianyi

Address before: 518000 No. 3101 Qianhai Road, Nanshan District, Shenzhen, Guangdong

Patentee before: Lu Zhongmei

Country or region before: China

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20250904

Address after: 110000 Liaoning Province Shenyang City Tixi District Baogong North Street 3.NO(11-6)

Patentee after: Liaoning Hengmao Installation Engineering Co.,Ltd.

Country or region after: China

Address before: No. 69, North Street, Xuewa Village, Sima Town, Jinxiang County, Jining City, Shandong Province, China 272000

Patentee before: Shang Qingfei

Country or region before: China

Patentee before: Cui Lianyi