CN221609220U - Boom mounting structure - Google Patents

Boom mounting structure Download PDF

Info

Publication number
CN221609220U
CN221609220U CN202323437807.5U CN202323437807U CN221609220U CN 221609220 U CN221609220 U CN 221609220U CN 202323437807 U CN202323437807 U CN 202323437807U CN 221609220 U CN221609220 U CN 221609220U
Authority
CN
China
Prior art keywords
suspender
transverse
decoration panel
keel
boom
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202323437807.5U
Other languages
Chinese (zh)
Inventor
彦博磊
隗立松
陈鹏
沈思潮
张永杰
孙志云
何海涛
赵洪涛
李强
段帅冰
潘鹏家
王斌
訾铁
郭建伟
郭永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Chengjian Yatai Decoration Design Co ltd
Original Assignee
Beijing Chengjian Yatai Decoration Design Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Chengjian Yatai Decoration Design Co ltd filed Critical Beijing Chengjian Yatai Decoration Design Co ltd
Priority to CN202323437807.5U priority Critical patent/CN221609220U/en
Application granted granted Critical
Publication of CN221609220U publication Critical patent/CN221609220U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The application relates to the field of building construction, in particular to a boom installation structure, which comprises a first boom device, a second boom device and a first connecting component, wherein the first boom device is connected with a basic layer of a solid structure and comprises an expansion bolt arranged at the top, a first boom connected with one end of the expansion bolt far away from the basic layer of the solid structure, and the first connecting component connected with one end of the first boom far away from the expansion bolt; the second suspender device is connected with the steel structure and comprises a galvanized corner bracket arranged at the bottom of the steel structure, a second suspender arranged at the bottom of the galvanized corner bracket and a second connecting component arranged at the bottom of the second suspender; and the transverse decoration panel is simultaneously arranged at the bottoms of the first connecting piece and the second connecting piece. The application can simply connect the suspender with the substrate with both solid structure and steel structure.

Description

Boom mounting structure
Technical Field
The application relates to the field of building construction, in particular to a suspender mounting structure.
Background
The hanging rod is one of the most important parts of the indoor suspended ceiling, plays a role in connecting the whole suspended ceiling surface with the top of a room, and is the foundation of the whole suspended ceiling engineering. With the development of the building industry and the progress of the times, the building construction is basically finished, the ceiling suspended ceiling, the installation lamps and the pipeline are designed more and more, and the hanging rods involved in the installation are also installed more and more.
In the suspended ceiling installation engineering, one of the steps is the installation of a suspension rod, and the suspension rod is usually connected with a base layer with a solid structure, but when the base layer has both the solid structure and a steel structure, the installation of the suspension rod is relatively difficult.
Disclosure of utility model
In order to simply connect the hanger rod with the substrate with both the solid structure and the steel structure, the application provides a hanger rod mounting structure.
The application provides a boom mounting structure, which adopts the following technical scheme:
A boom mounting structure comprising:
The first suspender device is connected with the physical structure base layer and comprises an expansion bolt arranged at the top, a first suspender connected with one end of the expansion bolt far away from the physical structure base layer and a first connecting component connected with one end of the first suspender far away from the expansion bolt;
The second suspender device is connected with the steel structure and comprises a galvanized corner bracket arranged at the bottom of the steel structure, a second suspender arranged at the bottom of the galvanized corner bracket and a second connecting component arranged at the bottom of the second suspender;
And the transverse decoration panel is simultaneously arranged at the bottoms of the first connecting piece and the second connecting piece.
Through adopting above-mentioned technical scheme, when needs install first jib, be connected first jib and expansion bolts, expansion bolts are connected with entity structure basic unit again, and rethread first jib is connected with first coupling assembling to realize being connected between first jib and the horizontal decoration panel. When the second suspender is required to be installed, the second suspender is connected with the galvanized corner connector, the second suspender is connected with the top of the steel structure, and the second suspender is connected with the second connecting component through the second suspender, so that the connection between the second suspender and the transverse decoration panel is realized.
Optionally, the first coupling assembling is including installing the vertical main joist of first jib bottom and with the horizontal secondary joist that vertical main joist is connected, horizontal secondary joist sets up the top of horizontal decoration panel, and through self tapping screw with horizontal secondary joist is connected.
Through adopting above-mentioned technical scheme, the setting of first coupling assembling is as being connected between first jib and the horizontal decoration panel, becomes more firm with the connection of first jib with horizontal decoration panel, and during the installation, place horizontal secondary joist on horizontal decoration panel earlier, set up vertical main joist on horizontal secondary joist again, be connected first jib and vertical main joist, horizontal secondary joist again to reach the connection with horizontal groove decoration panel indirectly.
Optionally, a threaded rod is disposed at the bottom of the first boom, and the threaded rod can be inserted into the longitudinal main keel, and the longitudinal main keel is perpendicular to the transverse secondary keel.
Through adopting above-mentioned technical scheme, the threaded rod setting links together first jib and horizontal secondary joist and vertical main joist simultaneously for be connected between first jib and the horizontal secondary joist inseparabler, increase holistic structural strength.
Optionally, the second coupling assembling is including setting up the connecting rod of second jib bottom and the limit fossil fragments that are connected with the connecting rod, the connecting rod can wear to establish simultaneously vertical main joist horizontal secondary joist with on the limit fossil fragments.
Through adopting above-mentioned technical scheme, during the installation, earlier with the fixed back in top of second jib, wear to establish on vertical main joist and the horizontal secondary joist simultaneously with the connecting rod, fix both together, wear to establish on the connecting rod with the secondary joist again, simultaneously with horizontal secondary joist looks butt to fix the second jib is stable.
Optionally, the setting of limit fossil fragments is the U type, limit fossil fragments U type bottom with the bottom looks butt of horizontal secondary joist, the side of limit fossil fragments with horizontal decoration panel looks butt.
Through adopting above-mentioned technical scheme, the setting of limit fossil fragments makes the connection between second jib and the horizontal secondary joist inseparabler to the limit fossil fragments set up to the U type, make the both sides of limit fossil fragments parallel, can provide bigger structural strength for the second jib, limit fossil fragments still are connected with horizontal decoration panel simultaneously, thereby are connected second jib with horizontal decoration panel.
Optionally, the end that horizontal decoration panel is close to the second jib is connected with vertical decoration panel perpendicularly, vertical decoration panel passes through self tapping screw with another horizontal secondary joist is connected, two horizontal secondary joist is capable to set up perpendicularly, the limit fossil fragments insert in the horizontal secondary joist.
Through adopting above-mentioned technical scheme, vertical decoration panel is arranged in reinforcing for the vertical face in the jib structure to also be connected with second coupling assembling, thereby be connected with horizontal secondary joist through self-tapping screw, and still be connected with the limit fossil fragments, indirectly strengthened the joint strength between horizontal secondary joist and the limit fossil fragments.
Optionally, the length of the transverse decoration panel is set to be 350mm-450mm, and the length of the longitudinal decoration panel is set to be 140mm-160mm.
By adopting the technical scheme, the transverse decoration panel is arranged at the bottom of the transverse secondary joist, so that the length of the transverse decoration panel is set to be 350-400 mm, and the transverse decoration panel can bear the weight of all the transverse secondary joists and the weight of the first suspender and the second suspender; the length of the longitudinal decoration panel can support the second connecting component.
Optionally, the expansion bolts are set as expansion bolts of M6, M8 or M10.
Through adopting above-mentioned technical scheme, do certain restriction to expansion bolts's specification, avoid when expansion bolts's diameter that selects to use is too little, can't carry out stable fixed to first jib and second jib, perhaps when expansion bolts's diameter that selects to use is too big, can need more unnecessary manpower on the installation of first jib and second jib, so expansion bolts's selection of specification still very need.
In summary, the present application includes at least one of the following beneficial technical effects:
1. through having set up first jib device, expansion bolts, first jib, first coupling assembling, second jib device, galvanized angle sign indicating number, second jib, second coupling assembling and horizontal decoration panel, when first jib is installed to needs, be connected first jib and expansion bolts, expansion bolts is connected with the entity structure basic unit again, and rethread first jib is connected with first coupling assembling to realize being connected between first jib and the horizontal decoration panel. When the second suspender is required to be installed, the second suspender is connected with the galvanized corner connector, the second suspender is connected with the top of the steel structure, and then the second suspender is connected with the second connecting assembly, so that the connection between the second suspender and the transverse decoration panel is realized, the installation mode realizes the simple connection of the first suspender with the entity structure and the simple connection of the second suspender with the base layer of the steel structure;
2. Through having set up vertical main joist, horizontal secondary joist, threaded rod and self-tapping screw, the setting of first coupling assembling is as being connected between first jib and the horizontal decoration panel, becomes more firm with the connection of first jib with horizontal decoration panel, and the threaded rod setting links together first jib and horizontal secondary joist and vertical main joist simultaneously for be connected between first jib and the horizontal secondary joist inseparabler, increase holistic structural strength. During installation, the transverse secondary joists are firstly placed on the transverse decoration panel, then the longitudinal main joists are erected on the transverse secondary joists, and then the connecting rod of the first suspender is connected with the longitudinal main joists and the transverse secondary joists, so that the indirect connection with the transverse groove decoration panel is achieved;
3. Through having set up connecting rod and limit fossil fragments, during the installation, earlier with the fixed back in top of second jib, wear to establish on vertical main joist and the horizontal secondary joist simultaneously with the connecting rod, fix both together, wear to establish on the connecting rod with the limit fossil fragments again, simultaneously with horizontal secondary joist looks butt to fix the second jib is stable. The setting of limit fossil fragments makes the connection between second jib and the horizontal secondary joist inseparabler to the limit fossil fragments set up to the U type, make the both sides of limit fossil fragments parallel, can provide bigger structural strength for the second jib, the limit fossil fragments still are connected with horizontal decoration panel simultaneously, thereby are connected second jib and horizontal decoration panel.
Drawings
Fig. 1 is a schematic view of the overall structure of the present application.
Reference numerals illustrate: 1. a first boom means; 11. an expansion bolt; 12. a first boom; 13. a first connection assembly; 131. a longitudinal main keel; 132. a transverse secondary keel; 133. a threaded rod; 2. self-tapping screw; 3. a second boom means; 31. zinc plating corner brackets; 32. a second boom; 33. a second connection assembly; 331. a connecting rod; 332. edge keels; 333. a transverse decoration panel; 4. a longitudinal decoration panel; 5. a physical structure base layer; 6. and (3) a steel structure.
Detailed Description
The present application will be described in further detail with reference to fig. 1.
The embodiment of the application discloses a boom mounting structure.
Referring to fig. 1, a boom mounting structure includes a first boom device 1 connected to a solid structural substrate 5, a second boom device 3 connected to a steel structure 6, and a lateral decoration panel 333 provided under the first boom device 1 and the second boom device 3.
The first boom device 1 comprises an expansion bolt 11 arranged on top of the physical structure base layer 5, a first boom 12 connected to the end of the expansion bolt 11 remote from the physical structure base layer 5, and a first connection assembly 13 connected to the end of the first boom 12 remote from the expansion bolt 11. The second boom device 3 comprises a galvanised horn 31 mounted at the bottom of the steel structure 6, a second boom 32 arranged at the bottom of the galvanised horn 31 and a second connection assembly 33 arranged at the bottom of the second boom 32. The lateral decoration panel 333 is provided at the bottom of both the first and second connection members.
When the first suspender 12 needs to be installed, the first suspender 12 is connected with the expansion bolt 11, the expansion bolt 11 is connected with the physical structure base layer 5, and then the first suspender 12 is connected with the first connecting component 13, so that the connection between the first suspender 12 and the transverse decoration panel 333 is realized. When the second suspender 32 needs to be installed, the second suspender 32 is connected with the galvanized corner connector 31, the second suspender 32 is connected with the top of the steel structure 6, and then the second suspender 32 is connected with the second connecting component 33, so that the connection between the second suspender 32 and the transverse decoration panel 333 is realized, and the installation mode realizes that the first suspender 12 is simply and conveniently connected with the entity structure, and the second suspender 32 is simply and conveniently connected with the base layer of the steel structure 6.
Referring to fig. 1, the first link assembly 13 includes a longitudinal main runner 131 mounted to the bottom of the first boom 12 and a transverse cross runner 132 connected to the longitudinal main runner 131, the transverse cross runner 132 being disposed perpendicular to the longitudinal main runner 131. The bottom of the first boom 12 is provided with a threaded rod 133 that can be threaded into the longitudinal main runners 131 and the transverse cross runners 132 to connect the three together. The cross runner 132 is disposed above the cross trim panel 333 and is connected to the cross runner 132 by self-tapping screws 2.
The setting of first coupling assembling 13 becomes the connection between first jib 12 and the horizontal decoration panel 333, becomes more firm with the connection of first jib 12 and horizontal decoration panel 333, and threaded rod 133 sets up and links together first jib 12 and horizontal secondary joist 132 and vertical main joist 131 simultaneously for the connection between first jib 12 and the horizontal secondary joist 132 is inseparabler, increases holistic structural strength. During installation, the transverse secondary joist 132 is firstly placed on the transverse decoration panel 333, then the longitudinal main joist 131 is erected on the transverse secondary joist 132, and then the connecting rod 331 of the first suspender 12 is connected with the longitudinal main joist 131 and the transverse secondary joist 132, so that the connection between the connecting rod 331 and the transverse groove decoration panel is achieved.
Referring to fig. 1, the second connection assembly 33 includes a connection rod 331 disposed at the bottom of the second boom 32 and a side keel 332 connected to the connection rod 331, and the connection rod 331 can be simultaneously inserted on the longitudinal main keel 131, the transverse cross runners 132 and the side keel 332, and the top of the side keel 332 is abutted to the transverse cross runners 132. The side keel 332 is set to be U-shaped, the bottom of the U-shaped side keel 332 is abutted against the bottom of the transverse secondary keel 132, and the side surface of the side keel 332 is abutted against the transverse decoration panel 333.
During installation, after the top end of the second suspender 32 is fixed, the connecting rod 331 is simultaneously penetrated through the longitudinal main joist 131 and the transverse secondary joist 132 to fix the longitudinal main joist 131 and the transverse secondary joist 132 together, and then the edge joist 332 is penetrated into the connecting rod 331 to be abutted against the transverse secondary joist 132, so that the second suspender 32 is stably fixed. The arrangement of the edge runner 332 makes the connection between the second boom 32 and the transverse secondary runner 132 tighter, and the edge runner 332 is arranged in a U-shape, so that the two sides of the edge runner 332 are parallel, and can provide greater structural strength for the second boom 32, while the edge runner 332 is also connected with the transverse decoration panel 333, thereby connecting the second boom 32 with the transverse decoration panel 333.
Referring to fig. 1, the end of the transverse decoration panel 333, which is close to the second boom 32, is vertically connected with a longitudinal decoration panel 4, the longitudinal decoration panel 4 is connected with another transverse cross runner 132 by self-tapping screws 2, two transverse cross runners 132 are vertically arranged, and an edge runner 332 is inserted into the transverse cross runner 132. The longitudinal decoration panel 4 is used for reinforcing a vertical surface in the boom structure and is also connected with the second connecting assembly 33, thereby being connected with the transverse secondary joist 132 through the self-tapping screw 2 and also being connected with the edge joist 332, and indirectly strengthening the connection strength between the transverse secondary joist 132 and the edge joist 332.
The length of the transverse trim panel 333 is selected to be 350mm-450mm and the length of the longitudinal trim panel 4 is selected to be 140mm-160mm. In the drawings, the transverse decorative plate is 400mm, and the longitudinal decorative plate is 150 mm. The expansion bolts 11 are selected from expansion bolts 11 of M6, M8 or M10, namely, the tail diameter of the expansion bolts 11 is about 12 mm.
The lateral decoration panel 333 is provided at the bottom of the lateral cross runner 132 so that the length thereof is set to 350mm to 400mm so that the lateral decoration panel 333 can support the weight of all the lateral cross runners 132 and the weight of the first and second booms 12, 32; the longitudinal trim panel 4 is provided with a length that enables the second attachment assembly 33 to be supported.
The specification of the expansion bolts 11 is limited to a certain extent, so that the specification of the expansion bolts 11 is still necessary because stable fixing of the first hanger rod 12 and the second hanger rod 32 cannot be performed when the diameter of the expansion bolts 11 is too small, or because more unnecessary labor is required for mounting the first hanger rod 12 and the second hanger rod 32 when the diameter of the expansion bolts 11 is too large.
The implementation principle of the boom mounting structure provided by the embodiment of the application is as follows: when the first suspender 12 is required to be installed, the first suspender 12 is connected with the expansion bolt 11, the expansion bolt 11 is connected with the entity structure base layer 5 again, the transverse secondary joist 132 is placed on the transverse decoration panel 333, the longitudinal main joist 131 is erected on the transverse secondary joist 132, and the connecting rod 331 of the first suspender 12 is connected with the longitudinal main joist 131 and the transverse secondary joist 132, so that the connection with the transverse groove decoration panel is achieved indirectly. When the second suspender 32 is required to be installed, the second suspender 32 is connected with the galvanized corner connector 31, the second suspender 32 is connected with the top of the steel structure 6, after the top end of the second suspender 32 is fixed, the connecting rod 331 is simultaneously penetrated through the longitudinal main keel 131 and the transverse secondary keel 132 and is fixed together, the edge keel 332 is penetrated into the connecting rod 331 and is abutted with the transverse secondary keel 132, so that the second suspender 32 is stably fixed, and the connection between the second suspender 32 and the transverse decoration panel 333 is realized. This mounting allows for easy attachment of the first boom 12 to the solid structure and easy attachment of the second boom 32 to the base layer of the steel structure 6.
The above embodiments are not intended to limit the scope of the present application, so: all equivalent changes in structure, shape and principle of the application should be covered in the scope of protection of the application.

Claims (8)

1. A jib mounting structure, its characterized in that: comprising the following steps:
the first suspender device (1) is connected with the solid structure base layer (5), and the first suspender device (1) comprises an expansion bolt (11) arranged at the top, a first suspender (12) connected with one end of the expansion bolt (11) far away from the solid structure base layer (5) and a first connecting component (13) connected with one end of the first suspender (12) far away from the expansion bolt (11);
the second suspender device (3) is connected with the steel structure (6), and the second suspender device (3) comprises a galvanized corner bracket (31) arranged at the bottom of the steel structure (6), a second suspender (32) arranged at the bottom of the galvanized corner bracket (31) and a second connecting component (33) arranged at the bottom of the second suspender (32);
And a transverse decoration panel (333) arranged at the bottoms of the first connecting piece and the second connecting piece at the same time.
2. A boom mounting structure as claimed in claim 1, wherein: the first connecting assembly (13) comprises a longitudinal main keel (131) arranged at the bottom of the first suspender (12) and a transverse secondary keel (132) connected with the longitudinal main keel (131), wherein the transverse secondary keel (132) is arranged above the transverse decoration panel (333) and is connected with the transverse secondary keel (132) through a self-tapping screw (2).
3. A boom mounting structure as claimed in claim 2, wherein: the bottom of first jib (12) is provided with threaded rod (133), threaded rod (133) can wear to establish into vertical main joist (131), vertical main joist (131) with horizontal secondary joist (132) looks is perpendicular.
4. A boom mounting structure as claimed in claim 2, wherein: the second connecting assembly (33) comprises a connecting rod (331) arranged at the bottom of the second suspender (32) and a side keel (332) connected with the connecting rod (331), wherein the connecting rod (331) can be simultaneously penetrated on the longitudinal main keel (131) and the transverse secondary keel (132) and the side keel (332).
5. A boom mounting structure as defined in claim 4, wherein: the side keel (332) is arranged to be U-shaped, the U-shaped bottom of the side keel (332) is abutted to the bottom of the transverse secondary keel (132), and the side surface of the side keel (332) is abutted to the transverse decoration panel (333).
6. A boom mounting structure according to any one of claims 4 or 5, characterized in that: the end part of the transverse decoration panel (333) close to the second suspender (32) is vertically connected with a longitudinal decoration panel (4), the longitudinal decoration panel (4) is connected with the other transverse cross runners (132) through self-tapping screws (2), the two transverse cross runners (132) are vertically arranged, and the edge runners (332) are inserted into the transverse cross runners (132).
7. A boom mounting structure as defined in claim 6, wherein: the length of the transverse decoration panel (333) is set to 350-450 mm, and the length of the longitudinal decoration panel (4) is set to 140-160 mm.
8. A boom mounting structure as claimed in claim 1, wherein: the expansion bolts (11) are arranged as expansion bolts (11) of M6, M8 or M10.
CN202323437807.5U 2023-12-15 2023-12-15 Boom mounting structure Active CN221609220U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202323437807.5U CN221609220U (en) 2023-12-15 2023-12-15 Boom mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202323437807.5U CN221609220U (en) 2023-12-15 2023-12-15 Boom mounting structure

Publications (1)

Publication Number Publication Date
CN221609220U true CN221609220U (en) 2024-08-27

Family

ID=92440023

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202323437807.5U Active CN221609220U (en) 2023-12-15 2023-12-15 Boom mounting structure

Country Status (1)

Country Link
CN (1) CN221609220U (en)

Similar Documents

Publication Publication Date Title
CN212078415U (en) Deformable card formula keel and curved surface furred ceiling mounting structure
CN219451231U (en) Assembled conversion layer suspended ceiling structure
CN205382610U (en) Abnormal shape suspended ceiling structure
CN221609220U (en) Boom mounting structure
CN115822162A (en) Special-shaped curved surface modeling keel supporting system and construction method
CN217150624U (en) Fire prevention heat preservation safety type steel construction
CN219100584U (en) Wall aluminum honeycomb panel stone pendant adjusting screw mounting structure
CN2533360Y (en) Grate type electric cable bridge support
CN213741969U (en) Color steel tile roof tiling is with installation guide rail
CN211817324U (en) Indoor corrugated suspended ceiling external corner installation node structure
CN111691596B (en) Adjustable suspender and installation method thereof
CN117266528B (en) A triangular truss suspended basket support arm for supporting irregularly shaped structures
CN114182873A (en) A-class fireproof and environmental protection ceiling system and its construction method and application
CN214402394U (en) A light steel keel energy-saving building installation device
CN218714249U (en) Hyperboloid dome furred ceiling
CN221030936U (en) Assembled furred ceiling structure based on complicated molding large-span rack
CN218843505U (en) Suspended ceiling counter-support piece
CN220080307U (en) F-shaped corner brace structure suitable for overhanging part
CN222759445U (en) A floor sound insulation structure
CN221168339U (en) Assembled suspended ceiling
CN217232363U (en) Ceiling internal support member capable of being directly connected with auxiliary keel
CN214785234U (en) Splicing design mounting structure of assembled suspended ceiling
CN218564566U (en) double-C-shaped purline lower hanging pipeline mounting support and hanger device for steel structure roof
CN220666626U (en) Novel externally hung wallboard node suitable for assembled steel structure
CN223805728U (en) A prefabricated building ALC panel wall hanging and reinforcement mechanism

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant