CN221591963U - Hydraulic engineering pipeline bracket - Google Patents

Hydraulic engineering pipeline bracket Download PDF

Info

Publication number
CN221591963U
CN221591963U CN202323189548.9U CN202323189548U CN221591963U CN 221591963 U CN221591963 U CN 221591963U CN 202323189548 U CN202323189548 U CN 202323189548U CN 221591963 U CN221591963 U CN 221591963U
Authority
CN
China
Prior art keywords
support
gun
fixedly connected
end surface
water conservancy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202323189548.9U
Other languages
Chinese (zh)
Inventor
韩林林
邢瑞兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Huanhao Construction Engineering Co ltd
Original Assignee
Henan Noah Environmental Protection Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Noah Environmental Protection Technology Co ltd filed Critical Henan Noah Environmental Protection Technology Co ltd
Priority to CN202323189548.9U priority Critical patent/CN221591963U/en
Application granted granted Critical
Publication of CN221591963U publication Critical patent/CN221591963U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

本实用新型公开了一种水利工程管道支架,包括支架主体,其特征在于,所述支架主体的前面开设有夹持孔,所述夹持孔内设置有水利工程管本体,所述支架主体的上端面开设有上端面螺纹孔,所述支架主体的两侧面均开设有侧面螺纹孔,所述支架主体的下端面搭接有承重架,所述承重架的侧面均固定连接有枪套,所述承重架内固定连接有液压杆,设置有滚轮可以使支架进行自由移动,并设置枪杆的升降可以对支架进行限位,当为了方便安装而改变水利工程管的位置时,需要对支架主体进行移动,这时将枪头从泥土里抽出,即可推动支架进行移动无需将支架抬起搬动,从而使得支架主体的移动更加便捷,省时省力。

The utility model discloses a water conservancy engineering pipeline support, including a support body, characterized in that a clamping hole is provided in the front of the support body, a water conservancy engineering pipe body is arranged in the clamping hole, an upper end surface of the support body is provided with an upper end surface threaded hole, both side surfaces of the support body are provided with side surface threaded holes, a load-bearing frame is overlapped on the lower end surface of the support body, a gun holster is fixedly connected to the side surface of the load-bearing frame, a hydraulic rod is fixedly connected in the load-bearing frame, rollers are provided to enable the support to move freely, and the lifting of the gun rod can limit the support, when the position of the water conservancy engineering pipe is changed for convenient installation, the support body needs to be moved, at this time, the gun head is pulled out of the soil, and the support can be pushed to move without lifting and moving the support, thereby making the movement of the support body more convenient, saving time and effort.

Description

一种水利工程管道支架A water conservancy project pipeline support

技术领域Technical Field

本实用新型涉及一种水利工程管道支架技术领域,尤其涉及一种水利工程管道支架。The utility model relates to the technical field of a water conservancy engineering pipeline support, in particular to a water conservancy engineering pipeline support.

背景技术Background Art

专利号CN218294743U为公开了一种水利工程管道支架,实用新型结构设计合理,可以调整第一固定台与第二固定台之间的距离,从而能够实现对不同半径大小的管道支撑的目的。Patent No. CN218294743U discloses a water conservancy project pipeline support. The utility model has a reasonable structural design and can adjust the distance between the first fixed platform and the second fixed platform, thereby achieving the purpose of supporting pipelines with different radii.

但是上述现有的一种水利工程管道支架支撑基座成尖角状,在对水利工程管进行支撑时,支撑基座需要插入泥土中对支架整体进行限位,想要对管道的安装位置进行调整时需要将整个支架抬起,费时费力。However, the supporting base of the existing hydraulic engineering pipe support is in a pointed shape. When supporting the hydraulic engineering pipe, the supporting base needs to be inserted into the soil to limit the entire support. When the installation position of the pipe is to be adjusted, the entire support needs to be lifted, which is time-consuming and laborious.

为了解决上述问题,本实用新型提出一种水利工程管道支架。In order to solve the above problems, the utility model provides a water conservancy project pipeline support.

实用新型内容Utility Model Content

针对现有技术的不足,本实用新型提供了一种水利工程管道支架,以解决现有技术中“但是上述现有的一种水利工程管道支架支撑基座成尖角状,在对水利工程管进行支撑时,支撑基座需要插入泥土中对支架整体进行限位,想要对管道的安装位置进行调整时需要将整个支架抬起,费时费力。”的技术问题。In view of the deficiencies in the prior art, the utility model provides a water conservancy project pipe support to solve the technical problem in the prior art that "however, the support base of the above-mentioned existing water conservancy project pipe support is in a sharp angle shape. When supporting the water conservancy project pipe, the support base needs to be inserted into the soil to limit the entire support. When the installation position of the pipe needs to be adjusted, the entire support needs to be lifted, which is time-consuming and laborious."

为实现以上目的,本实用新型通过以下技术方案予以实现:所述支架主体的前面开设有夹持孔,所述夹持孔内设置有水利工程管本体,所述支架主体的上端面开设有上端面螺纹孔,所述支架主体的两侧面均开设有侧面螺纹孔,所述支架主体的下端面搭接有承重架,所述承重架的侧面均固定连接有枪套,所述承重架内固定连接有液压杆,两个所述液压杆背离承重架的一端共同固定连接在支架主体上,所述枪套内滑动连接有枪杆,所述枪杆侧壁固定连接有提拉块,所述枪套的侧壁上开设有固定孔和提拉孔,所述固定孔内滑动连接有固定块,所述枪杆的侧壁上开设有与固定块相匹配固定槽,所述枪杆的上端面固定连接有弹簧,所述固定槽与固定孔相匹配,所述固定块贯穿固定孔抵在固定槽内,所述弹簧枪杆背离的一端固定连接在枪套的内壁上。To achieve the above purpose, the utility model is implemented through the following technical solutions: a clamping hole is provided on the front of the bracket body, a water conservancy engineering pipe body is arranged in the clamping hole, an upper end surface of the bracket body is provided with an upper end surface threaded hole, side surface threaded holes are provided on both sides of the bracket body, a load-bearing frame is overlapped on the lower end surface of the bracket body, and a holster is fixedly connected to the side of the load-bearing frame, a hydraulic rod is fixedly connected in the load-bearing frame, and one end of the two hydraulic rods away from the load-bearing frame is jointly fixedly connected to the bracket body, a gun rod is slidably connected in the holster, a lifting block is fixedly connected to the side wall of the gun rod, a fixing hole and a lifting hole are provided on the side wall of the holster, a fixing block is slidably connected in the fixing hole, a fixing groove matching the fixing block is provided on the side wall of the gun rod, a spring is fixedly connected to the upper end surface of the gun rod, the fixing groove matches the fixing hole, the fixing block passes through the fixing hole and abuts against the fixing groove, and the end of the spring gun rod away from is fixedly connected to the inner wall of the holster.

作为本实用新型的优选技术方案,所述侧面螺纹孔内均螺纹连接有侧面限位螺丝,所述上端面螺纹孔内螺纹连接有上端面限位螺丝。As a preferred technical solution of the utility model, the side threaded holes are threadedly connected with side limit screws, and the upper end surface threaded holes are threadedly connected with upper end surface limit screws.

作为本实用新型的优选技术方案,同一侧的两个所述枪套共同固定连接有支撑板,所述支撑板与支架主体固定连接。As a preferred technical solution of the utility model, the two holsters on the same side are fixedly connected to a support plate, and the support plate is fixedly connected to the bracket body.

作为本实用新型的优选技术方案,所述提拉块在提拉孔内竖直滑动连接,所述提拉孔设置为矩形。As a preferred technical solution of the utility model, the lifting block is vertically slidably connected in the lifting hole, and the lifting hole is arranged in a rectangular shape.

作为本实用新型的优选技术方案,所述承重架的下端面的四角分别设置有滚轮。As a preferred technical solution of the utility model, rollers are respectively provided at the four corners of the lower end surface of the load-bearing frame.

作为本实用新型的优选技术方案,所述枪杆的下端面固定连接有枪头。As a preferred technical solution of the utility model, a gun head is fixedly connected to the lower end surface of the gun rod.

本实用新型提供了一种水利工程管道支架,具备以下有益效果:The utility model provides a water conservancy project pipe support, which has the following beneficial effects:

1、设置有滚轮可以使支架进行自由移动,并设置枪杆的升降可以对支架进行限位,当为了方便安装而改变水利工程管的位置时,需要对支架主体进行移动,这时将枪头从泥土里抽出,即可推动支架进行移动无需将支架抬起搬动,从而使得支架主体的移动更加便捷,省时省力。1. The bracket can be moved freely by rollers, and the lifting and lowering of the gun rod can limit the bracket. When the position of the water conservancy engineering pipe is changed for the convenience of installation, the bracket body needs to be moved. At this time, the gun head is pulled out of the soil to push the bracket to move without lifting and moving the bracket, thereby making the movement of the bracket body more convenient, saving time and effort.

2、通过液压杆可以使支撑的水利工程管进行上下移动,能够使水利工程管在不同高度均能进行安装。2. The supported water conservancy engineering pipe can be moved up and down by the hydraulic rod, so that the water conservancy engineering pipe can be installed at different heights.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

图1为本实用新型提出的一种水利工程管道支架的结构示意图;FIG1 is a schematic structural diagram of a water conservancy project pipeline support proposed by the utility model;

图2为本实用新型提出的一种水利工程管道支架的刨面结构示意图;FIG2 is a schematic diagram of the planed structure of a water conservancy project pipeline support proposed by the utility model;

图3为本实用新型提出的一种水利工程管道支架枪套刨面的刨面结构示意图。FIG3 is a schematic diagram of the planed surface structure of a holster planed surface of a water conservancy project pipe support proposed by the utility model.

图中:1支架主体、2夹持孔、3上端面螺纹孔、4侧面螺纹孔、5承重架、6滚轮、7枪套、8固定块、9提拉块、10枪杆、11侧面限位螺丝、12上端面限位螺丝、13液压杆、14枪头、15弹簧、16固定槽。In the figure: 1 bracket body, 2 clamping hole, 3 upper end surface threaded hole, 4 side surface threaded hole, 5 load-bearing frame, 6 roller, 7 holster, 8 fixing block, 9 lifting block, 10 gun rod, 11 side limit screw, 12 upper end surface limit screw, 13 hydraulic rod, 14 gun head, 15 spring, 16 fixing groove.

具体实施方式DETAILED DESCRIPTION

下面结合附图和实施例对本实用新型的实施方式作进一步详细描述。以下实施例用于说明本实用新型,但不能用来限制本实用新型的范围。The following is a further detailed description of the implementation of the present invention in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but cannot be used to limit the scope of the present invention.

参考图1-3,本实用新型提供一种技术方案:支架主体1的前面开设有夹持孔2,通过设置最大规格水利工程管的夹持孔2可以对水利工程管本体进行夹持,夹持孔2内设置有水利工程管本体,支架主体1的上端面开设有上端面螺纹孔3,支架主体1的两侧面均开设有侧面螺纹孔4,支架主体1的下端面搭接有承重架5,通过设置承重架5可以承受支架主体1的重量,承重架5的侧面均固定连接有枪套7,通过设置枪套7可以使枪杆10在其内滑动,承重架5内固定连接有液压杆13,通过设置液压杆13可以使支架主体1进行上下移动,两个液压杆13背离承重架5的一端共同固定连接在支架主体1上,枪套7内滑动连接有枪杆10,通过设置枪杆10可以固定连接枪头14,枪杆10侧壁固定连接有提拉块9,通过设置提拉块9可以对枪杆10进行提拉,并可以对提拉块9进行施压使枪头14插入土壤中,枪套7的侧壁上开设有固定孔和提拉孔,通过设置固定孔可以使固定块8在其内进行滑动,固定孔内滑动连接有固定块8,通过设置固定块8可以对枪杆10起到固定的作用,枪杆10的侧壁上开设有与固定块8相匹配固定槽16,通过设置固定槽16可以使固定块8在其内进行滑动,枪杆10的上端面固定连接有弹簧15,通过设置弹簧15可以将枪套7内的枪杆10弹出,固定槽16与固定孔相匹配,固定块8贯穿固定孔抵在固定槽16内,弹簧15背离枪杆10的一端固定连接在枪套7的内壁上。With reference to FIGS. 1-3 , the utility model provides a technical solution: a clamping hole 2 is provided in the front of a support body 1, and the hydraulic engineering pipe body can be clamped by setting the clamping hole 2 of the maximum specification of the hydraulic engineering pipe, and the hydraulic engineering pipe body is arranged in the clamping hole 2, and an upper end surface threaded hole 3 is provided on the upper end surface of the support body 1, and side threaded holes 4 are provided on both sides of the support body 1, and a load-bearing frame 5 is overlapped on the lower end surface of the support body 1, and the weight of the support body 1 can be borne by setting the load-bearing frame 5, and the sides of the load-bearing frame 5 are fixedly connected with gun holsters 7, and the gun holsters 7 can be provided to make the gun rod 10 slide therein, and a hydraulic rod 13 is fixedly connected in the load-bearing frame 5, and the support body 1 can be moved up and down by setting the hydraulic rod 13, and the ends of the two hydraulic rods 13 away from the load-bearing frame 5 are fixedly connected to the support body 1, and the gun rod 10 is slidably connected in the gun holster 7, and the gun rod 10 is provided by setting the gun rod 10 The gun head 14 can be fixedly connected, and the side wall of the gun barrel 10 is fixedly connected with a lifting block 9. By setting the lifting block 9, the gun barrel 10 can be lifted, and the lifting block 9 can be pressed to insert the gun head 14 into the soil. The side wall of the holster 7 is provided with a fixing hole and a lifting hole. By setting the fixing hole, the fixing block 8 can be slid therein, and the fixing block 8 is slidably connected in the fixing hole. By setting the fixing block 8, the gun barrel 10 can be fixed. The side wall of the gun barrel 10 is provided with a fixing groove 16 matching the fixing block 8. By setting the fixing groove 16, the fixing block 8 can be slid therein. The upper end surface of the gun barrel 10 is fixedly connected with a spring 15. By setting the spring 15, the gun barrel 10 in the holster 7 can be ejected. The fixing groove 16 matches the fixing hole. The fixing block 8 passes through the fixing hole and rests in the fixing groove 16. The end of the spring 15 facing away from the gun barrel 10 is fixedly connected to the inner wall of the holster 7.

其中,侧面螺纹孔4内均螺纹连接有侧面限位螺丝11,通过设置侧面限位螺丝11可以对水利工程管的左右移动进行限位固定,上端面螺纹孔3内螺纹连接有上端面限位螺丝12,通过设置上端面限位螺丝12可以对水利工程管的上下移动进行限位固定。Among them, the side threaded holes 4 are all threadedly connected with side limit screws 11, and the left and right movement of the water conservancy engineering pipe can be limited and fixed by setting the side limit screws 11. The upper end surface threaded holes 3 are threadedly connected with upper end surface limit screws 12, and the upper end surface limit screws 12 can be set to limit and fix the up and down movement of the water conservancy engineering pipe.

其中,同一侧的两个枪套7共同固定连接有支撑板,支撑板与支架主体1固定连接。The two gun holsters 7 on the same side are fixedly connected to a support plate, and the support plate is fixedly connected to the bracket body 1 .

其中,提拉块9在提拉孔内竖直滑动连接,提拉孔设置为矩形。The lifting block 9 is vertically slidably connected in the lifting hole, and the lifting hole is set in a rectangular shape.

其中,承重架5的下端面的四角分别设置有滚轮6,通过设置滚轮6可以使水利工程管道支架进行自由移动。Among them, rollers 6 are respectively arranged at the four corners of the lower end surface of the load-bearing frame 5, and the rollers 6 can be arranged to enable the water conservancy project pipeline support to move freely.

其中,枪杆10的下端面固定连接有枪头14,通过设置枪头14可以插入土壤中从而对水利工程管道支架进行限位防止其移动。The lower end surface of the gun rod 10 is fixedly connected with a gun head 14, and the gun head 14 can be inserted into the soil to limit the position of the water conservancy project pipe support and prevent it from moving.

本实用新型的工作原理:施工时,推动支架到达指定位置,将固定槽16内的固定块8抽出,使得枪杆10受弹簧15的作用弹出枪套7内,对提拉块9施压将枪头14插入土壤内对支架进行定位,避免外界因素造成其发生移动,将水利工程管放置在夹持孔2内,拧动上端面限位螺丝12和侧面限位螺丝11抵在水利工程管的表面对水利工程管进行固定,并启动液压杆13将水利工程管进行升降到所需高度,从而方便对水利工程管进行安装,该装置可以通过枪杆10在枪套7内的上下滑动对支架进行限位,并通过滚轮6方便了支架在对水利工程管进行支撑时,移动调整水利工程管的位置,通过液压杆13可以对水利工程管的安装高度进行调整,方便了其安装。The working principle of the utility model is as follows: during construction, the bracket is pushed to the specified position, and the fixing block 8 in the fixing groove 16 is pulled out, so that the gun rod 10 is ejected from the holster 7 by the action of the spring 15, and the lifting block 9 is pressed to insert the gun head 14 into the soil to position the bracket to prevent it from moving due to external factors. The hydraulic engineering pipe is placed in the clamping hole 2, and the upper end face limit screw 12 and the side limit screw 11 are screwed against the surface of the hydraulic engineering pipe to fix the hydraulic engineering pipe, and the hydraulic rod 13 is started to lift the hydraulic engineering pipe to the required height, so as to facilitate the installation of the hydraulic engineering pipe. The device can limit the bracket by the gun rod 10 sliding up and down in the holster 7, and facilitates the bracket to move and adjust the position of the hydraulic engineering pipe when supporting the hydraulic engineering pipe through the roller 6. The installation height of the hydraulic engineering pipe can be adjusted through the hydraulic rod 13, which facilitates its installation.

以上所述,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,根据本实用新型的技术方案及其实用新型构思加以等同替换或改变,都应涵盖在本实用新型的保护范围之内。对于本领域技术人员而言,显然本实用新型不限于上述示范性实施例的细节,而且在不背离本实用新型的精神或基本特征的情况下,能够以其他的具体形式实现本实用新型。The above is only a preferred specific implementation of the utility model, but the protection scope of the utility model is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solution and utility model concept of the utility model within the technical scope disclosed by the utility model, which should be included in the protection scope of the utility model. For those skilled in the art, it is obvious that the utility model is not limited to the details of the above exemplary embodiments, and the utility model can be implemented in other specific forms without departing from the spirit or basic features of the utility model.

Claims (6)

1.一种水利工程管道支架,包括支架主体(1),其特征在于,所述支架主体(1)的前面开设有夹持孔(2),所述夹持孔(2)内设置有水利工程管本体,所述支架主体(1)的上端面开设有上端面螺纹孔(3),所述支架主体(1)的两侧面均开设有侧面螺纹孔(4),所述支架主体(1)的下端面搭接有承重架(5),所述承重架(5)的侧面均固定连接有枪套(7),所述承重架(5)内固定连接有液压杆(13),两个所述液压杆(13)背离承重架(5)的一端共同固定连接在支架主体(1)上,所述枪套(7)内滑动连接有枪杆(10),所述枪杆(10)侧壁固定连接有提拉块(9),所述枪套(7)的侧壁上开设有固定孔和提拉孔,所述固定孔内滑动连接有固定块(8),所述枪杆(10)的侧壁上开设有与固定块(8)相匹配固定槽(16),所述枪杆(10)的上端面固定连接有弹簧(15),所述固定槽(16)与固定孔相匹配,所述固定块(8)贯穿固定孔抵在固定槽(16)内,所述弹簧(15)背离枪杆(10)的一端固定连接在枪套(7)的内壁上。1. A water conservancy engineering pipeline support, comprising a support body (1), characterized in that a clamping hole (2) is provided on the front of the support body (1), a water conservancy engineering pipe body is arranged in the clamping hole (2), an upper end surface of the support body (1) is provided with an upper end surface threaded hole (3), both side surfaces of the support body (1) are provided with side surface threaded holes (4), a load-bearing frame (5) is overlapped on the lower end surface of the support body (1), a gun holster (7) is fixedly connected to the side surface of the load-bearing frame (5), a hydraulic rod (13) is fixedly connected inside the load-bearing frame (5), and the ends of the two hydraulic rods (13) facing away from the load-bearing frame (5) are fixedly connected to the support. On the frame body (1), a gun barrel (10) is slidably connected in the gun holster (7), a lifting block (9) is fixedly connected to the side wall of the gun barrel (10), a fixing hole and a lifting hole are provided on the side wall of the gun holster (7), a fixing block (8) is slidably connected in the fixing hole, a fixing groove (16) matching with the fixing block (8) is provided on the side wall of the gun barrel (10), a spring (15) is fixedly connected to the upper end surface of the gun barrel (10), the fixing groove (16) matches with the fixing hole, the fixing block (8) passes through the fixing hole and abuts against the fixing groove (16), and the end of the spring (15) facing away from the gun barrel (10) is fixedly connected to the inner wall of the gun holster (7). 2.根据权利要求1所述的一种水利工程管道支架,其特征在于,所述侧面螺纹孔(4)内均螺纹连接有侧面限位螺丝(11),所述上端面螺纹孔(3)内螺纹连接有上端面限位螺丝(12)。2. A water conservancy project pipe support according to claim 1, characterized in that the side threaded holes (4) are threadedly connected with side limit screws (11), and the upper end surface threaded holes (3) are threadedly connected with upper end surface limit screws (12). 3.根据权利要求1所述的一种水利工程管道支架,其特征在于,同一侧的两个所述枪套(7)共同固定连接有支撑板,所述支撑板与支架主体(1)固定连接。3. A water conservancy project pipe support according to claim 1, characterized in that the two gun holsters (7) on the same side are fixedly connected to a support plate, and the support plate is fixedly connected to the support body (1). 4.根据权利要求1所述的一种水利工程管道支架,其特征在于,所述提拉块(9)在提拉孔内竖直滑动连接,所述提拉孔设置为矩形。4. A water conservancy project pipe support according to claim 1, characterized in that the lifting block (9) is vertically slidably connected in the lifting hole, and the lifting hole is set to be rectangular. 5.根据权利要求1所述的一种水利工程管道支架,其特征在于,所述承重架(5)的下端面的四角分别设置有滚轮(6)。5. A hydraulic engineering pipeline support according to claim 1, characterized in that rollers (6) are respectively provided at the four corners of the lower end surface of the load-bearing frame (5). 6.根据权利要求1所述的一种水利工程管道支架,其特征在于,所述枪杆(10)的下端面固定连接有枪头(14)。6. A water conservancy project pipe support according to claim 1, characterized in that a gun head (14) is fixedly connected to the lower end surface of the gun rod (10).
CN202323189548.9U 2023-11-26 2023-11-26 Hydraulic engineering pipeline bracket Active CN221591963U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202323189548.9U CN221591963U (en) 2023-11-26 2023-11-26 Hydraulic engineering pipeline bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202323189548.9U CN221591963U (en) 2023-11-26 2023-11-26 Hydraulic engineering pipeline bracket

Publications (1)

Publication Number Publication Date
CN221591963U true CN221591963U (en) 2024-08-23

Family

ID=92408635

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202323189548.9U Active CN221591963U (en) 2023-11-26 2023-11-26 Hydraulic engineering pipeline bracket

Country Status (1)

Country Link
CN (1) CN221591963U (en)

Similar Documents

Publication Publication Date Title
CN209372826U (en) A mobile environment detection device
CN221591963U (en) Hydraulic engineering pipeline bracket
CN213390151U (en) Adjustable foundation pit supporting and reinforcing device for building
CN205387363U (en) Automatic material pushing device
CN220866882U (en) Unit curtain wall hoisting trolley
CN202447799U (en) Device for welding refined-welding arc striking-extinguishing plate
CN217539856U (en) Pipeline connecting device for hydraulic engineering
CN216552862U (en) Machine room antistatic device convenient to install
CN209579343U (en) Auxiliary work-piece is used in a kind of processing of mold
CN210361253U (en) Construction Engineering Pipe Fittings Placement Rack
CN206858045U (en) A kind of jack supporting piece of convenient regulation
CN209022025U (en) A flatness deformation console with horizontal plane detection
CN209671755U (en) A kind of pipeline fixing device
CN217364799U (en) Adjustable sweater processing positioning platform
CN218762267U (en) Lifting device for decoration
CN209750231U (en) An automatic lifting podium
CN221647774U (en) A water conservancy pipeline support connection structure
CN222717620U (en) Pipeline supporting mechanism for pipe pushing jack with double-side bearing
CN219688433U (en) Liftable conveyer chassis
CN216516825U (en) Height-adjustable mobile positioning pile
CN220668608U (en) A fixing device for water conservancy pipeline installation
CN219634876U (en) Staff drawing device
CN217875322U (en) Multifunctional gas storage tank
CN221034336U (en) Water conservancy pipeline bearing structure
CN207006984U (en) A kind of moveable cooling tower water tank

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240831

Address after: No. 9-3, Jinxin Garden, Jiangbei District, Chongqing, 400020

Patentee after: Long Yang

Country or region after: China

Patentee after: Yang Di

Address before: Room 1002, Building A, No. 17 Jianye Kaixuan Plaza, Kongming Road, Wancheng District, Nanyang City, Henan Province, China 473000

Patentee before: Henan Noah Environmental Protection Technology Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20241028

Address after: No. 60-05, Floors 1-3, Building 60, Yaoxing Fengdan Bailu, Shiba Community, Ala Street Office, Economic Development Zone, Kunming Area, China (Yunnan) Pilot Free Trade Zone, Kunming City, Yunnan Province 650000

Patentee after: Yunnan Huanhao Construction Engineering Co.,Ltd.

Country or region after: China

Address before: No. 9-3, Jinxin Garden, Jiangbei District, Chongqing, 400020

Patentee before: Long Yang

Country or region before: China

Patentee before: Yang Di

TR01 Transfer of patent right