CN221546484U - Crack reinforcing apparatus for construction - Google Patents

Crack reinforcing apparatus for construction Download PDF

Info

Publication number
CN221546484U
CN221546484U CN202323109854.7U CN202323109854U CN221546484U CN 221546484 U CN221546484 U CN 221546484U CN 202323109854 U CN202323109854 U CN 202323109854U CN 221546484 U CN221546484 U CN 221546484U
Authority
CN
China
Prior art keywords
fixed
fixedly connected
top surface
rod
reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202323109854.7U
Other languages
Chinese (zh)
Inventor
胡中华
高心芬
贺鹏
赵申军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Jinjian Shengxiang Water Conservancy Construction Engineering Co ltd
Original Assignee
Hubei Qingcheng Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Qingcheng Construction Engineering Co ltd filed Critical Hubei Qingcheng Construction Engineering Co ltd
Priority to CN202323109854.7U priority Critical patent/CN221546484U/en
Application granted granted Critical
Publication of CN221546484U publication Critical patent/CN221546484U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

本实用新型公开了一种建筑施工用裂缝加固装置,属于建筑施工技术领域,针对了加固装置不易适用不同大小的裂缝,且加固方式较为简单加固效果较差的问题,包括固定底板,固定底板两侧外壁均固定连接有两个呈平行分布的固定套杆,固定套杆顶面开设有第一限位孔,固定套杆空腔内壁滑动连接有固定插杆;本实用新型通过设置固定套杆和固定插杆,使得该加固装置可以使用不同大小的裂缝,通过设置安装螺栓和锁紧螺栓,对调整后的加固装置进行固定,通过拧柱的调节,使得锚固板移动,对裂缝的内壁进行支撑,通过设置连接杆,连接杆对两个锚固板进行支撑,有效避免了加固装置不易适用不同大小的裂缝,且加固方式较为简单加固效果较差的问题。

The utility model discloses a crack reinforcement device for building construction, belongs to the technical field of building construction, and aims at the problem that the reinforcement device is not easy to be applied to cracks of different sizes, and the reinforcement method is relatively simple and the reinforcement effect is poor. The utility model comprises a fixed base plate, and the outer walls on both sides of the fixed base plate are fixedly connected with two fixed sleeve rods distributed in parallel, the top surface of the fixed sleeve rod is provided with a first limiting hole, and the inner wall of the fixed sleeve rod cavity is slidably connected with a fixed plug rod; the utility model arranges the fixed sleeve rod and the fixed plug rod, so that the reinforcement device can be used for cracks of different sizes, and the adjusted reinforcement device is fixed by arranging installation bolts and locking bolts, and the anchor plate is moved by adjusting the screw column to support the inner wall of the crack, and the connecting rod is arranged, and the connecting rod supports the two anchor plates, which effectively avoids the problem that the reinforcement device is not easy to be applied to cracks of different sizes, and the reinforcement method is relatively simple and the reinforcement effect is poor.

Description

一种建筑施工用裂缝加固装置A crack reinforcement device for building construction

技术领域Technical Field

本实用新型属于建筑施工技术领域,具体涉及一种建筑施工用裂缝加固装置。The utility model belongs to the technical field of building construction, and in particular relates to a crack reinforcement device for building construction.

背景技术Background Art

建筑施工是指工程建设实施阶段的生产活动,是各类建筑物的建造过程,也可以说是把设计图纸上的各种线条,在指定的地点,变成实物的过程,建筑物(如桥梁、房屋等)经长期使用后因各种原因会出现承载力下降的现象,主要表现在旧建筑物的墙体(或桥梁)因沉降等原因出现裂缝等,为了防止裂缝继续恶化或者增大,需要及时加固出现裂缝的建筑物墙体,通常会通过裂缝加固装置来加固墙体。Building construction refers to production activities during the implementation phase of engineering construction. It is the construction process of various types of buildings. It can also be said to be the process of turning various lines on the design drawings into physical objects at designated locations. Buildings (such as bridges, houses, etc.) will experience a decrease in bearing capacity due to various reasons after long-term use. This is mainly manifested in cracks in the walls of old buildings (or bridges) due to settlement and other reasons. In order to prevent the cracks from continuing to deteriorate or increase, it is necessary to reinforce the walls of the buildings with cracks in a timely manner. Usually, crack reinforcement devices are used to reinforce the walls.

现有技术中裂缝加固装置普遍结构简单,在实际使用过程中墙体存在的裂缝大小不一,在对不同宽度的裂缝进行加固时,加固装置的可调整程度较低,适用性较差,且加固方式较为简单,加固效果较差。The crack reinforcement devices in the prior art generally have simple structures. In actual use, the cracks in the wall vary in size. When reinforcing cracks of different widths, the reinforcement device has a low degree of adjustability and poor applicability. In addition, the reinforcement method is relatively simple and the reinforcement effect is poor.

因此,需要一种建筑施工用裂缝加固装置,解决现有技术中存在的加固装置不易适用不同大小的裂缝,且加固方式较为简单加固效果较差的问题。Therefore, there is a need for a crack reinforcement device for construction to solve the problems in the prior art that the reinforcement devices are not easily applicable to cracks of different sizes and the reinforcement method is relatively simple and the reinforcement effect is poor.

实用新型内容Utility Model Content

本实用新型的目的在于提供一种建筑施工用裂缝加固装置,以解决上述背景技术中提出的问题。The purpose of the utility model is to provide a crack reinforcement device for building construction to solve the problems raised in the above background technology.

为实现上述目的,本实用新型提供如下技术方案:一种建筑施工用裂缝加固装置,包括固定底板,所述固定底板两侧外壁均固定连接有两个呈平行分布的固定套杆,所述固定套杆顶面开设有第一限位孔,所述固定套杆空腔内壁滑动连接有固定插杆,所述固定插杆顶面均匀开设有多个第二限位孔,所述固定插杆顶面螺纹穿设有安装螺栓,所述第一限位孔和相对的其中一个第二限位孔内设置有同一锁紧螺栓。To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a crack reinforcement device for construction, comprising a fixed base plate, two parallel fixed sleeve rods are fixedly connected to the outer walls on both sides of the fixed base plate, a first limiting hole is provided on the top surface of the fixed sleeve rod, a fixed plug rod is slidably connected to the inner wall of the fixed sleeve rod cavity, a plurality of second limiting holes are evenly provided on the top surface of the fixed plug rod, mounting bolts are threaded through the top surface of the fixed plug rod, and the same locking bolt is provided in the first limiting hole and one of the opposite second limiting holes.

方案中需要说明的是,所述固定底板顶面中心处固定连接有安装箱,所述安装箱顶面转动连接有转轴,所述转轴贯穿安装箱顶面,所述转轴顶端同轴固定连接有拧柱,所述转轴底端同轴固定连接有主动锥齿轮,所述固定底板顶面两侧均固定连接有固定板,两个所述固定板之间转动连接有双向螺纹杆,所述双向螺纹杆转动贯穿安装箱,所述双向螺纹杆外表面紧固套接有从动锥齿轮,所述主动锥齿轮与从动锥齿轮啮合连接。What needs to be explained in the scheme is that an installation box is fixedly connected at the center of the top surface of the fixed base plate, and a rotating shaft is rotatably connected to the top surface of the installation box. The rotating shaft passes through the top surface of the installation box, and a screw column is coaxially fixedly connected to the top end of the rotating shaft, and a driving bevel gear is coaxially fixedly connected to the bottom end of the rotating shaft. Fixed plates are fixedly connected to both sides of the top surface of the fixed base plate, and a bidirectional threaded rod is rotatably connected between the two fixed plates, and the bidirectional threaded rod rotatably passes through the installation box. A driven bevel gear is tightly sleeved on the outer surface of the bidirectional threaded rod, and the driving bevel gear is meshingly connected with the driven bevel gear.

进一步值得说明的是,所述双向螺纹杆外表面螺纹连接有两个呈平行分布的螺纹套,所述固定底板顶面两侧均开设有第一通槽,两个所述第一通槽两端内壁均开设有滑槽,所述螺纹套外表面固定连接有连接块,所述连接块底面固定连接有滑块,所述滑槽与滑块相适配,所述滑块底面固定连接有锚固板。It is further worth explaining that the outer surface of the bidirectional threaded rod is threadedly connected to two parallel threaded sleeves, first through grooves are provided on both sides of the top surface of the fixed base plate, and sliding grooves are provided on the inner walls at both ends of the two first through grooves, a connecting block is fixedly connected to the outer surface of the threaded sleeve, a sliding block is fixedly connected to the bottom surface of the connecting block, the sliding groove is adapted to the sliding block, and an anchor plate is fixedly connected to the bottom surface of the sliding block.

更进一步需要说明的是,所述固定底板底面中心处固定连接有插块,所述插块上开设有第二通槽,所述第二通槽内壁顶面和底面之间固定连接有滑柱,所述滑柱外表面滑动套设有滑套,所述滑套外表面与两个锚固板之间铰接有连接杆,所述锚固板远离连接杆一侧外壁固定连接有多个均匀分布的尖端。It should be further explained that an insert block is fixedly connected at the center of the bottom surface of the fixed base plate, a second through groove is opened on the insert block, a sliding column is fixedly connected between the top surface and the bottom surface of the inner wall of the second through groove, a sliding sleeve is provided on the outer surface of the sliding column, a connecting rod is hinged between the outer surface of the sliding sleeve and the two anchor plates, and a plurality of evenly distributed tips are fixedly connected to the outer wall of the anchor plate away from the connecting rod.

作为一种优选的实施方式,所述固定插杆以固定底板为中心呈对称分布,所述锁紧螺栓为手柄螺栓,所述安装箱为内部中空的无底方形结构,两个所述螺纹套分别设置于安装箱两侧。As a preferred embodiment, the fixed rods are symmetrically distributed with the fixed base plate as the center, the locking bolts are handle bolts, the installation box is a bottomless square structure with a hollow interior, and the two threaded sleeves are respectively arranged on both sides of the installation box.

作为一种优选的实施方式,两个所述第一通槽分别位于安装箱两侧,所述连接块底面宽度小于第一通槽的宽度,所述锚固板的宽度小于第一通槽的宽度。As a preferred implementation, the two first through slots are respectively located on both sides of the installation box, the bottom width of the connection block is smaller than the width of the first through slot, and the width of the anchoring plate is smaller than the width of the first through slot.

与现有技术相比,本实用新型提供的一种建筑施工用裂缝加固装置,至少包括如下有益效果:Compared with the prior art, the crack reinforcement device for construction provided by the utility model has at least the following beneficial effects:

(1)通过设置固定套杆和固定插杆,使得该加固装置可以使用不同大小的裂缝,通过设置安装螺栓和锁紧螺栓,对调整后的加固装置进行固定,操作简单,使用方便,有效避免了加固装置不易适用不同大小的裂缝的问题。(1) By setting a fixed sleeve rod and a fixed plug rod, the reinforcement device can be used for cracks of different sizes. By setting mounting bolts and locking bolts, the adjusted reinforcement device is fixed. The operation is simple and easy to use, and the problem that the reinforcement device is not easy to adapt to cracks of different sizes is effectively avoided.

(2)通过拧柱的调节,使得主动锥齿轮与从动锥齿轮相配合,进而带动双向螺纹杆转动,通过设置的螺纹套,螺纹套移动带动锚固板移动,对裂缝的内壁进行支撑,通过设置连接杆,连接杆对两个锚固板进行支撑,提高了加固效果和稳定性,有效避免了加固方式较为简单加固效果较差的问题。(2) By adjusting the screw column, the active bevel gear and the driven bevel gear are matched, thereby driving the bidirectional threaded rod to rotate. The threaded sleeve is set, and the movement of the threaded sleeve drives the anchor plate to move, thereby supporting the inner wall of the crack. By setting a connecting rod, the connecting rod supports the two anchor plates, thereby improving the reinforcement effect and stability, and effectively avoiding the problem of poor reinforcement effect due to a relatively simple reinforcement method.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

图1为本实用新型的整体结构示意图;Figure 1 is a schematic diagram of the overall structure of the utility model;

图2为本实用新型的固定套杆部分结构示意图;FIG2 is a schematic diagram of the structure of the fixed sleeve rod portion of the utility model;

图3为本实用新型的固定底板正视剖面部分结构示意图。FIG3 is a schematic diagram of a front cross-sectional structure of a fixed bottom plate of the present invention.

图中:1、固定底板;2、固定套杆;3、第一限位孔;4、固定插杆;5、第二限位孔;6、安装螺栓;7、锁紧螺栓;8、安装箱;9、转轴;10、拧柱;11、主动锥齿轮;12、固定板;13、双向螺纹杆;14、从动锥齿轮;15、螺纹套;16、第一通槽;17、滑槽;18、连接块;19、滑块;20、锚固板;21、插块;22、第二通槽;23、滑柱;24、滑套;25、连接杆;26、尖端。In the figure: 1. Fixed base plate; 2. Fixed sleeve rod; 3. First limiting hole; 4. Fixed plug rod; 5. Second limiting hole; 6. Mounting bolt; 7. Locking bolt; 8. Mounting box; 9. Rotating shaft; 10. Tightening column; 11. Active bevel gear; 12. Fixed plate; 13. Bidirectional threaded rod; 14. Driven bevel gear; 15. Threaded sleeve; 16. First through groove; 17. Slide groove; 18. Connecting block; 19. Sliding block; 20. Anchor plate; 21. Plug block; 22. Second through groove; 23. Sliding column; 24. Sliding sleeve; 25. Connecting rod; 26. Tip.

具体实施方式DETAILED DESCRIPTION

下面结合实施例对本实用新型做进一步的描述。The utility model is further described below in conjunction with embodiments.

请参阅图1-3,本实用新型提供一种建筑施工用裂缝加固装置,包括固定底板1,固定底板1两侧外壁均固定连接有两个呈平行分布的固定套杆2,固定套杆2顶面开设有第一限位孔3,固定套杆2空腔内壁滑动连接有固定插杆4,固定插杆4顶面均匀开设有多个第二限位孔5,固定插杆4顶面螺纹穿设有安装螺栓6,第一限位孔3和相对的其中一个第二限位孔5内设置有同一锁紧螺栓7。Please refer to Figures 1-3. The utility model provides a crack reinforcement device for construction, including a fixed base plate 1. Two parallel fixed sleeve rods 2 are fixedly connected to the outer walls on both sides of the fixed base plate 1. A first limiting hole 3 is opened on the top surface of the fixed sleeve rod 2. A fixed plug rod 4 is slidably connected to the inner wall of the cavity of the fixed sleeve rod 2. A plurality of second limiting holes 5 are evenly opened on the top surface of the fixed plug rod 4. A mounting bolt 6 is threadedly penetrated on the top surface of the fixed plug rod 4. The same locking bolt 7 is arranged in the first limiting hole 3 and one of the opposite second limiting holes 5.

进一步地如图1和图3所示,值得具体说明的是,固定底板1顶面中心处固定连接有安装箱8,安装箱8顶面转动连接有转轴9,转轴9贯穿安装箱8顶面,转轴9顶端同轴固定连接有拧柱10,转轴9底端同轴固定连接有主动锥齿轮11,固定底板1顶面两侧均固定连接有固定板12,两个固定板12之间转动连接有双向螺纹杆13,双向螺纹杆13转动贯穿安装箱8,双向螺纹杆13外表面紧固套接有从动锥齿轮14,主动锥齿轮11与从动锥齿轮14啮合连接。As further shown in Figures 1 and 3, it is worth specifically explaining that an installation box 8 is fixedly connected at the center of the top surface of the fixed base plate 1, and a rotating shaft 9 is rotatably connected to the top surface of the installation box 8. The rotating shaft 9 passes through the top surface of the installation box 8, and a screw column 10 is coaxially fixedly connected to the top of the rotating shaft 9. A driving bevel gear 11 is coaxially fixedly connected to the bottom end of the rotating shaft 9. Fixed plates 12 are fixedly connected to both sides of the top surface of the fixed base plate 1, and a bidirectional threaded rod 13 is rotatably connected between the two fixed plates 12. The bidirectional threaded rod 13 rotatably passes through the installation box 8, and a driven bevel gear 14 is fastened and sleeved on the outer surface of the bidirectional threaded rod 13, and the driving bevel gear 11 is meshingly connected with the driven bevel gear 14.

进一步地如图1和图3所示,值得具体说明的是,双向螺纹杆13外表面螺纹连接有两个呈平行分布的螺纹套15,固定底板1顶面两侧均开设有第一通槽16,两个第一通槽16两端内壁均开设有滑槽17,螺纹套15外表面固定连接有连接块18,连接块18底面固定连接有滑块19,滑槽17与滑块19相适配,滑块19底面固定连接有锚固板20。As further shown in Figures 1 and 3, it is worth specifically explaining that the outer surface of the bidirectional threaded rod 13 is threadedly connected to two parallel threaded sleeves 15, first through grooves 16 are provided on both sides of the top surface of the fixed base plate 1, and sliding grooves 17 are provided on the inner walls at both ends of the two first through grooves 16. A connecting block 18 is fixedly connected to the outer surface of the threaded sleeve 15, a sliding block 19 is fixedly connected to the bottom surface of the connecting block 18, the sliding groove 17 is adapted to the sliding block 19, and an anchor plate 20 is fixedly connected to the bottom surface of the sliding block 19.

进一步地如图1和图3所示,值得具体说明的是,固定底板1底面中心处固定连接有插块21,插块21上开设有第二通槽22,第二通槽22内壁顶面和底面之间固定连接有滑柱23,滑柱23外表面滑动套设有滑套24,滑套24外表面与两个锚固板20之间铰接有连接杆25,锚固板20远离连接杆25一侧外壁固定连接有多个均匀分布的尖端26。As further shown in Figures 1 and 3, it is worth specifically explaining that an insert block 21 is fixedly connected at the center of the bottom surface of the fixed base plate 1, a second through groove 22 is opened on the insert block 21, a sliding column 23 is fixedly connected between the top surface and the bottom surface of the inner wall of the second through groove 22, a sliding sleeve 24 is slidingly sleeved on the outer surface of the sliding column 23, a connecting rod 25 is hinged between the outer surface of the sliding sleeve 24 and the two anchor plates 20, and a plurality of evenly distributed tips 26 are fixedly connected to the outer wall of the anchor plate 20 away from the connecting rod 25.

本方案具备以下工作过程:工作人员在对裂缝进行加固工作时,首先将锚固板20和插块21插入裂缝中,拧松锁紧螺栓7解除对固定插杆4的限制,根据裂缝的大小将固定插杆4调整至合适的长度,通过安装螺栓6对固定插杆4进行固定,拧紧锁紧螺栓7将固定套杆2与固定插杆4进行锁止固定,完成对加固装置的安装。This solution has the following working process: when the staff is reinforcing the crack, they first insert the anchor plate 20 and the plug block 21 into the crack, loosen the locking bolt 7 to release the restriction on the fixed plug rod 4, adjust the fixed plug rod 4 to an appropriate length according to the size of the crack, fix the fixed plug rod 4 by installing the bolt 6, tighten the locking bolt 7 to lock and fix the fixed sleeve rod 2 and the fixed plug rod 4, and complete the installation of the reinforcement device.

转动拧柱10使得主动锥齿轮11转动,通过啮合作用主动锥齿轮11带动从动锥齿轮14转动,进而使得双向螺纹杆13转动,两个螺纹套15同时在双向螺纹杆13上进行相对移动,在滑块19的作用下带动两个锚固板20进行相对运动,两个锚固板20分别与裂缝两侧内壁相抵触,锚固板20外壁设置的多个尖端26插入裂缝内壁,实现对裂缝的支撑固定,两个连接杆25分别对锚固板20进行支撑,进一步提高加固效果,且稳定性更高。Rotating the screw column 10 causes the active bevel gear 11 to rotate, and through the meshing action, the active bevel gear 11 drives the driven bevel gear 14 to rotate, thereby causing the bidirectional threaded rod 13 to rotate, and the two threaded sleeves 15 move relatively on the bidirectional threaded rod 13 at the same time, and drive the two anchor plates 20 to move relative to each other under the action of the slider 19. The two anchor plates 20 respectively contact the inner walls on both sides of the crack, and multiple tips 26 arranged on the outer wall of the anchor plate 20 are inserted into the inner wall of the crack to support and fix the crack. The two connecting rods 25 respectively support the anchor plates 20, further improving the reinforcement effect and having higher stability.

根据上述工作过程可知:通过设置固定套杆2和固定插杆4,使得该加固装置可以使用不同大小的裂缝,通过设置安装螺栓6和锁紧螺栓7,对调整后的加固装置进行固定,操作简单,使用方便,有效避免了加固装置不易适用不同大小的裂缝的问题。According to the above working process, it can be known that by setting the fixed sleeve rod 2 and the fixed insertion rod 4, the reinforcement device can be used for cracks of different sizes, and by setting the mounting bolts 6 and the locking bolts 7, the adjusted reinforcement device is fixed. The operation is simple and easy to use, and the problem that the reinforcement device is not easily applicable to cracks of different sizes is effectively avoided.

通过拧柱10的调节,使得主动锥齿轮11与从动锥齿轮14相配合,进而带动双向螺纹杆13转动,通过设置的螺纹套15,螺纹套15移动带动锚固板20移动,对裂缝的内壁进行支撑,通过设置连接杆25,连接杆25对两个锚固板20进行支撑,提高了加固效果和稳定性,有效避免了加固方式较为简单加固效果较差的问题。By adjusting the screw column 10, the active bevel gear 11 and the driven bevel gear 14 are matched, thereby driving the bidirectional threaded rod 13 to rotate. Through the provided threaded sleeve 15, the movement of the threaded sleeve 15 drives the anchor plate 20 to move, thereby supporting the inner wall of the crack. By providing a connecting rod 25, the connecting rod 25 supports the two anchor plates 20, thereby improving the reinforcement effect and stability, and effectively avoiding the problem of a relatively simple reinforcement method with a poor reinforcement effect.

进一步地如图1和图3所示,值得具体说明的是,固定插杆4以固定底板1为中心呈对称分布,保证该装置能固定在裂缝两侧,锁紧螺栓7为手柄螺栓,便于工作人员更好的拧动锁紧螺栓7,安装箱8为内部中空的无底方形结构,两个螺纹套15分别设置于安装箱8两侧。As further shown in Figures 1 and 3, it is worth explaining in detail that the fixed rods 4 are symmetrically distributed with the fixed base plate 1 as the center, ensuring that the device can be fixed on both sides of the crack, the locking bolt 7 is a handle bolt, which is convenient for the staff to better turn the locking bolt 7, and the installation box 8 is a bottomless square structure with a hollow interior, and two threaded sleeves 15 are respectively arranged on both sides of the installation box 8.

进一步地如图1所示,值得具体说明的是,两个第一通槽16分别位于安装箱8两侧,连接块18底面宽度小于第一通槽16的宽度,锚固板20的宽度小于第一通槽16的宽度,便于滑块19在滑动时不会受到连接块18和锚固板20的干涉。As further shown in Figure 1, it is worth explaining in detail that the two first through grooves 16 are respectively located on both sides of the installation box 8, the bottom width of the connecting block 18 is smaller than the width of the first through groove 16, and the width of the anchor plate 20 is smaller than the width of the first through groove 16, so that the slider 19 will not be interfered with by the connecting block 18 and the anchor plate 20 when sliding.

综上:工作人员在对裂缝进行加固工作时,首先将锚固板20和插块21插入裂缝中,拧松锁紧螺栓7解除对固定插杆4的限制,根据裂缝的大小将固定插杆4调整至合适的长度,通过安装螺栓6对固定插杆4进行固定,拧紧锁紧螺栓7将固定套杆2与固定插杆4进行锁止固定,完成对加固装置的安装,操作简单,使用方便,有效避免了加固装置不易适用不同大小的裂缝的问题。In summary: When the staff is reinforcing the cracks, they first insert the anchor plate 20 and the plug block 21 into the cracks, loosen the locking bolt 7 to release the restriction on the fixed plug rod 4, adjust the fixed plug rod 4 to an appropriate length according to the size of the crack, fix the fixed plug rod 4 by installing the bolt 6, tighten the locking bolt 7 to lock the fixed sleeve rod 2 and the fixed plug rod 4, and complete the installation of the reinforcement device. The operation is simple and easy to use, and effectively avoids the problem that the reinforcement device is not easy to adapt to cracks of different sizes.

转动拧柱10使得主动锥齿轮11转动,通过啮合作用主动锥齿轮11带动从动锥齿轮14转动,进而使得双向螺纹杆13转动,两个螺纹套15同时在双向螺纹杆13上进行相对移动,在滑块19的作用下带动两个锚固板20进行相对运动,两个锚固板20分别与裂缝两侧内壁相抵触,锚固板20外壁设置的多个尖端26插入裂缝内壁,实现对裂缝的支撑固定,两个连接杆25分别对锚固板20进行支撑,进一步提高加固效果,且稳定性更高,有效避免了加固方式较为简单加固效果较差的问题。Rotating the screw column 10 causes the active bevel gear 11 to rotate, and through the meshing action, the active bevel gear 11 drives the driven bevel gear 14 to rotate, thereby causing the bidirectional threaded rod 13 to rotate, and the two threaded sleeves 15 move relatively on the bidirectional threaded rod 13 at the same time, and drive the two anchor plates 20 to move relative to each other under the action of the slider 19. The two anchor plates 20 respectively contact the inner walls on both sides of the crack, and multiple tips 26 provided on the outer wall of the anchor plate 20 are inserted into the inner wall of the crack to support and fix the crack. The two connecting rods 25 respectively support the anchor plates 20, further improving the reinforcement effect, and having higher stability, effectively avoiding the problem of relatively simple reinforcement method and poor reinforcement effect.

Claims (6)

1. The utility model provides a crack reinforcing apparatus for construction, includes PMKD (1), its characterized in that, fixed loop bar (2) that equal fixedly connected with in both sides outer wall of PMKD (1) is parallel distribution, first spacing hole (3) have been seted up to fixed loop bar (2) top surface, fixed loop bar (2) cavity inner wall sliding connection has fixed inserted bar (4), a plurality of second spacing holes (5) have evenly been seted up to fixed inserted bar (4) top surface, mounting bolt (6) have been worn to fixed inserted bar (4) top surface screw thread, be provided with same locking bolt (7) in first spacing hole (3) and the relative one of them second spacing hole (5).
2. The crack reinforcing apparatus for construction according to claim 1, wherein: the center of the top surface of the fixed bottom plate (1) is fixedly connected with a mounting box (8), the top surface of the mounting box (8) is rotationally connected with a rotating shaft (9), the rotating shaft (9) penetrates through the top surface of the mounting box (8), the top end of the rotating shaft (9) is coaxially and fixedly connected with a screwing column (10), the bottom end of the rotating shaft (9) is coaxially and fixedly connected with a driving bevel gear (11), the automatic fixing device is characterized in that fixing plates (12) are fixedly connected to two sides of the top surface of the fixing base plate (1), a bidirectional threaded rod (13) is rotatably connected between the fixing plates (12), the bidirectional threaded rod (13) rotates to penetrate through the mounting box (8), a driven bevel gear (14) is fixedly sleeved on the outer surface of the bidirectional threaded rod (13), and the driving bevel gear (11) is meshed with the driven bevel gear (14).
3. The crack reinforcing apparatus for construction according to claim 2, wherein: the two-way threaded rod (13) surface threaded connection has two thread bush (15) that are parallel distribution, first logical groove (16) have all been seted up to PMKD (1) top surface both sides, two spout (17) have all been seted up to first logical groove (16) both ends inner wall, thread bush (15) surface fixedly connected with connecting block (18), connecting block (18) bottom surface fixedly connected with slider (19), spout (17) and slider (19) looks adaptation, slider (19) bottom surface fixedly connected with anchor board (20).
4. A crack reinforcing apparatus for construction according to claim 3, wherein: fixed baseplate (1) bottom surface center department fixedly connected with inserted block (21), second through groove (22) have been seted up on inserted block (21), fixedly connected with traveller (23) between second through groove (22) inner wall top surface and the bottom surface, traveller (23) surface slip cap is equipped with sliding sleeve (24), articulated between sliding sleeve (24) surface and two anchor board (20) have connecting rod (25), anchor board (20) are kept away from connecting rod (25) one side outer wall fixedly connected with a plurality of evenly distributed's pointed ends (26).
5. The crack reinforcing apparatus for construction according to claim 4, wherein: the fixed inserted link (4) is symmetrical distribution with the fixed bottom plate (1) as the center, the locking bolt (7) is a handle bolt, the installation box (8) is of a hollow bottomless square structure, and the two threaded sleeves (15) are respectively arranged on two sides of the installation box (8).
6. The crack reinforcing apparatus for construction according to claim 5, wherein: the two first through grooves (16) are respectively arranged on two sides of the mounting box (8), the width of the bottom surface of the connecting block (18) is smaller than that of the first through grooves (16), and the width of the anchoring plate (20) is smaller than that of the first through grooves (16).
CN202323109854.7U 2023-11-17 2023-11-17 Crack reinforcing apparatus for construction Active CN221546484U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202323109854.7U CN221546484U (en) 2023-11-17 2023-11-17 Crack reinforcing apparatus for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202323109854.7U CN221546484U (en) 2023-11-17 2023-11-17 Crack reinforcing apparatus for construction

Publications (1)

Publication Number Publication Date
CN221546484U true CN221546484U (en) 2024-08-16

Family

ID=92260681

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202323109854.7U Active CN221546484U (en) 2023-11-17 2023-11-17 Crack reinforcing apparatus for construction

Country Status (1)

Country Link
CN (1) CN221546484U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN119666753A (en) * 2025-02-24 2025-03-21 山西省地质勘查局二一四地质队有限公司 A geological disaster crack measurement device
CN119877887A (en) * 2025-03-13 2025-04-25 中建八局第一建设有限公司 Building construction crack reinforcing apparatus

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN119666753A (en) * 2025-02-24 2025-03-21 山西省地质勘查局二一四地质队有限公司 A geological disaster crack measurement device
CN119877887A (en) * 2025-03-13 2025-04-25 中建八局第一建设有限公司 Building construction crack reinforcing apparatus

Similar Documents

Publication Publication Date Title
CN221546484U (en) Crack reinforcing apparatus for construction
CN211735454U (en) Slope anchor for building municipal works
CN114277804B (en) A stable foundation pit support beam and its installation method
CN110744725A (en) A kind of masonry drilling construction equipment
CN215367312U (en) Foundation pit supporting device
CN215565016U (en) Iron art fence connecting piece
CN212318046U (en) Loess tunnel lock foot stock construction guider
CN206360405U (en) A kind of novel building ergonomic support device
CN213269071U (en) A fixed bearing structure for building
CN222045206U (en) A building connection device
CN220014595U (en) Assembled steel support
CN220870500U (en) A grouting gun head support structure
CN114541736A (en) Outer wall climbing rack machine position fixing structure
CN220081303U (en) Slope support construction device
CN111732005A (en) Frame body for connecting tower crane and building and using method thereof
CN221822924U (en) Two-way supporting equipment of foundation ditch
CN207620386U (en) Plug-type surface roughening tool
CN221682981U (en) Special leveling device for subway construction cambered surface
CN220414928U (en) Safety supporting device
CN219466153U (en) Building templates stacking rack
CN219768221U (en) A kind of roller storage device
CN222834669U (en) Direction adjusting rod for fine adjustment of track panel in shield zone
CN222456084U (en) Building pile foundation deviation prevention device
CN222908483U (en) A spatula adjustment mechanism
CN217379808U (en) Tall and big slat mounting and positioning equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20241213

Address after: 438800 Building 1, Wulin Street, Tuanfeng Town, Tuanfeng County, Huanggang City, Hubei Province (Zhang Xuezhou's private residence)

Patentee after: Hubei Jinjian Shengxiang Water Conservancy Construction Engineering Co.,Ltd.

Country or region after: China

Address before: 443000 No.6 Xiling 1st Road, Xiling District, Yichang City, Hubei Province

Patentee before: Hubei Qingcheng Construction Engineering Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right