CN221546304U - Cantilever support frame and scaffold sharing system - Google Patents

Cantilever support frame and scaffold sharing system Download PDF

Info

Publication number
CN221546304U
CN221546304U CN202420042546.2U CN202420042546U CN221546304U CN 221546304 U CN221546304 U CN 221546304U CN 202420042546 U CN202420042546 U CN 202420042546U CN 221546304 U CN221546304 U CN 221546304U
Authority
CN
China
Prior art keywords
steel
cantilever
steel beam
layer
scaffold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202420042546.2U
Other languages
Chinese (zh)
Inventor
谢奠凡
欧阳特特
孟祥磊
胡源
邓衍
周路威
蒋健坤
文科
刘祖跃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Construction Investment Group Co ltd
Hunan Construction Engineering Group Co Ltd
Original Assignee
Hunan Construction Investment Group Co ltd
Hunan Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Construction Investment Group Co ltd, Hunan Construction Engineering Group Co Ltd filed Critical Hunan Construction Investment Group Co ltd
Priority to CN202420042546.2U priority Critical patent/CN221546304U/en
Application granted granted Critical
Publication of CN221546304U publication Critical patent/CN221546304U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

A shared system of an overhanging support frame and a scaffold belongs to the field of building construction and comprises an overhanging steel beam, an inclined pull rod, a high-strength bolt, a double-lug pull ring and a steel pipe frame body; the overhanging steel beam is screwed and fixed with the frame beam or the shear wall around the floor through a connecting steel plate and a high-strength bolt; one end of the diagonal draw bar and the cantilever the lifting lugs on the steel beams are connected, the other end is connected with the double-lug pull ring, the double ear pull ring is screwed with the frame beam or the shear wall around the floor; the cantilever steel beam is arranged on the nth layer, the double-lug pull ring is arranged on the (n+1) th layer, and the diagonal draw bar is arranged between the cantilever steel beam on the nth layer and the double-lug pull ring on the (n+1) th layer; the steel pipe frame body is erected on the overhanging steel beam, the steel pipe frame body is erected from the Nth layer to the (N+2) th layer, and the steel pipe frame body serves as a formwork support and an outer scaffold of the overhanging reinforced concrete structure of the (N+2) th layer. The system can save material consumption, reduce material loss, increase turnover times, facilitate subsequent process construction, reduce later repair and maintenance and reduce leakage risk of the outer wall.

Description

Cantilever support frame and scaffold sharing system
Technical Field
The utility model relates to the field of building construction, in particular to a shared system of a cantilever support frame and a scaffold.
Background
In the building construction process, the condition that the upper layer building structure picks out the side line of the lower layer building structure is frequently met, and the high-altitude overhanging structure is difficult to construct. The supporting frame of the high-altitude cantilever structure and the scaffold system are commonly provided with a cantilever type, a diagonal type and a lower supporting type, wherein the diagonal type in the prior art is mainly characterized in that cantilever steel beams are arranged in a lower floor slab, and the cantilever steel beams are fixed on an upper structure in a diagonal manner through steel wire ropes. The overhanging steel beam is arranged on the floor slab, the steel beam is used in a large amount, the concrete structure is damaged, the subsequent cave is blocked in a troublesome manner, and leakage is easy to cause; the construction of the subsequent process is affected, and the construction waste is inconvenient to clean; the inclined-pulling steel wire rope is easy to damage, and the turnover use times are affected.
Disclosure of utility model
The utility model aims to solve the technical problems and overcome the defects of the prior art, and provides a shared system of an overhanging support frame and a scaffold, which can save material consumption, reduce material loss, increase turnover times, facilitate subsequent process construction, reduce later repair and maintenance and reduce leakage risk of an outer wall.
The technical scheme adopted for solving the technical problems is as follows:
A shared system of an overhanging support frame and a scaffold comprises an overhanging steel beam, a diagonal draw bar, a high-strength bolt, a double-lug pull ring and a steel pipe frame body;
The cantilever steel beam is screwed and fixed with the frame beam or the shear wall around the floor through a connecting steel plate and a high-strength bolt; the cantilever steel beam is welded with a lifting lug, one end of the diagonal draw bar is connected with the lifting lug on the cantilever steel beam through a cotter pin, the other end of the diagonal draw bar is connected with a double-lug pull ring through a cotter pin, and the double-lug pull ring is screwed with a frame beam or a shear wall around a floor;
The cantilever steel beam is arranged on the nth layer, the double-lug pull ring is arranged on the (n+1) th layer, and the diagonal draw bar is arranged between the cantilever steel beam on the nth layer and the double-lug pull ring on the (n+1) th layer; the steel pipe support body is erected on the overhanging steel beam, and the steel pipe support body is erected from the Nth layer to the (N+2) th layer and serves as a formwork support and an outer scaffold of the overhanging reinforced concrete structure of the (N+2) th layer.
Further, the lifting lug is a U-shaped lifting lug steel plate.
Further, the diagonal draw bar consists of an upper section draw bar, a lower section draw bar and a middle section pipe; the upper section pull rod and the lower section pull rod are steel pull rods, one end of the hook is provided with a hole, one end of the arch wire; the middle section pipe is a basket screw pipe, and inlets at two ends arch into positive and negative wires; the upper section pull rod and the lower section pull rod are screwed into the middle section pipe, and the middle section pipe has the adjusting and locking functions.
Further, the steel pipe frame body is a fastener type or socket type disc buckle type steel pipe frame with other types, and consists of a vertical rod, a sweeping rod, a cross rod, an inclined strut, a scissor strut, a wall connecting piece, a scaffold board, a skirting board, a safety net and the like. The steel pipe frame body is not only a formwork support of a reinforced concrete structure, but also an outer scaffold.
Further, in order to ensure safety, a triangular support steel plate is welded at the joint of the cantilever steel beam and the connecting steel plate, so that firmness is enhanced.
Further, in order to ensure safety, a movable locating pin with the length of 100-150 mm and the outer diameter of 32mm is arranged at the vertical rod position on the upper surface of the overhanging steel beam according to the vertical rod positioning of the steel pipe frame body on the overhanging steel beam, and is used as a steel pipe sleeving point, the vertical rod is sleeved outside the steel pipe sleeve, and the vertical rod is prevented from sliding.
Compared with the prior art, the utility model has the advantages that:
1. According to the utility model, the overhanging steel beam arranged on the side surface of the frame beam or the shear wall replaces the overhanging steel beam arranged on the floor slab, so that the length of the overhanging steel beam is reduced, the material consumption is saved, and the material cost is reduced;
2. The diagonal draw bar replaces a diagonal draw wire rope, so that the loss of the wire rope is reduced, and the turnover frequency is far greater than that of the diagonal draw wire rope;
3. According to the utility model, the overhanging steel beam arranged on the side surface of the frame beam or the shear wall replaces the overhanging steel beam arranged on the floor slab, and the indoor non-profile steel beam does not interfere with the subsequent construction of various construction processes;
4. According to the utility model, the cantilever steel beam does not need to pass through the wall body, a cave penetrating through the cantilever steel beam is not required to be reserved on the wall body, the later repair and maintenance are reduced, and the leakage risk of the outer wall is reduced.
Drawings
FIG. 1 is an overall schematic of an embodiment of the present utility model;
FIG. 2 is a schematic view of a cantilever steel beam;
FIG. 3 is a schematic view of a diagonal draw bar;
Reference numerals illustrate: 1. overhanging the steel beam; 2. a diagonal draw bar; 3. a high-strength bolt; 4. a binaural pull ring; 5. a steel pipe rack body; 11. connecting steel plates; 12. triangular support steel plates; 13. u-shaped lifting lug steel plates; 14. a cotter pin; 21. an upper section pull rod; 22. a lower section pull rod; 23. a middle section pipe; 31. and embedding the sleeve.
Detailed Description
The utility model is further described below with reference to the drawings and examples, which are not intended to limit the scope of the utility model.
Referring to fig. 1 to 3, a shared system of an overhanging support frame and a scaffold comprises an overhanging steel beam 1, a diagonal draw bar 2, a high-strength bolt 3, a double-lug pull ring 4 and a steel pipe frame body 5;
The cantilever steel beam 1 is I-shaped steel, a connecting steel plate 11 is welded at the root of the cantilever steel beam 1, and the cantilever steel beam 1 is screwed with a frame beam or a shear wall around a floor through the connecting steel plate 11 and the high-strength bolts 3; one end of the diagonal draw bar 2 is connected with the U-shaped lifting lug steel plates 13 on the cantilever steel beam 1 through cotter pins 14, the other end of the diagonal draw bar is connected with the double-lug pull ring 4 through cotter pins, and the double-lug pull ring 4 is screwed with a frame beam or a shear wall around a floor;
The cantilever steel beam 1 is arranged on the nth layer, the double-lug pull ring 4 is arranged on the (n+1) th layer, and the diagonal draw bar 2 is arranged between the cantilever steel beam 1 on the nth layer and the double-lug pull ring 4 on the (n+1) th layer; the steel pipe frame body 5 is erected on the overhanging steel beam 1, the steel pipe frame body 5 is erected from the Nth layer to the (N+2) th layer, and the steel pipe frame body serves as a supporting frame and an outer scaffold of the overhanging reinforced concrete structure of the (N+2) th layer.
The diagonal draw bar 2 consists of an upper section draw bar 21, a lower section draw bar 22 and a middle section pipe 23, wherein the upper section draw bar 21 and the lower section draw bar 22 are steel draw bars, one end of each of the steel draw bars is hooked with a hole, and the other end of each of the steel draw bars is arched; the middle section pipe 23 is a basket screw pipe, and inlets at two ends arch into positive and negative wires; the upper section pull rod 21 and the lower section pull rod 22 are screwed into the middle section pipe 23, and the middle section pipe 23 has the adjusting and locking functions.
The steel pipe frame body 5 is a fastener type or socket type disc buckle type steel pipe frame of other types, and consists of a vertical rod, a floor sweeping rod, a cross rod, an inclined strut, a scissor strut, a wall connecting piece, a scaffold board, a skirting board, a safety net and the like. The steel pipe frame body 5 is not only a formwork support of a reinforced concrete structure, but also an outer scaffold.
In order to further ensure safety, a triangular support steel plate 12 is welded at the joint of the cantilever steel beam 1 and the connecting steel plate 11, so that firmness is enhanced.
In order to further ensure safety, a movable locating pin with the length of 100-150 mm and the outer diameter of 32mm is arranged at the vertical rod position on the upper surface of the cantilever steel beam 1 according to the vertical rod positioning of the steel pipe frame body 5 on the cantilever steel beam 1, and is used as a steel pipe sleeving point, and the vertical rod is sleeved outside the movable locating pin to prevent the vertical rod from sliding.
The construction method comprises the following steps:
After the frame beams or the structural steel bars of the shear wall at the periphery of the Nth floor are bound, before concrete is poured, a horizontal line is sprung from the place with the elevation of the floor being minus 0.2m, and the position of the plastic embedded sleeve 31 is rechecked by comparing with the layout of the overhanging steel beam 1. The square nut is arranged in the embedded sleeve 3, a hole is punched in the outer side template, the embedded sleeve 31 is fixed on the outer side template by the fixing screw, and the butterfly nut and the fixing screw are used for tightening, so that the embedded sleeve 31 is prevented from loosening when concrete is poured. The embedded sleeve 31 is accurately positioned according to the spacing required by the construction scheme, and the position deviation of the embedded sleeve is controlled.
When the Nth floor concrete is poured, the vibrating rod is prevented from vibrating on the embedded sleeve 31 as much as possible, and the sleeve is ensured not to run or deform. And (3) tracking and checking by special persons in the pouring process, and timely recovering the run-out and deformed embedded sleeve 31.
After the strength of the Nth floor concrete reaches 5MPa, dismantling the frame beams around the floor or the outer side templates of the shear wall, taking out the fixing screw rods, installing the double-head high-strength bolts 3, and determining whether the high-strength bolts 3 are firmly connected with square nuts in the embedded sleeve 31 by observing the exposed length of the high-strength bolts 3.
And after the strength of the concrete of the Nth floor is more than or equal to 15MPa, installing the cantilever steel beam 1. When the length of the cantilever steel beam 1 is less than or equal to 2m, two persons are cooperatively installed, one person lifts the cantilever steel beam 1 by shoulder, and the other person centers on the high-strength bolt 3 and adds a nut to screw down, the fastening is performed by 50% of initial screwing and 50% of re-screwing, and the final screwing is completed before the formwork support is erected. The I-steel is more than 2m or the cantilever steel beam 1 with the weight more than 50kg is lifted by adopting a tower crane, and is righted by one person and screwed by one person with a nut. The tightening torque must reach 45-60 N.m, after the layer of cantilever steel beam 1 is installed and adjusted in place (angle is adjusted in place and locked, the gap between the cantilever steel beam and the contact surface of concrete is filled by steel sheets), the final tightening is started; the final tightening torque must reach 117 N.m, and the screw exposes 3cm of screw teeth. After all bolts are screwed up and checked without errors, the cantilever steel beam 1 is installed.
After the cantilever steel beam 1 is installed, a steel pipe frame body 5 to an n+1th floor is erected on the cantilever steel beam 1. And (3) installing the double lug pull ring 4 of the (n+1) th layer according to the installation flow of the (N) th layer high-strength bolt 3, and screwing the double lug pull ring 4 and the square nut in the (n+1) th layer embedded sleeve 31. And installing the diagonal draw bar 2 when the strength of the concrete on the floor surface of the (n+1) th floor is more than or equal to 20 Mpa. The diagonal draw bar 2 is provided in a factory according to the design length, if a little error exists, the upper section draw bar 21 and the lower section draw bar 22 can be screwed in (or out) at the same time on site, so that the diagonal draw bar 2 has the proper length. The upper and lower shaft pins are inserted, the middle joint pipe 23 is screwed clockwise, and the upper and lower section pull rods are screwed into the middle joint pipe 23 simultaneously, so that the length of the diagonal draw rod 2 is shortened, and the diagonal draw rod 2 has a stress function. After the diagonal draw bar 2 is assembled, the diagonal draw bar 2 is preferably forced to shake and not swing, so that the diagonal draw bar 2 is stressed and unloaded. The tightening torque must reach 20 N.m, the diagonal tension rod 2 is not too tight, and the cantilever steel beam 1 is pulled up to cause instability.
When the length of the cantilever steel beam 1 is less than 1.8m, only one diagonal draw bar 2 can be arranged; when the length of the cantilever steel beam 1 is more than or equal to 1.8m, two diagonal braces are arranged.
After the diagonal draw bar 2 is assembled, the steel pipe frame body 5 is continuously erected to the n+2 layer and serves as a formwork support and an outer scaffold of the overhanging reinforced concrete structure of the n+2 layer. In order to ensure the stability of the support frame, the steel pipe frame body 5 is connected with the inner full-hall support frame into a whole. The steel pipe frame body 5 is provided with diagonal braces, scissors braces, wall connecting pieces, scaffold boards, skirting boards, safety nets and the like according to the requirements of the standard and the construction scheme, so that the construction safety is ensured.
And pouring overhanging structural concrete of the (N+2) th floor after the strength of the concrete of the (N) th floor reaches 100%.
While the application has been described in terms of preferred embodiments, it is to be understood that the application is not limited to the disclosed embodiments, but is not limited to, any person skilled in the art, using the disclosure of the present application, may make some changes or modifications equivalent to the equivalent embodiments without departing from the scope of the present application, and all such changes or modifications are within the scope of the present application.

Claims (6)

1. The utility model provides a support frame and scaffold frame sharing system encorbelments which characterized in that: comprises a cantilever steel beam, a diagonal draw bar, a high-strength bolt binaural pull ring and steel tube frame;
The cantilever steel beam is screwed and fixed with the frame beam or the shear wall around the floor through a connecting steel plate and a high-strength bolt; the cantilever steel beam is welded with a lifting lug, one end of the diagonal draw bar is connected with the lifting lug on the cantilever steel beam through a cotter pin, the other end of the diagonal draw bar is connected with a double-lug pull ring through a cotter pin, and the double-lug pull ring is screwed with a frame beam or a shear wall around a floor;
The cantilever steel beam is arranged on the nth layer, the double-lug pull ring is arranged on the (n+1) th layer, and the diagonal draw bar is arranged between the cantilever steel beam on the nth layer and the double-lug pull ring on the (n+1) th layer; the steel pipe support body is erected on the overhanging steel beam, and the steel pipe support body is erected from the Nth layer to the (N+2) th layer and serves as a formwork support and an outer scaffold of the overhanging reinforced concrete structure of the (N+2) th layer.
2. The cantilever support and scaffold sharing system according to claim 1, wherein: the lifting lug is a U-shaped lifting lug steel plate.
3. The cantilever support and scaffold sharing system according to claim 1 or 2, wherein: the diagonal draw bar consists of an upper section draw bar, a lower section draw bar and a middle section pipe; the upper section pull rod and the lower section pull rod are steel pull rods, one end of the hook is provided with a hole, one end of the arch wire; the middle section pipe is a basket screw pipe, and inlets at two ends arch into positive and negative wires; the upper section pull rod and the lower section pull rod are screwed into the middle section pipe, and the middle section pipe has the adjusting and locking functions.
4. The cantilever support and scaffold sharing system according to claim 1 or 2, wherein: the steel pipe frame body is a steel pipe frame with a fastener type or a socket type disc fastener type.
5. The cantilever support and scaffold sharing system according to claim 1 or 2, wherein: and a triangular support steel plate is welded at the joint of the cantilever steel beam and the connecting steel plate.
6. The cantilever support and scaffold sharing system according to claim 1 or 2, wherein: according to the vertical rod positioning of the steel pipe frame body on the overhanging steel beam, a movable positioning pin with the length of 100-150 mm and the outer diameter of 32mm is arranged at the vertical rod position on the upper surface of the overhanging steel beam and is used as a steel pipe sleeving point, and the vertical rod is sleeved outside the steel pipe sleeving point.
CN202420042546.2U 2024-01-09 2024-01-09 Cantilever support frame and scaffold sharing system Active CN221546304U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202420042546.2U CN221546304U (en) 2024-01-09 2024-01-09 Cantilever support frame and scaffold sharing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202420042546.2U CN221546304U (en) 2024-01-09 2024-01-09 Cantilever support frame and scaffold sharing system

Publications (1)

Publication Number Publication Date
CN221546304U true CN221546304U (en) 2024-08-16

Family

ID=92253600

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202420042546.2U Active CN221546304U (en) 2024-01-09 2024-01-09 Cantilever support frame and scaffold sharing system

Country Status (1)

Country Link
CN (1) CN221546304U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118997441A (en) * 2024-09-06 2024-11-22 上海建工一建集团有限公司 High-altitude large cantilever reinforced concrete structure formwork scaffold structure and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118997441A (en) * 2024-09-06 2024-11-22 上海建工一建集团有限公司 High-altitude large cantilever reinforced concrete structure formwork scaffold structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN104847123B (en) Connect the building method of steel corridor
CN112049235B (en) High-altitude large-span cantilever structure construction platform and method
CN104847102B (en) Attachment type raise scaffold is received attached wall method and the device thereof of section in external wall
CN104652813A (en) Tower crane construction technology used for super high-rise building steel structure
CN113914223A (en) High-pier arc-shaped upper cross beam light-weight bracket system and mounting method thereof
CN111218987A (en) Bearing type net rack construction method
CN117145043A (en) Prefabricated corridor, corridor end connection structure and construction method
CN102691267A (en) High pier construction method for external whole operation platform
CN113279582A (en) Hanging construction method for overhanging and hanging type cast-in-place plate
CN115043330B (en) Support structure of inner climbing frame of tower crane in non-core tube area, inner climbing frame and tower crane
CN215885954U (en) Construction elevator foundation supporting structure
CN109972512A (en) A kind of cast-in-situ construction method of profiled sheet-concrete combined bridge deck
CN212105057U (en) A high-altitude large-span cantilever formwork operating platform
CN113860190A (en) Cantilever tower crane girder-turning-free placing bracket and mounting method
CN210289075U (en) Adjustable elevator shaft operating platform system that can have enough to meet need
CN108797350B (en) Tower column inner and outer stiff skeleton device and construction method thereof
CN112502160A (en) Post-tensioning precast concrete supporting member, inner supporting system and construction method
CN111764623A (en) Down-hanging construction platform module and construction method of high-altitude large cantilevered steel roof truss
CN115341701B (en) Hanging formwork construction method for high-altitude overhanging steel bar truss floor support plate
CN110725526B (en) I-beam cantilever scaffold for caisson and construction method thereof
CN115749258A (en) High-altitude overhanging roof formwork supporting system
CN116216482A (en) An overall hoisting system and hoisting method for a standard section of a truss-type wind turbine tower
CN115898072A (en) A column-type telecommunication tower prestressed reinforcement structure and reinforcement method
CN117262979B (en) Balanced lifting technology of assembled steel-concrete components
CN112922322B (en) Construction method of two-way cosine three-dimensional corrugated steel plate arch-shaped supporting system