CN221546049U - Assembled curtain wall for building - Google Patents

Assembled curtain wall for building Download PDF

Info

Publication number
CN221546049U
CN221546049U CN202323667259.5U CN202323667259U CN221546049U CN 221546049 U CN221546049 U CN 221546049U CN 202323667259 U CN202323667259 U CN 202323667259U CN 221546049 U CN221546049 U CN 221546049U
Authority
CN
China
Prior art keywords
movable frame
groove
curtain wall
building
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202323667259.5U
Other languages
Chinese (zh)
Inventor
杨冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Port City Construction And Installation Engineering Co ltd
Original Assignee
Shanghai Port City Construction And Installation Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Port City Construction And Installation Engineering Co ltd filed Critical Shanghai Port City Construction And Installation Engineering Co ltd
Priority to CN202323667259.5U priority Critical patent/CN221546049U/en
Application granted granted Critical
Publication of CN221546049U publication Critical patent/CN221546049U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The application discloses an assembled curtain wall for a building, which relates to the technical field of curtain walls and comprises a curtain wall main body, wherein a movable frame is arranged on one side of the curtain wall main body, a fixed frame is arranged on one side of the curtain wall main body, which is far away from the movable frame, a mounting groove is formed in one side of the movable frame, a mounting block is fixedly arranged on one side of the fixed frame, the mounting block is movably inserted into the mounting groove, a groove is formed in the top end of the mounting block, a telescopic rod is fixedly arranged in the groove, a spring is sleeved on the outer side of the telescopic rod, a limiting block is fixedly arranged on the top end of the spring, the limiting block is fixedly connected with the telescopic rod, a limiting groove is formed in the mounting groove, and the limiting block is positioned in the limiting groove. The assembled curtain wall for the building is simple in structure, convenient to use, strong in connectivity and convenient to install and detach the movable frame and the fixed frame.

Description

Assembled curtain wall for building
Technical Field
The application relates to the technical field of curtain walls, in particular to an assembled curtain wall for a building.
Background
The curtain wall is a vertical surface which is frequently used in modern buildings, is generally made of metal, glass, stone, artificial boards and other materials, is arranged on the outermost layer of the building, and is mainly used for wall body attractiveness, wind resistance, rain resistance and energy-saving lamps, and the curtain wall does not bear any structural load, only bears dead weight and resists wind pressure with a structural board or a main chain.
The present assembled curtain, as described in the patent of bulletin number CN207714579U, including the curtain body and the frame that is used for installing the curtain body, the frame includes the fixed frame of pre-buried in the wall and with fixed frame complex movable frame, the side of fixed frame is equipped with the first locating column towards movable frame one side respectively, the curtain body is equipped with the first locating hole with first locating column complex towards one side of fixed frame, the curtain body is located between fixed frame and the movable frame, and pass through mounting fixed connection between fixed frame and the movable frame. According to the utility model, the fixed frame and the movable frame are arranged, so that the curtain wall body is arranged between the fixed frame and the movable frame, and the installation stability of the curtain wall body is ensured while the installation is convenient.
With respect to the above related art, the inventor considers that the fixing frame and the movable frame are fixed through a plurality of fastening bolts, which results in complicated installation and disassembly of the curtain wall, and is time-consuming and labor-consuming, and therefore, we propose an assembled curtain wall for building.
Disclosure of utility model
The application aims to solve the problems that the curtain wall is complicated in installation and disassembly and wastes time and labor caused by the fact that a plurality of fastening bolts are used for fixing a fixed frame and a movable frame.
In order to achieve the above purpose, the application provides an assembled curtain wall for a building, which adopts the following technical scheme:
the utility model provides an assembled curtain for building, includes the curtain main part, one side of curtain main part is provided with the movable frame, the curtain main part is kept away from one side of movable frame is provided with the fixed frame, the mounting groove has been seted up to one side of movable frame, one side fixed mounting of fixed frame has the installation piece, the installation piece with the mounting groove activity is pegged graft, the top of installation piece is seted up flutedly, the installation piece is located fixed mounting has the telescopic link in the recess, the outside cover of telescopic link is equipped with the spring, the top fixed mounting of spring has the stopper, the stopper with telescopic link fixed connection, the movable frame is located set up the spacing groove in the mounting groove, the stopper is located in the spacing groove.
Through adopting above-mentioned technical scheme, through installation piece and mounting groove activity grafting, make movable frame and fixed frame be connected, when being connected, through the cooperation of spring and telescopic link, make the stopper get into the spacing inslot, lock the installation piece, reinforcing connection stability, when dismantling, the staff inserts the spacing inslot through using external instrument, extrudes the spacing inslot stopper, and the movable frame of being convenient for is dismantled with fixed frame.
Optionally, a sealing ring is fixedly installed on one side of the fixed frame, a sealing groove is formed in one side of the movable frame, and the sealing ring is matched with the sealing groove.
Through adopting above-mentioned technical scheme, through being provided with the sealing washer, reinforcing connection leakproofness.
Optionally, the movable frame is located one side of spacing groove has seted up the standing groove, the movable frame is located be provided with the sealing plug in the standing groove, the sealing plug with the spacing groove activity grafting.
Through adopting above-mentioned technical scheme, through setting up the sealing plug, play the guard action to the spacing groove.
Optionally, a positioning block is fixedly installed on one side of the curtain wall main body, a positioning groove is formed in one side of the movable frame, and the positioning block is movably inserted into the positioning groove.
Through adopting above-mentioned technical scheme, through setting up the locating piece, reinforcing connects the compactness.
Optionally, a threaded hole is formed in one side of the movable frame, a lifting ring is arranged on one side of the movable frame, and one end of the lifting ring is in threaded connection with the threaded hole.
Through adopting above-mentioned technical scheme, through being provided with rings, make things convenient for the curtain main part to hoist and mount transportation.
Optionally, a reinforcing rod is fixedly installed in the movable frame.
Through adopting above-mentioned technical scheme, through being provided with the stiffener, reinforcing joint strength.
In summary, the application has the following beneficial effects:
Through installation piece and mounting groove activity grafting, make movable frame and fixed frame be connected, when being connected, through the cooperation of spring and telescopic link, make the stopper get into the spacing inslot, lock the installation piece, reinforcing connection stability, when dismantling, the staff inserts the spacing inslot through using external instrument, extrude spacing inslot stopper, be convenient for movable frame and fixed frame dismantle, through being provided with the sealing washer, reinforcing connection leakproofness, through setting up the sealing plug, play the guard action to the spacing groove, through setting up the locating piece, reinforcing connection compactness, through being provided with rings, make things convenient for the curtain main part to hoist and mount the transportation, through being provided with the stiffener, reinforcing joint strength.
Drawings
FIG. 1 is a schematic view of the overall structure of the present application;
FIG. 2 is a schematic view of the internal structure of the present application;
Fig. 3 is an enlarged schematic view of the structure of the area a in fig. 2 according to the present application.
Reference numerals illustrate: 1. a curtain wall main body; 2. a movable frame; 3. a fixed frame; 4. a mounting block; 5. a mounting groove; 6. a groove; 7. a telescopic rod; 8. a spring; 9. a limiting block; 10. a limit groove; 11. a seal ring; 12. a placement groove; 13. a sealing plug; 14. a positioning block; 15. a hanging ring; 16. and a reinforcing rod.
Detailed Description
The application is described in further detail below with reference to fig. 1-3.
Examples:
the embodiment of the application discloses an assembled curtain wall for a building. Referring to fig. 1 to 3, an assembled curtain wall for building comprises a curtain wall main body 1, wherein a movable frame 2 is arranged on one side of the curtain wall main body 1, a fixed frame 3 is arranged on one side, far away from the movable frame 2, of the curtain wall main body 1, a sealing ring 11 is fixedly arranged on one side of the fixed frame 3, a sealing groove is formed in one side of the movable frame 2, the sealing ring 11 is matched with the sealing groove, and the connection tightness is enhanced by the aid of the sealing ring 11. One side of the curtain wall main body 1 is fixedly provided with a positioning block 14, one side of the movable frame 2 is provided with a positioning groove, the positioning block 14 is movably inserted into the positioning groove, and the connection tightness is enhanced by arranging the positioning block 14.
Referring to fig. 1-2, the screw hole has been seted up to one side of movable frame 2, and one side of movable frame 2 is provided with rings 15, and rings 15's one end and screw hole threaded connection, through being provided with rings 15, make things convenient for curtain main part 1 to hoist and mount the transportation. The inside of the movable frame 2 is fixedly provided with a reinforcing rod 16, and the connecting strength is enhanced by the reinforcing rod 16.
Referring to fig. 1-3, mounting groove 5 has been seted up to one side of movable frame 2, one side fixed mounting of fixed frame 3 has installation piece 4, installation piece 4 and the activity of mounting groove 5 are pegged graft, recess 6 has been seted up on the top of installation piece 4, installation piece 4 is located recess 6 internal fixation and has telescopic link 7, the outside cover of telescopic link 7 is equipped with spring 8, the top fixed mounting of spring 8 has stopper 9, stopper 9 and telescopic link 7 fixed connection, spacing groove 10 has been seted up in the movable frame 2 is located mounting groove 5, spacing groove 10 runs through to the outer wall of movable frame 2, stopper 9 is located spacing groove 10, through installation piece 4 and the activity of mounting groove 5 grafting, make movable frame 2 and fixed frame 3 be connected, when connecting, through the cooperation of spring 8 and telescopic link 7, make stopper 9 get into spacing groove 10 in, lock to installation piece 4, reinforcing connection stability, during the dismantlement, the staff inserts spacing groove 10 through using external instrument, stopper 9 extrusion in the spacing groove 10, movable frame 2 and fixed frame 3 of being convenient for dismantlement.
Referring to fig. 1-3, a placing groove 12 is formed in one side of the movable frame 2, which is located in the limiting groove 10, a sealing plug 13 is arranged in the placing groove 12, the sealing plug 13 is movably inserted into the limiting groove 10, and the limiting groove 10 is protected by the arrangement of the sealing plug 13.
The implementation principle of the fabricated curtain wall for the building provided by the embodiment of the application is as follows:
When the assembled curtain wall for building is installed, the staff is movably inserted into the installation groove 5 through the installation block 4, the movable frame 2 is connected with the fixed frame 3, when the assembled curtain wall is connected, the limiting block 9 is matched with the telescopic rod 7 through the spring 8, the limiting block 9 enters the limiting groove 10, the installation block 4 is locked, the connection stability is enhanced, when the assembled curtain wall is disassembled, the staff inserts the limiting groove 10 through using an external tool, the limiting block 9 in the limiting groove 10 is extruded, the movable frame 2 and the fixed frame 3 are convenient to disassemble, the sealing ring 11 is arranged, the connection tightness is enhanced, the sealing plug 13 is arranged, the limiting groove 10 is protected, the connection tightness is enhanced through the positioning block 14, the hanging ring 15 is arranged, the curtain wall main body 1 is convenient to hoist and mount and transport, and the connection strength is enhanced through the reinforcing rod 16.
The above embodiments are not intended to limit the scope of the present application, so: all equivalent changes in structure, shape and principle of the application should be covered in the scope of protection of the application.

Claims (6)

1. The utility model provides an assembled curtain for building, includes curtain main part (1), one side of curtain main part (1) is provided with movable frame (2), curtain main part (1) is kept away from one side of movable frame (2) is provided with fixed frame (3), its characterized in that: mounting groove (5) have been seted up to one side of movable frame (2), one side fixed mounting of fixed frame (3) has installation piece (4), installation piece (4) with mounting groove (5) activity grafting, recess (6) have been seted up on the top of installation piece (4), installation piece (4) are located fixed mounting has telescopic link (7) in recess (6), the outside cover of telescopic link (7) is equipped with spring (8), the top fixed mounting of spring (8) has stopper (9), stopper (9) with telescopic link (7) fixed connection, movable frame (2) are located set up spacing groove (10) in mounting groove (5), stopper (9) are located in spacing groove (10).
2. The fabricated curtain wall for a building of claim 1, wherein: one side of the fixed frame (3) is fixedly provided with a sealing ring (11), one side of the movable frame (2) is provided with a sealing groove, and the sealing ring (11) is matched with the sealing groove.
3. The fabricated curtain wall for a building of claim 2, wherein: the movable frame (2) is located one side of the limiting groove (10) is provided with a placing groove (12), the movable frame (2) is located in the placing groove (12) and is provided with a sealing plug (13), and the sealing plug (13) is movably inserted into the limiting groove (10).
4. The fabricated curtain wall for a building of claim 1, wherein: one side of the curtain wall main body (1) is fixedly provided with a positioning block (14), one side of the movable frame (2) is provided with a positioning groove, and the positioning block (14) is movably inserted into the positioning groove.
5. The fabricated curtain wall for a building of claim 1, wherein: threaded holes are formed in one side of the movable frame (2), a hanging ring (15) is arranged on one side of the movable frame (2), and one end of the hanging ring (15) is in threaded connection with the threaded holes.
6. The fabricated curtain wall for a building of claim 1, wherein: a reinforcing rod (16) is fixedly arranged in the movable frame (2).
CN202323667259.5U 2023-12-29 2023-12-29 Assembled curtain wall for building Active CN221546049U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202323667259.5U CN221546049U (en) 2023-12-29 2023-12-29 Assembled curtain wall for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202323667259.5U CN221546049U (en) 2023-12-29 2023-12-29 Assembled curtain wall for building

Publications (1)

Publication Number Publication Date
CN221546049U true CN221546049U (en) 2024-08-16

Family

ID=92252259

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202323667259.5U Active CN221546049U (en) 2023-12-29 2023-12-29 Assembled curtain wall for building

Country Status (1)

Country Link
CN (1) CN221546049U (en)

Similar Documents

Publication Publication Date Title
CN110725597A (en) Construction platform erection structure and method for ring beam at top of concrete silo
CN217205526U (en) Industrial and civil building wall reinforcing device
CN214302743U (en) Scaffold convenient to dismouting
CN210661989U (en) A LED large screen display system
CN111088866A (en) Prefabricated three-hinged-arch roof panel and mounting method
CN206467844U (en) A kind of modular architectural girder steel exterior wall dried hanging structure
CN217840887U (en) Civil engineering construction support
CN210597622U (en) Novel can dismantle simple and easy house structure
CN221119172U (en) Telescopic heightening piece for attached lifting scaffold
CN108678362B (en) Fixed installation method for construction elevator and wall
CN216476628U (en) Landscape tower for communication
CN115198951B (en) Wood grain hyperboloid molding design structure based on GRC wall top basic unit
CN213774009U (en) Curtain wall plate mounting structure
CN209816909U (en) Composite cable utility tunnel unit and composite cable utility tunnel
CN219690733U (en) Steel structure building
CN220133314U (en) Glass breast board capable of being rapidly detached and reused
CN206909424U (en) A kind of portable poultry farming house based on standard unit structure
CN220868543U (en) Glass convenient installation structure of broken line curtain wall
CN217716317U (en) Non-concentric double-shaft spoke-shaped space steel structure interval measuring device
CN221194224U (en) Wall-attached support mounting device for climbing frame
CN218597466U (en) Outer facade curtain decorative structure of old building
CN219158141U (en) Suspended ceiling assembling structure
CN219240997U (en) Connecting structure on telescopic fixed unit type curtain wall
CN223317386U (en) Assembled tempered glass for building exterior wall
CN216156897U (en) Curtain convenient to assemble and use

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant