CN221481328U - Building scaffold structure - Google Patents
Building scaffold structure Download PDFInfo
- Publication number
- CN221481328U CN221481328U CN202323320965.2U CN202323320965U CN221481328U CN 221481328 U CN221481328 U CN 221481328U CN 202323320965 U CN202323320965 U CN 202323320965U CN 221481328 U CN221481328 U CN 221481328U
- Authority
- CN
- China
- Prior art keywords
- support
- strut
- steel pipes
- steel
- respectively arranged
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 53
- 239000010959 steel Substances 0.000 claims abstract description 53
- 238000010276 construction Methods 0.000 claims abstract description 17
- 239000002184 metal Substances 0.000 claims description 3
- 238000003466 welding Methods 0.000 abstract 1
- 238000000034 method Methods 0.000 description 3
- 239000011150 reinforced concrete Substances 0.000 description 3
- 238000009435 building construction Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 239000004566 building material Substances 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000001066 destructive effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
Landscapes
- Movable Scaffolding (AREA)
Abstract
A construction scaffolding structure comprising: the novel steel chain welding chain fixing device comprises a first support, a second support, a third support, a fourth support and a detachable pedal, wherein connecting lugs are respectively arranged at the upper end and the lower end of the four supports, the first support and the second support are connected through two connecting frames, the third support and the fourth support are connected through two connecting frames, connecting holes are embedded at two ends of the connecting frames, two first steel pipes are respectively arranged at the upper end and the lower end of the first support, two first steel pipes are respectively arranged at the upper end and the lower end of the second support, two third steel pipes are respectively arranged at the upper end and the lower end of the third support, two fourth steel pipes are respectively arranged at the upper end and the lower end of the fourth support, the first steel pipes are sleeved in the fourth steel pipes, the second steel pipes are sleeved in the third steel pipes, the sleeved parts of the four steel pipes are respectively welded through the matched first locating holes, second locating holes and third locating holes, the top ends and the central parts of the first support and the second support are respectively provided with mounting holes, the steel chain fixing device is provided with a fixing pin, and the other end of the steel chain is welded.
Description
Technical Field
The utility model relates to the technical field of building construction, in particular to a building scaffold structure.
Background
With the increasing level of living, there is an increasing demand for residential and office buildings. Most of the existing buildings are reinforced concrete structures, but the traditional reinforced concrete structures are complex in construction process, and a large amount of manpower and material resources are wasted; meanwhile, when the building with the reinforced concrete structure is dismantled, destructive dismantling is required, and the dismantled building materials cannot be recycled, so that resources are seriously wasted. Based on this, a steel structure integrally assembled building body has been developed, which can simply and rapidly complete building construction. In an assembled house system, a construction frame is required to be used for carrying out operations on a certain height plane, the traditional construction frame is mostly in the form of a gangway or a scaffold, but the safety performance of the gangway is poor, the lap joint process of the scaffold is complex, and the construction period progress is affected.
Disclosure of utility model
In order to overcome the defects in the prior art, the utility model provides a building scaffold structure which is convenient to install and construct, has higher construction safety and controls the stretching length according to the requirement.
In order to achieve the aim of the utility model, the utility model adopts the following technical scheme:
A construction scaffolding structure comprising: the novel chain fixing device comprises a first support, a second support, a third support, a fourth support, a second steel pipe and a detachable pedal, wherein connecting lugs are respectively arranged at the upper end and the lower end of the four supports, the first support and the second support are connected through two connecting frames, the third support and the fourth support are connected through two connecting frames, connecting holes are embedded at two ends of the connecting frames, two first steel pipes are respectively arranged at the upper end and the lower end of the first support, two third steel pipes are respectively arranged at the upper end and the lower end of the second support, two fourth steel pipes are respectively arranged at the upper end and the lower end of the third support, the first steel pipes are sleeved in the fourth steel pipes, sleeved parts of the four steel pipes are respectively welded through matched first locating holes, second locating holes and third locating holes, two first steel pipes are respectively arranged at the top end and the middle end of the second support, two third steel pipes are respectively arranged at the upper end and the lower end of the third support, two fourth steel pipes are respectively arranged at the upper end and the lower end of the fourth support, the first steel pipes are sleeved in the fourth steel pipes, the second steel pipes are sleeved in the third steel pipes, the first locating holes and the third locating holes are respectively welded through the first locating holes and the second locating holes of the fourth steel pipes.
Further, the locating pin can penetrate through the locating hole and be fastened according to construction requirements.
Further, the pedal is a metal mesh plate.
The beneficial effects of the utility model are as follows:
1. The steel pipes are sleeved and connected, so that the disassembly is convenient.
2. The steel pipe is provided with a positioning hole, and the length of the work frame can be adjusted according to the requirement.
3. The installation and construction are convenient, and the construction safety is high.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
Reference numeral control table:
1-first support, 11-first steel pipe, 2-second support, 21-second steel pipe, 3-third support, 31-third steel pipe, 4-fourth support, 41-fourth steel pipe, 5-mounting hole, 6-steel chain, 7-locating pin, 71-first locating hole, 72-second locating hole, 73-third locating hole, 8-engaging lug, 81-engaging hole, 9-engaging frame, 10-pedal.
Detailed Description
Specific embodiments of the present utility model will be further described below with reference to the accompanying drawings. Wherein like parts are designated by like reference numerals. It should be noted that the words "front", "rear", "left", "right", "upper" and "lower" used in the following description refer to directions in the drawings, and the words "inner" and "outer" refer to directions toward or away from, respectively, the geometric center of a particular component.
In order to make the contents of the present utility model more clearly understood, the technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model.
As shown in fig. 1, a construction scaffolding structure comprising: the novel chain transmission device comprises a first support 1, a second support 2, a third support 3, a fourth support 4, a second steel tube 21 and a detachable pedal 10, wherein connecting lugs 8 are respectively arranged at the upper end and the lower end of the four supports, the first support 1 and the second support 2 are connected through two connecting frames 9, the third support 3 and the fourth support 4 are connected through two connecting frames 9, connecting holes 81 are embedded at two ends of the connecting frames 9, two first steel tubes 11 are respectively arranged at the upper end and the lower end of the first support 1, two first steel tubes 11 are respectively arranged at the upper end and the lower end of the second support 2, two third steel tubes 31 are respectively arranged at the upper end and the lower end of the third support 3, two fourth steel tubes 41 are respectively arranged at the upper end and the lower end of the fourth support 4, the first steel tubes 11 are sleeved in the fourth steel tubes 41, the second support 21 is connected in the third steel tubes 31 through two connecting holes 9, two first positioning holes 71, second positioning holes 72, a third positioning pin 72, a first positioning pin 72, a second positioning pin 7, a second positioning pin 72, a first positioning pin 7 and a second positioning pin 73 are respectively arranged at the top end of the fourth steel tubes, and a fixing pin 7 are respectively arranged at the top ends of the first support 1.
The locating pin 7 can pass through the locating hole and be fastened according to construction requirements.
The tread plate 10 is a metal mesh plate.
In the use process of the device, the locating pin 7 can be inserted into a corresponding locating hole according to the needs of constructors, and the length of the construction frame can be adjusted.
The above description is illustrative of the preferred embodiments of the present utility model and is not intended to limit the scope of the present utility model, but is to be accorded the full scope of the claims.
Claims (3)
1. A construction scaffolding structure comprising: the utility model provides a first strut (1), second strut (2), third strut (3), fourth strut (4), second steel pipe (21) and detachable tread (10), four strut upper and lower ends are equipped with engaging lug (8) respectively, first strut (1) and second strut (2) are connected through two engaging lugs (9), third strut (3) and fourth strut (4) are connected through two engaging lugs (9), connecting hole (81) have been inlayed at engaging lugs (9) both ends, two first steel pipes (11) are installed respectively to first strut (1) upper and lower extreme, two first steel pipes (11) are installed respectively to second strut (2) upper and lower extreme, two third steel pipes (31) are installed respectively to third strut (3) upper and lower extreme, two fourth steel pipes (41) are installed respectively to fourth strut (4) upper and lower extreme, first strut (11) are cup jointed in fourth steel pipe (21), first steel pipe (31) and second strut (31) are equipped with locating hole (72) are cup jointed respectively to first strut (1), locating hole (71) are located at first strut (1), the mounting hole (5) welds one end of the steel chain (6), and the other end of the steel chain (6) is fixed with a locating pin (7).
2. A construction scaffolding structure according to claim 1, wherein: the locating pin (7) can penetrate through the locating hole and be fastened according to construction requirements.
3. A construction scaffolding structure according to claim 1, wherein: the pedal (10) is a metal mesh plate.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202323320965.2U CN221481328U (en) | 2023-12-06 | 2023-12-06 | Building scaffold structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202323320965.2U CN221481328U (en) | 2023-12-06 | 2023-12-06 | Building scaffold structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN221481328U true CN221481328U (en) | 2024-08-06 |
Family
ID=92349689
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202323320965.2U Active CN221481328U (en) | 2023-12-06 | 2023-12-06 | Building scaffold structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN221481328U (en) |
-
2023
- 2023-12-06 CN CN202323320965.2U patent/CN221481328U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN218467092U (en) | Adjustable supporting device for assembled steel bar truss floor bearing plate | |
| CN211873325U (en) | Steel construction prefabricated formula building coupling assembling | |
| CN204608980U (en) | A kind of hinged four-bladed vane for steel pipe foot joint | |
| CN205407672U (en) | Non - welded connection's photovoltaic support | |
| CN208202133U (en) | A kind of connecting node of tubular pillar and not contour girder steel | |
| CN203547021U (en) | Novel steel column | |
| CN215479065U (en) | Construction elevator overlength anchor support | |
| CN209779868U (en) | Steel pipe butt joint device in steel structure construction | |
| CN218406429U (en) | A triangular supports device for outer cantilever frame of shear force wall | |
| CN214461644U (en) | Detachable split open type floor support plate | |
| CN212924291U (en) | Forklift type electromechanical engineering pipeline installation lifting device | |
| CN206636157U (en) | A steel structure suitable for construction site assembly | |
| CN206110329U (en) | Rigid support pipe | |
| CN210459181U (en) | New and old ground is wall T joint design node even | |
| CN211037509U (en) | Suspended ceiling mounting structure under steel construction with spherical node | |
| CN211312974U (en) | A connecting structure for building decorative curtain wall and wall body that is easy to install and fix | |
| CN203034916U (en) | Assembled construction barrier | |
| CN221372910U (en) | Construction formwork support for building | |
| CN221442102U (en) | Can turnover formula shear force wall corner position template reinforcing apparatus | |
| CN201620592U (en) | Scaffold double steel pipe welding base | |
| CN208664041U (en) | A kind of quick assembly mold of concrete double-T plate | |
| CN201474093U (en) | Steel-concrete combined structure non-welding node connector | |
| CN221461441U (en) | Steel construction of pre-welding quick connect | |
| CN208815413U (en) | A kind of withdrawing pipe locating rack | |
| CN207568333U (en) | A kind of economic and environment-friendly, repeatable assembled steel enclosing and enclosing component |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |