CN221452866U - Construction engineering construction waste treatment device - Google Patents

Construction engineering construction waste treatment device Download PDF

Info

Publication number
CN221452866U
CN221452866U CN202322474018.2U CN202322474018U CN221452866U CN 221452866 U CN221452866 U CN 221452866U CN 202322474018 U CN202322474018 U CN 202322474018U CN 221452866 U CN221452866 U CN 221452866U
Authority
CN
China
Prior art keywords
shell
box body
dust removing
air
box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322474018.2U
Other languages
Chinese (zh)
Inventor
王峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202322474018.2U priority Critical patent/CN221452866U/en
Application granted granted Critical
Publication of CN221452866U publication Critical patent/CN221452866U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model belongs to the field of constructional engineering, and provides a constructional engineering construction waste treatment device which comprises a shell, a dust removing mechanism arranged on the shell, and an auxiliary mechanism arranged on the dust removing mechanism, wherein the dust removing mechanism comprises a dust removing mechanism body, a dust removing mechanism body and a dust removing mechanism body; according to the utility model, the fan box and the water pump are started in the treatment process, dust generated in the waste crushing treatment process is sucked into the box body through the matching of the air suction pipe and the air suction plate, the water pump can convey water at the bottom of the box body to the spraying plate through the water pipe, so that the air is sprayed and dedusted, the air is guided into the shell body again through the matching of the air outlet pipe and the air outlet plate after passing through the box body, the circulating dedusting is performed outside the shell body, the situation that the waste is wetted by the water or the water circulation is influenced by the waste can be effectively avoided, the clean air after dedusting can be blown into the shell body from top to bottom through the air outlet plate, and the situation that the dust generated in the waste crushing treatment process flies out through the feed inlet can be avoided.

Description

Construction engineering construction waste treatment device
Technical Field
The utility model belongs to the field of constructional engineering, and particularly relates to a treatment device for construction waste materials in constructional engineering.
Background
Certain building waste can be generated in the construction process of the building engineering, and the direct discarding not only can pollute the environment, but also can cause economic waste, so that the waste is required to be treated by a waste treatment device for recycling, the cost is reduced, and the environment is protected at the same time, so that the method is very important;
In the chinese patent with publication number CN 219463527U, there is mentioned a construction engineering construction waste treatment device, which comprises a box body, wherein the inner wall of the box body is fixedly connected with a filter plate, the right side of the box body is provided with a spraying mechanism, and the interior of the box body is provided with a treatment mechanism; the spraying mechanism comprises a fixing part and a connecting part, the fixing part is positioned on the right side of the box body, and the connecting part is positioned above the fixing part; the processing mechanism comprises a crushing part and a cleaning part, the crushing part is positioned inside the box body, the cleaning part is positioned below the crushing part, and the problem that the generated dust is filtered and collected by a filter screen and a dust collecting box when the device is used for garbage disposal and the filtering effect cannot be effectively achieved is solved.
However, the above-mentioned waste material treatment device is direct with water spray to the device in order to remove dust work, and the water that is infected with the dust can adsorb on the waste material, and the accumulative waste material can influence the filtration cycle of water, and dust collection efficiency is not ideal, inconvenient personnel use.
Disclosure of utility model
In order to solve the technical problems, the utility model provides a construction engineering and building waste treatment device, which aims to solve the problems that dust-contaminated water is adsorbed on waste materials, accumulated waste materials influence the filtration cycle of the water, the dust removal efficiency is not ideal and the like in the prior art.
The utility model provides a building engineering construction waste processing apparatus, includes, the casing, set up in dust removal mechanism on the casing, and set up in assist mechanism on the dust removal mechanism.
Preferably, the dust removing mechanism comprises a box body arranged at the other end of the box body, air outlet plates are arranged at two sides of the top of the box body, air suction plates are arranged at two sides of the box body, an air suction pipe is arranged between one side of the box body and the air suction plates, a fan box is arranged at the other end of the box body at the top of the box body, and an air outlet pipe is arranged between the fan box and the air outlet plates and between the fan box and the box body.
Preferably, the internally mounted of box has the board that sprays, the guide rail is all installed to the inside both sides of box of spraying board bottom, slidable mounting has the filter screen between the guide rail, the water pump is installed at the top of box, install the water pipe between water pump and spraying board and the box.
Preferably, the auxiliary mechanism comprises a sealing plate arranged on the filter screen, a limiting plate is arranged at the other end of the box body between the sealing plates, a fixing seat is respectively arranged at the top of the sealing plate and the other end of the box body at the bottom of the sealing plate, a limiting rod is arranged at the inner side of the fixing seat, and a baffle is arranged at the periphery of the limiting rod.
Preferably, a feeding port is arranged at the top of the shell between the air outlet plates, a discharging port is arranged at the bottom of the shell, and a crusher is arranged in the shell.
Compared with the prior art, the utility model has the following beneficial effects:
1. according to the utility model, the fan box and the water pump are started in the treatment process, dust generated in the waste crushing treatment process is sucked into the box body through the matching of the air suction pipe and the air suction plate, the water pump can convey water at the bottom of the box body to the spraying plate through the water pipe, so that the air is sprayed and dedusted, the air is guided into the shell through the matching of the air outlet pipe and the air outlet plate after passing through the box body, the circulating dedusting is performed outside the shell, the situation that the water wets the waste or the water circulation is influenced by the blockage of the waste can be effectively avoided, the air outlet plate is positioned at the top of the shell, and when the clean air after dedusting is guided into the air outlet plate through the air outlet pipe, the clean air is blown into the shell from top to bottom through the air outlet plate, so that the situation that the dust generated in the waste crushing treatment process flies out through the material inlet can be avoided, and the practicability of the device is improved.
2. According to the utility model, when one group of filter screens have longer working time, which causes blockage to influence water passing performance, the sealing plate is pulled to draw the filter screens out of the device for cleaning treatment, and when one group of filter screens are taken out for treatment, the baffle corresponding to the filter screens can be pushed to move downwards towards the filter screens under the limit guide of the limit rod, so that the baffle is overlapped with the opening at the sealing plate, the sealing performance of the box body is continuously ensured when the filter screens are taken out, and then the filtering work is continuously carried out through the other group of filter screens, so that the box body is continuously subjected to sealing filtering work in the filter screen treatment process, and air dust removal work is continuously carried out.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG.2 is a rear view of the present utility model;
FIG. 3 is a schematic view of an auxiliary mechanism according to the present utility model;
fig. 4 is a schematic view of the internal structure of the case of the present utility model.
In the figure:
1. A housing; 2. a dust removing mechanism; 3. an auxiliary mechanism;
101. A breaker; 102. a feed inlet; 103. a discharge port;
201. an air outlet plate; 202. an air suction plate; 203. an air suction pipe; 204. an air outlet pipe; 205. a fan case; 206. a water pump; 207. a case; 208. a water pipe; 209. a spray plate; 2010. a guide rail; 2011. a filter screen;
301. a sealing plate; 302. a limiting plate; 303. a baffle; 304. a fixing seat; 305. and a limit rod.
Detailed Description
Embodiments of the present utility model are described in further detail below with reference to the accompanying drawings and examples. The following examples are illustrative of the utility model but are not intended to limit the scope of the utility model.
As shown in fig. 1 to 4:
Embodiment one: the utility model provides a construction engineering construction waste treatment device, which comprises a shell 1, a dust removing mechanism 2 arranged on the shell 1, and an auxiliary mechanism 3 arranged on the dust removing mechanism 2.
Specifically, the dust removing mechanism 2 comprises a box 207 arranged at the other end of the casing 1, air outlet plates 201 are respectively arranged at two sides of the top of the casing 1, air suction plates 202 are respectively arranged at two sides of the casing 1, an air suction pipe 203 is arranged between one side of the box 207 and the air suction plates 202, a fan case 205 is arranged at the other end of the casing 1 at the top of the box 207, and an air outlet pipe 204 is arranged between the fan case 205 and the air outlet plates 201 and between the fan case 205 and the box 207.
Further, a spraying plate 209 is installed in the box 207, guide rails 2010 are installed on two sides in the box 207 at the bottom of the spraying plate 209, a filter screen 2011 is installed between the guide rails 2010 in a sliding mode, a water pump 206 is installed at the top of the box 207, and a water pipe 208 is installed between the water pump 206 and the spraying plate 209 and between the water pump 206 and the box 207.
From the above, the staff can lead the construction waste to be treated into the shell 1 for crushing treatment, start fan case 205 and water pump 206 in the course of treatment, fan case 205 can be through aspiration channel 203 and the cooperation of induced draft board 202 with the dust that waste material crushed treatment in-process produced inhale in the box 207, can lead into the inside of shell 1 again through the cooperation of air-out pipe 204 and air-out board 201 after passing through box 207, when the air that contains the dust gets into the inside of box 207, water pump 206 can carry the water that is in the bottom of box 207 to spray board 209 department through water-passing pipe 208, thereby spray the dust removal work to the air, can carry out the filtration work through filter screen 2011 when the water that contains the dust falls to it, until to the bottom of box 207 in order to circulate the dust removal work, air-out board 201 is located at the top of shell 1, when clean air after the dust removal is led into to air-out board 201 department through air-out board 204 from top to bottom blow into the inside of shell 1, can avoid the circumstances that the dust that produces in the waste material crushed treatment to fly out through material inlet 102.
Embodiment two: the difference between this embodiment and the previous embodiment is that the auxiliary mechanism 3 includes a sealing plate 301 disposed on a filter screen 2011, a limiting plate 302 is installed at the other end of the box 207 between the sealing plates 301, fixing bases 304 are respectively installed at the other ends of the box 207 at the top and bottom of the sealing plate 301, a limiting rod 305 is installed at the inner side of the fixing bases 304, and a baffle 303 is installed at the periphery of the limiting rod 305.
Specifically, a feed inlet 102 is installed at the top of the casing 1 between the air outlet plates 201, a discharge outlet 103 is installed at the bottom of the casing 1, and a breaker 101 is installed inside the casing 1.
From the above, when working, a user can introduce construction waste into the device through the feed inlet 102 and then carry out crushing treatment on the construction waste through the crusher 101, after the crushing treatment is finished, the construction waste is discharged out of the device through the discharge outlet 103, the device adopts two groups of filter screens 2011, the filtering effect and the service life are improved, when one group of filter screens 2011 has long working time and affects the water passing performance, the worker can pull the sealing plate 301 to draw the filter screens 2011 out of the device to carry out cleaning treatment, when one group of filter screens 2011 is taken out, the baffle 303 corresponding to the filter screens 2011 can be pushed to move downwards in the direction of the filter screens 2011 under the limit guide of the limit rod 305, so that the baffle 303 coincides with the opening of the sealing plate 301, the sealing performance of the box 207 can be continuously guaranteed when the filter screens 2011 are taken out, and then the box 207 can be continuously subjected to sealing filtration work through the other group of filter screens 2011, so that the box 207 can be continuously subjected to air dust removal work.
Working principle: during operation, a user can introduce construction waste into the device through the feed inlet 102 and then crush the construction waste through the crusher 101, the fan box 205 and the water pump 206 are started in the treatment process, dust generated in the waste treatment process is sucked into the box 207 by the fan box 205, the water pump 206 can suck water into the spraying plate 209 to spray water for dust removal, and after the crushing treatment is finished, the waste is discharged out of the device through the discharge opening 103 so as to finish one-time waste crushing treatment.
While embodiments of the present utility model have been shown and described above for purposes of illustration and description, it will be understood that the above embodiments are illustrative and not to be construed as limiting the utility model, and that variations, modifications, alternatives, and variations may be made to the above embodiments by one of ordinary skill in the art within the scope of the utility model.

Claims (2)

1. The utility model provides a building engineering construction waste material processing apparatus which characterized in that: comprises a shell (1), a dust removing mechanism (2) arranged on the shell (1), and an auxiliary mechanism (3) arranged on the dust removing mechanism (2);
The dust removing mechanism (2) comprises a box body (207) arranged at the other end of the shell body (1), air outlet plates (201) are arranged at two sides of the top of the shell body (1), air suction plates (202) are arranged at two sides of the shell body (1), an air suction pipe (203) is arranged between one side of the box body (207) and the air suction plates (202), a fan case (205) is arranged at the other end of the shell body (1) at the top of the box body (207), and an air outlet pipe (204) is arranged between the fan case (205) and the air outlet plates (201) and the box body (207);
The water pump (206) is arranged at the top of the box body (207), and a water pipe (208) is arranged between the water pump (206) and the spraying plate (209) and the box body (207);
The auxiliary mechanism (3) comprises sealing plates (301) arranged on the filter screens (2011), limiting plates (302) are arranged at the other ends of the box bodies (207) between the sealing plates (301), fixing seats (304) are respectively arranged at the top of each sealing plate (301) and the other ends of the box bodies (207) at the bottom of each sealing plate, limiting rods (305) are arranged on the inner sides of the fixing seats (304), and baffle plates (303) are arranged on the peripheries of the limiting rods (305).
2. A construction waste treatment apparatus according to claim 1, wherein: the top of the shell (1) between the air outlet plates (201) is provided with a feeding hole (102), the bottom of the shell (1) is provided with a discharging hole (103), and the inside of the shell (1) is provided with a crusher (101).
CN202322474018.2U 2023-09-12 2023-09-12 Construction engineering construction waste treatment device Active CN221452866U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322474018.2U CN221452866U (en) 2023-09-12 2023-09-12 Construction engineering construction waste treatment device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322474018.2U CN221452866U (en) 2023-09-12 2023-09-12 Construction engineering construction waste treatment device

Publications (1)

Publication Number Publication Date
CN221452866U true CN221452866U (en) 2024-08-02

Family

ID=92349040

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322474018.2U Active CN221452866U (en) 2023-09-12 2023-09-12 Construction engineering construction waste treatment device

Country Status (1)

Country Link
CN (1) CN221452866U (en)

Similar Documents

Publication Publication Date Title
CN208493585U (en) A kind of new-energy automobile air filter system
CN206304457U (en) A kind of textile dust-removing equipment
CN201664881U (en) Collection device for polishing dust
CN109176738A (en) A kind of building materials cutting equipment
CN118718636A (en) A separation and filtering device for vacuum negative pressure machine
CN206027334U (en) Improved generation sanding room dust collecting equipment
CN213728466U (en) A dust cleaning device for a field effect tube with integrated thermistor
CN211838198U (en) Building engineering construction waste treatment facility
CN214918493U (en) Dust cleaning equipment is maintained to portable converter
CN215103837U (en) Dust collecting device for single-side large circular knitting machine
CN213995286U (en) A dust removal unit
CN219050718U (en) Medicine waste gas prevents rose box of jam
CN209323210U (en) It is a kind of for recycling the collection device of process of textile production harmful substance
CN217042940U (en) Dust absorption and recovery device of pulverizer
CN215138258U (en) Negative pressure dust collector in paper production
CN220238162U (en) Multistage dust collector
CN220331034U (en) Sweeps collecting mechanism of polishing machine
CN222287417U (en) Building rubbish recovery plant
CN222743649U (en) Dust purification device with easily clear up structure
CN223337046U (en) Environment-friendly dust removal device for building construction
CN220992271U (en) Environment-friendly renewable resource smashing and processing equipment
CN221207368U (en) Waste gas spraying filtration equipment that exhaust-gas treatment used
CN218501649U (en) Dust removing device
CN222369904U (en) Crushing and dust removing device for recycling waste tires