CN221442140U - Reinforcing bar location structure for construction - Google Patents

Reinforcing bar location structure for construction Download PDF

Info

Publication number
CN221442140U
CN221442140U CN202323166821.6U CN202323166821U CN221442140U CN 221442140 U CN221442140 U CN 221442140U CN 202323166821 U CN202323166821 U CN 202323166821U CN 221442140 U CN221442140 U CN 221442140U
Authority
CN
China
Prior art keywords
connecting plate
lifting
upper connecting
screw rod
bidirectional screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202323166821.6U
Other languages
Chinese (zh)
Inventor
陈鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Baocheng Construction Engineering Co.,Ltd.
Original Assignee
Linzhou Yongsheng Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Linzhou Yongsheng Construction Co ltd filed Critical Linzhou Yongsheng Construction Co ltd
Priority to CN202323166821.6U priority Critical patent/CN221442140U/en
Application granted granted Critical
Publication of CN221442140U publication Critical patent/CN221442140U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a steel bar positioning structure for building construction, which comprises a base, wherein a lifting plate is arranged above the base, the upper surface of the lifting plate is connected with a mounting groove through an arm rod, the top in the mounting groove is in limit rotation connection with a bidirectional screw rod, two sliding blocks are symmetrically sleeved and connected on the outer side of the bidirectional screw rod in a threaded mode, an upper connecting plate is in limit sliding connection in the mounting groove and positioned below the sliding blocks, an arm rod is hinged between the bottom wall of each sliding block and the upper surface of the upper connecting plate, a plurality of electric push rods are arranged on the lower surface of each upper connecting plate at equal distance, a plurality of second clamping plates are connected at the free ends of the electric push rods, the structure can limit and fix a plurality of steel bars at one time, the fixing efficiency of the steel bars is improved, and meanwhile, limit and fixing are carried out on some steel bars with smaller diameters in a batch of steel bars to be limited and fixed through the cooperation of the upper connecting plates, so that the practicability of the whole device is improved.

Description

一种建筑施工用钢筋定位结构A steel bar positioning structure for building construction

技术领域Technical Field

本实用新型涉及建筑施工技术领域,特别是涉及一种建筑施工用钢筋定位结构。The utility model relates to the technical field of building construction, in particular to a steel bar positioning structure for building construction.

背景技术Background technique

建筑施工是指工程建设实施阶段的生产活动,是各类建筑物的建造过程,也可以说是把设计图纸上的各种线条,在指定的地点,变成实物的过程,在建筑施工时需要使用到钢筋,在对钢筋进行加工时需要使用到定位结构,对钢筋进行固定定位处理;Construction refers to the production activities in the implementation stage of engineering construction. It is the construction process of various buildings. It can also be said that it is the process of turning various lines on the design drawings into physical objects at designated locations. Steel bars are needed in construction, and positioning structures are needed when processing steel bars to fix and position the steel bars.

如授权公告号为CN219431404U的实用新型所公开的一种建筑施工用钢筋定位结构,其装置包括底座,底座的上表面通过升降机构滑动连接有升降块,升降块的上表面固定安装有两个定位框,定位框的侧壁设置有卡接机构,其装置解决现有的钢筋定位装置在使用过程中大多一次只能对单根钢筋进行固定定位处理,且在使用时难以对钢筋的高度进行调节处理,影响装置使用的问题。For example, a steel bar positioning structure for construction disclosed in the utility model with authorization announcement number CN219431404U comprises a base, the upper surface of the base is slidably connected with a lifting block via a lifting mechanism, two positioning frames are fixedly mounted on the upper surface of the lifting block, and the side walls of the positioning frames are provided with a clamping mechanism. The device solves the problem that the existing steel bar positioning devices can only fix and position a single steel bar at a time during use, and it is difficult to adjust the height of the steel bar during use, thus affecting the use of the device.

该装置在使用时,虽然可以对多根钢筋进行固定定位处理,但是在对多根钢筋进行固定定位处理时,却只能单个一一对多根钢筋分别进行固定定位处理,进而使得工作效率低下。When the device is in use, although it can perform fixed positioning processing on multiple steel bars, when performing fixed positioning processing on multiple steel bars, it can only perform fixed positioning processing on multiple steel bars one by one, thereby causing low work efficiency.

实用新型内容Utility Model Content

为了克服现有技术的不足,本实用新型提供一种建筑施工用钢筋定位结构,在对多根钢筋进行固定定位处理时,却只能单个一一对多根钢筋分别进行固定定位处理,进而使得工作效率低下的技术问题。In order to overcome the deficiencies of the prior art, the utility model provides a steel bar positioning structure for construction. However, when multiple steel bars are fixed and positioned, the multiple steel bars can only be fixed and positioned one by one, thereby causing a technical problem of low work efficiency.

为解决上述技术问题,本实用新型提供如下技术方案:一种建筑施工用钢筋定位结构,包括底座,所述底座上方设置有升降板,所述升降板上表面通过臂杆连接设置有安装槽,所述安装槽内顶部限位转动连接有双向丝杆,所述双向丝杆外侧螺纹对称套设连接有两个滑块,所述安装槽内且位于滑块下方限位滑动连接有上连接板,两个所述滑块底壁与上连接板上表面之间铰链连接有臂杆,所述上连接板下表面等距离设置有若干个电动推杆,若干个所述电动推杆自由端连接有第二夹板。To solve the above technical problems, the utility model provides the following technical solutions: a steel bar positioning structure for construction, comprising a base, a lifting plate is arranged above the base, an installation groove is arranged on the upper surface of the lifting plate through an arm rod, a bidirectional screw rod is connected to the top of the installation groove for limited rotation, two sliders are symmetrically sleeved on the outer side of the bidirectional screw rod, an upper connecting plate is connected to the installation groove for limited sliding movement below the slider, an arm rod is hinged between the bottom walls of the two sliders and the upper surface of the upper connecting plate, a number of electric push rods are equidistantly arranged on the lower surface of the upper connecting plate, and a second clamping plate is connected to the free ends of the several electric push rods.

作为本实用新型的一种优选技术方案,所述安装槽内底壁设置有下连接板,所述下连接板上表面等距离设置有若干个第一夹板。As a preferred technical solution of the utility model, a lower connecting plate is arranged on the inner bottom wall of the installation groove, and a plurality of first clamping plates are arranged at equal distances on the upper surface of the lower connecting plate.

作为本实用新型的一种优选技术方案,所述双向丝杆一端限位转动连接在安装槽内壁面上,所述双向丝杆另一端活动穿设过安装槽侧壁后与伺服电机动力输出端连接。As an optimal technical solution of the utility model, one end of the bidirectional screw rod is connected to the inner wall of the installation groove for limited rotation, and the other end of the bidirectional screw rod is movably passed through the side wall of the installation groove and connected to the power output end of the servo motor.

作为本实用新型的一种优选技术方案,所述底座表面开设有放置槽,所述底座表面且位于放置槽两侧开设有滑槽。As a preferred technical solution of the utility model, a placement groove is provided on the surface of the base, and sliding grooves are provided on the surface of the base and on both sides of the placement groove.

作为本实用新型的一种优选技术方案,两个所述滑槽内均限位转动连接有螺纹杆,两个所述螺纹杆外侧均螺纹套设连接有升降块,两个所述升降块分别固定设置在升降板两侧。As a preferred technical solution of the utility model, threaded rods are connected in the two sliding grooves for limited rotation, lifting blocks are threadedly sleeved on the outer sides of the two threaded rods, and the two lifting blocks are fixedly arranged on both sides of the lifting plate.

作为本实用新型的一种优选技术方案,所述螺纹杆底端固定套设连接有斜齿轮。As a preferred technical solution of the utility model, the bottom end of the threaded rod is fixedly sleeved and connected with a bevel gear.

与现有技术相比,本实用新型能达到的有益效果是:Compared with the prior art, the utility model can achieve the following beneficial effects:

1、通过双向丝杆与两个滑块的配合设置,实现对于两个滑块的移动调节,通过移动调节的两个滑块与两个臂杆的铰链连接,使得臂杆对上连接板向上拉动或向下推动,进而使得设置在上连接板底壁的第二夹板与第一夹板配合,实现对于钢筋的限位固定,该结构的设置可以一次性对多个钢筋进行限位固定,提高对钢筋的固定效率;1. The two sliders are adjusted by the cooperation of the two-way screw rod and the two sliders. The two sliders are hingedly connected to the two arm rods, so that the arm rods pull the upper connecting plate upward or push it downward, thereby making the second clamping plate arranged on the bottom wall of the upper connecting plate cooperate with the first clamping plate to achieve the limit fixation of the steel bars. The setting of this structure can limit and fix multiple steel bars at one time, thereby improving the fixing efficiency of the steel bars;

2、同时通过上连接板与电动推杆的配合设置,可以对升降调节后的第二夹板位置进行进一步调节移动,从而实现对于一批所要限位固定的钢筋中一些直径较小的钢筋进行限位固定,从而提高整个装置的实用性。2. At the same time, through the coordinated setting of the upper connecting plate and the electric push rod, the position of the second clamping plate after the lifting adjustment can be further adjusted and moved, so as to achieve the limit fixation of some steel bars with smaller diameters among a batch of steel bars to be limit fixed, thereby improving the practicality of the entire device.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

图1为本实用新型正面立体结构示意图;FIG1 is a schematic diagram of the front three-dimensional structure of the utility model;

图2为本实用新型安装槽内部立体结构示意图;FIG2 is a schematic diagram of the internal three-dimensional structure of the installation slot of the utility model;

图3为本实用新型上连接板底部立体结构示意图;Figure 3 is a schematic diagram of the three-dimensional structure of the bottom of the upper connecting plate of the utility model;

图4为本实用新型底座内部立体结构示意图;FIG4 is a schematic diagram of the internal three-dimensional structure of the base of the utility model;

其中:1、底座;2、升降板;3、安装槽;4、下连接板;5、第一夹板;6、第二夹板;7、上连接板;8、电动推杆;9、双向丝杆;10、滑块;11、臂杆;12、滑槽;13、螺纹杆;14、升降块;15、斜齿轮;16、放置槽。Among them: 1. Base; 2. Lifting plate; 3. Mounting slot; 4. Lower connecting plate; 5. First clamping plate; 6. Second clamping plate; 7. Upper connecting plate; 8. Electric push rod; 9. Bidirectional screw rod; 10. Slider; 11. Arm rod; 12. Slide slot; 13. Threaded rod; 14. Lifting block; 15. Bevel gear; 16. Placement slot.

具体实施方式Detailed ways

为了使本实用新型实现的技术手段、创作特征、达成目的与功效易于明白了解,下面结合具体实施例,进一步阐述本实用新型,但下述实施例仅仅为本实用新型的优选实施例,并非全部。基于实施方式中的实施例,本领域技术人员在没有做出创造性劳动的前提下所获得其它实施例,都属于本实用新型的保护范围。In order to make the technical means, creative features, objectives and effects of the present invention easy to understand, the present invention is further described below in conjunction with specific embodiments, but the following embodiments are only preferred embodiments of the present invention, not all. Based on the embodiments in the implementation mode, other embodiments obtained by those skilled in the art without creative work are all within the protection scope of the present invention.

实施例Example

请参照图1-4所示,本实用新型提供一种建筑施工用钢筋定位结构,在底座1上方设置有升降板2,然后在升降板2上表面通过臂杆11连接设置有安装槽3,接着在安装槽3内顶部限位转动连接有双向丝杆9,而在双向丝杆9一端活动穿设过安装槽3侧壁后与伺服电机动力输出端连接,通过伺服电机对双向丝杆9进行转动调节,接着在双向丝杆9外侧螺纹对称套设连接有两个滑块10,然后在安装槽3内且位于滑块10下方限位滑动连接有上连接板7,在两个滑块10底壁与上连接板7上表面之间铰链连接有臂杆11,接着在上连接板7下表面等距离设置有若干个电动推杆8,而若干个电动推杆8自由端连接有第二夹板6,同时在安装槽3内底壁设置有下连接板4,下连接板4上表面等距离设置有若干个第一夹板5,通过第一夹板5与第二夹板6的配合设置,从而实现对于钢筋进行定位;Please refer to Figures 1-4, the utility model provides a steel bar positioning structure for construction, a lifting plate 2 is arranged above the base 1, and then a mounting groove 3 is connected to the upper surface of the lifting plate 2 through an arm 11, and then a bidirectional screw rod 9 is connected to the top of the mounting groove 3 for limited rotation, and one end of the bidirectional screw rod 9 is movably passed through the side wall of the mounting groove 3 and connected to the power output end of the servo motor, the bidirectional screw rod 9 is rotated and adjusted by the servo motor, and then two sliders 10 are symmetrically sleeved on the outer side of the bidirectional screw rod 9, and then in the mounting groove 3, the lifting plate 2 is provided with a lifting plate 2, and then the lifting plate 2 is provided with a lifting plate 3 ... An upper connecting plate 7 is connected in a limited sliding manner in the mounting groove 3 and below the slider 10. An arm 11 is hingedly connected between the bottom walls of the two sliders 10 and the upper surface of the upper connecting plate 7. Then, a plurality of electric push rods 8 are arranged at equal distances on the lower surface of the upper connecting plate 7, and the free ends of the plurality of electric push rods 8 are connected to a second clamping plate 6. At the same time, a lower connecting plate 4 is arranged on the bottom wall of the mounting groove 3, and a plurality of first clamping plates 5 are arranged at equal distances on the upper surface of the lower connecting plate 4. The first clamping plate 5 and the second clamping plate 6 are matched to each other to realize the positioning of the steel bars.

在对钢筋进行定位时,先通过转动双向丝杆9,进而使得螺纹套设连接在双向丝杆9外侧的两个滑块10相互靠近移动,通过滑块10与臂杆11的铰链连接配合设置,从而对上连接板7下移推动,通过下移的上连接板7,对设置在上连接板7下方的第二夹板6进行下移,使得第二夹板6朝向第一夹板5靠近,对设置在第一夹板5以及第二夹板6之间的钢筋进行定位,当同一批被定位的钢筋中有直径较小的时,可以通过电动推杆8再次推动第二夹板6下移,对直径较小的钢筋进行定位,从而提高整个装置的实用性;When positioning the steel bar, first rotate the bidirectional screw rod 9, so that the two sliders 10 threadedly connected to the outer side of the bidirectional screw rod 9 move closer to each other, and the slider 10 is hingedly connected with the arm 11 to push the upper connecting plate 7 downward, and the second clamping plate 6 arranged below the upper connecting plate 7 is moved downward by the upper connecting plate 7 that moves downward, so that the second clamping plate 6 approaches the first clamping plate 5, and the steel bar arranged between the first clamping plate 5 and the second clamping plate 6 is positioned. When there are smaller diameter steel bars in the same batch of positioned steel bars, the electric push rod 8 can be used to push the second clamping plate 6 downward again to position the smaller diameter steel bars, thereby improving the practicality of the entire device;

作为本实施例进一步的实施方式,如图1-4所示,同时在底座1表面开设有放置槽16,然后在底座1表面且位于放置槽16两侧开设有滑槽12,接着在两个滑槽12内均限位转动连接有螺纹杆13,而在两个螺纹杆13外侧均螺纹套设连接有升降块14,两个升降块14分别固定设置在升降板2两侧,最后在两个螺纹杆13底端固定套设连接有斜齿轮15,斜齿轮15表面啮合连接有另一个与伺服电机连接的斜齿轮15,当需要调节钢筋高度时,启动伺服电机带动螺纹杆13转动,进而对螺纹套设连接在螺纹杆13外侧的升降块14以及固定设置在两个升降块14之间的升降板2;As a further implementation of this embodiment, as shown in Figures 1-4, a placement groove 16 is opened on the surface of the base 1 at the same time, and then a slide groove 12 is opened on the surface of the base 1 and located on both sides of the placement groove 16, and then a threaded rod 13 is connected to the two slide grooves for limited rotation, and a lifting block 14 is threadedly sleeved and connected to the outside of the two threaded rods 13, and the two lifting blocks 14 are respectively fixedly arranged on both sides of the lifting plate 2, and finally a bevel gear 15 is fixedly sleeved and connected to the bottom end of the two threaded rods 13, and another bevel gear 15 connected to the servo motor is meshed and connected on the surface of the bevel gear 15. When the height of the steel bar needs to be adjusted, the servo motor is started to drive the threaded rod 13 to rotate, and then the lifting block 14 threadedly sleeved and connected to the outside of the threaded rod 13 and the lifting plate 2 fixedly arranged between the two lifting blocks 14;

具体工作原理:Specific working principle:

调节定位时,可以先将待定位的钢筋设置在第一夹板5以及第二夹板6之间,接着转动双向丝杆9,进而使得螺纹套设连接在双向丝杆9外侧的两个滑块10相互靠近移动,通过滑块10与臂杆11的铰链连接配合设置,从而对上连接板7下移推动,通过下移的上连接板7,对设置在上连接板7下方的第二夹板6进行下移,使得第二夹板6朝向第一夹板5靠近,对设置在第一夹板5以及第二夹板6之间的钢筋进行定位,当同一批被定位的钢筋中有直径较小的时,可以通过电动推杆8再次推动第二夹板6下移,对直径较小的钢筋进行定位,从而提高整个装置的实用性,当需要调节钢筋高度时,启动伺服电机带动螺纹杆13转动,进而对螺纹套设连接在螺纹杆13外侧的升降块14以及固定设置在两个升降块14之间的升降板2。When adjusting the positioning, the steel bar to be positioned can be first set between the first clamping plate 5 and the second clamping plate 6, and then the bidirectional screw rod 9 is rotated, so that the two sliders 10 threadedly connected to the outside of the bidirectional screw rod 9 are moved closer to each other, and the slider 10 is hingedly connected to the arm rod 11 to cooperate with the upper connecting plate 7 to push the upper connecting plate 7 downward, and the second clamping plate 6 arranged below the upper connecting plate 7 is moved downward through the lowered upper connecting plate 7, so that the second clamping plate 6 is close to the first clamping plate 5, and the steel bar arranged between the first clamping plate 5 and the second clamping plate 6 is positioned. When there are steel bars with smaller diameters in the same batch of positioned steel bars, the second clamping plate 6 can be pushed down again by the electric push rod 8 to position the steel bars with smaller diameters, thereby improving the practicality of the entire device. When the height of the steel bar needs to be adjusted, the servo motor is started to drive the threaded rod 13 to rotate, and then the lifting block 14 threadedly connected to the outside of the threaded rod 13 and the lifting plate 2 fixedly set between the two lifting blocks 14 are pushed.

以上显示和描述了本实用新型的基本原理、主要特征和本实用新型的优点。本行业的技术人员应该了解,本实用新型不受上述实施例的限制,上述实施例和说明书中描述的仅为本实用新型的优选例,并不用来限制本实用新型,在不脱离本实用新型精神和范围的前提下,本实用新型还会有各种变化和改进,这些变化和改进都落入要求保护的本实用新型范围内。本实用新型要求保护范围由所附的权利要求书及其等效物界定。The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the utility model and are not used to limit the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection of the utility model is defined by the attached claims and their equivalents.

Claims (6)

1. The utility model provides a reinforcing bar location structure for construction, includes base (1), its characterized in that: the lifting device is characterized in that a lifting plate (2) is arranged above the base (1), an installation groove (3) is formed in the upper surface of the lifting plate (2) through an arm rod (11) in a connecting mode, a bidirectional screw rod (9) is connected to the upper surface of the lifting plate in a limiting rotating mode, two sliding blocks (10) are symmetrically sleeved on the outer side of the bidirectional screw rod (9), an upper connecting plate (7) is connected to the installation groove (3) in a limiting sliding mode and located below the sliding blocks (10), the arm rod (11) is hinged between the bottom wall of the sliding blocks (10) and the upper surface of the upper connecting plate (7), a plurality of electric pushing rods (8) are arranged on the lower surface of the upper connecting plate (7) in an equidistant mode, and the free ends of the electric pushing rods (8) are connected with second clamping plates (6).
2. The rebar positioning structure for building construction according to claim 1, wherein: the inner bottom wall of the mounting groove (3) is provided with a lower connecting plate (4), and a plurality of first clamping plates (5) are equidistantly arranged on the upper surface of the lower connecting plate (4).
3. The rebar positioning structure for building construction according to claim 1, wherein: one end of the bidirectional screw rod (9) is limited and rotatably connected to the inner wall surface of the mounting groove (3), and the other end of the bidirectional screw rod (9) movably penetrates through the side wall of the mounting groove (3) and then is connected with the power output end of the servo motor.
4. The rebar positioning structure for building construction according to claim 1, wherein: the base (1) surface is provided with a placing groove (16), and the two sides of the placing groove (16) on the surface of the base (1) are provided with sliding grooves (12).
5. The reinforcing bar positioning structure for construction according to claim 4, wherein: the two sliding grooves (12) are internally and respectively connected with threaded rods (13) in a limiting rotation mode, lifting blocks (14) are respectively sleeved on the outer sides of the threaded rods (13) in a threaded mode, and the two lifting blocks (14) are respectively and fixedly arranged on two sides of the lifting plate (2).
6. The reinforcing bar positioning structure for construction according to claim 5, wherein: the bottom end of the threaded rod (13) is fixedly sleeved with a bevel gear (15).
CN202323166821.6U 2023-11-23 2023-11-23 Reinforcing bar location structure for construction Active CN221442140U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202323166821.6U CN221442140U (en) 2023-11-23 2023-11-23 Reinforcing bar location structure for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202323166821.6U CN221442140U (en) 2023-11-23 2023-11-23 Reinforcing bar location structure for construction

Publications (1)

Publication Number Publication Date
CN221442140U true CN221442140U (en) 2024-07-30

Family

ID=92061233

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202323166821.6U Active CN221442140U (en) 2023-11-23 2023-11-23 Reinforcing bar location structure for construction

Country Status (1)

Country Link
CN (1) CN221442140U (en)

Similar Documents

Publication Publication Date Title
CN218909611U (en) A steel bar lifting and clamping device
CN210253683U (en) Plate bending machine for stainless steel door production
CN218226410U (en) Industrial equipment basic template device
CN218667016U (en) Concrete trowel for civil engineering construction
CN216228330U (en) Cutting device for aluminum alloy template processing
CN217169173U (en) Evaporate and press aerated concrete block cutting device
CN214144700U (en) Special-shaped concrete structure forming template reinforcing apparatus
CN214532007U (en) A positioning device for a solid web steel column
CN209998392U (en) Hole diameter adjustable punching device for metal sheet processing
CN213857869U (en) Assembly workbench for plastic-steel doors and windows
CN223522141U (en) A hoisting device for electromechanical equipment in construction engineering
CN222295748U (en) Prefabricated component positioner is used in house construction
CN218110572U (en) A clamping device for building aluminum formwork processing
CN220515119U (en) Space bending member machining precision control device
CN221001944U (en) A high-rise wall-attached climbing formwork
CN222288434U (en) Tubular part bending processing equipment
CN221158398U (en) Multi-angle bending device for reinforcing steel bars
CN221983751U (en) Reinforcing bar bending device for house construction
CN223368066U (en) Straightening device for hardware
CN223674140U (en) Prefabricated case roof beam template integral hoisting device
CN219946504U (en) Bending machine for processing reinforcing steel bars
CN223603172U (en) A high-precision continuous straightening production line for aluminum profiles
CN222414105U (en) Device for checking spacing between reinforcing bars of bottom plate of structure
CN221722077U (en) Reinforcing bar positioning mechanism for construction
CN219275188U (en) Aluminum profile positioning device for aluminum profile machining

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240816

Address after: No. 1-37, Xiaochang Fishing Ground, Jishan Town, Shayang County, Jingmen City, Hubei Province, China 448266

Patentee after: Xie Nanning

Country or region after: China

Address before: 456500 Hejian Changping Avenue Middle Section, Linzhou City, Anyang City, Henan Province

Patentee before: Linzhou Yongsheng Construction Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240911

Address after: 635000 Group 6, Shiluo Village, Huangting Township, Daxian County, Dazhou City, Sichuan Province

Patentee after: Zhou Yuanju

Country or region after: China

Address before: No. 1-37, Xiaochang Fishing Ground, Jishan Town, Shayang County, Jingmen City, Hubei Province, China 448266

Patentee before: Xie Nanning

Country or region before: China

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20241023

Address after: Building 13, 3rd to 4th floors, G-2 Annex 1, Sai Kung Pier, Dianchi Resort, Kunming City, Yunnan Province 650000

Patentee after: Yunnan Baocheng Construction Engineering Co.,Ltd.

Country or region after: China

Address before: 635000 Group 6, Shiluo Village, Huangting Township, Daxian County, Dazhou City, Sichuan Province

Patentee before: Zhou Yuanju

Country or region before: China

TR01 Transfer of patent right