CN221441605U - Foundation pit dredging equipment for building construction - Google Patents

Foundation pit dredging equipment for building construction Download PDF

Info

Publication number
CN221441605U
CN221441605U CN202420029275.7U CN202420029275U CN221441605U CN 221441605 U CN221441605 U CN 221441605U CN 202420029275 U CN202420029275 U CN 202420029275U CN 221441605 U CN221441605 U CN 221441605U
Authority
CN
China
Prior art keywords
fixedly connected
barrel body
foundation pit
building construction
pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202420029275.7U
Other languages
Chinese (zh)
Inventor
张玉锁
胡红超
韩硕
李玲
周春峰
赵伟
陈涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jilin Chenghui Construction Engineering Co., Ltd.
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202420029275.7U priority Critical patent/CN221441605U/en
Application granted granted Critical
Publication of CN221441605U publication Critical patent/CN221441605U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Crushing And Pulverization Processes (AREA)

Abstract

The utility model relates to the technical field of hydraulic engineering and discloses foundation pit dredging equipment for construction, which comprises a bottom plate, wherein the right side of the upper part of the bottom plate is fixedly connected with a barrel body, a filter plate is arranged in the barrel body, the left side of the barrel body is fixedly connected with a supporting plate, the upper part of the supporting plate is fixedly connected with a second motor, the output end of the second motor is fixedly connected with a screw rod, the external thread of the screw rod is connected with a thread block, the lower part of the thread block is fixedly connected with a spray head, the upper part of the barrel body is fixedly connected with a water tank, the left side of the water tank is fixedly connected with a water outlet pipe, the left end of the water outlet pipe is fixedly connected with a second water pump, and the output end of the second water pump is fixedly connected with a hose. According to the utility model, the cutting-off of impurities such as branches is realized, the impurities are prevented from blocking dredging equipment, the dredging effect is affected, the cleaning of the inside of the equipment is realized, and the service life of the equipment is prolonged.

Description

Foundation pit dredging equipment for building construction
Technical Field
The utility model relates to the technical field of hydraulic engineering, in particular to foundation pit dredging equipment for building construction.
Background
In the hydraulic engineering construction process, because the engineering project is close to water areas such as rivers, lakes, etc., foundation soil texture is softer, needs to excavate the foundation ditch and strengthens construction scope soil texture, reduces the possibility that later stage engineering project subsided, and then the security and the service life of protection engineering project, after the foundation ditch excavation, infiltration in the foundation ditch can lead to soil etc. in the foundation ditch to become silt mud, need adopt a foundation ditch silt dredging device to in time clear up it, make things convenient for subsequent foundation ditch reinforcement operation.
Because there is impurity such as longer branch in the silt, the filter screen is blocked easily, influences the silt effect of inhaling of silt pipe, and leaves certain silt existence to inside after the foundation ditch dredging equipment uses, influences the use of equipment easily, and the practicality is not strong.
Disclosure of utility model
In order to make up the defects, the utility model provides foundation pit dredging equipment for building construction, and aims to solve the problems that in the prior art, long branches and other impurities exist in sludge, a filter screen is easy to block, the dredging effect of a dredging pipe is affected, certain sludge exists in the foundation pit dredging equipment after the foundation pit dredging equipment is used, and the equipment use is easy to be affected.
In order to achieve the above purpose, the present utility model adopts the following technical scheme: the utility model provides a foundation ditch dredging equipment for construction, includes the bottom plate, the upper portion right side fixedly connected with staving of bottom plate, the inside of staving is provided with the filter plate, the left side fixedly connected with backup pad of staving, the upper portion fixedly connected with second motor of backup pad, the output fixedly connected with screw rod of second motor, the outside threaded connection of screw rod has the screw thread piece, the lower part fixedly connected with shower nozzle of screw thread piece, the upper portion fixedly connected with water tank of staving, the left side fixedly connected with outlet pipe of water tank, the left end fixedly connected with second water pump of outlet pipe, the output fixedly connected with hose of second water pump, the one end fixedly connected with shower nozzle of hose.
As a further description of the above technical solution:
The left side of the upper part of the bottom plate is fixedly connected with a crushing box, the upper part of the crushing box is fixedly connected with a first motor, the output end of the first motor is fixedly connected with a stirring shaft, both sides of the outer part of the stirring shaft are fixedly connected with a fixing sleeve, the utility model discloses a crushing box, including fixed cover, conveyer pump, second inlet tube, fixed cover's outside both sides all fixedly connected with cutter, the right side fixedly connected with raceway of crushing box, the right-hand member fixedly connected with delivery pump of raceway, the output fixedly connected with second inlet tube of delivery pump.
As a further description of the above technical solution:
The second water inlet pipe is fixedly connected to the left side of the barrel body.
As a further description of the above technical solution:
The right side fixedly connected with drain pipe of staving, the right side fixedly connected with third inlet tube of water tank.
As a further description of the above technical solution:
The left side fixedly connected with first inlet tube of crushing case, the left side fixedly connected with inlet scoop of first inlet tube.
As a further description of the above technical solution:
One end of the screw rod is rotationally connected to the left side of the fixing plate, and the fixing plate is fixedly connected to the upper side of the inside of the barrel body.
As a further description of the above technical solution:
The conveying pump is fixedly connected to the upper portion of the bottom plate.
As a further description of the above technical solution:
the second water pump is fixedly connected to the upper part of the barrel body.
The utility model has the following beneficial effects:
1. According to the utility model, through the cooperation of the first motor, the stirring shaft, the fixing sleeve, the cutter and other structures, the cutting-off of impurities such as branches is realized, and the phenomenon that the impurities block dredging equipment and influence dredging effect is avoided.
2. According to the utility model, through the cooperation of the structures of the second water pump, the water outlet pipe, the water tank, the hose, the spray head, the second motor, the screw rod, the threaded block and the like, the cleaning of the inside of the equipment is realized, and the service life of the equipment is prolonged.
Drawings
FIG. 1 is a perspective view of a foundation pit dredging device for building construction;
FIG. 2 is a diagram of the structure of the interior of a tank of a foundation pit dredging device for building construction;
Fig. 3 is a sectional view of a crushing box of a foundation pit dredging device for building construction.
Legend description:
1. A bottom plate; 2. a crushing box; 3. a first motor; 4. a stirring shaft; 5. a fixed sleeve; 6. a cutter; 7. a first water inlet pipe; 8. a water inlet bucket; 9. a water pipe; 10. a transfer pump; 11. a second water inlet pipe; 12. a tub body; 13. a filter plate; 14. a support plate; 15. a second motor; 16. a screw; 17. a screw block; 18. a spray head; 19. a water tank; 20. a water outlet pipe; 21. a second water pump; 22. a hose; 23. a fixing plate; 24. a third water inlet pipe; 25. and (5) a water drain pipe.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-3, one embodiment provided by the present utility model is: the utility model provides a foundation ditch dredging equipment for construction, including bottom plate 1, the upper portion right side fixedly connected with staving 12 of bottom plate 1, the inside of staving 12 is provided with filter plate 13, the left side fixedly connected with backup pad 14 of staving 12, the upper portion fixedly connected with second motor 15 of backup pad 14, the output fixedly connected with screw rod 16 of second motor 15, the outside threaded connection of screw rod 16 has screw thread piece 17, the lower part fixedly connected with shower nozzle 18 of screw thread piece 17, the upper portion fixedly connected with water tank 19 of staving 12, the left side fixedly connected with outlet pipe 20 of water tank 19, the left end fixedly connected with second water pump 21 of outlet pipe 20, the output fixedly connected with hose 22 of second water pump 21, the one end fixedly connected with shower nozzle 18 of hose 22.
Through starting second water pump 21, extract the rivers inside water tank 19, rivers get into outlet pipe 20, hose 22, inside shower nozzle 18, from inside blowout of shower nozzle 18, wash staving 12 inside, start second motor 15, second motor 15 drives screw rod 16 and rotates, screw rod 16 drives screw thread piece 17 and removes, makes shower nozzle 18 round trip movement, has realized wasing inside equipment, has improved the life of equipment.
The upper portion left side fixedly connected with of bottom plate 1 smashes case 2, smashes the upper portion fixedly connected with first motor 3 of case 2, and the output fixedly connected with (mixing) shaft 4 of first motor 3, the equal fixedly connected with of outside both sides of (mixing) shaft 4 is fixed the cover 5, and the equal fixedly connected with cutter 6 of outside both sides of fixed cover 5 smashes the right side fixedly connected with raceway 9 of case 2, and the right-hand member fixedly connected with delivery pump 10 of raceway 9, the output fixedly connected with second inlet tube 11 of delivery pump 10.
Through starting first motor 3, first motor 3 starts to drive (mixing) shaft 4, fixed cover 5, cutter 6 rotates, has realized cutting off impurity such as branch, avoids impurity to block up dredging equipment, influences the dredging effect, then starts delivery pump 10, makes raceway 9 to smash the inside of case 2 and extract, and silt gets into the inside of second inlet tube 11 through delivery pump 10 from the inside of raceway 9, then gets into staving 12 inside, falls to filter plate 13's upper portion, carries out filtration treatment to silt.
The second water inlet pipe 11 is fixedly connected to the left side of the tub 12.
The second water inlet pipe 11 is fixedly connected to the left side of the barrel body 12, and the effect of conveying sludge is achieved.
The right side of the barrel body 12 is fixedly connected with a drain pipe 25, and the right side of the water tank 19 is fixedly connected with a third water inlet pipe 24.
The drain pipe 25 is fixedly connected to the right side of the barrel body 12, so that the sludge is discharged, and the third water inlet pipe 24 is fixedly connected to the right side of the water tank 19, so that the water tank 19 is used for conveying water.
The left side fixedly connected with first inlet tube 7 of crushing case 2, the left side fixedly connected with inlet scoop 8 of first inlet tube 7.
The first water inlet pipe 7 is fixedly connected to the left side of the crushing box 2, and the water inlet hopper 8 is fixedly connected to the left side of the first water inlet pipe 7, so that the effect of conveying sludge is achieved.
One end of the screw 16 is rotatably coupled to the left side of the fixing plate 23, and the fixing plate 23 is fixedly coupled to the inner upper side of the tub 12.
One end of the screw 16 is rotatably connected to the left side of the fixing plate 23, and the fixing plate 23 is fixedly connected to the upper side of the inside of the tub 12, thereby performing a function of fixedly supporting the screw 16.
The transfer pump 10 is fixedly connected to the upper portion of the base plate 1.
The transfer pump 10 is fixedly connected to the upper part of the bottom plate 1, and the transfer pump 10 is fixedly supported.
The second water pump 21 is fixedly connected to the upper portion of the tub 12.
The second water pump 21 is fixedly connected to the upper part of the barrel body 12, and plays a role in fixedly supporting the second water pump 21.
Working principle: when using this device, through inside leading-in water bucket 8 with silt, inside entering first inlet tube 7 from 8 inside of water bucket, inside entering crushing case 2 from first inlet tube 7 inside, through starting first motor 3, first motor 3 starts to drive (mixing) shaft 4 and rotates, (mixing) shaft 4 rotates and drives fixed cover 5 and rotate, fixed cover 5 rotates and drives cutter 6 and rotate, realized cutting off impurity such as branch, avoid impurity jam dredging equipment, influence dredging effect, through starting delivery pump 10, delivery pump 10 starts to drive raceway 9 and to take out inside crushing case 2, silt gets into inside 12 from inside of raceway 9 through the inside of delivery pump 10 entering second inlet tube 11, fall to filter plate 13's upper portion from inside entering barrel body 11, reentrant drain pipe 25 inside is discharged, through starting second water pump 21, second water pump 21 starts and drives outlet pipe 20 and carry out the extraction to water tank 19, rivers get into inside through second water pump 21 and get into inside 22, inside entering spray head 18 from inside hose 22, it carries out inside the inside to drive the second screw rod 15 to drive the inside of barrel body 12 from inside of spray head 18, the second screw rod 17 has been carried out the inside of barrel body 15, the screw rod has been moved 17 has been realized, the screw rod has been moved 17 has been moved, and has been realized, the screw rod has been moved the device has been moved, and has been moved the device has been moved the inside of the screw rod has been moved 17.
Finally, it should be noted that: the foregoing description is only illustrative of the preferred embodiments of the present utility model, and although the present utility model has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described, or equivalents may be substituted for elements thereof, and any modifications, equivalents, improvements or changes may be made without departing from the spirit and principles of the present utility model.

Claims (8)

1. Foundation ditch dredging equipment for construction, including bottom plate (1), its characterized in that: the right side of the upper part of the bottom plate (1) is fixedly connected with a barrel body (12), a filter plate (13) is arranged in the barrel body (12), the left side of the barrel body (12) is fixedly connected with a supporting plate (14), the upper part of the supporting plate (14) is fixedly connected with a second motor (15), the output end of the second motor (15) is fixedly connected with a screw rod (16), the external thread of the screw rod (16) is connected with a thread block (17), the utility model discloses a shower nozzle, including threaded block (17), upper portion fixedly connected with shower nozzle (18) of threaded block (17), upper portion fixedly connected with water tank (19) of staving (12), the left side fixedly connected with outlet pipe (20) of water tank (19), the left end fixedly connected with second water pump (21) of outlet pipe (20), the output fixedly connected with hose (22) of second water pump (21), the one end fixedly connected with shower nozzle (18) of hose (22).
2. The foundation pit dredging device for building construction according to claim 1, wherein: the utility model discloses a grinding machine, including bottom plate (1), fixed sleeve (5), conveyer pump (10) output fixedly connected with second inlet tube (11), fixed sleeve (5) are all fixedly connected with in the outside both sides of (4), fixed sleeve (5) are all fixedly connected with cutter (6), conveyer pump (9) are smashed to the right side fixedly connected with of bottom plate (1), conveyer pump (10) are smashed the upper portion fixedly connected with of case (2), conveyer pump (10) are smashed the right-hand member fixedly connected with of conveyer pipe (9).
3. The foundation pit dredging device for building construction according to claim 2, wherein: the second water inlet pipe (11) is fixedly connected to the left side of the barrel body (12).
4. The foundation pit dredging device for building construction according to claim 1, wherein: the right side of staving (12) fixedly connected with drain pipe (25), the right side of water tank (19) fixedly connected with third inlet tube (24).
5. The foundation pit dredging device for building construction according to claim 2, wherein: the left side fixedly connected with first inlet tube (7) of crushing case (2), the left side fixedly connected with of first inlet tube (7) is advanced water bucket (8).
6. The foundation pit dredging device for building construction according to claim 1, wherein: one end of the screw rod (16) is rotatably connected to the left side of the fixing plate (23), and the fixing plate (23) is fixedly connected to the upper side of the inside of the barrel body (12).
7. The foundation pit dredging device for building construction according to claim 2, wherein: the conveying pump (10) is fixedly connected to the upper part of the bottom plate (1).
8. The foundation pit dredging device for building construction according to claim 1, wherein: the second water pump (21) is fixedly connected to the upper part of the barrel body (12).
CN202420029275.7U 2024-01-05 2024-01-05 Foundation pit dredging equipment for building construction Active CN221441605U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202420029275.7U CN221441605U (en) 2024-01-05 2024-01-05 Foundation pit dredging equipment for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202420029275.7U CN221441605U (en) 2024-01-05 2024-01-05 Foundation pit dredging equipment for building construction

Publications (1)

Publication Number Publication Date
CN221441605U true CN221441605U (en) 2024-07-30

Family

ID=92067008

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202420029275.7U Active CN221441605U (en) 2024-01-05 2024-01-05 Foundation pit dredging equipment for building construction

Country Status (1)

Country Link
CN (1) CN221441605U (en)

Similar Documents

Publication Publication Date Title
CN220521381U (en) Anti-blocking drainage device for civil foundation pit
CN112459224A (en) Be applied to desilting device in building escape canal
CN215053384U (en) Sludge cleaning device
CN221441605U (en) Foundation pit dredging equipment for building construction
CN111677041B (en) River course ecological remediation sediment removal device for hydraulic engineering
CN212506482U (en) Dredging device is used in water conservancy construction convenient to remove
CN210439417U (en) A rainwater recovery device for sponge city
CN108842847A (en) The quick desilting equipment of water conservancy construction
CN218880922U (en) Basement drainage structure
CN214402062U (en) Waterproof drainage device of hydraulic engineering construction
CN106430907A (en) Bottom mud dredging treatment system
CN201099911Y (en) Water saving environment-friendly type seat bowl
CN215669789U (en) Water conservancy water and electricity is ditch desilting device for construction
CN214614269U (en) A high-efficiency dredging device for water conservancy construction
CN215052621U (en) Waterproof drainage device of hydraulic engineering construction
CN220450943U (en) Hydraulic engineering dredging device
CN220847763U (en) River channel excavation device for river channel management in water conservancy projects
CN210482517U (en) Integrated sewage lifting pump station with dredging device
CN211158760U (en) Domestic sewage treatment anti-clogging device
CN216108853U (en) Drainage device for building site
CN219825428U (en) Hydraulic ecological engineering dredging device
CN220150417U (en) A water conservancy construction drainage device
CN215290497U (en) Water conservancy construction drainage device
CN220150359U (en) Energy-saving drainage structure for foundation pit construction
CN216973654U (en) Open channel adds dark composite escape canal of containing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20260115

Address after: 130000 Jilin Province, Changchun City, Erdao District, No. 1333 Jilin Avenue, Hongchang F, G Building, No. 113

Patentee after: Jilin Chenghui Construction Engineering Co., Ltd.

Country or region after: China

Address before: 054100 Hebei Province Xingtai City Shahe City Chai Guan Township Chen Nao Village

Patentee before: Chen Tao

Country or region before: China