CN221441429U - Intelligent sluice gate for hydraulic engineering - Google Patents
Intelligent sluice gate for hydraulic engineering Download PDFInfo
- Publication number
- CN221441429U CN221441429U CN202322533561.5U CN202322533561U CN221441429U CN 221441429 U CN221441429 U CN 221441429U CN 202322533561 U CN202322533561 U CN 202322533561U CN 221441429 U CN221441429 U CN 221441429U
- Authority
- CN
- China
- Prior art keywords
- gate
- fixedly connected
- frame
- base
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Barrages (AREA)
Abstract
Description
技术领域Technical Field
本实用新型涉及水利工程技术领域,具体为一种智能化水利工程用泄水闸门。The utility model relates to the technical field of water conservancy projects, in particular to an intelligent water discharge gate for water conservancy projects.
背景技术Background technique
水利工程主要研究工程水文、水利工程测量、水利钢筋混凝土、水工建筑物、工程制图等方面的基础知识和技能,在水利工程领域进行工程规划设计、工程现场施工、工程预算、水利设备维护维修;例如:修建坝、堤、溢洪道、水闸、渠道、渡漕、筏道、鱼道等不同类型的水工建筑物,用以宣泄洪水并调节控制水库水位的工作闸门;它具有承受各种静、动载荷的能力;能在动水中启闭;并具备良好的结构和水力学特性;泄洪闸门的水流流态接影响闸门运行的可靠性。Water conservancy engineering mainly studies the basic knowledge and skills in engineering hydrology, water conservancy engineering surveying, water conservancy reinforced concrete, hydraulic structures, engineering drawing, etc., and carries out engineering planning and design, on-site construction, engineering budgeting, and maintenance and repair of water conservancy equipment in the field of water conservancy engineering; for example: construction of different types of hydraulic structures such as dams, dikes, spillways, sluices, channels, ferries, rafts, fishways, etc., to discharge floods and regulate and control the water level of reservoirs; it has the ability to withstand various static and dynamic loads; it can be opened and closed in moving water; and it has good structural and hydraulic characteristics; the flow pattern of the flood discharge gate directly affects the reliability of the gate operation.
现有的可参考公告号为:CN218990075U的中国实用新型专利,其公开了一种智能化水利工程用泄水闸门,本实用新型包括:闸门、出水口、加强防护外壳、连接杆、水位传感器、隔绝箱、进水管、集水箱、调节机构、开闸机构、弧形液压杆、排水管、过滤板、泄洪闸门、电磁换向阀、增压泵、防护隔离外壳、杂物筛板;闸门的一端固定安装有出水口,闸门的外端固定安装有加强防护外壳,闸门的一端固定安装有连接杆,连接杆的一端固定安装有水位传感器,水位传感器的下端固定安装有进水管,能够将长期处于水中浸泡会生锈,导致卡顿不灵敏,使门体容易卡死的问题能够减少,也能对人工转动螺纹杆来升起闸门从而浪费大量的人力物力,而能够减少人力物力浪费。The existing referenceable Chinese utility model patent has a publication number of CN218990075U, which discloses an intelligent water discharge gate for water conservancy projects. The utility model includes a gate, a water outlet, a reinforced protective shell, a connecting rod, a water level sensor, an isolation box, a water inlet pipe, a water collecting box, an adjusting mechanism, a gate opening mechanism, an arc-shaped hydraulic rod, a drain pipe, a filter plate, a flood discharge gate, an electromagnetic reversing valve, a booster pump, a protective isolation shell, and a debris sieve plate; a water outlet is fixedly installed at one end of the gate, a reinforced protective shell is fixedly installed at the outer end of the gate, a connecting rod is fixedly installed at one end of the gate, a water level sensor is fixedly installed at one end of the connecting rod, and a water inlet pipe is fixedly installed at the lower end of the water level sensor, which can reduce the problem of rust caused by long-term immersion in water, resulting in jamming and insensitivity, and making the door body easily stuck, and can also reduce the waste of manpower and material resources by manually rotating the threaded rod to raise the gate, thereby wasting a lot of manpower and material resources.
上述的智能化水利工程用泄水闸门使用闸门进行上下升降使用,导致闸门多次使用启闭的情况下,会造成闸门和基座结构之间相互摩擦损坏,导致降低结构之间实用性,同时泄水闸门在启动时,会将泄水中的杂质进行过滤,进而这些过滤掉的杂质不便于进行清理使用,导致停留在闸门结构中,降低闸门的使用效果,影响闸门维修操作使用。The above-mentioned intelligent water conservancy project uses the gate for lifting and lowering, which causes friction and damage between the gate and the base structure when the gate is opened and closed multiple times, resulting in reduced practicality of the structure. At the same time, when the gate is started, the impurities in the discharge water will be filtered out, and these filtered impurities are not easy to clean and use, resulting in them staying in the gate structure, reducing the use effect of the gate and affecting the maintenance and operation of the gate.
实用新型内容Utility Model Content
(一)解决的技术问题1. Technical issues to be solved
针对现有技术的不足,本实用新型提供了一种智能化水利工程用泄水闸门,具备增加闸门使用摩擦性,增加过滤结构使用功能等优点,解决了上述技术问题。In view of the deficiencies in the prior art, the utility model provides an intelligent water discharge gate for water conservancy projects, which has the advantages of increasing the friction of the gate and increasing the function of the filtering structure, thereby solving the above-mentioned technical problems.
(二)技术方案(II) Technical solution
为实现上述目的,本实用新型提供如下技术方案:In order to achieve the above purpose, the utility model provides the following technical solutions:
该智能化水利工程用泄水闸门,包括用于连接整体结构的闸门基座,所述闸门基座的上方固定连接有支撑配合使用的支撑架,所述闸门基座的上方活动连接有连接夹持的夹持架,所述闸门基座的内部固定安装有用于过滤的过滤箱,所述过滤箱的内部固定连接有用于配合过滤使用的过滤网,所述过滤箱的上方固定连接有用于杂质排出的排出管,所述排出管的上方固定连接有用于和泵体连接的接口,所述夹持架的一侧固定连接有用于增加结构实用性的防摩擦框。The intelligent water conservancy project sluice gate comprises a gate base for connecting the overall structure, a support frame for supporting and cooperating is fixedly connected to the top of the gate base, a clamping frame for connecting and clamping is movably connected to the top of the gate base, a filter box for filtering is fixedly installed inside the gate base, a filter screen for cooperating with filtering is fixedly connected inside the filter box, a discharge pipe for discharging impurities is fixedly connected to the top of the filter box, an interface for connecting to a pump body is fixedly connected to the top of the discharge pipe, and an anti-friction frame for increasing the practicality of the structure is fixedly connected to one side of the clamping frame.
作为本实用新型的优选技术方案,所述闸门基座的一侧固定贯穿连接有进水管,所述进水管的一侧固定连接有连接管;所述连接管设置有两个,另外一侧连接过滤箱和防摩擦框的对侧配合使用。As the preferred technical solution of the utility model, a water inlet pipe is fixedly connected to one side of the gate base, and a connecting pipe is fixedly connected to one side of the water inlet pipe; two connecting pipes are provided, and the other side is connected to the filter box and the opposite side of the anti-friction frame for coordinated use.
作为本实用新型的优选技术方案,所述闸门基座的内表面底部固定连接有支撑块,所述支撑块的上方固定连接有吸音套,所述吸音套的上方固定连接有连接管;所述吸音套连接在闸门基座内部配合连接管使用。As an optimal technical solution of the utility model, a support block is fixedly connected to the bottom of the inner surface of the gate base, a sound absorbing sleeve is fixedly connected to the top of the support block, and a connecting pipe is fixedly connected to the top of the sound absorbing sleeve; the sound absorbing sleeve is connected to the inside of the gate base for use with the connecting pipe.
作为本实用新型的优选技术方案,所述过滤箱的上方固定连接有内密封圈,所述内密封圈的内表面一侧固定连接有排出管;所述内密封圈和外密封圈使用为耐高温硅胶。As a preferred technical solution of the utility model, an inner sealing ring is fixedly connected to the top of the filter box, and a discharge pipe is fixedly connected to one side of the inner surface of the inner sealing ring; the inner sealing ring and the outer sealing ring are made of high temperature resistant silicone.
作为本实用新型的优选技术方案,所述闸门基座的另外一侧固定贯穿连接有排水管,所述排水管的外表面结构和进水管的一样;所述排出管用于闸门进行使用。As a preferred technical solution of the utility model, a drainage pipe is fixedly connected through the other side of the gate base, and the outer surface structure of the drainage pipe is the same as that of the water inlet pipe; the discharge pipe is used for the gate.
作为本实用新型的优选技术方案,所述支撑架的上方固定连接有闸门升降结构,所述闸门升降结构的下方活动连接有升降杆,所述升降杆的下方固定连接有移动门;所述闸门升降结构驱动控制升降上下启闭操作使用。As a preferred technical solution of the utility model, a gate lifting structure is fixedly connected to the top of the support frame, a lifting rod is movably connected to the bottom of the gate lifting structure, and a movable door is fixedly connected to the bottom of the lifting rod; the gate lifting structure drives and controls the lifting, up and down opening and closing operations.
作为本实用新型的优选技术方案,所述夹持架的上方固定连接有外密封圈,所述外密封圈的内表面一侧固定连接有接口,所述防摩擦框的内部活动连接有移动门;所述夹持架均设置有两个连接在闸门基座的上方,且呈现出“L”形状。As the preferred technical solution of the utility model, an outer sealing ring is fixedly connected to the top of the clamping frame, an interface is fixedly connected to one side of the inner surface of the outer sealing ring, and a movable door is movably connected to the inside of the anti-friction frame; the clamping frame is provided with two connections on the top of the gate base, and presents an "L" shape.
与现有技术相比,本实用新型提供了一种智能化水利工程用泄水闸门,具备以下有益效果:Compared with the prior art, the utility model provides an intelligent water discharge gate for water conservancy projects, which has the following beneficial effects:
1、本实用新型通过在闸门和夹持架活动连接,夹持架带动一侧的防摩擦框连接在闸门结构中进行配合使用,当闸门和移动门进行多次启闭的情况下,通过防摩擦框起到防护作用,避免了闸门结构之间出现摩擦损坏的情况,同时夹持架和闸门活动连接,便于对防摩擦框结构进行定期更换使用,增加该种智能化水利工程用泄水闸门的实用性。1. The utility model movably connects the gate and the clamping frame, and the clamping frame drives the anti-friction frame on one side to be connected to the gate structure for coordinated use. When the gate and the movable door are opened and closed multiple times, the anti-friction frame plays a protective role, avoiding friction damage between the gate structures. At the same time, the clamping frame and the gate are movably connected, which is convenient for regular replacement of the anti-friction frame structure, thereby increasing the practicality of the intelligent water discharge gate for water conservancy projects.
2、本实用新型通过将过滤箱安装在闸门基座的内部,连接进水管和排水管,当闸门进行开启使用时,泄水中存在一定的杂质,通过过滤结构进行过滤使用,避免排水管出现堵塞的情况,增加该种智能化水利工程用泄水闸门的使用效果,同时在过滤箱上方连接排出和接口,接口用于和吸泵进行连接,大多将过滤箱内部的杂物进行高压吸收排出,增加过滤结构的使用效果,提高闸门的使用,便于对闸门进行维修操作使用;2. The utility model installs the filter box inside the gate base, connects the water inlet pipe and the drain pipe, and when the gate is opened for use, there are certain impurities in the discharge water, which are filtered by the filter structure to avoid clogging of the drain pipe, thereby increasing the use effect of the intelligent water conservancy project discharge gate. At the same time, the discharge and interface are connected above the filter box, and the interface is used to connect with the suction pump, and most of the impurities inside the filter box are absorbed and discharged with high pressure, thereby increasing the use effect of the filter structure, improving the use of the gate, and facilitating the maintenance and operation of the gate;
2、本实用新型通过在排水管和进水管的外表面设置吸音套,该吸音套材质为吸音棉结构,大多对进水管和排水管水流进行吸音使用,同时在排出管外表面均连接内密封圈和外密封圈,便于增加排出管和结构之间连接使用密封性,增加该智能化水利工程用泄水闸门的使用。2. The utility model arranges a sound-absorbing sleeve on the outer surface of the drainage pipe and the water inlet pipe. The sound-absorbing sleeve is made of a sound-absorbing cotton structure and is mostly used to absorb the sound of the water flow in the water inlet pipe and the drainage pipe. At the same time, an inner sealing ring and an outer sealing ring are connected to the outer surface of the discharge pipe to increase the sealing performance of the connection between the discharge pipe and the structure, thereby increasing the use of the sluice gate for the intelligent water conservancy project.
附图说明BRIEF DESCRIPTION OF THE DRAWINGS
图1为本实用新型结构示意图;Fig. 1 is a schematic diagram of the structure of the utility model;
图2为本实用新型支撑架示意图;Figure 2 is a schematic diagram of the support frame of the utility model;
图3为本实用新型闸门基座内部示意图;Figure 3 is a schematic diagram of the interior of the gate base of the utility model;
图4为本实用新型过滤箱内部示意图;Figure 4 is a schematic diagram of the interior of the filter box of the utility model;
图5为本实用新型夹持架示意图。FIG. 5 is a schematic diagram of a clamping frame of the present invention.
其中:1、闸门基座;11、进水管;12、连接管;13、支撑块;14、吸音套;15、过滤箱;16、过滤网;17、内密封圈;18、排出管;19、接口;110、排水管;2、支撑架;21、闸门升降结构;22、升降杆;23、移动门;3、夹持架;31、防摩擦框;32、外密封圈。Among them: 1. Gate base; 11. Water inlet pipe; 12. Connecting pipe; 13. Support block; 14. Sound-absorbing sleeve; 15. Filter box; 16. Filter net; 17. Inner sealing ring; 18. Discharge pipe; 19. Interface; 110. Drain pipe; 2. Support frame; 21. Gate lifting structure; 22. Lifting rod; 23. Moving door; 3. Clamping frame; 31. Anti-friction frame; 32. Outer sealing ring.
具体实施方式Detailed ways
下面结合附图和实施例对本实用新型的实施方式作进一步详细描述。以下实施例用于说明本实用新型,但不能用来限制本实用新型的范围。The following is a further detailed description of the implementation of the present invention in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but cannot be used to limit the scope of the present invention.
在本实用新型的描述中,除非另有说明,“多个”的含义是两个或两个以上;术语“上”“下”“左”“右”“内”“外”“前端”“后端”“头部”“尾部”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。此外,术语“第一”“第二”“第三”等仅用于描述目的,而不能理解为指示或暗示相对重要性。In the description of the present invention, unless otherwise specified, "multiple" means two or more than two; the terms "upper", "lower", "left", "right", "inner", "outer", "front end", "rear end", "head", "tail", etc. indicate the orientation or position relationship based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first", "second", "third", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.
在本实用新型的描述中,需要说明的是,除非另有明确的规定和限定,术语“相连”“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体的连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本实用新型中的具体含义。In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "connected" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
结合附图1-图5,在本实施方式中,一种智能化水利工程用泄水闸门,包括闸门基座1,闸门基座1的上方固定连接有支撑架2,闸门基座1的上方活动连接有夹持架3。1 to 5 , in this embodiment, an intelligent water discharge gate for a water conservancy project includes a gate base 1 , a support frame 2 is fixedly connected to the top of the gate base 1 , and a clamping frame 3 is movably connected to the top of the gate base 1 .
具体地,通过将闸门基座1连接在水利工程建设中进行配合使用,闸门基座1和上方支撑架2固定连接,支撑架2带动闸门驱动结构配合使用,在闸门基座1的上方活动连接夹持架3,该夹持架3呈现出“L”形状,便于带动一侧的防摩擦框31进行配合使用,增加该智能化水利工程用泄水闸门结构之间实用性。Specifically, by connecting the gate base 1 to the water conservancy project construction for coordinated use, the gate base 1 is fixedly connected to the upper support frame 2, the support frame 2 drives the gate driving structure for coordinated use, and the clamping frame 3 is movably connected above the gate base 1. The clamping frame 3 presents an "L" shape, which is convenient for driving the anti-friction frame 31 on one side for coordinated use, thereby increasing the practicality of the intelligent water conservancy project discharge gate structure.
闸门基座1的内部固定安装有过滤箱15,过滤箱15的内部固定连接有过滤网16,过滤箱15的上方固定连接有排出管18,排出管18的上方固定连接有接口19。A filter box 15 is fixedly installed inside the gate base 1 , a filter screen 16 is fixedly connected inside the filter box 15 , a discharge pipe 18 is fixedly connected above the filter box 15 , and an interface 19 is fixedly connected above the discharge pipe 18 .
闸门基座1的一侧固定贯穿连接有进水管11,进水管11的一侧固定连接有连接管12,闸门基座1的内表面底部固定连接有支撑块13,支撑块13的上方固定连接有吸音套14,吸音套14的上方固定连接有连接管12。A water inlet pipe 11 is fixedly connected to one side of the gate base 1, a connecting pipe 12 is fixedly connected to one side of the water inlet pipe 11, a supporting block 13 is fixedly connected to the bottom of the inner surface of the gate base 1, a sound absorbing sleeve 14 is fixedly connected above the supporting block 13, and a connecting pipe 12 is fixedly connected to the top of the sound absorbing sleeve 14.
过滤箱15的上方固定连接有内密封圈17,内密封圈17的内表面一侧固定连接有排出管18。An inner sealing ring 17 is fixedly connected to the top of the filter box 15 , and a discharge pipe 18 is fixedly connected to one side of the inner surface of the inner sealing ring 17 .
闸门基座1的另外一侧固定贯穿连接有排水管110,排水管110的外表面结构和进水管11的一样。A drainage pipe 110 is fixedly connected and penetrated through the other side of the gate base 1 , and the outer surface structure of the drainage pipe 110 is the same as that of the water inlet pipe 11 .
具体地,通过在闸门基座1的两侧均连接进水管11和排水管110,便于将水利工程建设进行闸门水源排出使用,同时在闸门基座1的内部设置有过滤箱15,过滤箱15和进水管11连接配合使用,将泄水中的杂质进行过滤去除使用,增加排水管110使用,避免了管体之间出现堵塞的情况,增加该智能化水利工程用泄水闸门使用功能性。Specifically, by connecting the water inlet pipe 11 and the drainage pipe 110 on both sides of the gate base 1, it is convenient to discharge the gate water source for water conservancy project construction. At the same time, a filter box 15 is arranged inside the gate base 1. The filter box 15 and the water inlet pipe 11 are connected and used in coordination to filter and remove impurities in the discharged water. The drainage pipe 110 is added to avoid blockage between the pipe bodies, thereby increasing the functionality of the intelligent water discharge gate for water conservancy projects.
支撑架2的上方固定连接有闸门升降结构21,闸门升降结构21的下方活动连接有升降杆22,升降杆22的下方固定连接有移动门23。A gate lifting structure 21 is fixedly connected to the upper part of the support frame 2 , a lifting rod 22 is movably connected to the lower part of the gate lifting structure 21 , and a movable door 23 is fixedly connected to the lower part of the lifting rod 22 .
具体地,通过支撑架2和上方闸门升降结构21固定连接,便于带动下方的移动门23进行启闭使用,便于配合该智能化水利工程用泄水闸门的工作使用。Specifically, the support frame 2 is fixedly connected to the upper gate lifting structure 21, so as to facilitate the lower movable door 23 to be opened and closed, and facilitate the operation of the intelligent water conservancy project discharge gate.
夹持架3的一侧固定连接有防摩擦框31,夹持架3的上方固定连接有外密封圈32,外密封圈32的内表面一侧固定连接有接口19,防摩擦框31的内部活动连接有移动门23。An anti-friction frame 31 is fixedly connected to one side of the clamping frame 3, an outer sealing ring 32 is fixedly connected to the upper part of the clamping frame 3, an interface 19 is fixedly connected to one side of the inner surface of the outer sealing ring 32, and a movable door 23 is movably connected inside the anti-friction frame 31.
具体地,通过夹持架3均设置有两个连接在闸门基座1的上方,对侧带动防摩擦框31连接阿紫闸门基座1的开口槽中,该防摩擦框31材质为耐磨陶瓷涂料,增加闸门基座1和移动门23之间连接实用性,避免该智能化水利工程用泄水闸门结构之间出现摩擦损坏的情况。Specifically, two clamping frames 3 are provided on the top of the gate base 1, and the anti-friction frames 31 are driven on the opposite side to connect to the opening groove of the A Zi gate base 1. The anti-friction frame 31 is made of wear-resistant ceramic coating, which increases the practicality of the connection between the gate base 1 and the movable door 23 and avoids friction damage between the discharge gate structures of the intelligent water conservancy project.
工作原理:首先,将闸门基座1连接在水利工程建设中配合使用,闸门基座1带动上方支撑架2,支撑架2和闸门升降结构21固定连接,闸门升降结构21驱动下方升降杆22,升降杆22活动贯穿在支撑架2上方两侧,升降杆22和下方移动门23固定连接,打开闸门升降结构21带动移动门23进行上下移动使用,使得将闸门启动使用,使泄水通过进水管11中流动到连接管12的内部,连接管12贯穿连接在过滤箱15的内部,过滤箱15的内部过滤网16对泄水中杂质进行过滤,然后过滤箱15和防摩擦框31之间使用连接管12进行贯穿连接使用,且闸门基座1的另外一侧固定连接排水管110,该排水管110的下方也设置有吸音套14配合使用,使得排水管110和过滤箱15一侧的连接管12进行连接使用,便于将过滤之间的水进行排出使用,排出之间随之将移动门23向下移动到防摩擦框31的内部进行闸门关闭使用,闸门关闭之后工作人员使用吸泵和接口19进行匹配连接使用,将过滤箱15内部的杂质进行高压吸收排出使用,便捷该智能化水利工程用泄水闸门的使用。Working principle: First, connect the gate base 1 to the construction of water conservancy projects for use. The gate base 1 drives the upper support frame 2. The support frame 2 is fixedly connected to the gate lifting structure 21. The gate lifting structure 21 drives the lower lifting rod 22. The lifting rod 22 is movable and runs through both sides above the support frame 2. The lifting rod 22 is fixedly connected to the lower moving door 23. The gate lifting structure 21 is opened to drive the moving door 23 to move up and down, so that the gate is started and used, so that the drain water flows through the water inlet pipe 11 to the inside of the connecting pipe 12. The connecting pipe 12 runs through and is connected to the inside of the filter box 15. The internal filter screen 16 of the filter box 15 filters the impurities in the drain water, and then filters A connecting pipe 12 is used to penetrate and connect the box 15 and the anti-friction frame 31, and a drain pipe 110 is fixedly connected to the other side of the gate base 1. A sound-absorbing sleeve 14 is also provided below the drain pipe 110 for use in conjunction with the drain pipe 110, so that the drain pipe 110 and the connecting pipe 12 on one side of the filter box 15 are connected for use, so that the water between filtration can be discharged. During the discharge, the movable door 23 is moved downward to the inside of the anti-friction frame 31 to close the gate. After the gate is closed, the staff uses a suction pump and an interface 19 for matching connection to absorb and discharge the impurities inside the filter box 15 under high pressure, thereby facilitating the use of the water discharge gate for the intelligent water conservancy project.
尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202322533561.5U CN221441429U (en) | 2023-09-18 | 2023-09-18 | Intelligent sluice gate for hydraulic engineering |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202322533561.5U CN221441429U (en) | 2023-09-18 | 2023-09-18 | Intelligent sluice gate for hydraulic engineering |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN221441429U true CN221441429U (en) | 2024-07-30 |
Family
ID=92056479
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202322533561.5U Active CN221441429U (en) | 2023-09-18 | 2023-09-18 | Intelligent sluice gate for hydraulic engineering |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN221441429U (en) |
-
2023
- 2023-09-18 CN CN202322533561.5U patent/CN221441429U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN111827234A (en) | An automatic collection device for surface garbage | |
| CN109281372A (en) | A kind of drainage equipment for drainage system | |
| CN111335274A (en) | River course cleaning device for hydraulic engineering | |
| CN221441429U (en) | Intelligent sluice gate for hydraulic engineering | |
| CN216475468U (en) | Cut dirty main pipe and prevent flowing backward reposition of redundant personnel well | |
| CN218454387U (en) | Split type energy-saving water gate | |
| CN204619462U (en) | Filter tank water inlet automaton | |
| CN218952360U (en) | Drainage device | |
| CN215391089U (en) | Dam cleaning device for water conservancy and hydropower | |
| CN220352751U (en) | A construction hydraulic gate | |
| CN211621489U (en) | River sluice for hydraulic engineering | |
| WO2023097471A1 (en) | Integrated smart well | |
| CN111945824A (en) | Surface water taking device capable of automatically rising and falling along with water level | |
| CN218116515U (en) | a drainage mechanism | |
| CN218990075U (en) | Intelligent sluice gate for hydraulic engineering | |
| CN217175131U (en) | Water accumulation preventing drainage structure for water conservancy design | |
| CN214832481U (en) | Water conservancy tunnel groundwater accuse row device | |
| CN114182803B (en) | Intelligent split-flow well for preventing dirty-intercepting dry pipe from flowing backwards and using method | |
| CN223593457U (en) | River course ecological management system | |
| CN218686826U (en) | Sewage treatment device with adjustable | |
| CN220815744U (en) | A tunnel water drainage pipeline with silt removal function | |
| CN219886891U (en) | A cofferdam water leakage sealing device with an installation structure | |
| CN222375319U (en) | Novel automatic gate of retaining dam | |
| CN223074887U (en) | Leak-proof intercepting well | |
| CN219527553U (en) | A new screw type opening and closing device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20250124 Address after: No. 184, Niankou Village, Xiwang Town, Jizhou City, Hengshui City, Hebei Province 053200 Patentee after: Shen Bin Country or region after: China Address before: Room 452, No. 2 Limu Road, Beixiaoying Town, Shunyi District, Beijing, 101300 Patentee before: Beijing Dinghe Taihua Technology Development Co.,Ltd. Country or region before: China |
|
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20250410 Address after: 053000 West of Niankou Village, Xiwang Town, Jizhou District, Hengshui City, Hebei Province Patentee after: Hengshui Jingdu Water Conservancy Machinery Co.,Ltd. Country or region after: China Address before: No. 184, Niankou Village, Xiwang Town, Jizhou City, Hengshui City, Hebei Province 053200 Patentee before: Shen Bin Country or region before: China |
|
| TR01 | Transfer of patent right |