CN221400081U - A construction engineering guardrail that is easy to install - Google Patents
A construction engineering guardrail that is easy to install Download PDFInfo
- Publication number
- CN221400081U CN221400081U CN202322720949.6U CN202322720949U CN221400081U CN 221400081 U CN221400081 U CN 221400081U CN 202322720949 U CN202322720949 U CN 202322720949U CN 221400081 U CN221400081 U CN 221400081U
- Authority
- CN
- China
- Prior art keywords
- rod
- slot
- column
- cross bar
- cavity
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
本实用新型公开了一种便于安装的建筑工程防护栏,包括:立柱、第一横杆和立杆;所述立柱一侧设置有第一横杆,所述第一横杆底部设置有立杆,通过将立柱立起来,向一侧滑动推杆,带动固定杆向一侧滑动挤压弹簧,将固定杆的端部收进空腔内,然后向下扳动推杆,将推杆卡合在空槽内,把L型杆插入第二横杆底部的第一插槽内,然后将立杆插入第二插槽内,将第一横杆放置在立杆上方并向下移动,将立杆插入第三插槽内,向上推动推杆推进通槽内,弹簧将固定杆的端部推进卡槽内,将第一横杆卡合住,进而便于安装,通过将收纳槽内的支撑杆向外拉出,并拉动支撑杆进行延长,将支撑杆固定住,然后旋紧螺栓固定所在长度,进而稳定支撑。
The utility model discloses a construction engineering guardrail which is easy to install, comprising: a column, a first cross bar and a column; a first cross bar is arranged on one side of the column, and a column is arranged at the bottom of the first cross bar, by standing up the column and sliding a push rod to one side, driving a fixing rod to slide to one side and compressing a spring, the end of the fixing rod is received into a cavity, and then the push rod is pulled downward to engage the push rod in an empty slot, the L-shaped rod is inserted into a first slot at the bottom of a second cross bar, and then the column is inserted into the second slot, the first cross bar is placed above the column and moved downward, the column is inserted into a third slot, the push rod is pushed upward to be pushed into the through slot, the spring pushes the end of the fixing rod into the slot, engages the first cross bar, and thus is easy to install, by pulling the support rod in the receiving slot outward, and pulling the support rod to extend, the support rod is fixed, and then the bolt is tightened to fix the length, and thus stable support is provided.
Description
技术领域Technical Field
本实用新型涉及建筑工程技术领域,具体为一种便于安装的建筑工程防护栏。The utility model relates to the technical field of construction engineering, in particular to a construction engineering guardrail that is easy to install.
背景技术Background technique
建筑工程,指通过对各类房屋建筑及其附属设施的建造和与其配套的线路、管道、设备的安装活动所形成的工程实体。在进行施工时,通常采用防护栏对施工场地隔离开来,防止无关人员误入,现有的防护栏在使用时还存在一定缺陷,就比如;Construction engineering refers to the engineering entity formed by the construction of various buildings and their ancillary facilities and the installation of supporting lines, pipelines, and equipment. During construction, guardrails are usually used to isolate the construction site to prevent unauthorized personnel from entering. The existing guardrails still have certain defects when used, such as;
为了方便运输,防护栏通常拆解成多个部件进行运输,送到场地后再进行安装,现有的防护栏大多采用多组螺栓进行安装固定,安装效率较慢,影响施工,并且现有的防护栏大多是两根柱子中间连接栏杆进行防护,在受到外面撞击时,容易倾倒,进而影响防护,稳定性较差等问题。For the convenience of transportation, guardrails are usually disassembled into multiple parts for transportation and then installed after being delivered to the site. Most existing guardrails are installed and fixed with multiple sets of bolts, which has a slow installation efficiency and affects the construction. In addition, most existing guardrails are connected by railings in the middle of two columns for protection. When hit by the outside, they are easy to topple over, which affects the protection and has poor stability.
实用新型内容Utility Model Content
本实用新型的目的在于提供一种便于安装的建筑工程防护栏,以解决上述背景技术提出的目前市场上的防护栏不便于安装,且稳定性较差的问题。The utility model aims to provide a construction engineering guardrail which is easy to install, so as to solve the problem that the guardrails currently on the market are difficult to install and have poor stability, as mentioned in the above background technology.
为实现上述目的,本实用新型提供如下技术方案:一种便于安装的建筑工程防护栏,包括:立柱、第一横杆和立杆;To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a construction engineering guardrail that is easy to install, comprising: a column, a first crossbar and a vertical pole;
所述立柱一侧设置有第一横杆,所述第一横杆底部设置有立杆,且立柱作为支撑基础。A first cross bar is arranged on one side of the column, a vertical bar is arranged at the bottom of the first cross bar, and the column serves as a supporting base.
优选的,所述立柱一侧连接有L型杆,所述L型杆卡合在第一插槽内,所述第一插槽开设在第二横杆底部,所述第二横杆设置在立柱一侧。Preferably, an L-shaped rod is connected to one side of the column, the L-shaped rod is engaged in a first slot, the first slot is opened at the bottom of the second cross bar, and the second cross bar is arranged on one side of the column.
优选的,所述第二横杆上表面开设有第二插槽,所述第二插槽内卡合有立杆,所述立杆另一端卡合在第三插槽内,所述第三插槽开设在第一横杆底部。Preferably, a second slot is provided on the upper surface of the second crossbar, a vertical rod is engaged in the second slot, the other end of the vertical rod is engaged in a third slot, and the third slot is provided at the bottom of the first crossbar.
优选的,所述第一横杆端部开设有卡槽,所述卡槽内卡合有固定杆,所述固定杆滑动连接在空腔内,所述空腔内壁上连接有弹簧,所述弹簧连接在固定杆一侧。Preferably, a slot is formed at the end of the first cross bar, a fixing rod is engaged in the slot, the fixing rod is slidably connected in the cavity, a spring is connected to the inner wall of the cavity, and the spring is connected to one side of the fixing rod.
优选的,所述固定杆前部连接有推杆,所述推杆滑动连接在通槽内,所述通槽开设在空腔前部。Preferably, a push rod is connected to the front portion of the fixing rod, the push rod is slidably connected in a through slot, and the through slot is provided at the front portion of the cavity.
优选的,所述通槽下方开设有空槽,所述空槽开设在空腔底部。Preferably, an empty slot is provided below the through slot, and the empty slot is provided at the bottom of the cavity.
优选的,所述立柱前部开设有收纳槽,所述收纳槽内壁上连接有转轴,所述转轴贯穿连接在滑杆内。Preferably, a storage groove is provided at the front of the column, a rotating shaft is connected to the inner wall of the storage groove, and the rotating shaft passes through and is connected in the sliding rod.
优选的,所述滑杆滑动连接在滑腔内,所述滑腔开设在支撑杆上表面,所述支撑杆设置在立柱前部。Preferably, the sliding rod is slidably connected in a sliding cavity, the sliding cavity is opened on the upper surface of the support rod, and the support rod is arranged at the front part of the column.
优选的,所述滑杆前部开设有限位槽,所述限位槽内壁上连接有挤压块,所述挤压块前部连接有螺栓,所述螺栓螺纹连接在滑腔内壁上。Preferably, a limiting groove is provided at the front of the slide rod, an extrusion block is connected to the inner wall of the limiting groove, a bolt is connected to the front of the extrusion block, and the bolt is threadedly connected to the inner wall of the slide cavity.
优选的,所述滑杆的横截面积与滑腔相等。Preferably, the cross-sectional area of the sliding rod is equal to that of the sliding cavity.
与现有技术相比,本实用新型的有益效果是:通过将立柱立起来,向一侧滑动推杆,带动固定杆向一侧滑动挤压弹簧,将固定杆的端部收进空腔内,然后向下扳动推杆,将推杆卡合在空槽内,把L型杆插入第二横杆底部的第一插槽内,然后将立杆插入第二插槽内,将第一横杆放置在立杆上方并向下移动,将立杆插入第三插槽内,向上推动推杆推进通槽内,弹簧将固定杆的端部推进卡槽内,将第一横杆卡合住,进而便于安装,通过将收纳槽内的支撑杆向外拉出,并拉动支撑杆进行延长,将支撑杆固定住,然后旋紧螺栓固定所在长度,进而稳定支撑,具体内容如下:Compared with the prior art, the beneficial effects of the utility model are as follows: by standing up the column, sliding the push rod to one side, driving the fixing rod to slide to one side to squeeze the spring, the end of the fixing rod is stored in the cavity, and then the push rod is pulled downward to engage the push rod in the empty slot, the L-shaped rod is inserted into the first slot at the bottom of the second crossbar, and then the vertical rod is inserted into the second slot, the first crossbar is placed above the vertical rod and moved downward, the vertical rod is inserted into the third slot, the push rod is pushed upward into the through slot, the spring pushes the end of the fixing rod into the slot, the first crossbar is engaged, and thus it is easy to install, by pulling the support rod in the storage slot outward, and pulling the support rod to extend, the support rod is fixed, and then the bolt is tightened to fix the length, thereby stabilizing the support, the specific contents are as follows:
1.通过向一侧滑动推杆带动固定杆挤压弹簧,然后向下扳动推杆卡合在空槽内,把L型杆插入第二横杆底部的第一插槽内,然后将立杆插入第二插槽内,将第一横杆放置在立杆上方并向下移动,将立杆插入第三插槽内,向上推动推杆将推杆推进通槽内,弹簧将固定杆端部推进卡槽内,将第一横杆卡合住,进而便于安装;1. Slide the push rod to one side to drive the fixed rod to squeeze the spring, then pull the push rod downward to engage in the empty slot, insert the L-shaped rod into the first slot at the bottom of the second crossbar, then insert the vertical rod into the second slot, place the first crossbar above the vertical rod and move it downward, insert the vertical rod into the third slot, push the push rod upward to push the push rod into the through slot, the spring pushes the end of the fixed rod into the slot, and engages the first crossbar, making it easier to install;
2.通过将收纳槽内的支撑杆向外拉出并拉动支撑杆进行延长,将支撑杆固定住,然后旋紧螺栓固定所在长度,进而稳定支撑。2. Pull the support rod in the storage slot outward and extend it, secure it, and then tighten the bolts to fix the length, thereby stabilizing the support.
附图说明BRIEF DESCRIPTION OF THE DRAWINGS
图1为本实用新型结构示意图;Fig. 1 is a schematic diagram of the structure of the utility model;
图2为本实用新型主视结构示意图;Figure 2 is a schematic diagram of the main structure of the utility model;
图3为本实用新型侧视结构示意图;Figure 3 is a schematic side view of the structure of the utility model;
图4为本实用新型挤压块示意图。FIG4 is a schematic diagram of an extrusion block of the utility model.
图中:1、立柱;2、第一横杆;3、立杆;4、L型杆;5、第一插槽;6、第二横杆;7、第二插槽;8、第三插槽;9、卡槽;10、固定杆;11、空腔;12、弹簧;13、推杆;14、通槽;15、空槽;16、收纳槽;17、转轴;18、滑杆;19、滑腔;20、支撑杆;21、限位槽;22、挤压块;23、螺栓。In the figure: 1. column; 2. first cross bar; 3. vertical bar; 4. L-shaped bar; 5. first slot; 6. second cross bar; 7. second slot; 8. third slot; 9. slot; 10. fixing rod; 11. cavity; 12. spring; 13. push rod; 14. through slot; 15. empty slot; 16. storage slot; 17. rotating shaft; 18. sliding rod; 19. sliding cavity; 20. supporting rod; 21. limiting slot; 22. extrusion block; 23. bolt.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
请参阅图1-4,本实用新型提供一种技术方案:一种便于安装的建筑工程防护栏,包括:立柱1、第一横杆2和立杆3;Please refer to Figures 1-4. The utility model provides a technical solution: a construction engineering guardrail that is easy to install, comprising: a column 1, a first crossbar 2 and a vertical pole 3;
立柱1一侧设置有第一横杆2,第一横杆2底部设置有立杆3,且立柱1作为支撑基础。A first crossbar 2 is arranged on one side of the column 1, a column 3 is arranged at the bottom of the first crossbar 2, and the column 1 serves as a supporting foundation.
立柱1一侧连接有L型杆4,L型杆4卡合在第一插槽5内,第一插槽5开设在第二横杆6底部,第二横杆6设置在立柱1一侧,将第二横杆6放置在立柱1一侧,把L型杆4插入第一插槽5内,快速安装第二横杆6,第二横杆6上表面开设有第二插槽7,第二插槽7内卡合有立杆3,立杆3另一端卡合在第三插槽8内,第三插槽8开设在第一横杆2底部,将立杆3插入第二插槽7内,然后将第一横杆2放置在立杆3上方,将立杆3插入第三插槽8,快速安装立杆3,第一横杆2端部开设有卡槽9,卡槽9内卡合有固定杆10,固定杆10滑动连接在空腔11内,空腔11内壁上连接有弹簧12,弹簧12连接在固定杆10一侧,将固定杆10的端部从空腔11内推出,卡合在卡槽9内,将第一横杆2固定在立柱1一侧,固定杆10前部连接有推杆13,推杆13滑动连接在通槽14内,通槽14开设在空腔11前部,向一侧滑动通槽14内的推杆13,带动固定杆10向一侧滑动挤压弹簧12,将固定杆10的端部收进空腔11内,解除对第一横杆2的卡合,将第一横杆2取下,通槽14下方开设有空槽15,空槽15开设在空腔11底部,在向一侧滑动推杆13后,向下扳动推杆13,将推杆13卡合在空槽15内,对固定杆10进行限位,将另一组立柱1上的推杆13以同样的方式进行操作,不需要两个人进行安装。An L-shaped rod 4 is connected to one side of the column 1, and the L-shaped rod 4 is engaged in the first slot 5. The first slot 5 is opened at the bottom of the second cross bar 6. The second cross bar 6 is set at one side of the column 1. The second cross bar 6 is placed on one side of the column 1, and the L-shaped rod 4 is inserted into the first slot 5. The second cross bar 6 is quickly installed. A second slot 7 is opened on the upper surface of the second cross bar 6. The second slot 7 is engaged with the vertical rod 3. The other end of the vertical rod 3 is engaged in the third slot 8. The third slot 8 is opened at the bottom of the first cross bar 2. The vertical rod 3 is inserted into the second slot 7, and then the first cross bar 2 is placed above the vertical rod 3. The vertical rod 3 is inserted into the third slot 8, and the vertical rod 3 is quickly installed. A slot 9 is opened at the end of the first cross bar 2, and a fixing rod 10 is engaged in the slot 9. The fixing rod 10 is slidably connected in the cavity 11. A spring 12 is connected to the inner wall of the cavity 11, and the spring 12 is connected to the fixing rod 10. On one side of the fixed rod 10, the end of the fixing rod 10 is pushed out from the cavity 11 and engaged in the slot 9 to fix the first cross bar 2 to one side of the column 1. A push rod 13 is connected to the front part of the fixing rod 10, and the push rod 13 is slidably connected in the through slot 14. The through slot 14 is opened at the front part of the cavity 11. The push rod 13 in the through slot 14 is slid to one side, driving the fixing rod 10 to slide to one side to squeeze the spring 12, and the end of the fixing rod 10 is retracted into the cavity 11, releasing the engagement of the first cross bar 2, and the first cross bar 2 is removed. An empty slot 15 is opened below the through slot 14, and the empty slot 15 is opened at the bottom of the cavity 11. After sliding the push rod 13 to one side, the push rod 13 is pulled downward to engage the push rod 13 in the empty slot 15 to limit the fixing rod 10. The push rod 13 on the other set of columns 1 is operated in the same way, and does not require two people to install.
立柱1前部开设有收纳槽16,收纳槽16内壁上连接有转轴17,转轴17贯穿连接在滑杆18内,让滑杆18在收纳槽16内旋转,能够收纳进收纳槽16内,滑杆18滑动连接在滑腔19内,滑腔19开设在支撑杆20上表面,支撑杆20设置在立柱1前部,拉动支撑杆20,滑杆18在滑腔19内滑动,进行延长,滑杆18前部开设有限位槽21,限位槽21内壁上连接有挤压块22,挤压块22前部连接有螺栓23,螺栓23螺纹连接在滑腔19内壁上,滑杆18在滑腔19内滑动时,挤压块22在限位槽21内滑动,对滑杆18进行限位,防止从滑腔19内脱落,旋紧螺栓23带动挤压块22挤压在限位槽21内壁上,固定所在长度,滑杆18的横截面积与滑腔19相等,防止在滑动时晃动。A receiving groove 16 is provided at the front of the column 1, and a rotating shaft 17 is connected to the inner wall of the receiving groove 16. The rotating shaft 17 is connected to the slide rod 18, so that the slide rod 18 can rotate in the receiving groove 16 and can be stored in the receiving groove 16. The slide rod 18 is slidably connected in the slide cavity 19, and the slide cavity 19 is provided on the upper surface of the support rod 20. The support rod 20 is provided at the front of the column 1. When the support rod 20 is pulled, the slide rod 18 slides in the slide cavity 19 to extend. A limiting groove 21 is provided at the front of the slide rod 18 An extrusion block 22 is connected to the inner wall of the limiting groove 21, and a bolt 23 is connected to the front of the extrusion block 22. The bolt 23 is threadedly connected to the inner wall of the sliding cavity 19. When the slide rod 18 slides in the sliding cavity 19, the extrusion block 22 slides in the limiting groove 21 to limit the slide rod 18 to prevent it from falling off from the sliding cavity 19. Tightening the bolt 23 drives the extrusion block 22 to be squeezed on the inner wall of the limiting groove 21 to fix the length. The cross-sectional area of the slide rod 18 is equal to that of the sliding cavity 19 to prevent shaking during sliding.
工作原理:如图1-4所示,在使用该一种便于安装的建筑工程防护栏时,对本装置进行简单的一个了解,首先,将立柱1立起来,向一侧滑动通槽14内的推杆13,带动固定杆10向一侧滑动挤压弹簧12,将固定杆10的端部收进空腔11内,然后向下扳动推杆13,将推杆13卡合在空槽15内,对固定杆10进行限位,将第二横杆6放置在立柱1一侧并向下移动,把L型杆4插入第一插槽5内,然后将立杆3插入第二插槽7内,将第一横杆2放置在立杆3上方并向下移动,将立杆3插入第三插槽8内,向上推动空槽15内的推杆13,将推杆13推进通槽14内,弹簧12发生弹性形变将固定杆10的端部推进卡槽9内,将第一横杆2卡合住,完成组装,然后将收纳槽16内的支撑杆20向外拉出,并拉动支撑杆20延长插入地面或用重物挡住,然后旋紧螺栓23带动挤压块22挤压在限位槽21内壁上,固定所在长度,对该装置进行支撑,本说明中未作详细描述的内容属于本领域专业技术人员公知的现有技术。Working principle: As shown in Figures 1-4, when using this easy-to-install construction project guardrail, a simple understanding of the device is performed. First, stand up the column 1, slide the push rod 13 in the through slot 14 to one side, drive the fixed rod 10 to slide to one side to squeeze the spring 12, and retract the end of the fixed rod 10 into the cavity 11, then pull the push rod 13 downward, engage the push rod 13 in the empty slot 15, limit the fixed rod 10, place the second cross bar 6 on one side of the column 1 and move it downward, insert the L-shaped rod 4 into the first slot 5, and then insert the column 3 into the second slot 7, place the first cross bar 2 on the column 3 and move downward, insert the vertical rod 3 into the third slot 8, push the push rod 13 in the empty slot 15 upward, push the push rod 13 into the through slot 14, the spring 12 is elastically deformed to push the end of the fixing rod 10 into the clamping slot 9, and the first cross bar 2 is clamped to complete the assembly, and then the support rod 20 in the storage slot 16 is pulled outward, and the support rod 20 is pulled to extend and insert into the ground or block it with a heavy object, and then the bolt 23 is tightened to drive the extrusion block 22 to squeeze on the inner wall of the limiting slot 21 to fix the length and support the device. The contents not described in detail in this specification belong to the prior art known to professional and technical personnel in this field.
尽管参照前述实施例对本实用新型进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对部分技术特征进行等同替换,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art may still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202322720949.6U CN221400081U (en) | 2023-10-10 | 2023-10-10 | A construction engineering guardrail that is easy to install |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202322720949.6U CN221400081U (en) | 2023-10-10 | 2023-10-10 | A construction engineering guardrail that is easy to install |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN221400081U true CN221400081U (en) | 2024-07-23 |
Family
ID=91935993
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202322720949.6U Active CN221400081U (en) | 2023-10-10 | 2023-10-10 | A construction engineering guardrail that is easy to install |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN221400081U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119392584A (en) * | 2024-11-13 | 2025-02-07 | 清华大学 | A new wind-resistant and stable composite bridge deck structure and construction method |
-
2023
- 2023-10-10 CN CN202322720949.6U patent/CN221400081U/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119392584A (en) * | 2024-11-13 | 2025-02-07 | 清华大学 | A new wind-resistant and stable composite bridge deck structure and construction method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110700538A (en) | Building scaffold convenient to dismouting | |
| CN201125536Y (en) | Window construction protection device | |
| CN212317658U (en) | A safety net fence fixing frame used in building construction | |
| CN111255221B (en) | Supporting structure for erecting pipe fittings | |
| CN209443893U (en) | A kind of building construction protective fence | |
| CN209429427U (en) | A liftable balcony guardrail | |
| CN114562099B (en) | High scaffold frame for building engineering construction of security | |
| CN109025246B (en) | Scaffold frame for building engineering convenient to installation | |
| CN215717520U (en) | A light steel villa wall panel back inclined support device | |
| CN209397897U (en) | A kind of Multi-functional indoor scaffold | |
| CN218970557U (en) | Building scaffold with breakage-proof brick structure that drops | |
| CN209874658U (en) | Rail guard is used in bridge construction | |
| CN222253448U (en) | A protective fence for construction engineering | |
| CN219241283U (en) | Safe horizontal net-picking connecting device | |
| CN221463388U (en) | Fixing device based on construction engineering equipment | |
| CN222391136U (en) | An adjustable column with pull-wire extension angle | |
| CN221941894U (en) | A scaffolding support structure | |
| CN209062043U (en) | A kind of reinforced bar straight thread Automatic Link Establishment | |
| CN220521945U (en) | Scaffold hanging ladder | |
| CN220848575U (en) | Scaffold device of demolishs is installed fast | |
| CN221741306U (en) | A building anti-collapse support structure | |
| CN224016957U (en) | Building construction safety fence | |
| CN218346712U (en) | Fastener type steel pipe scaffold | |
| CN219840465U (en) | Assembled rail guard of foundation ditch limb | |
| CN221346240U (en) | Scaffold convenient and fast to carry |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |