CN221376677U - A field benchmark for construction project management - Google Patents

A field benchmark for construction project management Download PDF

Info

Publication number
CN221376677U
CN221376677U CN202420068821.8U CN202420068821U CN221376677U CN 221376677 U CN221376677 U CN 221376677U CN 202420068821 U CN202420068821 U CN 202420068821U CN 221376677 U CN221376677 U CN 221376677U
Authority
CN
China
Prior art keywords
end cylinder
pair
fixedly mounted
bolt
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202420068821.8U
Other languages
Chinese (zh)
Inventor
邬鹏
邬屹
杨芳
胡小海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pingxiang New District Construction And Installation Corp
Original Assignee
Pingxiang New District Construction And Installation Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pingxiang New District Construction And Installation Corp filed Critical Pingxiang New District Construction And Installation Corp
Priority to CN202420068821.8U priority Critical patent/CN221376677U/en
Application granted granted Critical
Publication of CN221376677U publication Critical patent/CN221376677U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Signs Or Road Markings (AREA)

Abstract

The utility model relates to the technical field of constructional engineering, in particular to a field marker post for constructional engineering management, which comprises an outer rod body, wherein a first bracket is fixedly arranged on two sides of the outer rod body, a pair of solar panels are fixedly arranged on the first brackets, an illuminating lamp is fixedly arranged below the solar panels, a first end cylinder is fixedly arranged on the outer rod body, a second end cylinder is movably arranged on the first end cylinder, a fixing assembly is arranged below the second end cylinder, and the field marker post further comprises a telescopic assembly; when the retarding motor is started, the worm rotates and can be self-locked through the worm wheel, the worm rotates to drive the roller to rotate to drive the first end cylinder to extend or shorten, the arranged limiting block limits the displacement of the conveyor belt, the arranged sliding block slides on the inner wall of the outer rod body, and the guide rod arranged on the outer wall below the end cylinder can enable the bolt to move up and down so as to fix the second end cylinder. Solves the problems of safety of the prior personnel and the change of the height of the marker post.

Description

On-site marker post for building engineering management
Technical Field
The utility model relates to the technical field of constructional engineering, in particular to a field pole for constructional engineering management.
Background
The building engineering refers to engineering entities formed by building various house buildings and auxiliary facilities thereof and installing and moving lines, pipelines and equipment matched with the building buildings. In building engineering management, a marker post is a construction tool which is commonly used on a construction site.
Through searching, in Chinese patent with publication number CN216194193U, a field marker post for building engineering management is disclosed, and belongs to the technical field of building marker posts. The utility model provides a building engineering is on-spot target for management, the on-spot target comprises a base, the base top surface is connected and is fixed with the sill bar, sill bar top surface threaded connection has the vaulting pole group, the vaulting pole group top surface rotates and is connected with the ejector pin, the ejector pin middle part is hollow structure setting, the ejector pin top surface rotates and is connected with the lead screw, the ejector pin upper end is bilateral symmetry structure and articulates there are two dead levers, through setting up fixed stabilizer blade, a plurality of fixed stabilizer blades that are the slope structure setting, when inserting in earth, when the device atress, the fixed stabilizer blade of slope mainly receives radial pulling force, the fixed stabilizer blade that the slope structure set up can provide better ground force for the device is more stable when using, then under the effect of splint, can fix solar panel, thereby be convenient for solar panel's installation, convenient for dismantle, the light can provide good light when night, thereby make warning effect better.
Based on the above search in combination with the prior art findings:
although the existing marker post can be used for indicating a measuring point, the cone of the marker post is exposed, so that the marker post has certain danger when being carried or conveyed, the height of the marker post is fixed, adjustment of different heights cannot be performed according to an actual placement area, and observation of staff is inconvenient.
Disclosure of utility model
In order to solve the technical problems, the utility model provides a field pole for building engineering management, which solves the problems in the background technology.
The technical solution for realizing the purpose of the utility model is as follows: the utility model provides a building engineering management is with on-the-spot mark post, includes the outer body of rod, the both sides fixed mounting of the outer body of rod has support one, a pair of fixed mounting has solar panel on the support one, solar panel below fixed mounting has the light, fixed mounting has a first end section of thick bamboo on the outer body of rod, movable mounting has a second end section of thick bamboo on the first end section of thick bamboo, end section of thick bamboo below is provided with fixed subassembly, still includes, flexible subassembly includes the stopper of fixed mounting at outer body of rod inner wall, and the top fixed mounting of end section of thick bamboo second has a pair of extension frame, two rotate between the extension frame and install a pair of gyro wheel, and the cover is equipped with the conveyer belt on two gyro wheels, offered the spacing groove with stopper sliding fit on the conveyer belt, fixed mounting has the slider on the conveyer belt, slider and outer body of rod inner wall fixed connection, one of which fixed mounting worm wheel on the gyro wheel, fixed mounting has the support second on the support, the output shaft fixed mounting of retarder motor has with worm gear intermeshing.
Preferably, the fixed subassembly includes the base of fixed mounting on end section of thick bamboo two, the inside fixed mounting of base has a plurality of springs two, spring two lower extreme fixed mounting has the link, the fixed support leg of a plurality of toper of lower surface fixed mounting of link, the screw has been seted up to the base outer wall, fixed mounting has a pair of connecting plate on the link, every movable mounting has a pair of bolt on the connecting plate.
Preferably, a pair of gaskets are rotatably mounted on each bolt, a first spring is fixedly mounted on each gasket, and the other end of the first spring is fixedly mounted on the connecting plate.
Preferably, a guide rod is fixedly arranged on the outer wall below the end cylinder, a bolt is slidably arranged on the guide rod, a supporting spring is fixedly arranged on the guide rod, and the other end of the supporting spring is fixedly arranged on the bolt.
Preferably, a plurality of round holes are formed in the second end cylinder, and the round holes are matched with the bolts for use.
Compared with the prior art, the utility model, its apparent advantage is:
the method comprises the following steps: when the retarding motor is started, the worm rotates and can be self-locked through the worm wheel, the worm rotates to drive the roller to rotate so as to drive the first end cylinder to extend or shorten, the arranged limiting block limits the displacement of the conveyor belt, the arranged sliding block slides on the inner wall of the outer rod body, and the guide rod arranged on the outer wall below the end cylinder can enable the bolt to move up and down so as to fix the second end cylinder;
And two,: according to the utility model, the bolt arranged on the base is matched with the second spring, so that the conical fixing support leg can extend and retract, the carrying or conveying of the marker post is facilitated, the safety of conveying personnel can be guaranteed, the bolt is put into the screw hole for screwing after the conical fixing support leg is released by the bolt, the conical fixing support leg is inserted into soil for fixing the marker post, and the diagonal opening arranged at the lower end of the base can facilitate the marker post to be inserted into the better fixed marker post in the soil.
Solves the problems of safety of the prior personnel and the change of the height of the marker post.
Drawings
The utility model is further explained below with reference to the drawings and examples:
FIG. 1 is a schematic view of a first view structure provided in an embodiment of the present utility model;
FIG. 2 is a schematic view of a roller structure provided in an embodiment of the present utility model;
FIG. 3 is a schematic view of a second view structure provided in an embodiment of the present utility model;
FIG. 4 is a schematic view of a front cut-away structure provided in one embodiment of the present utility model;
Fig. 5 is an enlarged schematic view of a bolt according to an embodiment of the present utility model.
Reference numerals illustrate:
1. A solar panel; 2. a first bracket; 3. a lighting lamp; 4. an outer rod body; 5. an end cylinder I; 6. a guide rod; 7. a plug pin; 8. an end cylinder II; 801. an extension frame; 9. a round hole; 10. a bolt; 101. a gasket; 102. a first spring; 11. a base; 12. a connecting plate; 13. a connecting frame; 14. a roller; 15. a limiting block; 16. a second bracket; 17. a screw hole; 18. a conveyor belt; 19. a retarded motor; 20. a worm wheel; 21. a second spring; 22. a worm; 23. a slide block; 24. conical fixing support legs; 25. and a support spring.
Detailed Description
The following detailed description of the present utility model clearly and fully describes the technical solutions of the embodiments of the present utility model, and it is apparent that the described embodiments are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
The utility model provides a field marker post for building engineering management through improvement, which comprises the following technical scheme:
As shown in fig. 1-5, a field post for building engineering management comprises an outer rod body 4, wherein two sides of the outer rod body 4 are fixedly provided with a first bracket 2, a pair of first brackets 2 are fixedly provided with a solar panel 1, a lighting lamp 3 is fixedly arranged below the solar panel 1, an end cylinder I5 is fixedly arranged on the outer rod body 4, an end cylinder II 8 is movably arranged on the end cylinder I5, and a fixing component is arranged below the end cylinder II 8;
The telescopic assembly comprises a limiting block 15 fixedly arranged on the inner wall of the outer rod body 4, a pair of extending frames 801 are fixedly arranged at the top of the end barrel II 8, a pair of rollers 14 are rotatably arranged between the two extending frames 801, a conveying belt 18 is sleeved on the two rollers 14, a limiting groove which is in sliding fit with the limiting block 15 is formed in the conveying belt 18, a sliding block 23 is fixedly arranged on the conveying belt 18, the sliding block 23 is fixedly connected with the inner wall of the outer rod body 4, a worm wheel 20 is fixedly arranged on one of the rollers 14, a bracket II 16 is fixedly arranged on the inner wall of the outer rod body 4, a retarding motor 19 is fixedly arranged on the bracket II 16, and an output shaft of the retarding motor 19 is fixedly provided with a worm 22 which is mutually meshed with the worm wheel 20.
In sum, the solar panel 1 is arranged to supply power to the illuminating lamp 3, the standard rod is convenient to place without an external power supply, energy is saved, when the retarding motor 19 is started, the worm 22 rotates and can perform self-locking through the worm wheel 20, the worm 22 rotates to drive the roller 14 to rotate to drive the end cylinder I5 to rise or fall, the arranged limiting block 15 limits the displacement of the conveying belt 18, and the arranged sliding block 23 is fixed on the outer rod body 4 and drives the relative displacement of the end cylinder I5 and the end cylinder II 8 through the rotation of the conveying belt 18.
Further, the fixed assembly comprises a base 11 fixedly arranged on the second end cylinder 8, a plurality of second springs 21 are fixedly arranged in the base 11, a connecting frame 13 is fixedly arranged at the lower end of each second spring 21, a plurality of conical fixing support legs 24 are fixedly arranged on the lower surface of each connecting frame 13, screw holes 17 are formed in the outer wall of the base 11, a pair of connecting plates 12 are fixedly arranged on each connecting frame 13, and a pair of bolts 10 are movably arranged on each connecting plate 12.
By means of the structure, the bolt 10 arranged on the base 11 is matched with the second spring 21 to enable the conical fixing support leg 24 to extend and retract, so that the marker post is convenient to carry or transport, safety of a person can be guaranteed, the bolt 10 is put into the screw hole 17 for screwing after the conical fixing support leg 24 is loosened to pop out, the conical fixing support leg 24 is inserted into the soil to fix the marker post, and the bevel connection arranged at the lower end of the base 11 can facilitate the marker post to be inserted into the better fixed marker post in the soil.
Further, a pair of washers 101 are rotatably mounted on each bolt 10, a first spring 102 is fixedly mounted on each washer 101, and the other end of the first spring 102 is fixedly mounted on the connecting plate 12.
With the above structure, the support effect can be achieved by the first spring 102 fixedly installed on the bolt 10 when the bolt 10 is rotated by the movably installed spacer 101.
Further, a guide rod 6 is fixedly arranged on the outer wall below the first end cylinder 5, a bolt 7 is slidably arranged on the guide rod 6, a supporting spring 25 is fixedly arranged on the guide rod 6, and the other end of the supporting spring 25 is fixedly arranged on the bolt 7.
By means of the structure, the bolt 7 can move up and down through the guide rod 6, the bolt 7 is convenient to fix the second end cylinder 8, and the supporting spring 25 is used for supporting and fixing the bolt 7.
Further, a plurality of round holes 9 are formed in the second end cylinder 8, and the round holes 9 are matched with the bolts 7 for use.
By the above structure, the first end cylinder 5 is prevented from being displaced by inserting the plug 7 into the circular hole 9.
The specific working method is as follows: loosening the conical fixing support 24 of the bolt 10 to pop out, putting the bolt 10 into the screw hole 17 to screw up, then inserting the marker post into the soil, enabling the marker post to be more stable through the inclined opening formed between the conical fixing support 24 and the lower end of the base 11, and adjusting the marker post to the required height after the marker post is fixed. When the retarding motor 19 is started, the worm 22 rotates and can be self-locked through the worm wheel 20, the worm 22 rotates to drive the roller 14 to rotate and drive the conveyor belt 18 to rotate, the sliding block 23 is fixed on the outer rod body 4, and the end cylinder I5 and the end cylinder II 8 are driven to relatively displace through the rotation of the conveyor belt 18, so that the end cylinder I5 is further driven to rise or fall, and the limiting block 15 is arranged to limit the displacement of the conveyor belt 18. The guide rod 6 can enable the bolt 7 to move up and down, the bolt 7 is convenient to fix the end cylinder II 8, the supporting spring 25 is used for supporting and fixing the bolt 7, and the bolt 7 is inserted into the round hole 9 to prevent the end cylinder I5 from displacing. The solar panel 1 is arranged to supply power to the illuminating lamp 3, so that the marker post is convenient to place without an external power supply, and energy is saved.
The technical means disclosed by the scheme of the utility model is not limited to the technical means disclosed by the technical means, and also comprises the technical scheme consisting of the technical characteristics and the equivalent substitution. The present utility model is not limited to the prior art.

Claims (5)

1. The utility model provides a building engineering management is with on-the-spot mark post, includes outer body of rod (4), the both sides fixed mounting of outer body of rod (4) has support one (2), a pair of fixed mounting has solar panel (1) on support one (2), solar panel (1) below fixed mounting has light (3), fixed mounting has an end section of thick bamboo one (5) on outer body of rod (4), movable mounting has an end section of thick bamboo two (8) on an end section of thick bamboo one (5), its characterized in that: a fixing component is arranged below the second end cylinder (8), and the fixing component further comprises;
The telescopic assembly comprises a limiting block (15) fixedly mounted on the inner wall of the outer rod body (4), a pair of extending frames (801) are fixedly mounted at the top of the end barrel II (8), a pair of rollers (14) are rotatably mounted between the extending frames (801), a conveying belt (18) is sleeved on the two rollers (14), a limiting groove which is in sliding fit with the limiting block (15) is formed in the conveying belt (18), a sliding block (23) is fixedly mounted on the conveying belt (18), the sliding block (23) is fixedly connected with the inner wall of the outer rod body (4), one of the sliding blocks is fixedly mounted on the rollers (14), a worm wheel (20) is fixedly mounted on the inner wall of the outer rod body (4), a bracket II (16) is fixedly mounted on the bracket II (16), and a worm (22) which is meshed with the worm wheel (20) is fixedly mounted on an output shaft of the retarding motor (19).
2. The field pole for construction engineering management according to claim 1, wherein: the fixing assembly comprises a base (11) fixedly installed on a second end cylinder (8), a plurality of second springs (21) are fixedly installed inside the base (11), a connecting frame (13) is fixedly installed at the lower end of the second springs (21), a plurality of conical fixing support legs (24) are fixedly installed on the lower surface of the connecting frame (13), screw holes (17) are formed in the outer wall of the base (11), a pair of connecting plates (12) are fixedly installed on the connecting frame (13), and a pair of bolts (10) are movably installed on each connecting plate (12).
3. The field pole for construction engineering management according to claim 2, wherein: a pair of gaskets (101) are rotatably mounted on each bolt (10), a first spring (102) is fixedly mounted on each gasket (101), and the other end of the first spring (102) is fixedly mounted on the connecting plate (12).
4. The field pole for construction engineering management according to claim 1, wherein: the guide rod (6) is fixedly arranged on the outer wall below the first end cylinder (5), the bolt (7) is slidably arranged on the guide rod (6), the support spring (25) is fixedly arranged on the guide rod (6), and the other end of the support spring (25) is fixedly arranged on the bolt (7).
5. The field pole for construction engineering management according to claim 1, wherein: a plurality of round holes (9) are formed in the end cylinder II (8), and the round holes (9) are matched with the bolts (7) for use.
CN202420068821.8U 2024-01-11 2024-01-11 A field benchmark for construction project management Expired - Fee Related CN221376677U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202420068821.8U CN221376677U (en) 2024-01-11 2024-01-11 A field benchmark for construction project management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202420068821.8U CN221376677U (en) 2024-01-11 2024-01-11 A field benchmark for construction project management

Publications (1)

Publication Number Publication Date
CN221376677U true CN221376677U (en) 2024-07-19

Family

ID=91870706

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202420068821.8U Expired - Fee Related CN221376677U (en) 2024-01-11 2024-01-11 A field benchmark for construction project management

Country Status (1)

Country Link
CN (1) CN221376677U (en)

Similar Documents

Publication Publication Date Title
CN111600253B (en) Bridge structure and assembling method thereof
CN116065875B (en) Environmental protection construction enclosure with warning function and use method
CN207160743U (en) A kind of job site safe fence
CN111365673A (en) New forms of energy street lamp convenient to maintenance
CN214897320U (en) Signboard convenient to installation
CN223524882U (en) A geological disaster monitoring device
CN221146467U (en) Lighting equipment for construction site
CN222839594U (en) A supporting anchor rod for photovoltaic power station
CN224031951U (en) Photovoltaic building integrated outer wall node structure
CN221218834U (en) Building deep foundation pit support plate
CN221878942U (en) A safety protection device for electric power engineering operation
CN221546590U (en) Safety device that engineering construction was used is administered to geological disaster
CN219177362U (en) Thunder and lightning early warning device
CN220273584U (en) Mountain region photovoltaic board prevent wind fixed knot and construct
CN221502777U (en) Foundation pit guard rail for building engineering
CN221197276U (en) Outdoor temporary lighting equipment
CN219864441U (en) Protective guard for house construction engineering
CN222142598U (en) Environmental noise detection device
CN222142890U (en) Lighting equipment for building engineering
CN219451412U (en) Safety frame for engineering construction
CN222595597U (en) Buffering formula construction building net
CN223358860U (en) Safety protection device for construction foundation pit
CN222651263U (en) A lighting structure for construction engineering
CN218997973U (en) Support for wind power photovoltaic
CN219862489U (en) Safety warning device for construction engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20240719

CF01 Termination of patent right due to non-payment of annual fee