CN221345980U - An assembled steel plate shear wall structure - Google Patents

An assembled steel plate shear wall structure Download PDF

Info

Publication number
CN221345980U
CN221345980U CN202322899233.7U CN202322899233U CN221345980U CN 221345980 U CN221345980 U CN 221345980U CN 202322899233 U CN202322899233 U CN 202322899233U CN 221345980 U CN221345980 U CN 221345980U
Authority
CN
China
Prior art keywords
shear wall
steel plate
clamping
keel
wall structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN202322899233.7U
Other languages
Chinese (zh)
Inventor
丁泽成
王文广
周东珊
蔡帅帅
黄慧
鲍晓娜
余启锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yasha Decoration Co Ltd
Original Assignee
Zhejiang Yasha Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Yasha Decoration Co Ltd filed Critical Zhejiang Yasha Decoration Co Ltd
Priority to CN202322899233.7U priority Critical patent/CN221345980U/en
Application granted granted Critical
Publication of CN221345980U publication Critical patent/CN221345980U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

The utility model provides an assembled steel plate shear wall structure, which relates to the technical field of decoration design and comprises a shear wall main body, clamping keels arranged on the shear wall main body, a base layer keel arranged on the clamping keels and a wall panel arranged on the base layer keel, wherein the shear wall main body comprises an upper beam, a lower beam and steel plates arranged between the upper beam and the lower beam, corner codes used for being connected with the ends of the clamping keels are arranged on the upper beam and the lower beam, clamping grooves are formed in one side, away from the steel plates, of the clamping keels, and the base layer keel comprises a mounting plate used for being connected with the wall panel and a clamping plate used for being matched with the clamping grooves. The utility model has simple structure, and the installation of the wall panel is completed by installing the clamping keels and the base keels between the upper beam and the lower beam of the shear wall main body, and the installation of the wall panel has no damage to the fireproof coating on the steel plate surface of the shear wall main body, thereby ensuring the stable installation of the facing of the steel plate shear wall and the complete fireproof function.

Description

一种装配式钢板剪力墙结构An assembled steel plate shear wall structure

技术领域Technical Field

本实用新型涉及装修设计技术领域,尤其是,本实用新型涉及一种装配式钢板剪力墙结构。The utility model relates to the technical field of decoration design, and in particular, to an assembled steel plate shear wall structure.

背景技术Background technique

目前的装饰行业正在向着工业化安装的方向发展,一般来说,墙面装饰是室内设计中普遍采用的装饰方法,可以增加室内空间的层次感,起到美化装饰的作用,尤其是钢板剪力墙具有自重轻、承载力高、初始刚度大、屈曲后强度大、滞回性能好、易规模化生产等优点,是现代建筑中一种较为常见的抗侧力构件。The current decoration industry is developing towards the direction of industrialized installation. Generally speaking, wall decoration is a commonly used decoration method in interior design, which can increase the sense of hierarchy of the interior space and play a role in beautification and decoration. In particular, steel plate shear walls have the advantages of light weight, high bearing capacity, high initial stiffness, high post-buckling strength, good hysteresis performance, and easy large-scale production. They are a more common lateral force resisting component in modern buildings.

装配式装饰是近年新兴的一种装饰施工形式。装配式装饰顾名思义,即是将装饰所需要使用的各个部品部件在工厂内实现生产完成,然后运输到装饰现场进行组合安装,免去了传统的装饰现场对各部品部件的测量、切割等作业,施工更为简单方便,可以极大地提高装饰现场的施工效率,是一种更为绿色环保的装饰施工形式,现在兴起对钢板剪力墙进行装配式安装的设计开发,例如中国专利发明专利CN112064823A公开了一种钢板剪力墙,包括连接组件、两个阻隔组件及波形板组件:连接组件包括第一端板、第二端板,第一端板、第二端板相互平行且间隔设置,第二端板相对第一端板的一侧向内开设有两个滑槽,每一滑槽均沿第二端板的长度方向设置;两个阻隔组件设置于第一端板与第二端板之间且分别设置于第一端板的两侧,阻隔组件与滑槽一一对应,每一个所阻隔组件包括第一固定板、阻隔板,第一固定板连接于第一端板,阻隔板的一端可滑动插设于滑槽、另一端连接于第一固定板;波形板组件包括波形板,波形板设置于两个阻隔板之间,波形板的两端分别连接于第一端板、第二端板。本发明所述钢板剪力墙的便于后续进行装修。Prefabricated decoration is a new form of decoration construction in recent years. Prefabricated decoration, as the name implies, is to produce all the parts and components needed for decoration in the factory, and then transport them to the decoration site for assembly and installation, eliminating the traditional decoration site's measurement, cutting and other operations of various parts and components, making the construction simpler and more convenient, which can greatly improve the construction efficiency of the decoration site. It is a more environmentally friendly form of decoration construction. Now, the design and development of prefabricated installation of steel plate shear walls is on the rise. For example, the Chinese patent invention patent CN112064823A discloses a steel plate shear wall, including a connection component, two barrier components and a corrugated plate component: the connection component includes a first end plate, a second end plate, and a second end plate. The first end plate and the second end plate are parallel to each other and arranged at intervals. The second end plate has two slide grooves inwardly provided on one side relative to the first end plate, and each slide groove is arranged along the length direction of the second end plate; two blocking components are arranged between the first end plate and the second end plate and are respectively arranged on both sides of the first end plate, and the blocking components correspond to the slide grooves one by one. Each blocked component includes a first fixed plate and a blocking plate. The first fixed plate is connected to the first end plate, and one end of the blocking plate can be slidably inserted in the slide groove and the other end is connected to the first fixed plate; the corrugated plate component includes a corrugated plate, which is arranged between the two blocking plates, and the two ends of the corrugated plate are respectively connected to the first end plate and the second end plate. The steel plate shear wall described in the present invention is convenient for subsequent decoration.

但是上述装配式钢板剪力墙结构依然存在以下问题:钢结构建筑钢板剪力墙需要进行防火处理,钢板剪力墙的防火以现场喷涂防火涂料作为防火措施,后续安装饰面层不能以任何方式破坏防火涂层,上述装配式钢板剪力墙钢结构的防火涂层很难进行涂覆,且没有考虑饰面层的安装,涂层涂覆之后安装饰面层很容易对防火涂层进行损坏,导致饰面板的安装强度和整个剪力墙的防火功能不可兼得。However, the above-mentioned prefabricated steel plate shear wall structure still has the following problems: the steel plate shear wall of the steel structure building needs to be fireproofed, and the fire protection of the steel plate shear wall uses on-site spraying of fire retardant coating as a fire protection measure. The subsequent installation of the decorative surface layer cannot damage the fire retardant coating in any way. The fire retardant coating of the above-mentioned prefabricated steel plate shear wall steel structure is difficult to apply, and the installation of the decorative layer is not considered. After the coating is applied, the installation of the decorative surface layer can easily damage the fire retardant coating, resulting in the installation strength of the decorative panel and the fire protection function of the entire shear wall cannot be achieved at the same time.

因此为了解决上述问题,设计一种合理高效的装配式钢板剪力墙结构对我们来说是很有必要的。Therefore, in order to solve the above problems, it is necessary for us to design a reasonable and efficient assembled steel plate shear wall structure.

实用新型内容Utility Model Content

本实用新型的目的在于提供一种装配式钢板剪力墙结构,其结构简单,通过在剪力墙主体的上梁和下梁之间安装卡接龙骨和基层龙骨,完成墙面板的安装,且墙面板的安装对于剪力墙主体的钢板表面的防火涂层没有损坏,确保同时满足钢板剪力墙的饰面稳定安装和防火功能的完整。The purpose of the utility model is to provide an assembled steel plate shear wall structure with a simple structure. The installation of the wall panel is completed by installing a clamping keel and a base keel between the upper beam and the lower beam of the shear wall body. The installation of the wall panel does not damage the fire-retardant coating on the surface of the steel plate of the shear wall body, ensuring that the stable installation of the facing and the complete fire-proof function of the steel plate shear wall are met at the same time.

为达到上述目的,本实用新型采用如下技术方案得以实现的:In order to achieve the above purpose, the utility model adopts the following technical solutions:

一种装配式钢板剪力墙结构,包括剪力墙主体、设置于所述剪力墙主体上的卡接龙骨、设置于所述卡接龙骨上的基层龙骨以及设置于所述基层龙骨上的墙面板,所述剪力墙主体包括上梁、下梁以及设置于所述上梁和下梁之间的钢板,所述上梁和下梁上均设置有用于与所述卡接龙骨端部连接的角码,所述卡接龙骨远离所述钢板的一侧设置有卡接槽,所述基层龙骨包括用于与所述墙面板连接的安装板和用于与所述卡接槽配合的卡接板。A prefabricated steel plate shear wall structure comprises a shear wall body, a clamping keel arranged on the shear wall body, a base keel arranged on the clamping keel and a wall panel arranged on the base keel, the shear wall body comprises an upper beam, a lower beam and a steel plate arranged between the upper beam and the lower beam, the upper beam and the lower beam are both provided with angle codes for connecting with the ends of the clamping keel, a clamping groove is provided on the side of the clamping keel away from the steel plate, and the base keel comprises a mounting plate for connecting with the wall panel and a clamping plate for cooperating with the clamping groove.

作为本实用新型的优选,所述钢板上设置有加劲肋,所述卡接龙骨上设置有用于与所述加劲肋连接的卡接件。As a preferred embodiment of the utility model, the steel plate is provided with stiffening ribs, and the clamping keel is provided with clamping parts for connecting with the stiffening ribs.

作为本实用新型的优选,所述卡接件包括主板、上翘板以及下翘板,所述下翘板远离所述主板的一端设置有与所述主板平行设置的夹板,所述加劲肋至少有一部分位于所述主板和夹板之间,所述上翘板上设置有用于与所述卡接龙骨连接的螺栓孔。As a preferred embodiment of the present invention, the clip-on component includes a main board, an upper rocker plate and a lower rocker plate, a clamping plate arranged parallel to the main board is arranged at one end of the lower rocker plate away from the main board, at least a part of the stiffening rib is located between the main board and the clamping plate, and a bolt hole for connecting to the clip-on keel is arranged on the upper rocker plate.

作为本实用新型的优选,所述螺栓孔为长条形孔。As a preferred embodiment of the present invention, the bolt hole is an elongated hole.

作为本实用新型的优选,所述主板和夹板上均设置有连接孔和用于插入至所述连接孔内的连接螺栓。As a preferred embodiment of the present invention, the main board and the clamping plate are both provided with connecting holes and connecting bolts for being inserted into the connecting holes.

作为本实用新型的优选,所述卡接件为一体成型的钣金件。As a preferred embodiment of the present invention, the clamping part is an integrally formed sheet metal part.

作为本实用新型的优选,所述角码、卡接龙骨和基层龙骨的数量均至少为一个。As a preferred embodiment of the present invention, the number of the angle code, the clamping keel and the base keel is at least one.

作为本实用新型的优选,所述钢板和加劲肋外侧均设置有涂漆层。As a preferred embodiment of the present invention, a paint layer is provided on the outer sides of the steel plate and the stiffening ribs.

本实用新型一种装配式钢板剪力墙结构的有益效果在于:结构简单,通过在剪力墙主体的上梁和下梁之间安装卡接龙骨和基层龙骨,完成墙面板的安装,且墙面板的安装对于剪力墙主体的钢板表面的防火涂层没有损坏,确保同时满足钢板剪力墙的饰面稳定安装和防火功能的完整。The beneficial effects of the assembled steel plate shear wall structure of the utility model are: the structure is simple, the installation of the wall panel is completed by installing the clamping keel and the base keel between the upper beam and the lower beam of the shear wall body, and the installation of the wall panel does not damage the fire-retardant coating on the surface of the steel plate of the shear wall body, ensuring that the stable installation of the facing and the complete fire-proof function of the steel plate shear wall are met at the same time.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

图1为本实用新型一种装配式钢板剪力墙结构的一个实施例的整体结构示意图;FIG1 is a schematic diagram of the overall structure of an embodiment of an assembled steel plate shear wall structure of the utility model;

图2为本实用新型一种装配式钢板剪力墙结构的一个实施例中的剪力墙主体(含角码)的结构示意图;FIG2 is a schematic structural diagram of a shear wall body (including corner brackets) in an embodiment of an assembled steel plate shear wall structure of the utility model;

图3为本实用新型一种装配式钢板剪力墙结构的一个实施例中在图2的基础上安装卡接龙骨后的结构示意图;FIG3 is a schematic structural diagram of an embodiment of an assembled steel plate shear wall structure of the utility model after a clamping keel is installed on the basis of FIG2 ;

图4为本实用新型一种装配式钢板剪力墙结构的一个实施例中在图3的基础上安装基层龙骨后的结构示意图;FIG4 is a schematic structural diagram of an embodiment of an assembled steel plate shear wall structure of the utility model after the base keel is installed on the basis of FIG3 ;

图5为本实用新型一种装配式钢板剪力墙结构的一个实施例中在图4的基础上安装墙面板后的结构示意图;FIG5 is a schematic structural diagram of an embodiment of an assembled steel plate shear wall structure of the utility model after a wall panel is installed on the basis of FIG4 ;

图6为本实用新型一种装配式钢板剪力墙结构的另一个实施例中图4的主视示意图;FIG6 is a front view schematic diagram of FIG4 in another embodiment of an assembled steel plate shear wall structure of the utility model;

图7为本实用新型一种装配式钢板剪力墙结构的另一个实施例中图4的侧视示意图;FIG. 7 is a side view schematic diagram of FIG. 4 in another embodiment of an assembled steel plate shear wall structure of the utility model;

图8为本实用新型一种装配式钢板剪力墙结构的另一个实施例中图7的A处结构放大示意图;FIG8 is an enlarged schematic diagram of the structure at A in FIG7 in another embodiment of an assembled steel plate shear wall structure of the utility model;

图9为本实用新型一种装配式钢板剪力墙结构的另一个实施例中的卡接件的结构示意图;FIG9 is a schematic structural diagram of a clamping member in another embodiment of an assembled steel plate shear wall structure of the utility model;

图中:1、剪力墙主体,11、上梁,12、下梁,13、钢板,14、加劲肋,2、卡接龙骨,21、角码,22、卡接槽,3、基层龙骨,31、安装板,32、卡接板,4、墙面板,5、卡接件,51、主板,52、上翘板,53、下翘板,54、夹板,55、螺栓孔,56、连接孔。In the figure: 1. shear wall body, 11. upper beam, 12. lower beam, 13. steel plate, 14. stiffening rib, 2. snap-in keel, 21. angle code, 22. snap-in groove, 3. base keel, 31. mounting plate, 32. snap-in plate, 4. wall panel, 5. snap-in piece, 51. main board, 52. upper swing plate, 53. lower swing plate, 54. plywood, 55. bolt hole, 56. connecting hole.

具体实施方式Detailed ways

以下是本实用新型的具体实施例,对本实用新型的技术方案作进一步的描述,但本实用新型并不限于这些实施例。The following are specific embodiments of the present invention, which further describe the technical solution of the present invention, but the present invention is not limited to these embodiments.

现在将参照附图来详细描述本实用新型的各种示例性实施例。应注意到:除非另外具体说明,否则在这些实施例中阐述的模块和步骤的相对布置和步骤不限制本实用新型的范围。Various exemplary embodiments of the present invention will now be described in detail with reference to the accompanying drawings. It should be noted that unless otherwise specifically stated, the relative arrangement and steps of the modules and steps described in these embodiments do not limit the scope of the present invention.

同时,应当明白,为了便于描述,附图中的流程并不仅仅是单独进行,而是多个步骤相互交叉进行。At the same time, it should be understood that for the convenience of description, the processes in the drawings are not just performed separately, but multiple steps are performed in an interlaced manner.

在本实用新型的描述中,需要说明的是,术语“中心”、“上”、“下”、“左”、“右”、“竖直”、“水平”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,或者是本实用新型产品使用时惯常摆放的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。此外,术语“第一”、“第二”等仅用于区分描述,而不能理解为指示或暗示相对重要性。In the description of the present utility model, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside", etc. indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, or the positions or positional relationships in which the product of the present utility model is usually placed when in use. They are only for the convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as a limitation on the present utility model. In addition, the terms "first", "second", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.

以下对至少一个示例性实施例的描述实际上仅仅是说明性的,决不作为对本实用新型及其应用或使用的任何限制。The following description of at least one exemplary embodiment is merely illustrative in nature and is in no way intended to limit the present invention, its application, or uses.

对于相关领域普通技术人员已知的技术、方法及系统可能不作详细讨论,但在适当情况下,技术、方法及系统应当被视为授权说明书的一部分。Technologies, methods, and systems known to ordinary technicians in the relevant fields may not be discussed in detail, but where appropriate, the technologies, methods, and systems should be considered part of the authorization specification.

实施例一:如图1至5所示,仅仅为本实用新型的其中一个的实施例,一种装配式钢板剪力墙结构,包括剪力墙主体1、设置于所述剪力墙主体1上的卡接龙骨2、设置于所述卡接龙骨2上的基层龙骨3以及设置于所述基层龙骨3上的墙面板4,所述剪力墙主体1包括上梁11、下梁12以及设置于所述上梁11和下梁12之间的钢板13,所述上梁11和下梁12上均设置有用于与所述卡接龙骨2端部连接的角码21,所述卡接龙骨2远离所述钢板13的一侧设置有卡接槽22,所述基层龙骨3包括用于与所述墙面板4连接的安装板31和用于与所述卡接槽22配合的卡接板32。Embodiment 1: As shown in Figures 1 to 5, which is only one of the embodiments of the utility model, an assembled steel plate shear wall structure includes a shear wall body 1, a clip-on keel 2 arranged on the shear wall body 1, a base keel 3 arranged on the clip-on keel 2, and a wall panel 4 arranged on the base keel 3. The shear wall body 1 includes an upper beam 11, a lower beam 12, and a steel plate 13 arranged between the upper beam 11 and the lower beam 12. The upper beam 11 and the lower beam 12 are both provided with an angle code 21 for connecting to the end of the clip-on keel 2. The clip-on keel 2 is provided with a clip-on groove 22 on the side away from the steel plate 13. The base keel 3 includes a mounting plate 31 for connecting to the wall panel 4 and a clip-on plate 32 for cooperating with the clip-on groove 22.

剪力墙主体1采用工字型模块结构,由上梁11、下梁12以及中间的钢板13组成工字结构,上梁11直接与天花板或者横梁连接,下梁12与地面进行连接,钢板13则构成墙体的基础部分,当然,钢板13上若是需要增加强度还可以设置加劲肋14,为了给钢结构进行防火隔热,需要在所述钢板13和加劲肋14外侧均设置有涂漆层,涂覆一层起到防火、隔热以及防腐蚀的涂层。The shear wall body 1 adopts an I-shaped module structure, which is composed of an upper beam 11, a lower beam 12 and a middle steel plate 13. The upper beam 11 is directly connected to the ceiling or the cross beam, the lower beam 12 is connected to the ground, and the steel plate 13 constitutes the foundation of the wall. Of course, if the strength needs to be increased, stiffening ribs 14 can be provided on the steel plate 13. In order to provide fireproof and heat-insulating services for the steel structure, a paint layer is provided on the outer side of the steel plate 13 and the stiffening rib 14, and a layer of fireproof, heat-insulating and corrosion-resistant coating is applied.

在该剪力墙主体1上安装饰面板(即墙面板4)则无需直接在钢板13上进行安装,避免破坏涂层,直接在上梁11和下梁12之间竖直安装卡接龙骨2,再在卡接龙骨2上安装横向设置的基层龙骨3,最后在基层龙骨3上安装墙面板4即可。When installing the decorative panel (i.e., the wall panel 4) on the shear wall body 1, there is no need to install it directly on the steel plate 13 to avoid damaging the coating. The clip-on keel 2 is directly installed vertically between the upper beam 11 and the lower beam 12, and then the horizontally arranged base keel 3 is installed on the clip-on keel 2, and finally the wall panel 4 is installed on the base keel 3.

首先是卡接龙骨2的安装,所述上梁11和下梁12上均设置有用于与所述卡接龙骨2端部连接的角码21,卡接龙骨2竖直设置,且卡接龙骨2的长度等于上梁11和下梁12之间的间距,角码21为L型结构,角码21的一侧通过螺栓连接至上梁11下表面或下梁12的上表面,角码21的另一侧则与卡接龙骨2平行,卡接龙骨2的端部通过螺栓与角码21进行固定安装连接,当然,卡接龙骨2安装之后,所述卡接龙骨2远离所述钢板13的一侧设置有卡接槽22。The first is the installation of the clip-on keel 2. The upper beam 11 and the lower beam 12 are both provided with an angle code 21 for connecting to the end of the clip-on keel 2. The clip-on keel 2 is vertically arranged, and the length of the clip-on keel 2 is equal to the distance between the upper beam 11 and the lower beam 12. The angle code 21 is an L-shaped structure. One side of the angle code 21 is connected to the lower surface of the upper beam 11 or the upper surface of the lower beam 12 by bolts, and the other side of the angle code 21 is parallel to the clip-on keel 2. The end of the clip-on keel 2 is fixedly installed and connected to the angle code 21 by bolts. Of course, after the clip-on keel 2 is installed, a clip-on groove 22 is provided on the side of the clip-on keel 2 away from the steel plate 13.

然后是基层龙骨3的结构,所述基层龙骨3包括用于与所述墙面板4连接的安装板31和用于与所述卡接槽22配合的卡接板32,实际上,安装板31的两端都设置有卡接板32,卡接板32与安装板31垂直设置,使得基层龙骨3整体形成C字型结构,基层龙骨3的两个卡接板32都延伸卡入至卡接龙骨2的卡接槽22内,对基层龙骨3进行固定安装,当然,基层龙骨3的安装板31刚好位于卡接龙骨2远离所述钢板13的一侧。Next is the structure of the base keel 3, which includes a mounting plate 31 for connecting to the wall panel 4 and a snap-in plate 32 for cooperating with the snap-in groove 22. In fact, snap-in plates 32 are provided at both ends of the mounting plate 31, and the snap-in plates 32 are vertically arranged to the mounting plate 31, so that the base keel 3 forms a C-shaped structure as a whole. The two snap-in plates 32 of the base keel 3 extend and snap into the snap-in groove 22 of the snap-in keel 2 to fix the base keel 3. Of course, the mounting plate 31 of the base keel 3 is just located on the side of the snap-in keel 2 away from the steel plate 13.

最后是墙面板4的安装,通过打钉将墙面板4固定安装至安装板31上即可,当然,此时进行的打钉操作,只会穿透安装板31,并不会对钢板13产生破坏,不影响钢板13上的涂层。The last step is to install the wall panel 4 , which can be fixed to the mounting plate 31 by nailing. Of course, the nailing operation at this time will only penetrate the mounting plate 31 , and will not damage the steel plate 13 , and will not affect the coating on the steel plate 13 .

这样,采用装配式安装设置,墙面板4安装结构稳固,且不会影响钢板13上的涂层稳定,确保同时满足钢板剪力墙的饰面稳定安装和防火功能的完整。In this way, by adopting the assembled installation arrangement, the installation structure of the wall panel 4 is stable and will not affect the stability of the coating on the steel plate 13, ensuring that the stable installation of the facing and the integrity of the fire protection function of the steel plate shear wall are met at the same time.

本实用新型一种装配式钢板剪力墙结构,其结构简单,通过在剪力墙主体的上梁和下梁之间安装卡接龙骨和基层龙骨,完成墙面板的安装,且墙面板的安装对于剪力墙主体的钢板表面的防火涂层没有损坏,确保同时满足钢板剪力墙的饰面稳定安装和防火功能的完整。The utility model discloses an assembled steel plate shear wall structure with a simple structure. The installation of the wall panel is completed by installing a clamping keel and a base keel between the upper beam and the lower beam of the shear wall body. The installation of the wall panel does not damage the fireproof coating on the surface of the steel plate of the shear wall body, thereby ensuring that the stable installation of the facing and the complete fireproof function of the steel plate shear wall are met at the same time.

实施例二,如图6至9所示,仅为本实用新型的其中一个实施例,在实施例一的基础上,本实用新型一种装配式钢板剪力墙结构中,所述钢板13上设置有加劲肋14,所述卡接龙骨2上设置有用于与所述加劲肋14连接的卡接件5。Embodiment 2, as shown in Figures 6 to 9, is only one of the embodiments of the present invention. On the basis of Embodiment 1, in an assembled steel plate shear wall structure of the present invention, stiffening ribs 14 are provided on the steel plate 13, and a clamping part 5 for connecting with the stiffening rib 14 is provided on the clamping keel 2.

在本实用新型中,所述卡接件5包括主板51、上翘板52以及下翘板53,所述下翘板53远离所述主板51的一端设置有与所述主板51平行设置的夹板54,所述加劲肋14至少有一部分位于所述主板51和夹板54之间,所述上翘板52上设置有用于与所述卡接龙骨2连接的螺栓孔55。In the utility model, the clamping member 5 includes a main board 51, an upper rocker plate 52 and a lower rocker plate 53, and the lower rocker plate 53 is provided with a clamping plate 54 arranged parallel to the main board 51 at one end away from the main board 51, and at least a part of the stiffening rib 14 is located between the main board 51 and the clamping plate 54, and the upper rocker plate 52 is provided with a bolt hole 55 for connecting with the clamping keel 2.

上翘板52以及下翘板53均与主板51垂直设置,下翘板53下端的夹板54又与下翘板53垂直设置,使得整个卡接件5的上端延伸出一个平面板,下端则开口设置有一个夹口,考虑到钢板13上设置有加劲肋14,可以使得加劲肋14刚好卡入至主板51和夹板54之间,完成卡接件5的固定安装,然后通过螺栓和螺栓孔55将上翘板52与卡接龙骨2进行固定连接,对卡接龙骨2进行辅助支撑。The upper swing plate 52 and the lower swing plate 53 are both arranged perpendicularly to the main board 51, and the clamping plate 54 at the lower end of the lower swing plate 53 is arranged perpendicularly to the lower swing plate 53, so that a flat plate is extended from the upper end of the entire clip 5, and a clamping opening is opened at the lower end. Considering that the steel plate 13 is provided with a stiffening rib 14, the stiffening rib 14 can be just inserted between the main board 51 and the clamping plate 54 to complete the fixed installation of the clip 5, and then the upper swing plate 52 is fixedly connected to the clip keel 2 through bolts and bolt holes 55 to provide auxiliary support for the clip keel 2.

需要注意的是,钢板13可以是平面板,也可以是弯折板,甚至是波纹板,只要加劲肋14是水平或竖向设置,均可对卡接龙骨2进行辅助支撑。It should be noted that the steel plate 13 can be a flat plate, a bent plate, or even a corrugated plate. As long as the stiffening ribs 14 are arranged horizontally or vertically, they can provide auxiliary support for the clamping keel 2.

实施例三,仍如图1至9所示,仅为本实用新型的其中一个实施例,在实施例二的基础上,本实用新型一种装配式钢板剪力墙结构中,所述卡接件5为一体成型的钣金件,那么辅助支撑的结构更稳定。Embodiment 3, still as shown in Figures 1 to 9, is only one of the embodiments of the present invention. On the basis of Embodiment 2, in an assembled steel plate shear wall structure of the present invention, the clamping part 5 is an integrally formed sheet metal part, so the auxiliary support structure is more stable.

当然,所述螺栓孔55为长条形孔。Of course, the bolt hole 55 is an elongated hole.

还有,所述主板51和夹板54上均设置有连接孔56和用于插入至所述连接孔56内的连接螺栓,连接螺栓插入至主板51和夹板54上的连接孔56时,再加上螺母进行拧紧,就可以使得主板51和夹板54向中间夹紧,从而夹紧加劲肋14,安装结构更稳固。In addition, the main board 51 and the splint 54 are both provided with connecting holes 56 and connecting bolts for inserting into the connecting holes 56. When the connecting bolts are inserted into the connecting holes 56 on the main board 51 and the splint 54 and tightened with nuts, the main board 51 and the splint 54 can be clamped in the middle, thereby clamping the stiffening rib 14 and making the installation structure more stable.

最后,所述角码21、卡接龙骨2和基层龙骨3的数量均至少为一个。Finally, the number of the angle code 21, the clamping keel 2 and the base keel 3 is at least one.

实施例四,仅为本实用新型的其中一个实施例,在上述任一实施例的基础上,本实用新型还提供了一种装配式钢板剪力墙结构的安装方法,包括以下步骤:Embodiment 4 is only one of the embodiments of the present invention. Based on any of the above embodiments, the present invention further provides an installation method of an assembled steel plate shear wall structure, comprising the following steps:

S1:在剪力墙主体的上梁和下梁处进行定位,在定位处安装角码;S1: Position the upper and lower beams of the shear wall body and install angle brackets at the positioning points;

S2:将卡接龙骨竖直安装在上梁和下梁之间,且卡接龙骨的端部与角码进行连接;S2: vertically install the clamping keel between the upper beam and the lower beam, and connect the end of the clamping keel with the angle bracket;

S3:在卡接龙骨上安装基层龙骨,使得基层龙骨的卡接板插入至卡接龙骨的卡接槽内;S3: Installing the base keel on the clamping keel so that the clamping plate of the base keel is inserted into the clamping groove of the clamping keel;

S4:在基层龙骨的安装板上安装墙面板。S4: Install the wall panels on the mounting plate of the base keel.

在执行步骤S2之后,通过卡接件将卡接龙骨与剪力墙主体的钢板上的加劲肋进行连接固定,使得加强筋刚好卡在卡接件的主板和夹板之间,卡接件的上翘板与卡接龙骨连接,加固拉结龙骨。After executing step S2, the clamping keel is connected and fixed to the stiffening ribs on the steel plate of the shear wall body through the clamping piece, so that the reinforcing ribs are just clamped between the main board and the clamping plate of the clamping piece, and the upward plate of the clamping piece is connected to the clamping keel to reinforce the tie keel.

在执行步骤S3之前,在钢板以及加劲肋外侧涂漆形成涂漆层。Before executing step S3, the steel plate and the outer side of the stiffening rib are painted to form a paint layer.

本实用新型一种装配式钢板剪力墙结构,其结构简单,通过在剪力墙主体的上梁和下梁之间安装卡接龙骨和基层龙骨,完成墙面板的安装,且墙面板的安装对于剪力墙主体的钢板表面的防火涂层没有损坏,确保同时满足钢板剪力墙的饰面稳定安装和防火功能的完整。The utility model discloses an assembled steel plate shear wall structure with a simple structure. The installation of the wall panel is completed by installing a clamping keel and a base keel between the upper beam and the lower beam of the shear wall body. The installation of the wall panel does not damage the fireproof coating on the surface of the steel plate of the shear wall body, thereby ensuring that the stable installation of the facing and the complete fireproof function of the steel plate shear wall are met at the same time.

本实用新型不局限于上述具体的实施方式,本实用新型可以有各种更改和变化。凡是依据本实用新型的技术实质对以上实施方式所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围。The present invention is not limited to the above specific implementation modes, and the present invention can have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made to the above implementation modes based on the technical essence of the present invention shall be included in the protection scope of the present invention.

Claims (8)

1. The utility model provides an assembled steel sheet shear wall structure which characterized in that: including shear wall main part (1), set up in joint fossil fragments (2) on shear wall main part (1), set up in basic unit fossil fragments (3) on joint fossil fragments (2) and set up in wall panel (4) on basic unit fossil fragments (3), shear wall main part (1) include upper beam (11), underbeam (12) and set up in steel sheet (13) between upper beam (11) and underbeam (12), all be provided with on upper beam (11) and underbeam (12) be used for with angle sign indicating number (21) of joint fossil fragments (2) end connection, joint fossil fragments (2) are kept away from one side of steel sheet (13) is provided with joint groove (22), basic unit fossil fragments (3) including be used for with mounting panel (31) that wall panel (4) are connected and be used for with joint groove (22) complex joint board (32).
2. The fabricated steel plate shear wall structure of claim 1, wherein: the steel plate (13) is provided with stiffening ribs (14), and the clamping keel (2) is provided with clamping pieces (5) used for being connected with the stiffening ribs (14).
3. The fabricated steel plate shear wall structure of claim 2, wherein: the clamping piece (5) comprises a main board (51), an upper rocker (52) and a lower rocker (53), wherein one end of the lower rocker (53), which is far away from the main board (51), is provided with a clamping plate (54) which is arranged in parallel with the main board (51), at least one part of the stiffening rib (14) is positioned between the main board (51) and the clamping plate (54), and the upper rocker (52) is provided with a bolt hole (55) which is used for being connected with the clamping keel (2).
4. A fabricated steel plate shear wall structure according to claim 3, wherein: the bolt hole (55) is a strip-shaped hole.
5. A fabricated steel plate shear wall structure according to claim 3, wherein: and the main board (51) and the clamping plate (54) are respectively provided with a connecting hole (56) and a connecting bolt which is used for being inserted into the connecting holes (56).
6. A fabricated steel plate shear wall structure according to claim 3, wherein: the clamping piece (5) is an integrally formed sheet metal part.
7. The fabricated steel plate shear wall structure of claim 1, wherein: the number of the corner connector (21), the clamping keels (2) and the base keels (3) is at least one.
8. The fabricated steel plate shear wall structure of claim 1, wherein: and the outer sides of the steel plates (13) and the stiffening ribs (14) are respectively provided with a paint layer.
CN202322899233.7U 2023-10-27 2023-10-27 An assembled steel plate shear wall structure Withdrawn - After Issue CN221345980U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322899233.7U CN221345980U (en) 2023-10-27 2023-10-27 An assembled steel plate shear wall structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322899233.7U CN221345980U (en) 2023-10-27 2023-10-27 An assembled steel plate shear wall structure

Publications (1)

Publication Number Publication Date
CN221345980U true CN221345980U (en) 2024-07-16

Family

ID=91848284

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322899233.7U Withdrawn - After Issue CN221345980U (en) 2023-10-27 2023-10-27 An assembled steel plate shear wall structure

Country Status (1)

Country Link
CN (1) CN221345980U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117266407A (en) * 2023-10-27 2023-12-22 浙江亚厦装饰股份有限公司 A prefabricated steel plate shear wall structure and installation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117266407A (en) * 2023-10-27 2023-12-22 浙江亚厦装饰股份有限公司 A prefabricated steel plate shear wall structure and installation method
CN117266407B (en) * 2023-10-27 2025-07-01 浙江亚厦装饰股份有限公司 Assembled steel plate shear wall structure and installation method

Similar Documents

Publication Publication Date Title
US9587399B2 (en) Insulating wall, a column assembly therefore and a method of constructing such an insulating wall
US20070151192A1 (en) Multi-Purpose Construction Panel and Method
CN221345980U (en) An assembled steel plate shear wall structure
KR100655890B1 (en) Drywall system using panel stud and construction method
CN221682338U (en) Assembled keel clip
CN113530067B (en) Eye-splice falling-stage suspended ceiling module, suspended ceiling assembly and installation method of suspended ceiling assembly
CN216239157U (en) A prefabricated gypsum board partition wall structure system
CN117266407B (en) Assembled steel plate shear wall structure and installation method
CN216202426U (en) Anti-bending corrosion-resistant C-shaped steel convenient to assemble
CN111075093B (en) Keel connecting structure for grid suspended ceiling
CN117306804A (en) An assembled keel clamping piece
CN116497985B (en) Connection structure of modularized wall body and steel beam and assembly method
US20150085474A1 (en) Beam support
CN219825749U (en) Fireproof metal composite curtain wall plate
CN223446434U (en) ALC partition board installation reinforcement structure
CN217233216U (en) A whole window frame and window installation receipts limit structure for integrated wallboard
CN216766392U (en) ALC wallboard connected node
CN220565499U (en) ALC panel connection structure
CN223423493U (en) Assembled building wall panel
CN218091421U (en) Energy-saving external wall internal thermal insulation system for residential building
CN216276589U (en) Wallboard mounting part and mounting structure
CN223151408U (en) A unit modular exterior wall structure and exterior wall system
CN219654178U (en) Interior partition wall girder steel fitment structure
CN220133348U (en) Arc honeycomb plate and installation positioning assembly thereof
CN116464191B (en) Clamping structure of modularized wall body and steel beam and mounting method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20240716

Effective date of abandoning: 20250701

AV01 Patent right actively abandoned

Granted publication date: 20240716

Effective date of abandoning: 20250701

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned