CN221278910U - Construction monitor convenient to installation is dismantled - Google Patents
Construction monitor convenient to installation is dismantled Download PDFInfo
- Publication number
- CN221278910U CN221278910U CN202322930634.4U CN202322930634U CN221278910U CN 221278910 U CN221278910 U CN 221278910U CN 202322930634 U CN202322930634 U CN 202322930634U CN 221278910 U CN221278910 U CN 221278910U
- Authority
- CN
- China
- Prior art keywords
- fixed
- monitor
- construction
- block
- connecting block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 67
- 238000009434 installation Methods 0.000 title claims abstract description 12
- 238000012423 maintenance Methods 0.000 description 6
- 238000012544 monitoring process Methods 0.000 description 3
- 210000001503 joint Anatomy 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 238000010030 laminating Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 238000003756 stirring Methods 0.000 description 1
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
The utility model discloses a construction monitor convenient to mount and dismount, which comprises a vertical rod, a monitor body and a connecting block, wherein a clamping plate is sleeved on one side of the vertical rod, an arc-shaped groove is formed in one side of the clamping plate close to the vertical rod, racks are fixed on two sides of the clamping plate, the connecting block is arranged on one side of the vertical rod far from the clamping plate, and a first limit groove is formed in the connecting block. This construction monitor convenient to installation is dismantled changes the mounting means of original bolt cooperation staple bolt, inserts the spacing inslot through the rack for gear and rack meshing are rotated through worm restriction worm wheel simultaneously, thereby lock the gear, make splint and connecting block mutually support the fastening in the pole setting, conveniently install the dismantlement fast construction monitor, remove the stopper through the plectrum, and then the stopper shifts out from the second spacing inslot, finally take out the inserted bar and make the housing break away from the block with the monitor body, thereby open monitor body top, make things convenient for the staff to overhaul.
Description
Technical Field
The utility model relates to the technical field of construction monitors, in particular to a construction monitor convenient to mount and dismount.
Background
In various construction sites such as buildings and projects, life safety, physical health and property safety of workers and related personnel in the construction process are guaranteed by adopting a series of safety measures and management measures, a construction monitor is frequently used for monitoring the construction site, the construction monitor is equipment for monitoring and recording the construction process of the construction site in real time, engineers and construction supervision personnel can remotely monitor the condition of the construction site through the construction monitor, and timely master information such as construction progress, safety and quality, so that smooth construction is guaranteed, and safety and quality problems are avoided.
The construction monitor generally comprises a high-definition camera, a sound collector, a temperature sensor, a humidity sensor, a vibration sensor and data processing equipment, the construction monitor is generally installed on a vertical rod to monitor a construction site, a traditional installation mode is that the construction monitor is fastened on the vertical rod through a hoop, workers need to repeatedly screw the bolt when installing the construction monitor, the size of the bolt is small, the bolt is difficult to accurately insert into a corresponding hole during high-altitude operation, the construction monitor is inconvenient to install and detach, the upper half part of the construction monitor is usually clamped on the construction monitor through a closed plastic shell, the construction monitor needs to be detached when the construction monitor is damaged, the construction monitor needs to be pried by a screwdriver when the construction monitor is detached, the plastic shell is fragile, the movable plastic shell is easy to damage the buckle, and the construction monitor is inconvenient to detach for maintenance.
The above problems are thus improved.
Disclosure of utility model
The utility model aims to provide a construction monitor convenient to assemble and disassemble, so as to solve the problems that the construction monitor is inconvenient to assemble and disassemble and is inconvenient to disassemble for overhauling and maintenance, which are proposed by the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a construction monitor convenient to installation is dismantled, includes pole setting, monitor body and connecting block, one side cover of pole setting is equipped with splint, and splint are close to one side of pole setting and have been seted up the arc wall to the both sides of splint all are fixed with the rack, one side that the pole setting kept away from the splint is provided with the connecting block, and the inside of connecting block has seted up first spacing groove, the upper portion of rack is provided with the gear, and one side of gear is fixed with the worm wheel through the connecting axle;
The upper wall symmetry of connecting block is fixed with first fixed block, and the diapire of connecting block is fixed with the spliced pole to the bottom mounting of spliced pole has the watch-dog body, the inside grafting of first fixed block has the worm, the one end that the pole setting was kept away from to the worm is fixed with the handle.
Preferably, the rack is inserted in the first limiting groove, the rack is meshed with the gear, the gear and the worm wheel are both connected with the connecting block in a rotating mode through the bearing, the worm wheel is meshed with the worm, and the worm is connected with the first fixing block in a rotating mode through the bearing.
Preferably, the top of monitor body is provided with housing shell and fixed shell, and the housing shell both sides are all fixed with the slider, the fixed shell is fixed at monitor body top.
Preferably, the inner wall of the monitor body is provided with sliding grooves on two sides of the end part, close to the outer cover shell, of the monitor body, and the monitor body is in sliding connection with the sliding block through the sliding grooves.
Preferably, the two sides of the fixed shell are both fixed with second fixed blocks, and limiting blocks are arranged in grooves of the second fixed blocks.
Preferably, a poking plate is fixed on one side of the limiting block, penetrates through the second fixing block and is connected with the second fixing block in a sliding mode.
Preferably, a spring is arranged at the upper end of the limiting block, one end of the spring is abutted against the inner wall of the second fixed block, and the other end of the spring is abutted against the upper end of the limiting block.
Preferably, the inside of second fixed block is pegged graft and is had the inserted bar, and the second spacing groove has been seted up to one side that the inserted bar is close to the stopper, and the stopper is pegged graft in the second spacing groove.
Compared with the prior art, the utility model has the beneficial effects that: this construction monitor convenient to installation is dismantled changes the mounting means of original bolt cooperation staple bolt, inserts the spacing inslot through the rack for gear and rack meshing are rotated through worm restriction worm wheel simultaneously, thereby lock the gear, make splint and connecting block mutually support the fastening in the pole setting, conveniently install the dismantlement fast construction monitor, remove the stopper through the plectrum, and then the stopper shifts out from the second spacing inslot, finally take out the inserted bar and make the housing break away from the block with the monitor body, thereby open monitor body top, make things convenient for the staff to overhaul.
1. The construction monitor convenient to install and detach is characterized in that if the construction monitor is required to be installed, the rack is inserted into the first limiting groove, the rack is limited by utilizing the characteristics of the worm and the worm wheel, the final clamping plate and the connecting block are matched with each other to form clamping on the opposite rod, the installation of the construction monitor is completed, the clamping plate and the connecting block are separated to detach, and the construction monitor is convenient and quick to install and detach;
2. This construction monitor convenient to installation is dismantled, if need overhauling the maintenance to construction monitor, stir the plectrum and remove the stopper and make inserted bar and second fixed block break away from, finally take out the inserted bar, remove the dustcoat shell simultaneously, open the monitor body, conveniently overhauls the maintenance to construction monitor.
Drawings
FIG. 1 is a schematic side view cross-sectional structure of the present utility model;
FIG. 2 is a schematic view of a partial enlarged structure of the portion A in FIG. 1 according to the present utility model;
FIG. 3 is a schematic elevational view of the present utility model;
fig. 4 is a schematic top view of the present utility model.
In the figure: 1. a vertical rod; 2. a clamping plate; 3. an arc-shaped groove; 4. a connecting column; 5. a monitor body; 6. an outer housing; 7. a rack; 8. a first limit groove; 9. a gear; 10. a handle; 11. a connecting block; 12. a first fixed block; 13. a worm; 14. a worm wheel; 15. a slide block; 16. a chute; 17. a rod; 18. a second fixed block; 19. a spring; 20. a pulling piece; 21. a limiting block; 22. the second limit groove; 23. and fixing the shell.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1, 3 and 4, the present utility model provides a technical solution: the utility model provides a construction monitor convenient to installation is dismantled, includes pole setting 1, monitor body 5 and connecting block 11, one side cover of pole setting 1 is equipped with splint 2, and splint 2 is close to one side of pole setting 1 and has been seted up arc wall 3 to splint 2's both sides all are fixed with rack 7, one side that pole setting 1 kept away from splint 2 is provided with connecting block 11, and the inside of connecting block 11 has seted up first spacing groove 8, rack 7's upper portion is provided with gear 9, and one side of gear 9 is fixed with worm wheel 14 through the connecting axle, connecting block 11's upper wall symmetry is fixed with first fixed block 12, and connecting block 11's diapire is fixed with spliced pole 4 to spliced pole 4's bottom is fixed with monitor body 5, the inside grafting of first fixed block 12 has worm 13, worm 13 is kept away from pole setting 1's one end is fixed with handle 10.
Referring to fig. 1, 3 and 4, the rack 7 is inserted into the first limiting groove 8, the rack 7 is meshed with the gear 9, the gear 9 and the worm wheel 14 are both rotatably connected with the connecting block 11 through bearings, the worm wheel 14 is meshed with the worm 13, and the worm 13 is rotatably connected with the first fixed block 12 through bearings.
During implementation, the pole setting 1 provides the supporting point for the construction monitor, be favorable to expanding the monitoring scope of construction monitor, the spliced pole 4 is fixed monitor body 5 on connecting block 11, if need install the construction monitor, it makes arc groove 3 laminating on pole setting 1 to remove splint 2, and then remove connecting block 11 towards splint 2's direction, make rack 7 dock with first spacing groove 8, and then rotate worm 13 through handle 10, first fixed block 12 provides the supporting point for worm 13, worm 13 pivoted drives worm wheel 14 rather than meshing and rotates, worm wheel 14 drives gear 9 simultaneously and rotates, gear 9 pivoted drives rack 7 rather than meshing because of the gear drive principle simultaneously, make rack 7 drive splint 2 remove, finally splint 2 and connecting block 11 are close to each other and hold pole setting 1 tightly, worm 13 stops rotating and can lock worm wheel 14, restriction rack 7 shifts out, separate splint 2 and connecting block 11 through above-mentioned reverse operation, realize carrying out the purpose of quick installation dismantlement to the construction monitor.
Referring to fig. 1, 2, 3 and 4, the top of the monitor body 5 is provided with an outer casing 6 and a fixed casing 23, the two sides of the outer casing 6 are both fixed with a sliding block 15, the fixed casing 23 is fixed at the top of the monitor body 5, two sides of the end of the inner wall of the monitor body 5, which is close to the outer casing 6, are both provided with a sliding slot 16, the monitor body 5 is slidably connected with the sliding block 15 through the sliding slot 16, two sides of the fixed casing 23 are both fixed with a second fixed block 18, a limiting block 21 is arranged in a groove of the second fixed block 18, one side of the limiting block 21 is fixed with a pulling piece 20, the pulling piece 20 penetrates the second fixed block 18 and is slidably connected with the second fixed block 18, the upper end of the limiting block 21 is provided with a spring 19, one end of the spring 19 is in butt joint with the inner wall of the second fixed block 18, the other end of the spring 19 is in butt joint with the upper end of the limiting block 21, the second fixed block 18 is internally spliced with a inserting rod 17, one side of the inserting rod 17, which is close to the limiting block 21, is provided with a second limiting groove 22, and the second limiting block 21 is inserted into the second limiting groove 22.
During the implementation, if maintenance is needed to be carried out on the construction monitor, the limiting block 21 is moved through the pulling piece 20, and then the limiting block 21 is moved out of the second limiting groove 22, so that the inserting rod 17 and the second fixed block 18 are separated from each other, the spring 19 is contracted when the limiting block 21 moves, the inserting rod 17 is pulled out to one side, so that the outer cover shell 6 is separated from the fixed shell 23, the outer cover shell 6 is moved, the sliding block 15 is driven to move when the outer cover shell 6 moves, the sliding block 15 moves along the sliding groove 16, and finally the outer cover shell 6 is taken down from the monitor body 5, so that maintenance is carried out on the construction monitor.
To sum up, through connecting block 11 and splint 2 mutually support with pole setting 1 press from both sides tightly and install the construction monitor, dismantle connecting block 11 and splint 2 separation, realize the purpose of the staff's installation of being convenient for dismantles the construction monitor, take off housing 6 and open monitor body 5 upper portion, the staff of being convenient for overhauls and maintains the construction monitor, let the stable work of construction monitor, can monitor the job site, ensure the security of engineering construction, the content of not making detailed description in this specification belongs to the prior art that the expert in the field knows.
Although the present utility model has been described with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described, or equivalents may be substituted for elements thereof, and any modifications, equivalents, improvements and changes may be made without departing from the spirit and principles of the present utility model.
Claims (8)
1. Construction monitor convenient to installation is dismantled, including pole setting (1), monitor body (5) and connecting block (11), its characterized in that:
One side of the vertical rod (1) is sleeved with a clamping plate (2), one side of the clamping plate (2) close to the vertical rod (1) is provided with an arc-shaped groove (3), racks (7) are respectively fixed on two sides of the clamping plate (2), one side of the vertical rod (1) far away from the clamping plate (2) is provided with a connecting block (11), the inside of the connecting block (11) is provided with a first limit groove (8), the upper part of the racks (7) is provided with a gear (9), and one side of the gear (9) is fixed with a worm wheel (14) through a connecting shaft;
The upper wall symmetry of connecting block (11) is fixed with first fixed block (12), and the diapire of connecting block (11) is fixed with spliced pole (4) to the bottom mounting of spliced pole (4) has watch-dog body (5), the inside grafting of first fixed block (12) has worm (13), the one end that pole setting (1) was kept away from to worm (13) is fixed with handle (10).
2. The construction monitor of claim 1, wherein the construction monitor is adapted to be installed and removed: the rack (7) is inserted into the first limiting groove (8), the rack (7) is meshed with the gear (9), the gear (9) and the worm wheel (14) are rotatably connected with the connecting block (11) through bearings, the worm wheel (14) is meshed with the worm (13), and the worm (13) is rotatably connected with the first fixed block (12) through bearings.
3. The construction monitor of claim 1, wherein the construction monitor is adapted to be installed and removed: the top of monitor body (5) is provided with dustcoat (6) and fixed shell (23), and dustcoat (6) both sides all are fixed with slider (15), fixed shell (23) are fixed at monitor body (5) top.
4. A construction monitor according to claim 3, wherein: the inner wall of the monitor body (5) is close to both sides of the end part of the outer cover shell (6) and is provided with sliding grooves (16), and the monitor body (5) is in sliding connection with the sliding blocks (15) through the sliding grooves (16).
5. A construction monitor according to claim 3, wherein: the two sides of the fixed shell (23) are both fixed with second fixed blocks (18), and limiting blocks (21) are arranged in grooves of the second fixed blocks (18).
6. The construction monitor according to claim 5, wherein: one side of the limiting block (21) is fixed with a poking piece (20), and the poking piece (20) penetrates through the second fixed block (18) and is connected with the second fixed block (18) in a sliding mode.
7. The construction monitor according to claim 5, wherein: the upper end of stopper (21) is provided with spring (19), the inner wall butt of one end and second fixed block (18) of spring (19), and the upper end butt of stopper (21) is held to the other end of spring (19).
8. The construction monitor of claim 7, wherein the construction monitor is adapted to be installed and removed: the inside of second fixed block (18) is pegged graft and is had inserted bar (17), and one side that inserted bar (17) are close to stopper (21) has been seted up second spacing groove (22), and stopper (21) are pegged graft in second spacing groove (22).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202322930634.4U CN221278910U (en) | 2023-10-31 | 2023-10-31 | Construction monitor convenient to installation is dismantled |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202322930634.4U CN221278910U (en) | 2023-10-31 | 2023-10-31 | Construction monitor convenient to installation is dismantled |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN221278910U true CN221278910U (en) | 2024-07-05 |
Family
ID=91697393
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202322930634.4U Active CN221278910U (en) | 2023-10-31 | 2023-10-31 | Construction monitor convenient to installation is dismantled |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN221278910U (en) |
-
2023
- 2023-10-31 CN CN202322930634.4U patent/CN221278910U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN221278910U (en) | Construction monitor convenient to installation is dismantled | |
| CN205581758U (en) | Demountor case fast | |
| CN220817097U (en) | Remote monitoring management device for fire control maintenance | |
| CN113198848B (en) | Efficient and stable steel pipe bundling machine angle gear box | |
| CN213815111U (en) | Air bag computer repair experiment table with recording and broadcasting functions | |
| CN215263846U (en) | Detection apparatus for computer circuit board | |
| CN221801069U (en) | A construction project management information management device | |
| CN212887292U (en) | Clamp for disassembling and assembling clamp nut | |
| CN213816752U (en) | Electric appliance cabinet with high expansibility | |
| CN114060696A (en) | Environmental monitoring system for construction engineering | |
| CN219101026U (en) | Hinge structure of fireproof door | |
| CN112217101A (en) | Electric appliance cabinet with high expansibility | |
| CN219451199U (en) | Assembled curtain wall convenient to installation | |
| CN222831675U (en) | Camera disassembly and assembly tool capable of assisting clamping | |
| CN113190091B (en) | A Computer Model Based on Visual Information Acquisition | |
| CN219104174U (en) | Install stable sound collection system for fan | |
| CN220184942U (en) | Door structure easy to disassemble and assemble | |
| CN222993756U (en) | Intelligent greenhouse environment monitoring system | |
| CN222364680U (en) | A pressure sensor that is easy to disassemble | |
| CN222103253U (en) | A construction cost progress management device | |
| CN221121611U (en) | Monitoring support | |
| CN223013162U (en) | Workpiece placement frame capable of being spliced | |
| CN218211741U (en) | Pressure monitoring system of mining explosion-proof device | |
| CN221323845U (en) | Internet of things equipment management device convenient to maintain | |
| CN221985152U (en) | A camera mounting structure for an explosive disposal robot |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |