CN221278710U - Building engineering strutting arrangement - Google Patents
Building engineering strutting arrangement Download PDFInfo
- Publication number
- CN221278710U CN221278710U CN202323097276.XU CN202323097276U CN221278710U CN 221278710 U CN221278710 U CN 221278710U CN 202323097276 U CN202323097276 U CN 202323097276U CN 221278710 U CN221278710 U CN 221278710U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- bearing
- transverse plate
- block
- auxiliary slide
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 10
- 230000001681 protective effect Effects 0.000 claims abstract description 3
- 238000010276 construction Methods 0.000 claims description 8
- 238000009434 installation Methods 0.000 abstract description 4
- 239000003351 stiffener Substances 0.000 description 4
- 230000008901 benefit Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model belongs to the technical field of building engineering auxiliary equipment, and discloses a building engineering supporting device, which comprises a beam body, hanging rods, reinforcing rods, an anti-skid sleeve, a bearing transverse plate, a few-type connecting rod, a limiting assembly, a limiting block and an adjusting assembly, wherein the bottom of the beam body is fixedly connected with the top of the hanging rods, the two ends of the reinforcing rods are fixedly connected with the hanging rods, the surfaces of the reinforcing rods are sleeved with protective sleeves, the bearing transverse plate is arranged between the two hanging rods, the bottom of the few-type connecting rod is fixedly connected with the top of the bearing transverse plate, the limiting assembly is arranged at the bottom of the few-type connecting rod, and the limiting block is arranged at the top of the bearing transverse plate. The problem that the connection mode between the hanging bar and the cross bar is connected together through the screws and the nuts, a large amount of time is consumed when a worker works, the nuts at each position are screwed up, the installation or the disassembly is inconvenient, the cross bar is inconvenient to adjust on the same horizontal line, and the labor intensity of the worker is increased is solved.
Description
Technical Field
The utility model belongs to the technical field of building engineering auxiliary equipment, and particularly relates to a building engineering supporting device.
Background
The building engineering refers to engineering entities formed by building various house buildings and auxiliary facilities thereof and installing and moving lines, pipelines and equipment matched with the building buildings. The house building is a project which has a top cover, a beam column, a wall, a foundation and can form an internal space and meet the requirements of people on production, living, study and public activities. When the pipeline is installed, a supporting device is needed to support the pipeline, so that the pipeline is prevented from being broken under the action of gravity.
At present, when the pipeline bearing, all with the hanging bar pre-buried on the roof beam, the hanging bar level is laid, utilizes the horizontal pole to link up the hanging bar of both sides, utilizes the horizontal pole to carry out the bearing to the pipeline, but the connected mode between hanging bar and the horizontal pole is in the same place through screw and nut connection, and the workman is at the during operation, need consume a large amount of time, screw up the nut of every department, is inconvenient for installation or dismantlement, is inconvenient for adjusting the horizontal pole on same horizon, has increased workman's intensity of labour's problem.
Disclosure of utility model
The utility model aims to provide a supporting device for building engineering, which aims to solve the technical problems in the background technology.
In order to achieve the above purpose, the specific technical scheme of the utility model is as follows: the utility model provides a building engineering strutting arrangement, includes roof beam body, jib, stiffener, antiskid cover, bearing diaphragm, several types of connecting rods, spacing subassembly, stopper and adjusting part, the bottom of roof beam body and the top fixed connection of jib, the both ends and the jib fixed connection of stiffener, the surface and the lag cover of stiffener establish to be connected, the bearing diaphragm sets up between two jibs, the bottom and the top fixed connection of bearing diaphragm of several types of connecting rods, spacing subassembly sets up the bottom at several types of connecting rods, the stopper sets up the top at the bearing diaphragm, adjusting part sets up the inside at left side jib, adjusting part is connected with the bearing diaphragm, spacing subassembly is connected with several types of connecting rods;
The limiting assembly comprises an electric telescopic column and arc-shaped clamping blocks, wherein the top of the electric telescopic column is fixedly connected with the bottoms of the several types of connecting rods, the output end of the electric telescopic column is connected with the top of the arc-shaped clamping blocks, the number of the electric telescopic column and the number of the arc-shaped clamping blocks are several, and the electric telescopic column and the arc-shaped clamping blocks are uniformly distributed at the bottoms of the several types of connecting rods;
The adjusting component comprises a servo motor, a screw rod and a moving block, wherein the servo motor is arranged in the left suspender, the output end of the servo motor is fixedly connected with the top of the screw rod, the surface of the screw rod is in threaded connection with the inner part of the moving block, and the right side of the moving block is fixedly connected with the left side of the bearing diaphragm.
Preferably, the right side fixedly connected with auxiliary slide block of bearing diaphragm, auxiliary slide bar's inner wall cover is established and is connected with auxiliary slide bar, auxiliary slide bar's both ends all run through auxiliary slide block and the inner wall fixed connection of right side jib, the right side auxiliary slide groove with auxiliary slide block cooperation use has been seted up in the left side of jib, auxiliary slide bar is located auxiliary slide groove.
Preferably, the right side the screw hole of a plurality of has been seted up to the front side of jib, the right side the front side threaded connection of jib has spacing post, spacing post and supplementary slider threaded connection.
Preferably, the right side of the boom on the left side is provided with an opening, and the opening is matched with the moving block and the screw rod for use.
Preferably, the bottom of the screw rod is sleeved with a limit bearing, and the bottom of the limit bearing is fixedly connected with the inner wall of the left suspender.
Preferably, the front side fixedly connected with spacing slider of movable block, the left side the inner wall of jib is seted up and is used with spacing slider cooperation spacing spout.
The utility model has the following advantages:
1. This building engineering strutting arrangement, through setting up including the roof beam body, the jib, the reinforcing rod, the antiskid cover, the bearing diaphragm, several types of connecting rods, electric telescopic column, the arc grip block, the stopper, servo motor, screw rod and movable block, when building engineering strutting arrangement is to the pipeline bearing, the user places the pipeline between two stoppers on the bearing diaphragm, the user starts electric telescopic column, electric telescopic column drives the arc grip block and removes, make the arc grip block carry out spacing chucking to the pipeline, then the user starts servo motor, servo motor drives the screw rod and rotates, the screw rod rotates and drives the movable block and remove, the movable block drives the bearing diaphragm and remove, adjust, make the pipeline remove suitable position, thereby reach convenient to use's installation, reduce intensity of labour's advantage.
2. This building engineering strutting arrangement, through setting up supplementary slider, supplementary slide bar, supplementary spout, spacing post and screw hole, supplementary slider, supplementary slide bar and supplementary spout carry out supplementary spacing to the right side of bearing diaphragm, avoid the bearing diaphragm to take place to deviate when removing, spacing post and screw hole simultaneously, make the user adjust the back to the bearing diaphragm, the user rotates spacing post, carries out spacing fixedly to supplementary slider to carry out spacing fixedly to the bearing diaphragm, avoid the bearing diaphragm to take place to remove.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present utility model, the drawings that are needed in the embodiments will be briefly described below, it being understood that the following drawings only illustrate some examples of the present utility model and therefore should not be considered as limiting the scope, and other related drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a schematic elevational cross-sectional structural view of the support device for construction work of the present utility model;
FIG. 3 is a schematic view of a right side cross-sectional structure of the support device for construction work of the present utility model;
FIG. 4 is a schematic top cross-sectional view of the architectural engineering support apparatus of the present utility model;
Fig. 5 is a schematic view of a left-hand cross-sectional structure of the construction supporting apparatus of the present utility model.
The figure indicates: 1. a beam body; 2. a boom; 3. a reinforcing rod; 4. an anti-skid sleeve; 5. a bearing cross plate; 6. a several-type connecting rod; 7. a limiting block; 8. an electric telescopic column; 9. an arc-shaped clamping block; 10. a servo motor; 11. a screw; 12. a moving block; 13. a threaded hole; 14. a limit column; 15. an auxiliary slide bar; 16. an auxiliary chute; 17. an opening; 18. a limit bearing; 19. an auxiliary slide block; 20. a limit sliding block; 21. limiting sliding groove.
Detailed Description
Hereinafter, only certain exemplary embodiments are briefly described. As will be recognized by those of skill in the pertinent art, the described embodiments may be modified in numerous different ways without departing from the spirit or scope of the embodiments of the present utility model. Accordingly, the drawings and description are to be regarded as illustrative in nature and not as restrictive.
Example 1
As shown in figures 1-5, the building engineering supporting device comprises a beam body 1, a hanging rod 2, a reinforcing rod 3, an anti-slip sleeve 4, a bearing transverse plate 5, a table-shaped connecting rod 6, a limiting component, a limiting block 7 and an adjusting component, wherein the bottom of the beam body 1 is fixedly connected with the top of the hanging rod 2, two ends of the reinforcing rod 3 are fixedly connected with the hanging rod 2, the surface of the reinforcing rod 3 is sleeved with a protective sleeve, the bearing transverse plate 5 is arranged between the two hanging rods 2, the bottom of the table-shaped connecting rod 6 is fixedly connected with the top of the bearing transverse plate 5, the limiting component is arranged at the bottom of the table-shaped connecting rod 6, the limiting component is arranged at the top of the bearing transverse plate 5, the adjusting component is arranged in the left hanging rod 2, the adjusting component is connected with the bearing transverse plate 5, the limiting component is connected with the table-shaped connecting rod 6, the limiting component comprises an electric telescopic column 8 and an arc-shaped clamping block 9, the top of electric telescopic column 8 is fixedly connected with the bottom of several types of connecting rods 6, the output of electric telescopic column 8 is connected with the top of arc grip block 9, the quantity of electric telescopic column 8 and arc grip block 9 is a plurality of, electric telescopic column 8 and arc grip block 9 evenly distributed are in the bottom of several types of connecting rods 6, the regulating assembly includes servo motor 10, screw rod 11 and movable block 12, servo motor 10 sets up in the inside of left side jib 2, the output of servo motor 10 and the top fixed connection of screw rod 11, the surface of screw rod 11 and the inside threaded connection of movable block 12, the right side of movable block 12 and the left side fixed connection of bearing diaphragm 5 through setting up including roof beam body 1, jib 2, stiffener 3, anti-skidding sleeve 4, bearing diaphragm 5, several types of connecting rods 6, electric telescopic column 8, arc grip block 9, stopper 7, servo motor 10, screw rod 11 and movable block 12, building engineering strutting arrangement pipeline bearing, the user places the pipeline between two stopper 7 on bearing diaphragm 5, the user starts electric telescopic column 8, electric telescopic column 8 drives arc grip block 9 and removes, make arc grip block 9 carry out spacing chucking to the pipeline, then the user starts servo motor 10, servo motor 10 drives screw rod 11 and rotates, screw rod 11 rotates and drives movable block 12 and remove, movable block 12 drives bearing diaphragm 5 and removes, adjust, make the pipeline remove suitable position, thereby reach the user's installation of being convenient for, opening 17 has been seted up on the right side of left side jib 2, opening 17 and movable block 12 and screw rod 11 cooperation use, set up opening 17, can make screw rod 11 and movable block 12 have the activity space, the wearing and tearing of movable block 12 and screw rod 11 have been reduced, the bottom cover of screw rod 11 is established and is connected with spacing bearing 18, the bottom of spacing bearing 18 and the inner wall fixed connection of left side jib 2, set up spacing bearing 18, can carry out spacing to screw rod 11, avoid the screw rod 11 to change in the position when rotating, the front side fixed connection of movable block 12 has slider 20 to set up spacing slider 20 and the spacing slider 20 along with the inner wall 20 of movable block 12, can be avoided moving slider 20 to the spacing to the slider of the side, along with the setting up and the slider 20 is used to the slider to the spacing.
Example 2
The embodiment is an improvement made on the basis of embodiment 1, and in particular, please refer to fig. 1 to 3, the right side fixedly connected with auxiliary slide block 19 of bearing diaphragm 5, auxiliary slide bar 15 is established to the inner wall cover of auxiliary slide block 19, auxiliary slide bar 15's both ends all run through auxiliary slide block 19 and the inner wall fixed connection of right side jib 2, auxiliary spout 16 that cooperates with auxiliary slide block 19 and use is offered in the left side of right side jib 2, auxiliary slide bar 15 is located auxiliary spout 16, a plurality of screw holes 13 have been offered to the front side of right side jib 2, the front side threaded connection of right side jib 2 has spacing post 14, spacing post 14 and auxiliary slide block 19 threaded connection, through setting up auxiliary slide block 19, auxiliary slide bar 15, auxiliary slide slot 16, spacing post 14 and screw hole 13, auxiliary slide bar 15 and auxiliary slide slot 16 carry out auxiliary spacing to the right side of bearing diaphragm 5, avoid bearing diaphragm 5 to deviate when moving, simultaneously spacing post 14 and screw hole 13, make the user rotate spacing post 14 to support diaphragm 5, carry out fixed spacing to bearing diaphragm 19, thereby avoid bearing diaphragm 5 to take place fixed spacing.
The working principle of the supporting device for the building engineering is as follows: when building engineering strutting arrangement is to pipeline bearing, the user places the pipeline between two stopper 7 on the bearing diaphragm 5, the user starts electric telescopic column 8, electric telescopic column 8 drives arc grip block 9 and removes, make arc grip block 9 carry out spacing chucking to the pipeline, then the user starts servo motor 10, servo motor 10 drives screw rod 11 and rotates, screw rod 11 rotates and drives movable block 12 and remove, movable block 12 drives bearing diaphragm 5 and removes, adjust, make the pipeline remove suitable position, then the user rotates spacing post 14, carry out spacing fixedly to supplementary slider 19, thereby carry out spacing fixedly to bearing diaphragm 5.
It will be understood that the utility model has been described in terms of several embodiments, and that various changes and equivalents may be made to these features and embodiments by those skilled in the art without departing from the spirit and scope of the utility model. In addition, many modifications may be made to adapt a particular situation or material to the teachings of the utility model without departing from the essential scope thereof. Therefore, it is intended that the utility model not be limited to the particular embodiment disclosed, but that the utility model will include all embodiments falling within the scope of the appended claims.
Claims (6)
1. The utility model provides a building engineering strutting arrangement, includes roof beam body (1), jib (2), stiffening rod (3), antiskid cover (4), bearing diaphragm (5), several types connecting rod (6), spacing subassembly, stopper (7) and adjusting part, its characterized in that: the bottom of the beam body (1) is fixedly connected with the top of the hanging rods (2), the two ends of the reinforcing rod (3) are fixedly connected with the hanging rods (2), the surface of the reinforcing rod (3) is sleeved and connected with the protective sleeves, the bearing transverse plate (5) is arranged between the two hanging rods (2), the bottom of the several connecting rods (6) is fixedly connected with the top of the bearing transverse plate (5), the limiting component is arranged at the bottom of the several connecting rods (6), the limiting block (7) is arranged at the top of the bearing transverse plate (5), the adjusting component is arranged in the left hanging rod (2), the adjusting component is connected with the bearing transverse plate (5), and the limiting component is connected with the several connecting rods (6);
The limiting assembly comprises an electric telescopic column (8) and arc-shaped clamping blocks (9), wherein the top of the electric telescopic column (8) is fixedly connected with the bottom of the several types of connecting rods (6), the output end of the electric telescopic column (8) is connected with the top of the arc-shaped clamping blocks (9), the number of the electric telescopic column (8) and the arc-shaped clamping blocks (9) is a plurality of, and the electric telescopic column (8) and the arc-shaped clamping blocks (9) are uniformly distributed at the bottom of the several types of connecting rods (6);
The adjusting assembly comprises a servo motor (10), a screw rod (11) and a moving block (12), wherein the servo motor (10) is arranged in the left hanging rod (2), the output end of the servo motor (10) is fixedly connected with the top of the screw rod (11), the surface of the screw rod (11) is in threaded connection with the inner part of the moving block (12), and the right side of the moving block (12) is fixedly connected with the left side of the supporting transverse plate (5).
2. A construction support device according to claim 1, wherein: the right side fixedly connected with auxiliary slide block (19) of bearing diaphragm (5), auxiliary slide bar (15) are established to the inner wall cover of auxiliary slide block (19), auxiliary slide bar (15) both ends all run through auxiliary slide block (19) and the inner wall fixed connection of right side jib (2), the right side auxiliary spout (16) that use with auxiliary slide block (19) cooperation has been seted up in the left side of jib (2), auxiliary slide bar (15) are located auxiliary spout (16).
3. A construction support device according to claim 2, wherein: the front side of the boom (2) on the right side is provided with a plurality of threaded holes (13), the front side of the boom (2) on the right side is in threaded connection with a limit column (14), and the limit column (14) is in threaded connection with an auxiliary sliding block (19).
4. A construction support device according to claim 1, wherein: the right side of the boom (2) on the left side is provided with an opening (17), and the opening (17) is matched with the moving block (12) and the screw rod (11).
5. A construction support device according to claim 1, wherein: the bottom of the screw rod (11) is sleeved and connected with a limit bearing (18), and the bottom of the limit bearing (18) is fixedly connected with the inner wall of the left suspender (2).
6. A construction support device according to claim 1, wherein: the front side of the moving block (12) is fixedly connected with a limiting sliding block (20), and the inner wall of the suspender (2) on the left side is provided with a limiting sliding groove (21) matched with the limiting sliding block (20).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202323097276.XU CN221278710U (en) | 2023-11-16 | 2023-11-16 | Building engineering strutting arrangement |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202323097276.XU CN221278710U (en) | 2023-11-16 | 2023-11-16 | Building engineering strutting arrangement |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN221278710U true CN221278710U (en) | 2024-07-05 |
Family
ID=91708024
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202323097276.XU Active CN221278710U (en) | 2023-11-16 | 2023-11-16 | Building engineering strutting arrangement |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN221278710U (en) |
-
2023
- 2023-11-16 CN CN202323097276.XU patent/CN221278710U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN221278710U (en) | Building engineering strutting arrangement | |
| CN216340376U (en) | Device capable of adjusting distance and applying initial load to suspender | |
| CN210289062U (en) | Adjustable cushion block for climbing frame | |
| CN210458982U (en) | Fixture for positioning embedded steel bars of bridge pier column | |
| CN210562935U (en) | Low-cost light gauge steel mounting structure for furred ceiling | |
| CN210459899U (en) | Plastering device for building construction | |
| CN209620560U (en) | A new climbing frame hanger | |
| CN210263929U (en) | A preformed hole template for building civil engineering | |
| CN115637839A (en) | Quick assembly disassembly structure for building scaffold | |
| CN208415867U (en) | A kind of outdoor architecture mortar application device | |
| CN220686703U (en) | Clamping assembly and hanging basket for building construction | |
| CN208870243U (en) | A kind of curtain wall installing structure | |
| CN216016322U (en) | Combined cable bridge with remote real-time fault alarm function | |
| CN211201230U (en) | Building safety device | |
| CN216344370U (en) | Adjustable support with warning function for constructional engineering | |
| CN224048197U (en) | An automatic alarm-equipped rainwater well protection device | |
| CN221546041U (en) | Curtain wall connecting piece convenient to install | |
| CN223738946U (en) | Curved steel structure roof arched beam auxiliary steel ladder device | |
| CN220601006U (en) | Video monitoring device for building security management | |
| CN215331898U (en) | Safety device for building engineering | |
| CN205791413U (en) | Novel railway groove cable bearer | |
| CN216197198U (en) | Safety protection net for construction | |
| CN213402293U (en) | Pipeline fixing device on civil and industrial building scaffold | |
| CN211774995U (en) | Special screw rod of architectural decoration furred ceiling | |
| CN220016703U (en) | Hoisting structure and comprehensive distribution box thereof |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |