CN221273439U - Hydrologic water resource surveys buoy - Google Patents

Hydrologic water resource surveys buoy Download PDF

Info

Publication number
CN221273439U
CN221273439U CN202322990889.XU CN202322990889U CN221273439U CN 221273439 U CN221273439 U CN 221273439U CN 202322990889 U CN202322990889 U CN 202322990889U CN 221273439 U CN221273439 U CN 221273439U
Authority
CN
China
Prior art keywords
fixed
water resource
resource survey
survey buoy
buoy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322990889.XU
Other languages
Chinese (zh)
Inventor
赵长帧
尹华峰
周少琛
李吉祥
王奎全
卢玉军
辛英华
田新卫
成良春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Binzhou Water Conservancy Survey Design And Research Institute Co ltd
Original Assignee
Binzhou Water Conservancy Survey Design And Research Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Binzhou Water Conservancy Survey Design And Research Institute Co ltd filed Critical Binzhou Water Conservancy Survey Design And Research Institute Co ltd
Priority to CN202322990889.XU priority Critical patent/CN221273439U/en
Application granted granted Critical
Publication of CN221273439U publication Critical patent/CN221273439U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A90/00Technologies having an indirect contribution to adaptation to climate change
    • Y02A90/30Assessment of water resources

Landscapes

  • Testing Or Calibration Of Command Recording Devices (AREA)

Abstract

The utility model discloses a hydrologic water resource survey buoy, which belongs to the technical field of hydrologic water resource survey and aims at solving the problems of limitation in use and insufficient use protection of the water resource survey buoy, and the hydrologic water resource survey buoy comprises a water resource survey buoy body, wherein a fixing frame is fixed on one side of the water resource survey buoy body, a rotary groove is formed in the middle of the fixing frame, a rotary table is rotationally connected to the inner wall of the rotary groove, a screw rod is fixed in the middle of the rotary table, a handle is fixed at one end of the screw rod, a limiting block is fixed at the other end of the screw rod, a thread plate is connected to the outer surface of the screw rod in a threaded manner, buoys are fixed at two ends of the thread plate, and sliding plates are fixed at the other ends of the two buoys; according to the utility model, the handle is manually rotated to perform rotary operation, so that the effect of conveniently adjusting the draft is realized, the effect of improving the practicability of the water resource survey buoy is achieved, the floating objects collide with the protective frame to perform mobile operation, the buffering effect is realized, and the effect of improving the use protection performance of the water resource survey buoy is achieved.

Description

Hydrologic water resource surveys buoy
Technical Field
The utility model belongs to the technical field of hydrologic water resource survey, and particularly relates to a hydrologic water resource survey buoy.
Background
The hydrologic survey engineering is used for surveying the water environment such as terrains, soil, water sources, drainage systems and the like and the factors such as water receiving, drainage, management control and the like, determining reasonable hydrologic parameters, and a construction scheme provides quantitative and scientific basis for the construction of the hydraulic engineering, and in order to position the detected equipment, a hydrologic water resource survey buoy is needed.
The publication number of the comparison patent document is: "CN 214001975U's a hydrologic water resource surveys buoy, including the mounting panel, be equipped with the showy bucket on the mounting panel, be equipped with the mount table on the mounting panel, be equipped with coupling mechanism on the mount table, coupling mechanism includes fixed cover, wear to be equipped with the cylinder on the support frame, it has wire rope to coil on the cylinder, wear to be equipped with the spliced pole on the fixed cover, wear to be equipped with the button on the spliced pole, be equipped with reset spring in the spliced pole, be equipped with the fixed section of thick bamboo on the mount table, the spacing hole has been seted up on the fixed section of thick bamboo, be equipped with the steady section of thick bamboo on the mount table, the through-hole has been seted up on the steady section of thick bamboo, wear to be equipped with the push rod in the steady section of thick bamboo, be equipped with extrusion spring in the steady section of thick bamboo.
The above patent still has the following problems in the actual use cases: although this patent can carry out daily water resource survey operation, in the in-service use, because the position of flotation pontoon is comparatively fixed for inconvenient to carry out the regulation operation to the draft of water resource survey buoy according to staff's needs, and then make water resource survey buoy's use have the limitation, and when the water resource survey buoy floats and survey the operation on the surface of water, be bumped by surface of water floater easily, make the impact force that the collision produced directly act on the water resource survey buoy, lead to the damage of water resource survey buoy, thereby make water resource survey buoy use the protectiveness not enough.
Therefore, there is a need for a hydrologic water resource survey buoy that solves the problems of limitations in the use of water resource survey buoys and insufficient protection of the use of water resource survey buoys in the prior art.
Disclosure of utility model
The present utility model is directed to a hydrologic water resource survey buoy that solves the above-mentioned problems.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a buoy is surveyed to hydrology water resource, includes that buoy main part is surveyed to the water resource, buoy main part one side is fixed with the mount, the change groove has been seted up at the mount middle part, change inslot wall rotation is connected with the carousel, the carousel middle part is fixed with the lead screw, lead screw one end is fixed with the handle, the lead screw other end is fixed with the stopper, lead screw surface threaded connection has the screw thread board, the screw thread board both ends all are fixed with the flotation pontoon, two the flotation pontoon other end is fixed with the slide, slide middle part sliding connection has the gag lever post, gag lever post one end is fixed with the link, water resource surveys buoy main part both sides all to be fixed with two stabilizer bars, four the stabilizer other end all is fixed with the stabilizer, two wherein stabilizer bar surface sliding connection has one of them protection frame, two the close end of protection frame all is fixed with two springs.
In the scheme, the outer surface of the rotary table is rotationally connected to the inner wall of the rotary table, the rotary table is in a circular arrangement, the rotary table penetrates through the middle of the fixing frame, and the middle of the rotary table is fixed on one side of the screw rod.
It is further worth to say that mount one end is fixed in water resource survey buoy main part one side, link one end is fixed in water resource survey buoy main part opposite side, gag lever post one end is fixed in the link middle part, the gag lever post is T type setting.
It should be further noted that, each stabilizer bar one end is fixed in the water resource survey buoy main part one side, the stabilizer bar other end is fixed in every stabilizer plate middle part, every stabilizer bar surface sliding connection is in every protection frame one side, every spring one end is fixed in every protection frame one side, every spring other end is fixed in water resource survey buoy main part one side.
As a preferred embodiment, two guard frames are disposed opposite to each other, and each guard frame is disposed in a semicircular shape.
As a preferred implementation mode, the middle part of the handle is fixed at one end of the screw rod, the middle part of the limiting block is fixed at the other end of the screw rod, the handle is arranged in a zigzag mode, and the cross section of the limiting block is circular.
As a preferable implementation mode, one end of each pontoon is fixed at two ends of the screw plate, the other end of each pontoon is fixed at two ends of the sliding plate, and the pontoons are oppositely arranged.
Compared with the prior art, the hydrologic water resource survey buoy provided by the utility model at least comprises the following beneficial effects:
(1) The handle is rotated by manpower to perform rotary operation, so that the handle, the turntable, the rotary groove, the fixing frame, the screw rod, the screw plate, the pontoon, the sliding plate, the limiting rod, the connecting frame and the limiting block are mutually matched to perform operation, the effect of convenient adjustment of the draft is realized, corresponding adjustment operation can be performed according to the needs of workers, and the effect of improving the practicability of the water resource survey buoy is achieved.
(2) Through floater collision protection frame operation for protection frame, stabilizer bar, stabilizer disc, spring mutually support the operation, realize the effect of buffering, can survey the buoy to the water resource and carry out abundant protection operation, and then reach the effect that improves the buoy and use the protectiveness that surveys the water resource.
Drawings
FIG. 1 is a perspective view of the present utility model;
FIG. 2 is a cross-sectional view of a holder according to the present utility model;
FIG. 3 is an enlarged schematic view of the area A in FIG. 2;
Fig. 4 is a top view of the present utility model.
In the figure: 1. a water resource survey buoy body; 2. a fixing frame; 3. a rotary groove; 4. a turntable; 5. a screw rod; 6. a handle; 7. a limiting block; 8. a thread plate; 9. a pontoon; 10. a slide plate; 11. a limit rod; 12. a connecting frame; 13. a stabilizer bar; 14. a stabilizer plate; 15. a protective frame; 16. and (3) a spring.
Detailed Description
The utility model is further described below with reference to examples.
Referring to fig. 1-4, the utility model provides a hydrologic water resource survey buoy, which comprises a water resource survey buoy main body 1, wherein the water resource survey buoy main body 1 surveys the water environment such as the terrain, soil, water source, drainage system and the like and receives water, drainage, management control purpose and other factors, a fixing frame 2 is fixed on one side of the water resource survey buoy main body 1, the effect of stabilizing a screw rod 5 by the fixing frame 2, a rotary groove 3 is arranged in the middle of the fixing frame 2, a rotary disc 4 is rotatably connected to the inner wall of the rotary groove 3, a screw rod 5 is fixed in the middle of the rotary disc 4, the screw rod 5 drives a screw plate 8 to conveniently adjust the draft under the limit of a slide plate 10 and a limit rod 11, one end of the screw rod 5 is fixed with a handle 6, the other end of the screw rod 5 is fixed with a limit block 7, the screw rod 5 is in threaded connection with the screw plate 8, two ends of the screw plate 8 are both ends of the buoy 9 are fixed with the slide plate 10, the middle of the slide plate 10 is slidably connected with the limit rod 11, one end of the limit rod 11 is fixed with a connecting frame 12, two stabilizing rods 13 are fixed on both sides of the water resource survey main body 1, the other ends of the four stabilizing rods 13 are fixedly provided with the stabilizing rods 14, the other ends of the stabilizing rods 13 are fixedly provided with the stabilizing plates 14, the two protecting frames 16 are fixedly connected with the two protecting frames 16, and the two protecting frames 16 are fixedly connected with the outer surfaces 16.
Further, as shown in fig. 1, fig. 2 and fig. 3, it is worth specifically explaining that the outer surface of the turntable 4 is rotatably connected to the inner wall of the turntable 3, the turntable 4 is circularly arranged, the turntable 3 penetrates through the middle part of the fixed frame 2, the middle part of the turntable 4 is fixed on one side of the screw rod 5, one end of the fixed frame 2 is fixed on one side of the water resource survey buoy main body 1, one end of the connecting frame 12 is fixed on the other side of the water resource survey buoy main body 1, one end of the limiting rod 11 is fixed on the middle part of the connecting frame 12, and the limiting rod 11 is in a T-shaped arrangement.
Further, as shown in fig. 1, 2 and 4, it should be noted that one end of each stabilizer bar 13 is fixed at one side of the water resource survey buoy body 1, the other end of each stabilizer bar 13 is fixed at the middle of each stabilizer plate 14, the outer surface of each stabilizer bar 13 is slidably connected at one side of each protection frame 15, one end of each spring 16 is fixed at one side of each protection frame 15, the other end of each spring 16 is fixed at one side of the water resource survey buoy body 1, the two protection frames 15 are oppositely arranged, and each protection frame 15 is semi-circular.
The scheme comprises the following working processes: when the float is surveyed by using water resources, the handle 6 is rotated by manpower at first, the screw rod 5 fixedly connected with the middle part of the handle 6 is rotated under the stability of the rotary table 4 and the rotary groove 3, thereby the threaded plate 8 in threaded connection with the outer surface of the screw rod 5 drives the two buoys 9 to carry out height adjustment operation at the limit of the limit rod 11 and the slide plate 10, the effect of conveniently adjusting the draft is completed, corresponding adjustment operation can be carried out according to the needs of workers, the effect of improving the practicability of the float is further achieved, then the protective frame 15 is moved by the floater collision, the protective frame 15 is slid under the stability of the stabilizing rod 13 and the stabilizing disc 14, the spring 16 fixedly connected with the protective frame 15 is compressed under the support of the float main body 1, the spring 16 generates elastic force support, the impact force generated by collision is weakened, the buffering effect is completed, the water resources are fully protected, and the effect of improving the use protection performance of the float is further achieved.
The working process can be as follows: the handle 6 is rotated through manpower, make with handle 6 middle part fixed connection's lead screw 5 drive two buoys 9 carry out high regulation operation, realize the convenient effect of adjusting of draught, can carry out corresponding regulation operation according to staff's needs, and then reach the effect that improves the buoy practicality is surveyed to the water resource, later, collide protection frame 15 through the floater and remove the operation, make with protection frame 15 fixed connection's spring 16 compressed, realize the effect of buffering, can carry out abundant protection operation to the buoy is surveyed to the water resource, and then reach the effect that improves the buoy and use the protectiveness is surveyed to the water resource.
Further as shown in fig. 1, 2 and 4, it is worth specifically explaining that the middle part of the handle 6 is fixed at one end of the screw rod 5, the middle part of the limiting block 7 is fixed at the other end of the screw rod 5, the handle 6 is arranged in a zigzag manner, the cross section of the limiting block 7 is arranged in a round manner, the handle 6 is arranged in a zigzag manner, the effect of friction force can be improved, and workers are prevented from rotating due to insufficient friction force to cause the phenomenon of hand-off.
Further, as shown in fig. 1, 2 and 4, it is worth specifically explaining that one end of two buoys 9 is fixed at two ends of the screw plate 8, the other end of two buoys 9 is fixed at two ends of the slide plate 10, the two buoys 9 are oppositely arranged, the buoys 9 can depend on the floating effect of the water on the water surface, and the stability of the water resource survey buoy is improved.
To sum up: the effect of frictional force can be improved for the cockscomb structure setting through the handle 6 that sets up, prevents that the staff from taking place because frictional force is insufficient to lead to the condition of taking off the hand at the rotation, can rely on the buoyancy of water to float the effect on the surface of water through the flotation pontoon 9 that sets up, improves the effect of water resource survey buoy stability.

Claims (7)

1. The utility model provides a buoy is surveyed to hydrology water resource, includes water resource survey buoy main part (1), a serial communication port, water resource survey buoy main part (1) one side is fixed with mount (2), change groove (3) have been seted up at mount (2) middle part, change groove (3) inner wall rotation and be connected with carousel (4), carousel (4) middle part is fixed with lead screw (5), lead screw (5) one end is fixed with handle (6), the lead screw (5) other end is fixed with stopper (7), lead screw (5) surface threaded connection has screw thread board (8), screw thread board (8) both ends all are fixed with flotation pontoon (9), two flotation pontoon (9) other end is fixed with slide (10), slide (10) middle part sliding connection has gag lever post (11), gag lever post (11) one end is fixed with link (12), water resource survey buoy main part (1) both sides all are fixed with two stabilizer bars (13), four stabilizer bar (13) other end all are fixed with stabilizer plate (14), wherein two stabilizer bar (13) other end are connected with screw thread board (8), both have two protection frames (15) to be close.
2. A hydrological water resource survey buoy according to claim 1, characterized in that: the outer surface of the rotary table (4) is rotationally connected to the inner wall of the rotary groove (3), the rotary table (4) is in a circular arrangement, the rotary groove (3) penetrates through the middle of the fixing frame (2), and the middle of the rotary table (4) is fixed on one side of the screw rod (5).
3. A hydrological water resource survey buoy according to claim 1, characterized in that: one end of the fixing frame (2) is fixed on one side of the water resource survey buoy main body (1), one end of the connecting frame (12) is fixed on the other side of the water resource survey buoy main body (1), one end of the limiting rod (11) is fixed in the middle of the connecting frame (12), and the limiting rod (11) is in a T-shaped arrangement.
4. A hydrological water resource survey buoy according to claim 1, characterized in that: each stabilizer bar (13) one end is fixed on one side of the water resource survey buoy main body (1), the other end of each stabilizer bar (13) is fixed in the middle of each stabilizer disc (14), each stabilizer bar (13) outer surface sliding connection is on one side of each protection frame (15), each spring (16) one end is fixed on one side of each protection frame (15), and each spring (16) other end is fixed on one side of the water resource survey buoy main body (1).
5. A hydrological water resource survey buoy according to claim 1, characterized in that: the two protection frames (15) are oppositely arranged, and each protection frame (15) is arranged in a semicircular shape.
6. A hydrological water resource survey buoy according to claim 1, characterized in that: the middle part of the handle (6) is fixed at one end of the screw rod (5), the middle part of the limiting block (7) is fixed at the other end of the screw rod (5), the handle (6) is arranged in a zigzag mode, and the cross section of the limiting block (7) is circular.
7. A hydrological water resource survey buoy according to claim 1, characterized in that: one end of each pontoon (9) is fixed at two ends of the screw plate (8), the other end of each pontoon (9) is fixed at two ends of the sliding plate (10), and the two pontoons (9) are oppositely arranged.
CN202322990889.XU 2023-11-07 2023-11-07 Hydrologic water resource surveys buoy Active CN221273439U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322990889.XU CN221273439U (en) 2023-11-07 2023-11-07 Hydrologic water resource surveys buoy

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322990889.XU CN221273439U (en) 2023-11-07 2023-11-07 Hydrologic water resource surveys buoy

Publications (1)

Publication Number Publication Date
CN221273439U true CN221273439U (en) 2024-07-05

Family

ID=91694928

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322990889.XU Active CN221273439U (en) 2023-11-07 2023-11-07 Hydrologic water resource surveys buoy

Country Status (1)

Country Link
CN (1) CN221273439U (en)

Similar Documents

Publication Publication Date Title
CN113098370B (en) Floating net-shaped supporting device based on photovoltaic power generation
CN221273439U (en) Hydrologic water resource surveys buoy
CN111934604A (en) Photovoltaic power generation device with good protection effect
CN213571776U (en) Water retaining device for hydraulic engineering
CN112994601B (en) Photovoltaic power generation equipment
CN210597218U (en) Dam reinforcing structure for hydraulic engineering
CN217320676U (en) Buoy with buffer protection structure for ocean monitoring
CN212058879U (en) Marine environment monitoring device based on buoyancy technology
CN214119620U (en) Adjustable hydrology and water resource monitoring device
CN214886139U (en) A novel protection network device for engineering construction
CN220123542U (en) Ecological mangrove floating plate device of growing seedlings
CN211929194U (en) Comprehensive protection mechanism of marine transformer of hydraulic engineering
CN211083083U (en) A water conservancy pipeline supports connection structure for hydraulic engineering
CN210139392U (en) A stop device is stacked to pipeline for hydraulic engineering
CN209805322U (en) Novel cable support
CN214883377U (en) Water conservancy construction cut-off equipment
CN219547725U (en) Assembled trash buoy
CN220857521U (en) A line protection component
CN211286201U (en) Component type curtain wall connecting structure
CN210064988U (en) Tower crane monitoring device with long service life
CN219772862U (en) Protection device for hydraulic and hydroelectric engineering side slope
CN214654308U (en) Ecological restoration structure based on degraded lakeside wetland
CN215329684U (en) Flood control device for water conservancy and hydropower
CN213900304U (en) Pipeline hanger for boats and ships
CN212506071U (en) Hydraulic engineering is with preventing unrestrained device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant