CN221253830U - Auxiliary tool for installing electric meter box - Google Patents
Auxiliary tool for installing electric meter box Download PDFInfo
- Publication number
- CN221253830U CN221253830U CN202323053074.5U CN202323053074U CN221253830U CN 221253830 U CN221253830 U CN 221253830U CN 202323053074 U CN202323053074 U CN 202323053074U CN 221253830 U CN221253830 U CN 221253830U
- Authority
- CN
- China
- Prior art keywords
- gear
- rope
- motor
- meter box
- sliding rail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009434 installation Methods 0.000 claims description 7
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008602 contraction Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
Landscapes
- Manipulator (AREA)
Abstract
The utility model discloses an auxiliary tool for installing an electric power meter box, which comprises a bottom plate, wherein a first motor is fixedly arranged on the bottom plate, an output shaft of the first motor is fixedly connected with a threaded rod, the threaded rod is in threaded connection with a first lifting plate, a first sliding rail is fixedly arranged on the bottom plate, the first sliding rail is in sliding connection with the first lifting plate, a second sliding rail is fixedly arranged on the bottom plate, the second sliding rail is in sliding connection with the second lifting plate, a second motor is arranged at the top of the second sliding rail, an output shaft of the second motor is fixedly connected with a first gear, the first gear is fixedly connected with a first rope shrinkage frame, the first gear is meshed with a third gear, the third gear is meshed with a second gear, the second gear is fixedly arranged on the second rope shrinkage frame, and workers can replace and install the electric power meter box on the bottom plate, and the overall stability is improved.
Description
Technical Field
The utility model belongs to the technical field of auxiliary tools for installing an electric power meter box, and particularly relates to an auxiliary tool for installing an electric power meter box.
Background
The utility model provides an electric power meter box installs appurtenance specifically is a supplementary instrument when maintaining the change electric power meter box for maintenance work personnel.
The utility model has disclosed an electric power meter box installs the appurtenance in application number CN201520408135.1, including all become the vertical stand, support and carriage of the axisymmetric structure, the said support articulates in the middle part position of the vertical stand, there are horizontal pedals on the support; the back of the vertical frame is provided with a longitudinal chute I, the sliding frame is arranged in the chute I, and the sliding frame is provided with a supporting frame; the fixed pulley is fixed at the top of the vertical frame, the transverse rotating rod is arranged at the middle position of the vertical frame and driven by the crank, one end of the rope is fixed on the rotating rod, and the other end of the rope is fixed at the top of the sliding frame after passing through the fixed pulley.
The utility model can solve the problems that three or four persons are needed for installing the meter box and the working efficiency is low in the prior art, but when the power meter box is lifted to a certain position, a worker needs to climb a ladder and work on the ladder, which is very inconvenient and has a certain danger.
Disclosure of utility model
The utility model aims to provide an auxiliary tool for installing an electric meter box, which solves the problems that in the prior art, when a worker installs an electric meter, the worker needs to climb a ladder and work on the ladder, the worker is very inconvenient and has a certain danger.
In order to achieve the above purpose, the present utility model adopts the following technical scheme: the utility model provides an electric power meter box installation appurtenance, fixed mounting has first motor on the bottom plate, the output shaft fixed connection threaded rod of first motor, threaded rod threaded connection first lifter plate, the one end of first rope of first lifter plate fixed connection.
Specifically, a first sliding rail is fixedly arranged on the bottom plate, and the first sliding rail is in sliding connection with the first lifting plate.
Specifically, fixed mounting has the second slide rail on the bottom plate, second slide rail and second lifter plate sliding connection, the one end of second rope of second lifter plate fixed connection.
Specifically, the second motor is installed at the top of second slide rail, the output shaft fixed connection first gear of second motor, first rope shrink frame of first gear fixed connection, the other end of first rope shrink frame fixed connection second rope.
Specifically, first gear and third gear mesh mutually, third gear and second gear mesh mutually, second gear fixed mounting is on second rope shrink frame, the other end of second rope shrink frame fixed connection first rope, third gear fixed connection connecting rod, connecting rod fixed connection is at the top of second slide rail.
Specifically, a plurality of pulleys are installed at the bottom of the bottom plate.
The beneficial effects are that: according to the auxiliary tool for installing the electric power meter box, the first lifting plate is arranged on the bottom plate, the lifting height can be adjusted, and workers can replace and install the electric power meter box on the auxiliary tool, so that the auxiliary tool is very convenient.
According to the auxiliary tool for installing the electric power meter box, the lifting plate and the second lifting plate are fixedly connected with the ropes, the second motor drives the gear and the rope shrinkage frame to rotate to shrink the expansion and contraction when the first lifting plate ascends, so that a part of weight is allocated to the first sliding rail and the threaded rod, and the stability of the whole device is improved.
Drawings
FIG. 1 is a schematic view of the overall three-dimensional structure of the present utility model;
FIG. 2 is a left side view of the present utility model;
FIG. 3 is a top view of the present utility model;
Fig. 4 is an enlarged view at a in fig. 1.
In the figure: 1. a bottom plate; 101. a pulley; 2. a first slide rail; 3. a first motor; 301. a threaded rod; 302. a first lifting plate; 303. a first rope; 4. a second motor; 401. a first gear; 402. a first rope retraction rack; 403. a second gear; 404. a third gear; 405. a connecting rod; 406. a second rope retraction rack; 5. a second slide rail; 501. a second lifting plate; 502. a second rope.
Detailed Description
In order to more clearly illustrate the embodiments of the present utility model or the technical solutions in the prior art, the present utility model will be briefly described below with reference to the accompanying drawings and the description of the embodiments or the prior art, and it is obvious that the following description of the structure of the drawings is only some embodiments of the present utility model, and other drawings can be obtained according to these drawings without inventive effort to a person skilled in the art. It should be noted that the description of these examples is for aiding in understanding the present utility model, but is not intended to limit the present utility model.
Embodiment one: as shown in fig. 1, a first motor 3 is fixedly installed on the base plate 1, an output shaft of the first motor 3 is fixedly connected with a threaded rod 301, the threaded rod 301 is in threaded connection with a first lifting plate 302, the first lifting plate 302 is fixedly connected with one end of a first rope 303, a first sliding rail 2 is fixedly installed on the base plate 1, and the first sliding rail 2 is in sliding connection with the first lifting plate 302.
The first motor 3 can drive the threaded rod 301 to rotate, and the threaded rod 301 can push the first lifting plate 302 to move to play a lifting role, and the first lifting plate 302 is in sliding connection with the first sliding rail 2, so that a part of weight can be effectively distributed to the threaded rod 301.
The second sliding rail 5 is fixedly installed on the bottom plate 1, the second sliding rail 5 is in sliding connection with the second lifting plate 501, and the second lifting plate 501 is fixedly connected with one end of the second rope 502.
The second sliding rail 5 is slidably connected with the second lifting plate 501, and a second rope 502 is fixed on the second lifting plate 501, and the rope 502 mainly distributes part of the weight of the power box to the second lifting plate and improves certain stability.
Embodiment two: as shown in fig. 2, the second motor 4 is mounted on the top of the second sliding rail 5, an output shaft of the second motor 4 is fixedly connected with the first gear 401, the first gear 401 is fixedly connected with the first rope shrinkage frame 402, and the first rope shrinkage frame 402 is fixedly connected with the other end of the second rope 502.
The second motor 4 drives the first gear 401 and the second rope retraction frame 402 to rotate, and the second rope 502 is retracted onto the first rope retraction frame 402.
The first gear 401 is meshed with the third gear 404, the third gear 404 is meshed with the second gear 403, the second gear 403 is fixedly arranged on the second rope shrinkage frame 406, the second rope shrinkage frame 406 is fixedly connected with the other end of the first rope 303, the third gear 404 is fixedly connected with the connecting rod 405, and the connecting rod 405 is fixedly connected to the top of the second sliding rail 5.
The first gear 401 drives the third gear 404 to rotate under the drive of the second motor 4, the third gear 404 drives the second gear 403 to rotate, and the third gear 403 drives the second rope shrinkage bracket 406 to rotate, so that the first rope 303 is shrunk.
Working principle: the auxiliary tool is moved to a position where the auxiliary tool needs to work, firstly, the electric meter box is placed on the second lifting plate 501, a worker climbs on the first lifting plate 302, the first motor 3 and the second motor 4 are started, the second motor 4 drives the first gear 401 and the second rope shrinkage frame 402 to rotate, the second rope 502 is received on the first rope shrinkage frame 402, the first gear 401 drives the third gear 404 to rotate, the third gear 404 drives the second gear 403 to rotate, the third gear 403 drives the second rope shrinkage frame 406 to rotate, the first rope 303 is shrunk, the first motor 3 drives the threaded rod 301 to rotate, and the threaded rod 301 drives the first lifting plate 302 to move so as to play a lifting role.
Finally, it should be noted that: the foregoing description is only of the preferred embodiments of the utility model and is not intended to limit the scope of the utility model. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present utility model should be included in the protection scope of the present utility model.
Claims (6)
1. The utility model provides an electric power table case installation appurtenance, includes bottom plate (1), its characterized in that: the novel lifting device is characterized in that a first motor (3) is fixedly installed on the bottom plate (1), an output shaft of the first motor (3) is fixedly connected with a threaded rod (301), the threaded rod (301) is in threaded connection with a first lifting plate (302), and the first lifting plate (302) is fixedly connected with one end of a first rope (303).
2. The power meter box installation aid according to claim 1, wherein: the base plate (1) is fixedly provided with a first sliding rail (2), and the first sliding rail (2) is in sliding connection with the first lifting plate (302).
3. The power meter box installation aid according to claim 1, wherein: the second sliding rail (5) is fixedly arranged on the bottom plate (1), the second sliding rail (5) is in sliding connection with the second lifting plate (501), and the second lifting plate (501) is fixedly connected with one end of the second rope (502).
4. A utility meter box installation aid as claimed in claim 3, wherein: the top of second slide rail (5) is installed second motor (4), the output shaft fixed connection first gear (401) of second motor (4), first gear (401) fixed connection first rope shrink frame (402), the other end of first rope shrink frame (402) fixed connection second rope (502).
5. The power meter box installation aid of claim 4, wherein: the first gear (401) is meshed with the third gear (404), the third gear (404) is meshed with the second gear (403), the second gear (403) is fixedly arranged on a second rope shrinkage frame (406), the second rope shrinkage frame (406) is fixedly connected with the other end of the first rope (303), the third gear (404) is fixedly connected with a connecting rod (405), and the connecting rod (405) is fixedly connected with the top of the second sliding rail (5).
6. The power meter box installation aid of claim 4, wherein: a plurality of pulleys (101) are mounted at the bottom of the bottom plate (1).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202323053074.5U CN221253830U (en) | 2023-11-13 | 2023-11-13 | Auxiliary tool for installing electric meter box |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202323053074.5U CN221253830U (en) | 2023-11-13 | 2023-11-13 | Auxiliary tool for installing electric meter box |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN221253830U true CN221253830U (en) | 2024-07-02 |
Family
ID=91628992
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202323053074.5U Active CN221253830U (en) | 2023-11-13 | 2023-11-13 | Auxiliary tool for installing electric meter box |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN221253830U (en) |
-
2023
- 2023-11-13 CN CN202323053074.5U patent/CN221253830U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN114152828B (en) | Flexible direct-current transmission converter valve submodule power overhaul test device and test method | |
| CN221253830U (en) | Auxiliary tool for installing electric meter box | |
| CN218950966U (en) | Wind driven generator overhauls climbing device | |
| CN217264706U (en) | Electric power installation and maintenance platform | |
| CN213602588U (en) | Outdoor adjustable angle integration support of photovoltaic power generation system | |
| CN216462577U (en) | Welding device for steel box girder tied arch bridge | |
| CN216549486U (en) | Indoor and outdoor electrician installation and overhaul operating platform | |
| CN110104593A (en) | A kind of electric power overhaul electric pole repairing frame that function is moved with automatic lifting | |
| CN114852887A (en) | Hoisting equipment for transformer substation | |
| CN222083981U (en) | Scaffold frame for electric power construction convenient to adjust | |
| CN220994433U (en) | Hydraulic support assembly workbench | |
| CN217354610U (en) | Wind power generation equipment overhauls platform | |
| CN222120878U (en) | A construction platform for building | |
| CN219779505U (en) | High-voltage compensation cabinet | |
| CN222478081U (en) | Scaffold for building engineering | |
| CN222524138U (en) | Lifting device for building engineering | |
| CN212909289U (en) | Generator maintenance operation panel | |
| CN221319227U (en) | Construction hoisting platform in subway tunnel | |
| CN218061311U (en) | Multifunctional trolley for field construction | |
| CN222082230U (en) | A mobile and adjustable lifting platform for a ditch photovoltaic power generation system | |
| CN219156459U (en) | Network communication construction device of ascending a height | |
| CN222338995U (en) | Power station circuit frame | |
| CN222209801U (en) | Auxiliary device for laser scanning | |
| CN219174164U (en) | Movable vertical lifting device for overhauling operation in transformer substation | |
| CN220502631U (en) | Cable overhauling equipment for high-altitude cable erection of power cable |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |