CN221253693U - Large modular unit lifting device - Google Patents

Large modular unit lifting device Download PDF

Info

Publication number
CN221253693U
CN221253693U CN202322652762.7U CN202322652762U CN221253693U CN 221253693 U CN221253693 U CN 221253693U CN 202322652762 U CN202322652762 U CN 202322652762U CN 221253693 U CN221253693 U CN 221253693U
Authority
CN
China
Prior art keywords
modular
frame
plug
workbench
lifting device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322652762.7U
Other languages
Chinese (zh)
Inventor
卢耀
梁以德
黃建闽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Caizhi Consulting Co ltd
Original Assignee
Caizhi Consulting Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Caizhi Consulting Co ltd filed Critical Caizhi Consulting Co ltd
Priority to CN202322652762.7U priority Critical patent/CN221253693U/en
Application granted granted Critical
Publication of CN221253693U publication Critical patent/CN221253693U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型公开了一种大型模块化单元吊运装置,包括多个模块化框架,模块化框架通过层层叠加成塔式结构,在最上层的模块化框架上设有顶层模块框架,顶层模块框架上设有可在模块化框架与顶层模块框架中垂直升降的工作台,在工作台上设有可垂直升降的升降台,以使工作台与升降台同时或不同时垂直升降。与现有技术相比,通过设置多个模块化框架层层叠加,在最上层的模块化框架上设置顶层模块框架,顶层模块框架中设有可升降的工作台以及升降台,辅助实现了大型模块化单元的垂直吊运,以替代塔式起重机垂直作业,避免在垂直作业的过程中发生摇摆或碰撞的问题,避免大型模块化单元损坏以及降低操作难度。

The utility model discloses a large modular unit lifting device, including a plurality of modular frames, wherein the modular frames are stacked layer by layer to form a tower structure, a top module frame is arranged on the uppermost modular frame, a workbench which can be vertically lifted and lowered between the modular frame and the top module frame is arranged on the top module frame, and a lifting platform which can be vertically lifted and lowered is arranged on the workbench, so that the workbench and the lifting platform can be vertically lifted and lowered simultaneously or at different times. Compared with the prior art, by arranging a plurality of modular frames to be stacked layer by layer, a top module frame is arranged on the uppermost modular frame, and a liftable workbench and a lift platform are arranged in the top module frame, the vertical lifting of the large modular unit is assisted, so as to replace the vertical operation of the tower crane, avoid the problem of swaying or collision in the process of vertical operation, avoid the damage of the large modular unit, and reduce the difficulty of operation.

Description

大型模块化单元吊运装置Large modular unit lifting device

技术领域Technical Field

本实用新型涉及一种吊运装置,特别涉及一种模块化的大型模块化单元吊运装置。The utility model relates to a lifting device, in particular to a modular large-scale modular unit lifting device.

背景技术Background technique

高层建筑施工中大型模块化单元的吊装受到其的尺寸的限制,往往使用塔式起重机进行吊运。The lifting of large modular units in high-rise building construction is limited by their size and tower cranes are often used for lifting.

在施工过程中,大型模块化单元在空中行驶存在安全风险,风险主要取决于大型模块化单元的重量和尺寸、垂直运输的持续时间以及风力和天气条件,这样容易因风力过大而在垂直运输时出现摇晃,当垂直运输空间狭小时,若出现摇晃则容易导致大型模块化单元损坏,同时容易出现安全隐患,由于塔式起重机在使用时需要同时操作水平以及垂直方向的动作才可实现大型模块化单元的吊装操作,无疑增加了操作难度。During the construction process, there are safety risks when large modular units are traveling in the air. The risks mainly depend on the weight and size of the large modular units, the duration of vertical transportation, and wind and weather conditions. It is easy for the units to shake during vertical transportation due to excessive wind. When the vertical transportation space is narrow, shaking may easily cause damage to the large modular units, and safety hazards may also occur. Since tower cranes need to operate horizontal and vertical movements at the same time to realize the lifting operation of large modular units, this undoubtedly increases the difficulty of operation.

实用新型内容Utility Model Content

本实用新型的目的在于提供一种大型模块化单元吊运装置,要解决的技术问题是辅助实现大型模块化单元的垂直吊运,避免大型模块化单元损坏,同时降低操作难度。The utility model aims to provide a large modular unit lifting device, and the technical problem to be solved is to assist in realizing the vertical lifting of the large modular unit, avoid damage to the large modular unit, and reduce the difficulty of operation.

为解决上述问题,本实用新型采用以下技术方案实现:一种大型模块化单元吊运装置,包括多个模块化框架,模块化框架通过层层叠加成塔式结构,在最上层的模块化框架上设有顶层模块框架,顶层模块框架上设有可在模块化框架与顶层模块框架中垂直升降的工作台,在工作台上设有可垂直升降的升降台,以使工作台与升降台同时或不同时垂直升降。In order to solve the above problems, the utility model adopts the following technical solutions: a large modular unit lifting device, including multiple modular frames, the modular frames are stacked layer by layer to form a tower structure, a top-level module frame is provided on the topmost modular frame, a workbench that can be vertically lifted and lowered between the modular frames and the top-level module frames is provided on the top-level module frame, and a lifting platform that can be vertically lifted and lowered is provided on the workbench, so that the workbench and the lifting platform can be vertically lifted and lowered simultaneously or at different times.

进一步地,所述顶层模块框架为梯形框架结构,在顶层模块框架的顶部设有与升降台连接的第一升降机构,在顶层模块框架顶部设有与工作台连接的第二升降机构。Furthermore, the top module frame is a trapezoidal frame structure, a first lifting mechanism connected to a lifting platform is provided at the top of the top module frame, and a second lifting mechanism connected to a workbench is provided at the top of the top module frame.

进一步地,所述模块化框架为矩形框架结构,在模块化框架的底部四个角上分别设有第一插接固定部,在模块化框架的顶部四个角上设有与第一插接固定部相适配的插接孔,以使相邻两个模块化框架通过上一层的模块化框架的第一插接固定部插入下一层的模块化框架的插接孔中,实现上下两层模块化框架之间的连接。Furthermore, the modular frame is a rectangular frame structure, and first plug-in fixing parts are respectively provided at the four bottom corners of the modular frame, and plug-in holes compatible with the first plug-in fixing parts are provided at the four top corners of the modular frame, so that two adjacent modular frames can be inserted into the plug-in holes of the modular frame of the next layer through the first plug-in fixing parts of the modular frame of the upper layer, thereby realizing the connection between the upper and lower modular frames.

进一步地,所述模块化框架的底部四个角以及顶部四个角外围上分别设有一对第一插销板,第一插销板上分别设有第一销孔套,当上下两层模块化框架相互插接连接后,下层的模块化框架位于顶部四个角上的第一插销板与上层的模块化框架位于底部四个角上的第一插销板均一一对应,且其上的第一销孔套均对齐,并分别通过插销插入第一销孔套中。Furthermore, a pair of first latch plates are respectively provided on the outer periphery of the four bottom corners and the four top corners of the modular frame, and first pin hole sleeves are respectively provided on the first latch plates. When the upper and lower modular frames are plugged into each other, the first latch plates on the four top corners of the lower modular frame correspond one to one with the first latch plates on the four bottom corners of the upper modular frame, and the first pin hole sleeves thereon are aligned and inserted into the first pin hole sleeves through latches.

进一步地,所述顶层模块框架的底部四个角上设有第二插接固定部,以使顶层模块框架通过第二插接固定部插入最上一层的模块化框架四个角上的插接孔中,实现与模块化框架的插接固定。Furthermore, second plug-in fixing parts are provided on the four bottom corners of the top module frame, so that the top module frame can be inserted into the plug-in holes on the four corners of the topmost modular frame through the second plug-in fixing parts to achieve plug-in fixation with the modular frame.

进一步地,所述顶层模块框架的底部四个角外围上分别设有一对第二插销板,第二插销板与模块化框架位于顶部的第一插接板一一对应。Furthermore, a pair of second latch plates are respectively provided on the periphery of the four bottom corners of the top module frame, and the second latch plates correspond one-to-one to the first latch plates at the top of the modular frame.

进一步地,所述工作台的面积大于升降台的面积。Furthermore, the area of the workbench is larger than the area of the lifting platform.

进一步地,所述第一升降机构与第二升降机构采用机械电动升降绞盘。Furthermore, the first lifting mechanism and the second lifting mechanism adopt mechanical electric lifting winches.

本实用新型与现有技术相比,通过设置多个模块化框架层层叠加,在最上层的模块化框架上设置顶层模块框架,顶层模块框架中设有可升降的工作台以及升降台,辅助实现了大型模块化单元的垂直吊运,以替代塔式起重机垂直作业,避免在垂直作业的过程中发生摇摆或碰撞的问题,避免大型模块化单元损坏以及降低操作难度。Compared with the prior art, the utility model arranges a plurality of modular frames in stacked layers, arranges a top-layer modular frame on the topmost modular frame, and provides a liftable workbench and a lifting platform in the top-layer modular frame, thereby assisting in the vertical lifting of large modular units to replace the vertical operation of tower cranes, avoiding the problem of swaying or collision during the vertical operation, avoiding damage to the large modular units and reducing the difficulty of operation.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

图1是本实用新型塔架的结构叠加后的结构示意图。FIG1 is a schematic diagram of the structure of the tower of the utility model after the structures are superimposed.

图2是本实用新型的模块化框架的结构示意图。FIG. 2 is a schematic structural diagram of a modular framework of the present invention.

图3是本实用新型模块化框架上下组装示意图。FIG. 3 is a schematic diagram of the upper and lower assembly of the modular frame of the utility model.

图4是图3中标示A的局部放大图。FIG. 4 is a partial enlarged view of the portion marked A in FIG. 3 .

图5是本实用新型模块化框架组装后的示意图。FIG. 5 is a schematic diagram of the assembled modular frame of the utility model.

图6是图5中标示B的局部放大图。FIG. 6 is a partial enlarged view of the portion marked B in FIG. 5 .

图7是本实用新型顶层模块框架的结构示意图。FIG. 7 is a schematic diagram of the structure of the top module frame of the utility model.

图8是本实用新型顶层模块框架的俯视图。FIG. 8 is a top view of the top module frame of the present invention.

图9是本实用新型顶层模块框架将大型模块化单元抬升至其顶部的示意图。FIG. 9 is a schematic diagram of the top module frame of the present invention lifting a large modular unit to its top.

具体实施方式Detailed ways

下面结合附图和实施例对本实用新型作进一步详细说明。The utility model is further described in detail below with reference to the accompanying drawings and embodiments.

如图1、图7和图8所示,本实用新型公开了一种大型模块化单元吊运装置,包括由钢材料制成的模块化框架1,模块化框架1设有多个,通过层层叠加成塔式结构,在最上层的模块化框架1上设有顶层模块框架2,顶层模块框架2上设有可在模块化框架1与顶层模块框架2中垂直升降的工作台3,在工作台3上设有可垂直升降的升降台4,以使工作台3与升降台4同时或不同时垂直升降,当工作台3与升降台4垂直抬升至顶层模块框架2中时,升降台4可继续抬升至顶层模块框架2的顶部,使位于升降台4中的大型模块化单元被抬升至顶层模块框架2的顶部外,实现塔式起重机对其进行水平方向的吊运。As shown in Figures 1, 7 and 8, the utility model discloses a large modular unit lifting device, including a modular frame 1 made of steel material, wherein a plurality of modular frames 1 are provided, which are stacked layer by layer to form a tower structure, a top-level module frame 2 is provided on the uppermost modular frame 1, a workbench 3 which can be vertically lifted and lowered between the modular frame 1 and the top-level module frame 2 is provided on the top-level module frame 2, a lifting platform 4 which can be vertically lifted and lowered is provided on the workbench 3, so that the workbench 3 and the lifting platform 4 can be vertically lifted and lowered simultaneously or at different times, and when the workbench 3 and the lifting platform 4 are vertically lifted into the top-level module frame 2, the lifting platform 4 can continue to be lifted to the top of the top-level module frame 2, so that the large modular unit located in the lifting platform 4 is lifted to the outside of the top of the top-level module frame 2, so that the tower crane can lift it horizontally.

如图2至图6所示,模块化框架1为矩形框架结构,在模块化框架1的底部四个角上分别设有第一插接固定部6,在模块化框架1的顶部四个角上设有与第一插接固定部6相适配的插接孔7,以使相邻两个模块化框架1通过上一层的模块化框架1的第一插接固定部6插入下一层的模块化框架1的插接孔7中,实现上下两层模块化框架1之间的连接。As shown in Figures 2 to 6, the modular frame 1 is a rectangular frame structure, and first plug-in fixing portions 6 are respectively provided at the four bottom corners of the modular frame 1, and plug-in holes 7 compatible with the first plug-in fixing portions 6 are provided at the four top corners of the modular frame 1, so that two adjacent modular frames 1 can be inserted into the plug-in holes 7 of the modular frame 1 of the next layer through the first plug-in fixing portions 6 of the modular frame 1 of the upper layer, thereby realizing the connection between the upper and lower layers of the modular frames 1.

如图3和图4所示,模块化框架1的底部四个角以及顶部四个角外围上分别设有一对第一插销板11,第一插销板11上分别设有第一销孔套12,当上下两层模块化框架1相互插接连接后,下层的模块化框架1位于顶部四个角上的第一插销板11与上层的模块化框架1位于底部四个角上的第一插销板11均一一对应,且其上的第二销孔套12均对齐,并分别通过插销13插入第一销孔套12中,将上下两层模块化框架1连接固定(图5和图6所示),具体地,位于最下层的模块化框架1的底部可通过锚栓与地面固定,该模块化框架1的底部不设置第一插接固定部6、第一插销板11以及第一销孔套6。As shown in Figures 3 and 4, a pair of first latch plates 11 are respectively provided on the outer periphery of the four bottom corners and the four top corners of the modular frame 1, and first pin hole sleeves 12 are respectively provided on the first latch plates 11. When the upper and lower modular frames 1 are plugged and connected to each other, the first latch plates 11 located at the four top corners of the lower modular frame 1 correspond one to one with the first latch plates 11 located at the four bottom corners of the upper modular frame 1, and the second pin hole sleeves 12 thereon are aligned and inserted into the first pin hole sleeves 12 through latches 13, respectively, to connect and fix the upper and lower modular frames 1 (as shown in Figures 5 and 6). Specifically, the bottom of the modular frame 1 located at the lowest layer can be fixed to the ground by anchor bolts, and the first plug-in fixing portion 6, the first latch plate 11 and the first pin hole sleeve 6 are not provided at the bottom of the modular frame 1.

如图7和图8所示,顶层模块框架2为梯形框架结构,在顶层模块框架2的顶部设有与升降台4连接的第一升降机构5,以使升降台4通过第一升降机构5抬升至顶层模块框架2的顶部,在顶层模块框架2顶部设有与工作台3连接的第二升降机构8,以使工作台3能够在最底层的模块化框架1与顶层模块框架2中垂直升降,在第二升降机构8驱动工作台3垂直升降时,第一升降机构5同时驱动升降台4同步垂直升降,并在抬升至顶层模块框架2中时驱动升降台4继续抬升,在升降台4与工作台3同步升降时,升降台4叠放在工作台3上。As shown in Figures 7 and 8, the top-level module frame 2 is a trapezoidal frame structure. A first lifting mechanism 5 connected to a lifting platform 4 is provided at the top of the top-level module frame 2, so that the lifting platform 4 is lifted to the top of the top-level module frame 2 through the first lifting mechanism 5. A second lifting mechanism 8 connected to a workbench 3 is provided at the top of the top-level module frame 2, so that the workbench 3 can be vertically lifted and lowered between the bottom modular frame 1 and the top-level module frame 2. When the second lifting mechanism 8 drives the workbench 3 to lift and lower vertically, the first lifting mechanism 5 simultaneously drives the lifting platform 4 to lift and lower vertically synchronously, and drives the lifting platform 4 to continue to lift when it is lifted to the top-level module frame 2. When the lifting platform 4 and the workbench 3 are lifted and lowered synchronously, the lifting platform 4 is stacked on the workbench 3.

如图7所示,在顶层模块框架2的底部四个角上设有第二插接固定部25,以使顶层模块框架2通过第二插接固定部25插入最上一层的模块化框架1四个角上的插接孔7中,实现与模块化框架1的插接固定。As shown in Figure 7, second plug-in fixing parts 25 are provided on the four bottom corners of the top-level module frame 2, so that the top-level module frame 2 can be inserted into the plug-in holes 7 on the four corners of the topmost modular frame 1 through the second plug-in fixing parts 25 to achieve plug-in fixation with the modular frame 1.

如图7和图8所示,在顶层模块框架2的底部四个角外围上分别设有一对第二插销板26,第二插销板26与模块化框架1位于顶部的第一插接板11一一对应,第二插销板26上分别设有第二销孔套24,当顶层模块框架2与最上层的模块化框架1相互插接后,第二销孔套24与第一销孔套12相对,并通过插销13插入两者内,实现顶层模块框架2与最上层的模块化框架1连接固定。As shown in Figures 7 and 8, a pair of second latch plates 26 are respectively provided on the outer periphery of the four corners at the bottom of the top-level module frame 2. The second latch plates 26 correspond one-to-one to the first plug-in plates 11 at the top of the modular frame 1. Second pin hole sleeves 24 are respectively provided on the second latch plates 26. When the top-level module frame 2 and the uppermost modular frame 1 are plugged into each other, the second pin hole sleeves 24 are opposite to the first pin hole sleeves 12, and the latches 13 are inserted into the two, so that the top-level module frame 2 and the uppermost modular frame 1 are connected and fixed.

如图7和图8所示,顶层模块框架2包括位于顶部的第一矩形框架21、位于底部的第二矩形框架22、斜连接柱23,其中,第一矩形框架21的长度小于第二矩形框架22的长度,斜连接柱23设有四个,两端分别连接第一矩形框架21以及第二矩形框架22的四个角,第一升降机构5和第二升降机构8均设置在第一矩形框架21的短边上,第二插接固定部25设置在第二矩形框架22的四个角的下端,在第一矩形框架21和第二矩形框架22之间还可设置支撑架27,以提高强度。As shown in Figures 7 and 8, the top-level module frame 2 includes a first rectangular frame 21 located at the top, a second rectangular frame 22 located at the bottom, and an oblique connecting column 23, wherein the length of the first rectangular frame 21 is smaller than the length of the second rectangular frame 22, four oblique connecting columns 23 are provided, and the two ends are respectively connected to the four corners of the first rectangular frame 21 and the second rectangular frame 22, the first lifting mechanism 5 and the second lifting mechanism 8 are both arranged on the short side of the first rectangular frame 21, the second plug-in fixing portion 25 is arranged at the lower end of the four corners of the second rectangular frame 22, and a support frame 27 can also be arranged between the first rectangular frame 21 and the second rectangular frame 22 to improve the strength.

如图8所示,工作台3的面积大于升降台4的面积,以使每侧的两个第一升降机构5设置在每侧的两个第二升降机构8之间。As shown in FIG. 8 , the area of the workbench 3 is larger than the area of the lifting platform 4 , so that the two first lifting mechanisms 5 on each side are arranged between the two second lifting mechanisms 8 on each side.

在本实用新型中,第一升降机构5与第二升降机构8可采用机械电动升降绞盘。In the present invention, the first lifting mechanism 5 and the second lifting mechanism 8 can adopt mechanical electric lifting winches.

如图3所示,模块化框架1上还可设有爬梯14,爬梯14外设置有防护栏15。As shown in FIG. 3 , a ladder 14 may be further provided on the modular frame 1 , and a guardrail 15 is provided outside the ladder 14 .

如图1和图9所示,当工作台3与升降台4从最底层的模块化框架1抬升至顶层模块框架2中后,第一升降机构5继续驱动升降台4垂直抬升,升降台4上的大型模块化单元100被抬升至顶层模块框架2的顶部外,从而实现垂直升降运输,替代塔式起重机的垂直吊装,塔式起重机仅需将大型模块化单元100水平吊装至建筑的适当位置,从而避免大型模块化单元100由于塔式起重机在垂直吊装过程中因风力以及空间狭小而导致大型模块化单元100损坏、摇摆等问题,避免垂直吊装的过程中出现安全隐患,同时降低垂直升降的操作难度。As shown in Figures 1 and 9, after the workbench 3 and the lifting platform 4 are lifted from the bottom modular frame 1 to the top modular frame 2, the first lifting mechanism 5 continues to drive the lifting platform 4 to lift vertically, and the large modular unit 100 on the lifting platform 4 is lifted to the outside of the top modular frame 2, thereby realizing vertical lifting transportation, replacing the vertical lifting of the tower crane. The tower crane only needs to lift the large modular unit 100 horizontally to the appropriate position of the building, thereby avoiding the large modular unit 100 being damaged or swaying due to wind force and narrow space during the vertical lifting process of the tower crane, avoiding safety hazards during the vertical lifting process, and reducing the difficulty of vertical lifting operation.

Claims (8)

1.一种大型模块化单元吊运装置,其特征在于:包括多个模块化框架(1),模块化框架(1)通过层层叠加成塔式结构,在最上层的模块化框架(1)上设有顶层模块框架(2),顶层模块框架(2)上设有可在模块化框架(1)与顶层模块框架(2)中垂直升降的工作台(3),在工作台(3)上设有可垂直升降的升降台(4),以使工作台(3)与升降台(4)同时或不同时垂直升降。1. A large modular unit lifting device, characterized in that it comprises a plurality of modular frames (1), wherein the modular frames (1) are stacked layer by layer to form a tower structure, a top modular frame (2) is arranged on the topmost modular frame (1), a workbench (3) which can be vertically lifted between the modular frames (1) and the top modular frame (2) is arranged on the top modular frame (2), and a lifting platform (4) which can be vertically lifted is arranged on the workbench (3), so that the workbench (3) and the lifting platform (4) can be vertically lifted at the same time or at different times. 2.根据权利要求1所述的大型模块化单元吊运装置,其特征在于:所述顶层模块框架(2)为梯形框架结构,在顶层模块框架(2)的顶部设有与升降台(4)连接的第一升降机构(5),在顶层模块框架(2)顶部设有与工作台(3)连接的第二升降机构(8)。2. The large modular unit lifting device according to claim 1 is characterized in that: the top module frame (2) is a trapezoidal frame structure, and a first lifting mechanism (5) connected to the lifting platform (4) is provided at the top of the top module frame (2), and a second lifting mechanism (8) connected to the workbench (3) is provided at the top of the top module frame (2). 3.根据权利要求2所述的大型模块化单元吊运装置,其特征在于:所述模块化框架(1)为矩形框架结构,在模块化框架(1)的底部四个角上分别设有第一插接固定部(6),在模块化框架(1)的顶部四个角上设有与第一插接固定部(6)相适配的插接孔(7),以使相邻两个模块化框架(1)通过上一层的模块化框架(1)的第一插接固定部(6)插入下一层的模块化框架(1)的插接孔(7)中,实现上下两层模块化框架(1)之间的连接。3. The large modular unit lifting device according to claim 2 is characterized in that: the modular frame (1) is a rectangular frame structure, and a first plug-in fixing portion (6) is respectively provided at the four bottom corners of the modular frame (1), and a plug-in hole (7) adapted to the first plug-in fixing portion (6) is provided at the four top corners of the modular frame (1), so that two adjacent modular frames (1) can be inserted into the plug-in hole (7) of the modular frame (1) of the next layer through the first plug-in fixing portion (6) of the modular frame (1) of the upper layer, thereby realizing the connection between the upper and lower layers of modular frames (1). 4.根据权利要求3所述的大型模块化单元吊运装置,其特征在于:所述模块化框架(1)的底部四个角以及顶部四个角外围上分别设有一对第一插销板(11),第一插销板(11)上分别设有第一销孔套(12),当上下两层模块化框架(1)相互插接连接后,下层的模块化框架(1)位于顶部四个角上的第一插销板(11)与上层的模块化框架(1)位于底部四个角上的第一插销板(11)均一一对应,且其上的第一销孔套(12)均对齐,并分别通过插销(13)插入第一销孔套(12)中。4. The large modular unit lifting device according to claim 3 is characterized in that: a pair of first latch plates (11) are respectively provided on the outer periphery of the four bottom corners and the four top corners of the modular frame (1), and the first latch plates (11) are respectively provided with first pin hole sleeves (12). When the upper and lower modular frames (1) are plugged into each other, the first latch plates (11) at the four top corners of the lower modular frame (1) correspond one to one with the first latch plates (11) at the four bottom corners of the upper modular frame (1), and the first pin hole sleeves (12) thereon are aligned and inserted into the first pin hole sleeves (12) through latches (13), respectively. 5.根据权利要求1-4任意一项所述的大型模块化单元吊运装置,其特征在于:所述顶层模块框架(2)的底部四个角上设有第二插接固定部(25),以使顶层模块框架(2)通过第二插接固定部(25)插入最上一层的模块化框架(1)四个角上的插接孔(7)中,实现与模块化框架(1)的插接固定。5. The large modular unit lifting device according to any one of claims 1 to 4 is characterized in that: second plug-in fixing parts (25) are provided on the four bottom corners of the top module frame (2), so that the top module frame (2) can be inserted into the plug-in holes (7) on the four corners of the topmost modular frame (1) through the second plug-in fixing parts (25) to achieve plug-in fixation with the modular frame (1). 6.根据权利要求5所述的大型模块化单元吊运装置,其特征在于:所述顶层模块框架(2)的底部四个角外围上分别设有一对第二插销板(26),第二插销板(26)与模块化框架(1)位于顶部的第一插销板(11)一一对应。6. The large modular unit lifting device according to claim 5 is characterized in that: a pair of second latch plates (26) are respectively provided on the outer periphery of the four bottom corners of the top module frame (2), and the second latch plates (26) correspond one-to-one to the first latch plates (11) located at the top of the modular frame (1). 7.根据权利要求6所述的大型模块化单元吊运装置,其特征在于:所述工作台(3)的面积大于升降台(4)的面积。7. The large modular unit lifting device according to claim 6, characterized in that the area of the workbench (3) is larger than the area of the lifting platform (4). 8.根据权利要求2所述的大型模块化单元吊运装置,其特征在于:所述第一升降机构(5)与第二升降机构(8)采用机械电动升降绞盘。8. The large modular unit lifting device according to claim 2, characterized in that the first lifting mechanism (5) and the second lifting mechanism (8) adopt mechanical electric lifting winches.
CN202322652762.7U 2023-09-28 2023-09-28 Large modular unit lifting device Active CN221253693U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322652762.7U CN221253693U (en) 2023-09-28 2023-09-28 Large modular unit lifting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322652762.7U CN221253693U (en) 2023-09-28 2023-09-28 Large modular unit lifting device

Publications (1)

Publication Number Publication Date
CN221253693U true CN221253693U (en) 2024-07-02

Family

ID=91657539

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322652762.7U Active CN221253693U (en) 2023-09-28 2023-09-28 Large modular unit lifting device

Country Status (1)

Country Link
CN (1) CN221253693U (en)

Similar Documents

Publication Publication Date Title
CN103132766A (en) Truss for lifting power transmission line tower connecting leg and erection method
CN111910912A (en) A synchronous lifting structure for grouping of construction machinery and building construction
CN217602282U (en) Hydraulic self-standing holding pole lifting frame
CN221855301U (en) A double-girder bridge erecting machine for assembling and carrying brackets
CN114737722A (en) A kind of indoor rotating steel ladder and installation method thereof
CN116591296A (en) Steel corridor and steel corridor installation method
CN219526083U (en) Self-climbing tower hoisting device
CN217053072U (en) Multifunctional steel cable tower cap and stay cable installation device
CN103121625B (en) Method for high altitude disassembly of large-scale part
CN108005373B (en) Integrated lifting platform system and assembling method thereof
CN101660660B (en) Novel installing method of gas cabinet
CN115613827B (en) Vertical transportation method for large steel members during floor reconstruction of upper part of existing building
CN206457187U (en) A kind of pole of mounting steel chimney
CN116639603A (en) A tower crane climbing frame
CN221625593U (en) A construction template hoisting device
CN214939283U (en) A pier body formwork safety protection operation platform
CN212076145U (en) A stacking floor hoisting device, hoisting structure and storage hoisting system
CN204980945U (en) Supplementary tower crane dismounting device
CN209974169U (en) Swing arm tower machine beam climbing device
CN115110833A (en) Hydraulic self-supporting pole holding lifting frame
CN211256677U (en) Anti-tilting device for large-scale steel member of bridge
CN208201662U (en) High pier bridge pier shaft reinforcing bar binding operation protective frame
CN219409065U (en) Crossing frame lifting device
CN223548961U (en) A frame column installation structure
CN110778201B (en) Installation and erection method of high-pressure tower

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant