CN221218783U - Wind-powered electricity generation foundation construction anchor slab installation adjusting device - Google Patents
Wind-powered electricity generation foundation construction anchor slab installation adjusting device Download PDFInfo
- Publication number
- CN221218783U CN221218783U CN202322742287.2U CN202322742287U CN221218783U CN 221218783 U CN221218783 U CN 221218783U CN 202322742287 U CN202322742287 U CN 202322742287U CN 221218783 U CN221218783 U CN 221218783U
- Authority
- CN
- China
- Prior art keywords
- anchor plate
- supporting rod
- bases
- adjusting device
- foundation construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 23
- 238000009434 installation Methods 0.000 title claims abstract description 21
- 230000005611 electricity Effects 0.000 title claims description 4
- 238000005192 partition Methods 0.000 claims description 8
- 238000010586 diagram Methods 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 230000000712 assembly Effects 0.000 description 1
- 238000000429 assembly Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 210000001503 joint Anatomy 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
Landscapes
- Foundations (AREA)
Abstract
The utility model discloses an anchor plate installation and adjustment device for wind power foundation construction, which comprises three bases, supporting plates and screws, wherein a bracket component is arranged between the three bases and consists of a first supporting rod and a second supporting rod, universal wheels are arranged at the bottom of the bases, the screws are vertically arranged on the bases, the supporting plates are sleeved on the screws, and limit nuts are arranged on the screws above and below the supporting plates. According to the utility model, the base is arranged at the end part of the supporting rod, and the supporting plate is arranged above the base, so that the anchor plate can be ensured to be positioned at the central position for installation quickly, and the ball is arranged at one side of the supporting plate, so that the anchor plate and the ground embedded bolt can be conveniently and accurately abutted, the working efficiency is improved, the construction difficulty is reduced, the use is convenient, and the operation is simple.
Description
Technical Field
The utility model relates to an auxiliary tool for installing a lower anchor plate, in particular to an anchor plate installation and adjustment device for wind power foundation construction, and belongs to the technical field of wind power foundation construction.
Background
When the lower anchor plate of the wind power foundation is installed, the lower anchor plate is required to be hoisted to a construction site by utilizing a hoisting tool, and then a worker accurately moves the anchor plate according to the installation position and performs the lowering operation; because the anchor plate is hung in half and half, the anchor plate is heavy, when a worker hangs the anchor plate near a construction site, a cushion block is needed to be placed on the ground, the anchor plate is placed on the cushion block, after the worker has a rest for a moment, a plurality of workers cooperate to accurately move the anchor plate again, so that the center of the anchor plate coincides with the installation center, and measurement is carried out; after the measurement is finished, the screw holes of the anchor plate are adjusted, so that the screw holes of the anchor plate are accurately butted with bolts on the ground, and the installation work can be carried out.
Disclosure of utility model
The technical problems to be solved by the utility model are as follows: overcomes the defects of the prior art, provides an anchor plate installation and adjustment device for wind power foundation construction, which is convenient for workers to quickly and accurately move the anchor plate, improves the working efficiency and lightens the working burden.
The technical scheme adopted by the utility model for solving the technical problems is as follows:
The utility model provides a wind-powered electricity generation foundation construction anchor plate installation adjusting device, includes base, extension board and screw rod, the base is three to be provided with the bracket component between three bases, the bottom of base is provided with the universal wheel, be provided with the screw rod on the base perpendicularly, the cover is equipped with the extension board on the screw rod to be provided with stop nut on the screw rod of extension board top and below.
The support assembly consists of a first support rod and a second support rod, wherein the first support rod and the second support rod are distributed in a T shape, and bases are respectively arranged at two ends of the first support rod and the end parts of the second support rod.
The base is provided with a positioning sleeve, and a jacking bolt is arranged outside the positioning sleeve; the two ends of the first supporting rod penetrate through the positioning sleeves of the two bases and are fixed through the jacking bolts, and the end part of the second supporting rod penetrates through the positioning sleeve of the other base and is fixed through the jacking bolts.
The top surface in the middle of the first branch is dug and is equipped with the location through-hole, it has the location borer to run through in the location through-hole.
The side in the middle of the first branch is provided with the uide bushing, the outside of uide bushing is provided with the jack bolt, second branch one end is inserted and is established in the direction to fix through the jack bolt.
The middle part of extension board top surface is provided with the baffle perpendicularly, the screw rod runs through the extension board at baffle rear.
Grooves are dug on the support plates in front of the partition plates, and balls are arranged in the grooves.
The utility model has the positive beneficial effects that:
1. According to the utility model, the bases are arranged at the end parts of the first support rod and the second support rod, so that the positions of the bases can be adjusted according to the radius of installation on a construction site; through setting up the location borer in the center of first branch, during the construction, only need with location borer and the coincidence of installation ground center, can guarantee that the anchor slab is in the central point of installation, improved work efficiency, reduced the construction degree of difficulty.
2. According to the utility model, the partition plate is sleeved on the screw rod, and the limit nuts are arranged on the screw rod on the upper part and the lower part of the partition plate, so that the anchor plate can be quickly lowered by adjusting the limit nuts after the anchor plate bolt holes are in butt joint with the ground embedded bolts, and the operation is convenient.
3. According to the utility model, the balls are arranged on one side of the support plate, and the bolt holes on the anchor plate can be butted with the ground embedded bolts by rotating the anchor plate, so that the effect of accurate positioning is achieved.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic view of the structure of the base and the partition plate of the present utility model;
FIG. 3 is a schematic view of the structure of a lower anchor plate half of the present utility model;
FIG. 4 is a connection diagram of a first strut and a second strut according to the present utility model;
Wherein: the device comprises a base, a 2-universal wheel, a 3-support plate, a 4-partition plate, a 5-screw rod, a 6-limit nut, a 7-positioning sleeve, an 8-first support rod, a 9-second support rod, a 10-positioning through hole, an 11-positioning drill rod, a 12-ball and an A-lower anchor plate.
Detailed Description
The utility model is further explained and illustrated below with reference to the drawings:
1-4, a wind power foundation construction anchor plate installation adjusting device comprises three bases 1, support plates 3 and screw rods 5, wherein support frame assemblies are arranged between the three bases 1, universal wheels 2 are arranged at the bottoms of the bases 1, the screw rods 5 are vertically arranged on the bases 1, the support plates 3 are sleeved on the screw rods 5, and limit nuts 6 are arranged on the screw rods 5 above and below the support plates 3.
The bracket component consists of a first supporting rod 8 and a second supporting rod 9, the first supporting rod 8 and the second supporting rod 9 are distributed in a T shape, and bases 1 are respectively arranged at two ends of the first supporting rod 8 and the end parts of the second supporting rod 9.
The base 1 is provided with a positioning sleeve 7, and a jacking bolt is arranged outside the positioning sleeve 7; the two ends of the first supporting rod 8 penetrate through the positioning sleeves 7 of the two bases 1 and are fixed through the jacking bolts, and the end parts of the second supporting rod 9 penetrate through the positioning sleeves 7 of the other base 1 and are fixed through the jacking bolts.
A positioning through hole 10 is dug on the top surface in the middle of the first supporting rod 8, and a positioning drill rod 11 penetrates through the positioning through hole 10.
A guide sleeve 801 is arranged on the side surface in the middle of the first supporting rod 8, a jacking bolt is arranged outside the guide sleeve 801, and one end of the second supporting rod 9 is inserted into the guide sleeve 801 and is fixed through the jacking bolt.
A baffle plate 4 is vertically arranged in the middle of the top surface of the support plate 3, and a screw 5 penetrates through the support plate 3 behind the baffle plate 4.
And a groove is dug on the support plate in front of the partition plate, and a ball is arranged in the groove.
In the above description, three bases are respectively distributed at the ends of the T-shaped supporting rod.
In the above description, the positioning sleeves on the bases at the two ends of the first supporting rod are respectively arranged at the side edges of the base; the locating sleeve on the base at the end part of the second supporting rod is positioned at the middle position of the base, when the second supporting rod penetrates through the base at the position, the height adjustment of the anchor plate is not affected, that is, the height of the second supporting rod is positioned at the position below the anchor plate after the anchor plate is installed.
In the above description, the lengths of the first and second struts satisfy the movements of the three base plates.
In the above description, the partition plates are distributed in an arc shape and can be tightly attached to the outer wall of the anchor plate.
In the above description, the outside of each positioning sleeve is provided with one pressing bolt, respectively.
Working principle:
Placing the device at a mounting point, enabling the center of the mounting range to coincide with a positioning drill rod, and then inserting the positioning drill rod at the center of a construction site by utilizing a hammer; adjusting the position of the base according to the outer diameter of the anchor plate; and then the support plate is positioned at the position above the embedded screw rods by adjusting the limit nuts, the anchor plate is placed on the three support plates by utilizing the lifting appliance, the anchor plate is horizontally rotated on the support plate by utilizing the balls on the support plate until the bolt holes on the anchor plate are aligned with the ground embedded bolts, and the height of the limit nuts is adjusted again, so that the anchor plate is downwards moved to the nuts of the embedded bolts.
In the above description, the top of the ground embedded bolt is provided with the nut, and the anchor plate is only required to be arranged above the nut.
In the above description, the position of the ground embedded bolt does not conflict with the position of the base.
In the above description, the anchor plate is placed on the nut of the ground screw, the three bases can be sequentially pulled away from the supporting rod, and then the supporting rod is taken away.
In the above description, the device can only install half anchor plate, and after half anchor plate is installed, only the second support rod and the base at the end part of the second support rod need to be dismantled and symmetrically installed at the other side, but the first support rod is not required to be moved, and only the first support rod needs to be rotated, so that the guide sleeve on the first support rod is turned to the other side.
According to the utility model, the base is arranged at the end part of the supporting rod, and the supporting plate is arranged above the base, so that the anchor plate can be ensured to be positioned at the central position for installation quickly, and the ball is arranged at one side of the supporting plate, so that the anchor plate and the ground embedded bolt can be conveniently and accurately abutted, the working efficiency is improved, the construction difficulty is reduced, the use is convenient, and the operation is simple.
Claims (7)
1. Wind-powered electricity generation foundation construction anchor plate installation adjusting device, including base (1), extension board (3) and screw rod (5), its characterized in that: the novel multifunctional electric bicycle is characterized in that the number of the bases (1) is three, a bracket assembly is arranged among the three bases (1), universal wheels (2) are arranged at the bottoms of the bases (1), screw rods (5) are vertically arranged on the bases (1), support plates (3) are sleeved on the screw rods (5), and limit nuts (6) are arranged on the screw rods (5) above and below the support plates (3).
2. The wind power foundation construction anchor plate installation adjusting device according to claim 1, wherein: the bracket assembly consists of a first supporting rod (8) and a second supporting rod (9), wherein the first supporting rod (8) and the second supporting rod (9) are distributed in a T shape, and bases (1) are respectively arranged at two ends of the first supporting rod (8) and at the end parts of the second supporting rod (9).
3. The wind power foundation construction anchor plate installation adjusting device according to claim 2, wherein: a positioning sleeve (7) is arranged on the base (1), and a jacking bolt is arranged outside the positioning sleeve (7); the two ends of the first supporting rod (8) penetrate through the positioning sleeves (7) of the two bases (1) and are fixed through the jacking bolts, and the end part of the second supporting rod (9) penetrates through the positioning sleeve (7) of the other base (1) and is fixed through the jacking bolts.
4. The wind power foundation construction anchor plate installation adjusting device according to claim 2, wherein: the top surface in the middle of first branch (8) is dug and is equipped with location through-hole (10), it has location borer (11) to run through in location through-hole (10).
5. The wind power foundation construction anchor plate installation adjusting device according to claim 2, wherein: the side in the middle of first branch (8) is provided with uide bushing (801), the outside of uide bushing (801) is provided with the jack bolt, the one end of second branch (9) is inserted and is established in uide bushing (801) to fix through the jack bolt.
6. The wind power foundation construction anchor plate installation adjusting device according to claim 1, wherein: the middle part of extension board (3) top surface is provided with baffle (4) perpendicularly, screw rod (5) run through extension board (3) at baffle (4) rear.
7. The wind power foundation construction anchor plate installation adjusting device according to claim 6, wherein: grooves are dug on the support plates (3) in front of the partition plates (4), and balls (12) are arranged in the grooves.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202322742287.2U CN221218783U (en) | 2023-10-12 | 2023-10-12 | Wind-powered electricity generation foundation construction anchor slab installation adjusting device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202322742287.2U CN221218783U (en) | 2023-10-12 | 2023-10-12 | Wind-powered electricity generation foundation construction anchor slab installation adjusting device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN221218783U true CN221218783U (en) | 2024-06-25 |
Family
ID=91572822
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202322742287.2U Active CN221218783U (en) | 2023-10-12 | 2023-10-12 | Wind-powered electricity generation foundation construction anchor slab installation adjusting device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN221218783U (en) |
-
2023
- 2023-10-12 CN CN202322742287.2U patent/CN221218783U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN210830741U (en) | Machine head guide rail device for adjusting axis deviation between pipe jacking machine and hole | |
| CN221218783U (en) | Wind-powered electricity generation foundation construction anchor slab installation adjusting device | |
| CN214738232U (en) | Raft plate type fan foundation anchor bolt assembly mounting and positioning tool | |
| CN217942432U (en) | Integral standard festival shaping frock of tower machine fishplate | |
| CN111555177A (en) | Tubular bus post insulator replacement tool | |
| CN216921499U (en) | Top bracing device for controlling crack of super-long reinforced concrete structure | |
| CN216999625U (en) | Pile fixing device of pile stabilizing platform | |
| CN116290824A (en) | Mounting equipment and mounting method for outer wall of fabricated building | |
| CN219754699U (en) | Auxiliary tool for installing fan tower barrel | |
| CN223734184U (en) | A hanging bracket welding lifting device | |
| CN210334462U (en) | Vertical bar planting accurate positioning drilling equipment | |
| CN219298831U (en) | Positioning device convenient to adjust and used for installing inclined column steel structure | |
| CN216991726U (en) | Attached beam installation auxiliary tool of attached tower crane | |
| CN220060781U (en) | Pipeline installer | |
| CN111308948A (en) | Intelligent power equipment monitoring device | |
| CN214466560U (en) | Pipeline energy-saving non-excavation directional drilling machine | |
| CN216341070U (en) | Auxiliary positioning device for installation of steel structure net rack | |
| CN221682397U (en) | An assembled building construction platform | |
| CN219885456U (en) | Indoor pipeline installation lifting device | |
| CN221030123U (en) | Wind-powered electricity generation foundation construction crab-bolt subassembly installation positioner | |
| CN219098488U (en) | Auxiliary machine tool convenient for hoisting and positioning installation of assembled building components | |
| CN221424085U (en) | Adjustable supporting platform for pipeline installation | |
| CN220645856U (en) | Frame base type emulsion drilling machine fixing support | |
| CN221917213U (en) | Temporary pipe piers for process pipeline prefabrication sites | |
| CN222470576U (en) | Pile foundation steel reinforcement cage welding auxiliary fixtures |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |