CN221194298U - Concrete reserved sleeve pulling tool - Google Patents

Concrete reserved sleeve pulling tool Download PDF

Info

Publication number
CN221194298U
CN221194298U CN202323243280.2U CN202323243280U CN221194298U CN 221194298 U CN221194298 U CN 221194298U CN 202323243280 U CN202323243280 U CN 202323243280U CN 221194298 U CN221194298 U CN 221194298U
Authority
CN
China
Prior art keywords
plate
clamping plate
reserved sleeve
reserved
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202323243280.2U
Other languages
Chinese (zh)
Inventor
路荣
宋爱民
孟震鲁
倪守增
孙强
王长伟
刘红
孙庆凯
刘彦睿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Urban Construction Group Construction Engineering Co ltd
Shandong Huicheng Mingzhi Technology Development Co ltd
Shandong Huida New Building Materials Co ltd
Jinan Urban Construction Group Co Ltd
Shandong Quanjian Engineering Testing Co Ltd
Jinan Municipal Engineering Construction Group Co Ltd
Shandong Huitong Construction Group Co Ltd
Shandong Huiyou Municipal Garden Group Co Ltd
Original Assignee
Shandong Huicheng Mingzhi Technology Development Co ltd
Shandong Huida New Building Materials Co ltd
Shandong Laiwu Construction Group Co ltd
Jinan Urban Construction Group Co Ltd
Shandong Quanjian Engineering Testing Co Ltd
Jinan Municipal Engineering Construction Group Co Ltd
Shandong Huitong Construction Group Co Ltd
Shandong Huiyou Municipal Garden Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Huicheng Mingzhi Technology Development Co ltd, Shandong Huida New Building Materials Co ltd, Shandong Laiwu Construction Group Co ltd, Jinan Urban Construction Group Co Ltd, Shandong Quanjian Engineering Testing Co Ltd, Jinan Municipal Engineering Construction Group Co Ltd, Shandong Huitong Construction Group Co Ltd, Shandong Huiyou Municipal Garden Group Co Ltd filed Critical Shandong Huicheng Mingzhi Technology Development Co ltd
Priority to CN202323243280.2U priority Critical patent/CN221194298U/en
Application granted granted Critical
Publication of CN221194298U publication Critical patent/CN221194298U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

本实用新型属于混凝土施工领域,尤其涉及一种混凝土预留套管拔除工具,包括L型拔杆,所述L型拔杆的横杆上套接一夹板,夹板上部设有矩形孔A,夹板通过矩形孔A套在横杆上;所述夹板下部为竖直板,上部为倾斜板,竖直板和倾斜板之间设有外凸的弧形板。本发明的工具,结构简单,使用方便,能够适用不同管径的预留套管,不会对预留套管造成破坏,使得预留套管可再次利用,不仅提高了施工效率高,还节省了施工材料。

The utility model belongs to the field of concrete construction, and particularly relates to a concrete reserved sleeve removal tool, comprising an L-shaped pull rod, a clamping plate is sleeved on the cross bar of the L-shaped pull rod, a rectangular hole A is provided on the upper part of the clamping plate, and the clamping plate is sleeved on the cross bar through the rectangular hole A; the lower part of the clamping plate is a vertical plate, and the upper part is an inclined plate, and an outwardly convex arc plate is provided between the vertical plate and the inclined plate. The tool of the invention has a simple structure and is easy to use. It can be used for reserved sleeves of different pipe diameters, will not damage the reserved sleeves, and allows the reserved sleeves to be reused, which not only improves the construction efficiency, but also saves construction materials.

Description

Concrete reserved sleeve pulling tool
Technical Field
The utility model belongs to the field of concrete construction, and particularly relates to a tool for pulling out a concrete reserved sleeve.
Background
In the construction of the concrete structure, the reserved sleeve is required to be pulled out after the concrete pouring is finished, and workers at present directly pull out the reserved sleeve through tools such as pliers, but because the force application point of the pliers is only on the side wall of the reserved sleeve on one side, the reserved sleeve is difficult to pull out, or the reserved sleeve can be pulled out only with great effort; sometimes, workers use steel drills to directly break the reserved sleeve, use U-shaped steel drills to chisel out a bit, or directly use impact drills to drill holes and then use chisels to remove the reserved sleeve, but the method is slow and easy to damage surrounding concrete structures, and the chiseled reserved sleeve cannot be reused.
At present, some new tools for pulling out the reserved sleeve, such as patent publication number CN211313382U, use the lever principle to pull out the lower shaft rod in the reserved sleeve, similarly, patent publication number CN216196623U also uses the lever principle to pull out the reserved sleeve by using hooks, but the arc motion of the reserved sleeve increases the difficulty of pulling out the reserved hole of the vertical concrete due to the arc motion of the whole body in the pulling-out process of the method, and meanwhile, the two parts need to damage the upper part of the reserved sleeve to a certain extent, so that the reserved sleeve is reused later.
Disclosure of Invention
The invention aims to overcome the defects of the background technology and provide a tool for pulling out a concrete reserved sleeve.
The invention is realized by the following technical scheme:
The utility model provides a concrete reserved sleeve pipe pulling tool, includes L type dead lever, cup joint a splint on the horizontal pole of L type dead lever, splint upper portion is equipped with rectangular hole A, splint cover on the horizontal pole through rectangular hole A; the lower part of the clamping plate is a vertical plate, the upper part of the clamping plate is an inclined plate, an outwards convex arc-shaped plate is arranged between the vertical plate and the inclined plate, and the arc-shaped plate is smoothly connected with the vertical plate and the inclined plate.
Preferably, a rubber block is sleeved on the cross rod of the L-shaped pulling rod and positioned at the outer side of the clamping plate, a rectangular hole B is formed in the rubber block, and the rubber block is sleeved on the cross rod through the rectangular hole B.
Preferably, the L-shaped pulling rod and the clamping plate are made of iron materials.
Preferably, rubber sheets are arranged on the inner side surfaces of the vertical rods of the L-shaped pulling rods and the inner side surfaces of the vertical plates of the clamping plates.
The tool provided by the invention has the advantages that the structure is simple, the use is convenient, the tool can be suitable for reserved sleeves with different pipe diameters, the reserved sleeves cannot be damaged in structure, the extracted reserved sleeves can be reused, the construction efficiency is high, and the construction materials are saved.
Drawings
FIG. 1 is a schematic diagram of the usage status structure of the present embodiment;
FIG. 2 is a schematic diagram of the structure of the present embodiment;
fig. 3 is a schematic diagram of a split structure of the present embodiment.
In the figure, 1L formula dead lever, 2 horizontal poles, 3 montants, 4 splint, 5 rectangular holes A,6 rubber blocks, 7 rectangular holes B,8 reserve the sleeve pipe.
Detailed Description
For the purpose of making the objects, technical solutions and advantages of the embodiments of the present invention more apparent, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is apparent that the described embodiments are some embodiments of the present invention, but not all embodiments of the present invention.
The instrument is pulled out to 8 sleeves of concrete reservation of this embodiment includes L type dead lever 1, L type dead lever 1 includes horizontal pole 2 and montant 3, and horizontal pole 2 is longer, and montant 3 is shorter, and horizontal pole 2 is the rectangle pole, and montant 3 lower part becomes thinner gradually, and montant 3's medial surface is vertical face. In this embodiment, the L-shaped pulling rod 1 is made of iron material. The clamping plate 4 and the rubber block 6 are sequentially sleeved on the cross rod 2 of the L-shaped pulling rod 1, a rectangular hole A5 is formed in the upper portion of the clamping plate 4, a rectangular hole B7 is formed in the rubber block 6, the clamping plate 4 is sleeved on the cross rod 2 through the rectangular hole A5, the rubber block 6 is sleeved on the cross rod 2 through the rectangular hole B7, and the rubber block 6 is located outside the clamping plate 4. The clamping plate 4 is also made of an iron material, and the iron material is high in hardness, so that the later-stage hammer beating is facilitated. The vertical rod 3 and the clamping plate 4 of the L-shaped pulling rod 1 are used for extruding and clamping the reserved sleeve 8, and the rubber block 6 is used for preventing the clamping plate 4 from retreating and buffering the force born by a human hand. In order to further protect the reserved sleeve 8 and increase friction, rubber sheets are preferably arranged on the inner side surface of the vertical rod 3 of the L-shaped pulling rod 1 and the inner side surface of the vertical plate of the clamping plate 4, wherein the inner side surface is the surface contacted with the reserved sleeve 8.
The upper portion of above-mentioned splint 4 is the hang plate, and the contained angle of hang plate and vertical direction is about 3 ~ 10, and the lower part of splint 4 is the vertical board, and vertical board is parallel with montant 3, is equipped with the arc of outwards evagination between vertical board and hang plate, all slick and sly transitional coupling between arc and vertical board and the hang plate. When the arc-shaped plate is used for extruding the reserved sleeve 8 by the clamping plate 4, the upper end of the reserved sleeve 8 is prevented from being damaged by the upper part of the clamping plate 4, after the arc-shaped plate is arranged, the clamping plate 4 can not directly extrude the edge of the pipe wall at the upper end of the reserved sleeve 8, and the upper end of the reserved sleeve 8 is prevented from being damaged.
When the invention is used, the clamping plate 4 and the rubber block 6 are sleeved on the cross rod 2 in sequence, then the tool is placed above the reserved sleeve 8, the upper part of the reserved sleeve 8 is enabled to be positioned between the vertical rod 3 and the vertical plate at the lower part of the clamping plate 4, then the clamping plate 4 is knocked towards the direction of the reserved sleeve 8 by using the hammer, when the inclined plate is not perpendicular to the cross rod 2, a larger friction force exists between the inclined plate and the cross rod 2, the clamping plate 4 is not easy to slide on the cross rod 2, at the moment, the movable clamping plate 4 is knocked by the hammer, the reserved sleeve 8 is gradually clamped between the clamping plate 4 and the vertical rod 3 along with the movement of the clamping plate 4 to the reserved sleeve 8, the clamping plate 4 is continuously knocked by the hammer until the reserved sleeve 8 is slightly deformed, at the moment, the rubber block 6 is squeezed tightly by sliding the clamping plate 4, then the cross rod 2 between the vertical rod 3 and the clamping plate 4 is held by one hand, the rubber block 6 is pushed by the hand, then the reserved sleeve 8 is directly pulled upwards, the reserved sleeve 8 is pulled out, the upper part of the reserved sleeve 8 is slightly deformed, the reserved sleeve 8 is separated from the reserved sleeve 8, and the reserved sleeve 8 is pulled out in a vertical direction, and the reserved sleeve 8 can be pulled out in a repeated period.
Finally, it should be noted that: the above embodiments are only for illustrating the technical solution of the present invention, and are not limiting; those of ordinary skill in the art will appreciate that: the technical scheme described in the above embodiments can be modified or some technical features thereof can be replaced by equivalents; such modifications and substitutions do not depart from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims (4)

1. The utility model provides a concrete reservation sleeve pipe extracting tool which characterized in that: the novel lifting device comprises an L-shaped lifting rod (1), wherein a clamping plate (4) is sleeved on a cross rod (2) of the L-shaped lifting rod (1), a rectangular hole A (5) is formed in the upper portion of the clamping plate (4), and the clamping plate (4) is sleeved on the cross rod (2) through the rectangular hole A (5); the lower part of the clamping plate (4) is a vertical plate, the upper part of the clamping plate is an inclined plate, an outwards convex arc-shaped plate is arranged between the vertical plate and the inclined plate, and the arc-shaped plate is smoothly connected with the vertical plate and the inclined plate.
2. The concrete pre-reserved sleeve extracting tool according to claim 1, wherein: a rubber block (6) is sleeved on the cross rod (2) of the L-shaped pulling rod (1), the rubber block (6) is located on the outer side of the clamping plate (4), a rectangular hole B (7) is formed in the rubber block (6), and the rubber block (6) is sleeved on the cross rod (2) through the rectangular hole B (7).
3. The concrete pre-reserved sleeve extracting tool according to claim 2, wherein: the L-shaped pulling rod (1) and the clamping plate (4) are made of iron materials.
4. The concrete pre-reserved sleeve extracting tool according to claim 2, wherein: rubber sheets are arranged on the inner side surfaces of the vertical rods (3) of the L-shaped pulling rod (1) and the inner side surfaces of the vertical plates of the clamping plates (4).
CN202323243280.2U 2023-11-30 2023-11-30 Concrete reserved sleeve pulling tool Active CN221194298U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202323243280.2U CN221194298U (en) 2023-11-30 2023-11-30 Concrete reserved sleeve pulling tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202323243280.2U CN221194298U (en) 2023-11-30 2023-11-30 Concrete reserved sleeve pulling tool

Publications (1)

Publication Number Publication Date
CN221194298U true CN221194298U (en) 2024-06-21

Family

ID=91524825

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202323243280.2U Active CN221194298U (en) 2023-11-30 2023-11-30 Concrete reserved sleeve pulling tool

Country Status (1)

Country Link
CN (1) CN221194298U (en)

Similar Documents

Publication Publication Date Title
CN207155687U (en) It is a kind of to be used for the repeatable lever removal tool using expansion bolt
CN217299863U (en) Aluminum die pulling-on piece end dismantling tool
CN114808975A (en) Reinforced concrete cast-in-place pile breakage-free pile head isolation device and application method thereof
CN207522817U (en) A kind of concrete demoulding traction hammer
CN217398399U (en) Multifunctional well lid opening device
CN206588904U (en) A kind of multifunctional hammer installed and removed for aluminum alloy mould plate
TWM574545U (en) Crowbar structure for plate mold
CN214505919U (en) Hydraulic unlocking and spring resetting locking injection head and blowout prevention box connector
CN210966754U (en) High-efficiency multifunctional steel bar flattening and skewing device
CN215857704U (en) Bridge bored concrete pile head cuts except that device
CN212129137U (en) Bridge pile foundation pile head crushing and chiseling device
CN205000334U (en) Recoverable prestressed anchorage cable
CN211306737U (en) Curve prestressed pipeline through hole device
CN201620601U (en) Embedded wall penetration body capable of being recycled
CN222796424U (en) A wear-type pile pulling device for demolishs of side slope skeleton template
CN218438296U (en) Simple and easy quick detach instrument of pulling-on piece
CN211945954U (en) A detachable lifting ring structure
CN215254643U (en) Form removal tool
CN222730538U (en) Synchronous drill rod discharging structure of pile breaker drill bit set
CN220132905U (en) Anti-sinking device of full-sleeve construction occluding cast-in-place pile reinforcement cage of pipe twisting drill
CN221932271U (en) Prosthesis lining removal device
CN209635850U (en) A kind of plank mould release ripping bar
CN213034516U (en) A U-shaped card lifter
CN216829460U (en) Reinforcing bar welding slag chisels instrument fast away
CN111101705A (en) Plastic formwork plug for fixing reserved steel bars and construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: No.33, East Automobile Factory Road, Tianqiao District, Jinan City, Shandong Province

Patentee after: SHANDONG HUIYOU MUNICIPAL GARDEN GROUP Co.,Ltd.

Country or region after: China

Patentee after: JINAN MUNICIPAL ENGINEERING CONSTRUCTION GROUP Co.,Ltd.

Patentee after: JINAN URBAN CONSTRUCTION GROUP Co.,Ltd.

Patentee after: SHANDONG QUANJIAN ENGINEERING TESTING Co.,Ltd.

Patentee after: SHANDONG HUITONG CONSTRUCTION GROUP Co.,Ltd.

Patentee after: Shandong Huida new building materials Co.,Ltd.

Patentee after: Shandong Huicheng Mingzhi Technology Development Co.,Ltd.

Patentee after: Jinan Urban Construction Group Construction Engineering Co.,Ltd.

Address before: No.33, East Automobile Factory Road, Tianqiao District, Jinan City, Shandong Province

Patentee before: SHANDONG HUIYOU MUNICIPAL GARDEN GROUP Co.,Ltd.

Country or region before: China

Patentee before: JINAN MUNICIPAL ENGINEERING CONSTRUCTION GROUP Co.,Ltd.

Patentee before: JINAN URBAN CONSTRUCTION GROUP Co.,Ltd.

Patentee before: SHANDONG QUANJIAN ENGINEERING TESTING Co.,Ltd.

Patentee before: SHANDONG HUITONG CONSTRUCTION GROUP Co.,Ltd.

Patentee before: Shandong Huida new building materials Co.,Ltd.

Patentee before: Shandong Huicheng Mingzhi Technology Development Co.,Ltd.

Patentee before: Shandong Laiwu Construction Group Co.,Ltd.

CP03 Change of name, title or address