Wireless synchronous acquisition and transmission system for cable grounding current
Technical Field
The utility model relates to a wireless synchronous acquisition and transmission system for cable grounding current, and belongs to the technical field of power cable grounding current detection.
Background
The operation of the power cable is one of important links of our daily life, work and production, and whether the operation of a cable line is safe or not is related to the safe production of enterprises and the safety of lives and properties of people. However, the cable is inevitably insulated in the process of manufacturing, installation and long-term operation, and the power cable has certain loss and aging phenomenon due to long-time use. Therefore, the monitoring of the insulation state of the power cable is an urgent need for ensuring the safe and stable operation of the cable and maximizing the power transmission value of the cable.
The current on-line monitoring method for the cable mainly comprises four aspects of temperature monitoring, grounding current monitoring, partial discharge monitoring and dielectric loss monitoring. Compared with other online monitoring means, the high-voltage system in the online monitoring method of the grounding current has strong adaptability, the leakage current component in the grounding current can represent the insulation state of the cable, but the measured grounding current also comprises a circulating current component, is not easy to separate, and cannot accurately measure the amplitude and the phase of the grounding current. In order to extract leakage current components in the cable grounding current, the two-end grounding current is required to be obtained simultaneously, the leakage current components are extracted through a vector difference method, in addition, when faults are positioned on line, the grounding currents at the same time at the two ends of the cable are required to be obtained, and the positions of the insulation faults are judged through comparing and analyzing the characteristics of the grounding currents at the two ends.
However, when the conventional NTP protocol and IRIG-B code are used for encoding, long-distance optical fibers or B code transmission lines are required for signal and data transmission, and the method is only suitable for network erection of cable lines before operation, and for cable lines in operation, the data acquisition in synchronization with medium and long distances is difficult to realize, and in addition, the conventional synchronous detection method has higher cost.
Disclosure of utility model
In order to solve the problems in the prior art, the utility model provides a wireless synchronous acquisition and transmission system for cable grounding current.
The technical scheme of the utility model is as follows:
The cable grounding current wireless synchronous acquisition and transmission system comprises a satellite time service module, a satellite antenna module, a current data acquisition module, a control module, a 4G communication module and a fault positioning module; the satellite antenna module is connected with the satellite time service module, receives satellite time information from the satellite antenna module and transmits the satellite time information to the satellite time service module to analyze the satellite time information; the satellite time service module is connected with the current data acquisition module, and the satellite time service module sends out a trigger pulse signal to control the current data acquisition module to acquire cable grounding current data; the control module is connected with the current data acquisition module, controls the on-off of the current data acquisition module through the control module, and stores the acquired cable grounding current data; the control module is in communication connection with the fault positioning module through the 4G communication module, and the fault positioning module is used for insulation diagnosis and fault positioning.
Preferably, the satellite time service module comprises two satellite time service devices, and the working time difference between the two satellite time service devices is smaller than a preset range.
Preferably, the current data acquisition module comprises a current data acquisition card and a current sensor, and the current data acquisition card is directly connected with the current sensor; the current data acquisition module is used for receiving the trigger pulse signal, and the current sensor is used for acquiring cable grounding current data.
Preferably, the current data acquisition cards are respectively arranged on the grounding wires at two ends of the cable, and the acquisition channels are not less than two channels.
Preferably, the control module is connected with the current data acquisition card and used for controlling the on-off of the current data acquisition card channel.
Preferably, the control module employs an industrial control computer.
The utility model has the following beneficial effects:
1. The utility model adopts the satellite device and the 4G communication module to collect the cable grounding current data, avoids long-distance optical fiber laying, breaks through the space limitation in the traditional grounding current method, and reduces the cost of synchronous detection.
2. According to the utility model, the satellite device is adopted to transmit the trigger pulse signal, so that the detection precision of synchronous detection is improved, the monitoring level of the insulation state of the power cable is further improved, and the safe and stable operation of the cable is ensured.
Drawings
FIG. 1 is a system block diagram of the present utility model;
fig. 2 is a system topology of the present utility model.
Detailed Description
The utility model will now be described in detail with reference to the drawings and to specific embodiments.
Referring to fig. 1, a cable grounding current wireless synchronous acquisition and transmission system comprises a satellite time service module, a satellite antenna module, a current data acquisition module, a control module, a 4G communication module and a fault positioning module; the satellite antenna module is connected with the satellite time service module, receives satellite time information from the satellite antenna module and transmits the satellite time information to the satellite time service module to analyze the satellite time information; the satellite time service module is connected with the current data acquisition module, and the satellite time service module sends out a trigger pulse signal to control the current data acquisition module to acquire cable grounding current data; the control module is connected with the current data acquisition module, controls the on-off of the current data acquisition module through the control module, and stores the acquired cable grounding current data; the control module is in communication connection with the fault positioning module through the 4G communication module, and the fault positioning module is used for insulation diagnosis and fault positioning.
In specific implementation, the satellite antenna is used for receiving electromagnetic wave signals emitted by satellites such as Beidou, GPS and the like and transmitting the electromagnetic wave signals to the satellite time service device. The satellite time service device decodes the satellite signal and carries out filtering processing to output standard 1PPS pulse, the current data acquisition module takes the 1PPS pulse as a trigger signal, acquires and stores grounding current data at a set node, and sends the grounding current data to the industrial control computer. The industrial control computer controls the on and off of the acquisition card through a built-in program, starts triggering through the program control when the whole minute pulse of the satellite time service device arrives, stores a group of data every 30 pulses through cycle counting, and gives a time stamp to the corresponding file. The industrial control computer is connected to the Internet through the 4G communication module respectively, and the collected data are automatically transmitted to the fault positioning module through the network; the fault positioning module is arranged at the monitoring background, processes and calculates signals transmitted by the industrial control computers at the two ends through built-in software, extracts leakage current components, and completes insulation diagnosis and fault positioning operation.
Furthermore, the satellite time service module comprises two satellite time service devices, and the working time difference between the two satellite time service devices is smaller than a preset range.
In the implementation, the time difference of the 1PPS pulse signals output by the two-end two satellite time service devices is not more than 30ns, and the pulse signals are output to one channel of the current data acquisition card.
Further, the current data acquisition module comprises a current data acquisition card and a current sensor, and the current data acquisition card is directly connected with the current sensor; the current data acquisition module is used for receiving the trigger pulse signal, and the current sensor is used for acquiring cable grounding current data.
Further, the current data acquisition cards are respectively arranged on the grounding wires at two ends of the cable, and the acquisition channels are not less than two channels.
In the specific implementation, the current data acquisition cards are respectively arranged on the grounding wires at two ends of the cable, the acquisition channels are not less than two channels, one channel of the current data acquisition card receives a 1PPS pulse signal output by the satellite time service device as a trigger signal, and the other channel is connected with the current sensor to acquire the cable grounding current data;
further, the control module is connected with the current data acquisition card and used for controlling the on-off of the current data acquisition card channel.
When the method is implemented, the control module controls the acquisition card to be switched on and off through a built-in program, starts triggering through the program control when the whole-minute pulse of the satellite time service device arrives, acquires and stores a group of data after every 30 pulses arrive through cycle counting, and gives a time stamp to the corresponding file;
Further, the control module adopts an industrial control computer.
During implementation, the industrial control computer is connected to the Internet through the 4G communication module respectively, collected data are automatically transmitted to the monitoring background through the network, software is built in the monitoring background, processing operation is carried out on signals transmitted by the industrial control computers at two ends, leakage current components are extracted, and insulation diagnosis and fault positioning operation are completed.
The foregoing description of the preferred embodiments of the utility model is not intended to be limiting, but rather is intended to cover all modifications, equivalents, and alternatives falling within the spirit and principles of the utility model.