CN221168755U - Measurement pay-off is used to building engineering - Google Patents
Measurement pay-off is used to building engineering Download PDFInfo
- Publication number
- CN221168755U CN221168755U CN202323154240.0U CN202323154240U CN221168755U CN 221168755 U CN221168755 U CN 221168755U CN 202323154240 U CN202323154240 U CN 202323154240U CN 221168755 U CN221168755 U CN 221168755U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- ash bucket
- baffle
- pull rod
- pay
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Road Paving Machines (AREA)
Abstract
The utility model provides a measuring and paying-off device for construction engineering, which belongs to the technical field of construction engineering, and comprises an ash bucket, wherein the bottom of the ash bucket is fixedly connected with a support frame, rollers are arranged on two sides of the support frame, the bottom of the ash bucket is fixedly connected with a blanking pipe, the middle part of one side of the support frame is fixedly connected with a push rod, the top of the ash bucket is provided with a cover plate, the top of the cover plate is fixedly connected with a lifting handle, a baffle is arranged in the blanking pipe, one end of the baffle penetrates through the blanking pipe and is fixedly connected with a side plate, and a driving mechanism for driving the baffle to move is arranged on the blanking pipe. This building engineering is with measuring pay-off, through the cooperation between actuating mechanism, baffle and the curb plate, can adjust the opening area of unloading pipe to change the width of unwrapping wire, it is more convenient to use, is favorable to improving work efficiency.
Description
Technical Field
The utility model belongs to the technical field of building engineering construction, and particularly relates to a measuring paying-off device for building engineering.
Background
The measurement paying-off work widely exists in the construction process, and the lime paying-off is an important mode, and is widely applied to earth excavation, road engineering and pipe well construction. The lime paying-off has the advantages of convenient material taking, obvious color, no environmental pollution and the like, and is necessary work immediately before construction in the building engineering.
However, the conventional measuring and paying-off device cannot adjust the width of lime spread on the construction ground according to the environments of different construction grounds, so that the measuring and paying-off device is indiscriminately applied to various paying-off positions on the construction ground, and for some requirements of larger or smaller paying-off width, the conventional measuring and paying-off device cannot meet the requirements, and is inconvenient to use.
Disclosure of utility model
The utility model aims to provide a measuring and paying-off device for constructional engineering, and aims to solve the problem that the measuring and paying-off device for constructional engineering cannot adjust paying-off width in the prior art.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a building engineering is with measuring pay-off, includes the ash bucket, the bottom fixedly connected with support frame of ash bucket, the both sides of support frame all are provided with the gyro wheel, the bottom fixedly connected with unloading pipe of ash bucket, one side middle part fixedly connected with push rod of support frame, the top of ash bucket is provided with the apron, the top fixedly connected with handle of apron, the inside of unloading pipe is provided with the baffle, the one end of baffle runs through unloading pipe and fixedly connected with curb plate, be provided with the actuating mechanism who is used for driving the baffle and removes on the unloading pipe.
As one preferable mode of the utility model, the driving mechanism comprises a threaded shaft which is rotationally connected with the blanking pipe, a movable frame is fixedly connected to the side plate, and the movable frame is in threaded connection with the threaded shaft.
As one preferable mode of the utility model, the push rod comprises a sleeve and a pull rod, one end of the pull rod is sleeved in the sleeve, the top end of the pull rod is fixedly connected with a handle, and a limiting mechanism is arranged between the sleeve and the pull rod.
As one preferable mode of the utility model, the limiting mechanism comprises a screw rod in threaded connection with the sleeve, and one end of the screw rod is fixedly connected with the rotary table.
As one preferable mode of the utility model, one side of the bottom of the ash bucket is fixedly connected with a bin wall vibrator, and the support frame is provided with a storage battery.
Preferably, one side of the ash bucket is provided with a transparent window.
Compared with the prior art, the utility model has the beneficial effects that:
1. This building engineering is with measuring pay-off, through the cooperation between actuating mechanism, baffle and the curb plate, can adjust the opening area of unloading pipe to change the width of unwrapping wire, it is more convenient to use, is favorable to improving work efficiency.
2. This building engineering is with measuring pay-off, cooperation between through sleeve pipe, pull rod, handle and stop gear makes the length of push rod adjust according to user's height, makes the device use more comfortable, is favorable to using widely.
Drawings
The accompanying drawings are included to provide a further understanding of the utility model and are incorporated in and constitute a part of this specification, illustrate the utility model and together with the embodiments of the utility model, serve to explain the utility model. In the drawings:
FIG. 1 is a schematic perspective view of the present utility model;
FIG. 2 is a second perspective view of the present utility model;
FIG. 3 is a schematic view of the internal structure of the blanking tube of the present utility model.
In the figure: 1. an ash bucket; 2. a support frame; 3. a roller; 4. a storage battery; 5. a sleeve; 6. a pull rod; 7. a handle; 8. a screw; 9. a transparent window; 10. a cover plate; 11. a handle; 12. discharging pipes; 13. a threaded shaft; 14. a baffle; 15. a side plate; 16. a movable frame; 17. a wall vibrator.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Examples
Referring to fig. 1-3, the present utility model provides the following technical solutions: the utility model provides a building engineering is with measuring pay-off, including ash bucket 1, the bottom fixedly connected with support frame 2 of ash bucket 1, the both sides of support frame 2 all are provided with gyro wheel 3, the bottom fixedly connected with unloading pipe 12 of ash bucket 1, one side middle part fixedly connected with push rod of support frame 2, the top of ash bucket 1 is provided with apron 10, the top fixedly connected with handle 11 of apron 10, the inside of unloading pipe 12 is provided with baffle 14, the one end of baffle 14 runs through unloading pipe 12 and fixedly connected with curb plate 15, be provided with the actuating mechanism who is used for driving baffle 14 and removes on the unloading pipe 12.
In the specific embodiment of the utility model, the lime is stored inside the hopper 1, and the cover plate 10 can seal the top of the hopper 1; when the discharging device is used, the driving mechanism is adjusted according to the use requirement, and the driving mechanism drives the side plates 15 to enable the baffle plate 14 to move in the discharging pipe 12, so that the opening area of the discharging pipe 12 is increased or reduced, the cross section of the discharging pipe 12 is rectangular, and the paying-off width is changed along with the movement of the baffle plate 14; pushing the push rod, the push rod drives the roller 3 to rotate through the support frame 2, so that the ash bucket 1 moves, lime in the ash bucket 1 falls from the bottom of the blanking pipe 12 and marks are left on the ground, and then paying-off work can be completed. The device can adjust the opening area of unloading pipe 12 to change the width of unwrapping wire, it is more convenient to use, is favorable to improving work efficiency.
Specifically, the driving mechanism comprises a threaded shaft 13 rotationally connected with the blanking pipe 12, a movable frame 16 is fixedly connected to the side plate 15, and the movable frame 16 is in threaded connection with the threaded shaft 13.
In this embodiment: the threaded shaft 13 is rotated, and the threaded shaft 13 enables the side plate 15 to move through the movable frame 16, so that the side plate 15 drives the baffle plate 14 to move in the blanking pipe 12, the paying-off width is changed, and the operation is simple and quick.
Specifically, the push rod includes sleeve pipe 5 and pull rod 6, and the one end cover of pull rod 6 is established in sleeve pipe 5's inside, and the top fixedly connected with handle 7 of pull rod 6 is provided with stop gear between sleeve pipe 5 and the pull rod 6.
In this embodiment: the pull rod 6 can move in the sleeve 5, so that the length of the push rod is changed, and the limiting mechanism limits the pull rod 6, so that the length of the push rod is kept fixed during use.
Specifically, stop gear includes screw rod 8 with sleeve pipe 5 threaded connection, and the one end fixedly connected with carousel of screw rod 8.
In this embodiment: the rotating disc is rotated, the rotating disc drives the screw rod 8 to move, when the screw rod 8 is far away from the pull rod 6, the limit can be released, the pull rod 6 can be adjusted at the moment, after the adjustment is finished, the rotating disc is rotated, one end of the screw rod 8 is abutted against the pull rod 6, and the limit can be carried out on the pull rod 6.
Specifically, a bin wall vibrator 17 is fixedly connected to one side of the bottom of the ash bucket 1, and a storage battery 4 is arranged on the support frame 2.
In this embodiment: the storage battery 4 provides electric energy for the bin wall vibrator 17, and the bin wall vibrator 17 can drive the side wall of the ash bucket 1 to vibrate, so that the blanking of the blanking pipe 12 is smoother.
Specifically, one side of the ash bucket 1 is provided with a transparent window 9.
In this embodiment: the transparent window 9 can observe the white ash allowance in the ash bucket 1, and the use is more convenient.
Finally, it should be noted that: the foregoing description is only a preferred embodiment of the present utility model, and the present utility model is not limited thereto, but it is to be understood that modifications and equivalents of some of the technical features described in the foregoing embodiments may be made by those skilled in the art, although the present utility model has been described in detail with reference to the foregoing embodiments. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present utility model should be included in the protection scope of the present utility model.
Claims (6)
1. The utility model provides a measurement pay-off for building engineering, includes ash bucket (1), its characterized in that: the novel ash bucket comprises an ash bucket body and is characterized in that a supporting frame (2) is fixedly connected to the bottom of the ash bucket body (1), rollers (3) are arranged on two sides of the supporting frame (2), a discharging pipe (12) is fixedly connected to the bottom of the ash bucket body (1), a push rod is fixedly connected to one middle portion of one side of the supporting frame (2), a cover plate (10) is arranged at the top of the ash bucket body (1), a lifting handle (11) is fixedly connected to the top of the cover plate (10), a baffle (14) is arranged inside the discharging pipe (12), one end of the baffle (14) penetrates through the discharging pipe (12) and is fixedly connected with a side plate (15), and a driving mechanism for driving the baffle (14) to move is arranged on the discharging pipe (12).
2. A survey pay-off for construction work according to claim 1, wherein: the driving mechanism comprises a threaded shaft (13) which is rotationally connected with the blanking pipe (12), a movable frame (16) is fixedly connected to the side plate (15), and the movable frame (16) is in threaded connection with the threaded shaft (13).
3. A survey pay-off for construction work according to claim 2, wherein: the push rod comprises a sleeve (5) and a pull rod (6), one end of the pull rod (6) is sleeved inside the sleeve (5), the top end of the pull rod (6) is fixedly connected with a handle (7), and a limiting mechanism is arranged between the sleeve (5) and the pull rod (6).
4. A survey pay-off for construction work according to claim 3, wherein: the limiting mechanism comprises a screw rod (8) in threaded connection with the sleeve (5), and one end of the screw rod (8) is fixedly connected with a rotary table.
5. A survey pay-off for construction work according to claim 1, wherein: the ash bucket (1) is fixedly connected with a bin wall vibrator (17) at one side of the bottom, and a storage battery (4) is arranged on the support frame (2).
6. A survey pay-off for construction work according to claim 1, wherein: one side of the ash bucket (1) is provided with a transparent window (9).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202323154240.0U CN221168755U (en) | 2023-11-22 | 2023-11-22 | Measurement pay-off is used to building engineering |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202323154240.0U CN221168755U (en) | 2023-11-22 | 2023-11-22 | Measurement pay-off is used to building engineering |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN221168755U true CN221168755U (en) | 2024-06-18 |
Family
ID=91435459
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202323154240.0U Expired - Fee Related CN221168755U (en) | 2023-11-22 | 2023-11-22 | Measurement pay-off is used to building engineering |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN221168755U (en) |
-
2023
- 2023-11-22 CN CN202323154240.0U patent/CN221168755U/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN206445946U (en) | A kind of cement mixer | |
| CN111214977A (en) | Construction cement transport vehicle for preventing cement from solidifying | |
| CN115233950B (en) | A tile gap plasterer for construction | |
| CN211514314U (en) | Powder stirring device | |
| CN213572891U (en) | Floor that fitment was used is transported and laying device | |
| CN209384682U (en) | A kind of engineering line style cloth ash machine | |
| CN220490823U (en) | Soil environment monitoring device | |
| CN211784398U (en) | A soil borrowing device for land planning | |
| CN211954369U (en) | An automatic weighing device for raw materials of aerated bricks | |
| CN220455712U (en) | An intelligent production scheduling scheduling system | |
| CN212586007U (en) | Sampling device for soil remediation | |
| CN209837732U (en) | Ash scattering device for building construction paying-off | |
| CN221298652U (en) | Construction marking equipment | |
| CN212249063U (en) | Automatic filling device for building brick joints | |
| CN211690106U (en) | Road rubbish cleaning device convenient to operate | |
| CN221501681U (en) | Road crack pouring device for road construction | |
| CN217755153U (en) | Novel ring-type garbage can | |
| CN216460706U (en) | An automatic cleaning device for sanitation garbage cans | |
| CN221933649U (en) | A stirring device for alloy rod preparation | |
| CN220448720U (en) | Pipeline handling mechanism | |
| CN210754327U (en) | A kind of soil turning and spraying device for the restoration of phosphogypsum piled up wasteland | |
| CN222194405U (en) | Plastic folding kettle with retractable handle | |
| CN220415375U (en) | Crack repairing device for highway tunnel maintenance | |
| CN217570162U (en) | Mercury contaminated soil remediation treatment device | |
| CN218346854U (en) | Construction site ash line scattering device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20240618 |