CN221143513U - Construction suspension platform - Google Patents
Construction suspension platform Download PDFInfo
- Publication number
- CN221143513U CN221143513U CN202322770001.1U CN202322770001U CN221143513U CN 221143513 U CN221143513 U CN 221143513U CN 202322770001 U CN202322770001 U CN 202322770001U CN 221143513 U CN221143513 U CN 221143513U
- Authority
- CN
- China
- Prior art keywords
- rectangular frame
- frame
- suspension
- suspension platform
- side cabinet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000000725 suspension Substances 0.000 title claims abstract description 62
- 238000010276 construction Methods 0.000 title claims abstract description 21
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 22
- 239000010959 steel Substances 0.000 claims abstract description 22
- 230000007246 mechanism Effects 0.000 claims abstract description 9
- 230000000694 effects Effects 0.000 claims abstract description 4
- 238000009434 installation Methods 0.000 claims description 5
- 238000012423 maintenance Methods 0.000 abstract description 5
- 230000003028 elevating effect Effects 0.000 description 8
- 230000009286 beneficial effect Effects 0.000 description 2
- 230000006835 compression Effects 0.000 description 2
- 238000007906 compression Methods 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Landscapes
- Patch Boards (AREA)
Abstract
The utility model relates to the technical field of suspension platforms, and discloses a construction suspension platform, which comprises: a suspension frame; the rectangular frame is fixedly arranged on the inner wall of the suspension frame; the rectangular frame is detachably arranged on the rectangular frame; one end of the baffle is blocked at the top of the rectangular frame, the other end of the baffle is fixedly connected with a movable plate, the movable plate is movably arranged in the side cabinet, and the side cabinet is detachably arranged on the outer wall of the suspension frame. One end of the steel cable is connected with the rectangular frame, the other end of the steel cable is connected with the lifting mechanism, the lifting mechanism is arranged externally, the weight of the suspension platform is reduced, the space occupation in the platform is reduced, meanwhile, the maintenance of the lifting mechanism is convenient, when a fault occurs, an external person can assist in solving, and the safety of the suspension platform is improved; the rectangular frame is mounted on the rectangular frame through the connecting bolts, the connecting structure is simple, the connecting operation is convenient, the connecting effect is stable, the top of the rectangular frame is blocked through the baffle, and the mounting stability of the rectangular frame is further improved.
Description
Technical Field
The utility model relates to the technical field of suspension platforms, in particular to a construction suspension platform.
Background
The suspension platform is a building machine for high-altitude operation, and is frequently seen in construction scenes such as curtain wall installation, outer wall cleaning and the like; the hoisting machine is generally installed on the suspension platform, and the hoisting machine is connected with the suspension mechanism through a steel rope, so that the suspension platform can move up and down along the vertical face of a building or a structure, and constructors stand in the suspension platform for construction.
Although the suspension platform is widely used and mature in technology, in practical application, we find that certain disadvantages still exist, such as:
The hoist is arranged on the suspension platform, so that the weight of the suspension platform is increased, and external assistance is difficult to obtain when the hoist fails;
Based on this, we propose a construction suspension platform.
Disclosure of utility model
(One) solving the technical problems
Aiming at the defects of the prior art, the utility model provides a construction suspension platform which has the advantages of light weight, external lifting mechanism and convenient and stable connection.
(II) technical scheme
In order to achieve the purposes of light weight, external lifting mechanism and convenient and stable connection, the utility model provides the following technical scheme: a construction suspension platform comprising:
A suspension frame;
the rectangular frame is fixedly arranged on the inner wall of the suspension frame;
The rectangular frame is detachably arranged on the rectangular frame;
One end of the baffle is blocked at the top of the rectangular frame, the other end of the baffle is fixedly connected with a movable plate, the movable plate is movably arranged in the side cabinet, and the side cabinet is detachably arranged on the outer wall of the suspension frame.
As a preferable technical scheme of the utility model, the rectangular frame is connected with the rectangular frame through the connecting bolt and the connecting nut, and the top of the rectangular frame is also provided with a sinking groove for accommodating the end head of the connecting bolt.
As a preferable technical scheme of the utility model, mounting plates are fixedly arranged at the top and the bottom of the side cabinet, and the mounting plates are detachably arranged on the outer wall of the suspension frame through mounting bolts.
As a preferable technical scheme of the utility model, the rectangular frame is connected with a lifting mechanism through a steel rope.
As a preferable technical scheme of the utility model, a screw is fixedly arranged on one side of the side cabinet, which is opposite to the suspension frame, the inner wall of the screw is in threaded connection with a screw rod, one end of the screw rod is propped against the movable plate, and the other end of the screw rod extends to the outside of the side cabinet and is fixedly connected with a knob.
As a preferable technical scheme of the utility model, a spring is fixedly arranged between one side of the movable plate, which is opposite to the screw rod, and the inner side wall of the side cabinet.
As a preferable technical scheme of the utility model, the hanging frame and the side cabinet are provided with plate grooves for the baffle plate to pass through.
As a preferable technical scheme of the utility model, a steel plate is fixedly arranged at the bottom of the movable plate, and a movable groove for moving the steel plate is formed at the bottom of the side cabinet;
A plurality of groups of fixing seats are uniformly arranged on one side, opposite to the suspension frame, of the steel plate, and pulleys are rotatably arranged between each group of fixing seats.
(III) beneficial effects
Compared with the prior art, the utility model provides a construction suspension platform, which has the following beneficial effects:
1. This construction suspension platform, rectangular frame is connected to the one end of cable wire, and elevating system is connected to the other end, and with elevating system external, not only alleviateed suspension platform's weight, reduced the space occupation in the platform, also be convenient for simultaneously to elevating system's maintenance, when elevating system breaks down, outside personnel can assist the solution, have improved suspension platform's security.
2. This construction suspension platform, rectangular frame pass through connecting bolt and install on the rectangular frame, connection structure is simple, and connection convenient operation, connection effect are stable, and the top of rectangular frame still blocks through the baffle, further has improved the stability of rectangular frame installation.
3. According to the construction suspension platform, the pulley on the steel plate is convenient for the suspension frame to move on the building elevation, so that the movement is stable and is not easy to shake; when the suspension frame and the pulley are impacted, the suspension platform can be effectively buffered through deformation of the steel plate and compression of the spring, and safety and stability of the suspension platform are improved.
Drawings
FIG. 1 is a schematic perspective view of the overall structure of the present utility model;
FIG. 2 is a cross-sectional view of the overall structure of the present utility model;
FIG. 3 is a front cross-sectional view of the overall structure of the present utility model;
fig. 4 is an enlarged schematic view of fig. 2a in accordance with the present utility model.
In the figure: 1. a suspension frame; 2. a rectangular frame; 3. a rectangular frame; 4. a connecting bolt; 5. a coupling nut; 6. a sinking groove; 7. a baffle; 8. a movable plate; 9. a side cabinet; 10. a mounting plate; 11. installing a bolt; 12. a screw rod; 13. a nut; 14. a steel plate; 15. a fixing seat; 16. and (3) a pulley.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Examples:
Referring to fig. 1-4, a construction suspension platform comprises a suspension frame 1, a rectangular frame 2 is fixedly installed on the inner wall of the suspension frame 1, a rectangular frame 3 is detachably installed on the rectangular frame 2, specifically, the rectangular frame 3 is connected with the rectangular frame 2 through a connecting bolt 4 and a connecting nut 5, and a sinking groove 6 for accommodating the end head of the connecting bolt 4 is further formed in the top of the rectangular frame 3;
In the present embodiment, the rectangular frame 3 is connected with a lifting mechanism such as a hoist or the like through a wire rope;
In this embodiment, rectangular frame 3 is connected to the one end of cable wire, and elevating system is connected to the other end, and with elevating system external, not only alleviateed the weight of hanging platform, reduced the space occupation in the platform, also be convenient for simultaneously to elevating system's maintenance, when elevating system breaks down, outside personnel can assist the solution, has improved hanging platform's security greatly.
As shown in fig. 2 and 4, a baffle 7 is further provided, one end of the baffle 7 is blocked at the top of the rectangular frame 3, the other end is fixedly connected with a movable plate 8, plate grooves for allowing the baffle 7 to pass through are formed in the suspension frame 1 and the side cabinet 9, the movable plate 8 is movably arranged in the side cabinet 9, the side cabinet 9 is detachably mounted on the outer wall of the suspension frame 1, in the embodiment, mounting plates 10 are fixedly mounted at the top and the bottom of the side cabinet 9, and the mounting plates 10 are detachably mounted on the outer wall of the suspension frame 1 specifically through mounting bolts 11, so that the mounting stability is ensured, and meanwhile, the mounting is convenient to detach and replace due to the modularized design;
The rectangular frame 3 is installed on the rectangular frame 2 through the connecting bolt 4, and connection structure is simple, connection convenient operation, and the connection effect is stable, and the top of rectangular frame 3 still blocks through baffle 7, further has improved the stability of rectangular frame 3 installation.
As shown in fig. 4, a screw 13 is fixedly arranged on one side of the side cabinet 9, which is opposite to the suspension frame 1, a screw rod 12 is connected with the inner wall of the screw 13 in a threaded manner, one end of the screw rod 12 is propped against the movable plate 8, the other end of the screw rod extends to the outside of the side cabinet 9 and is fixedly connected with a knob, and in addition, a spring is fixedly arranged between one side of the movable plate 8, which is opposite to the screw rod 12, and the inner side wall of the side cabinet 9.
The screw rod 12 can be moved by screwing the knob under the action of the screw nut 13, the screw rod 12 moves to push the movable plate 8 to move, the movable plate 8 moves to compress the spring and simultaneously can extend the baffle 7 to be blocked above the rectangular frame 3, otherwise, the rectangular frame 3 can retract, and the spring can recover deformation;
As shown in fig. 2 and 4, a steel plate 14 is fixedly installed at the bottom of the movable plate 8, a movable groove for moving the steel plate 14 is formed at the bottom of the side cabinet 9, a plurality of groups of fixed seats 15 are uniformly arranged on one side, facing away from the suspension frame 1, of the steel plate 14, and pulleys 16 are rotatably arranged between each group of fixed seats 15;
The pulley 16 on the steel plate 14 facilitates the movement of the suspension frame 1 on the building elevation, and the movement is more stable and is not easy to shake; when the suspension frame 1 and the pulley 16 are impacted, the suspension platform can be effectively buffered through deformation of the steel plate 14 and compression of the spring, and the safety and stability of the suspension platform are improved.
In the embodiment, the positions of the steel plate 14 and the pulley 16 can be adjusted by screwing the knob to adjust the position of the movable plate 8, so that the gap between the suspension frame 1 and the building elevation can be controlled;
when the steel plate 14 deforms due to buffer impact, the whole side cabinet 9 can be detached for replacement, so that the maintenance cost is lower, and the maintenance operation is more convenient.
In this embodiment, from the perspective of fig. 4, only when the movable plate 8 moves leftwards to the limit position, the baffle plate 7 is staggered with the rectangular frame 3, so that the rectangular frame 3 is convenient to detach or mount, and when the movable plate 8 is at other positions, the baffle plate 7 can be blocked at the top of the rectangular frame 3, thereby further ensuring the stability of the rectangular frame 3, and simultaneously, the position of the steel plate 14 can be adjusted.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.
Claims (7)
1. A construction suspension platform, comprising:
A suspension frame (1);
The rectangular frame (2) is fixedly arranged on the inner wall of the suspension frame (1);
The rectangular frame (3) is detachably arranged on the rectangular frame (2) and is connected with a lifting mechanism through a steel cable;
Baffle (7), one end keeps off and establishes at the top of rectangle frame (3), and the other end fixedly connected with fly leaf (8), fly leaf (8) activity sets up in sideboard (9), sideboard (9) demountable installation is on the outer wall of hanging frame (1).
2. A construction suspension platform according to claim 1, wherein: the rectangular frame (3) is connected with the rectangular frame (2) through a connecting bolt (4) and a connecting nut (5), and a sinking groove (6) for accommodating the end head of the connecting bolt (4) is further formed in the top of the rectangular frame (3).
3. A construction suspension platform according to claim 1, wherein: the top and the bottom of side cabinet (9) are all fixed mounting has mounting panel (10), mounting panel (10) are through mounting bolt (11) demountable installation on the outer wall of hanging frame (1).
4. A construction suspension platform according to claim 1, wherein: the side cabinet (9) is provided with screw (13) in a fixed way in one side of the back of the hanging frame (1), the inner wall of the screw (13) is connected with screw rod (12) in a threaded way, one end of the screw rod (12) is propped against the movable plate (8), and the other end of the screw rod extends to the outside of the side cabinet (9) and is fixedly connected with a knob.
5. A construction suspension platform according to claim 4, wherein: a spring is fixedly arranged between one side of the movable plate (8) back to the screw rod (12) and the inner side wall of the side cabinet (9).
6. A construction suspension platform according to claim 1, wherein: the hanging frame (1) and the side cabinet (9) are provided with plate grooves for the baffle plates (7) to pass through.
7. A construction suspension platform according to claim 5, wherein: the bottom of the movable plate (8) is fixedly provided with a steel plate (14), and the bottom of the side cabinet (9) is provided with a movable groove for moving the steel plate (14);
a plurality of groups of fixing seats (15) are uniformly arranged on one side, back to the suspension frame (1), of the steel plate (14), and pulleys (16) are rotatably arranged between each group of fixing seats (15).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202322770001.1U CN221143513U (en) | 2023-10-16 | 2023-10-16 | Construction suspension platform |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202322770001.1U CN221143513U (en) | 2023-10-16 | 2023-10-16 | Construction suspension platform |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN221143513U true CN221143513U (en) | 2024-06-14 |
Family
ID=91419378
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202322770001.1U Active CN221143513U (en) | 2023-10-16 | 2023-10-16 | Construction suspension platform |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN221143513U (en) |
-
2023
- 2023-10-16 CN CN202322770001.1U patent/CN221143513U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN116354221A (en) | Superimposed sheet hoist device that protection effect is good | |
| CN211600148U (en) | Green construction monitoring device convenient to installation | |
| CN221143513U (en) | Construction suspension platform | |
| CN223522114U (en) | A compensation device suitable for shallow pits | |
| CN221481359U (en) | Suspension type protective fence | |
| CN113026953A (en) | All-aluminum assembly component for assembly type building | |
| CN219194121U (en) | High strength sedan-chair top guardrail | |
| CN111365673A (en) | New forms of energy street lamp convenient to maintenance | |
| CN212695514U (en) | A lifting device for installation of power distribution cabinet | |
| CN217461401U (en) | Detachable vertical shaft lifting platform for lifting type super high-rise elevator | |
| CN2292857Y (en) | Anti-overturning and anti-falling integrally lifting scaffold | |
| CN210366899U (en) | a lift platform | |
| CN220599121U (en) | Wall-attached double-guide-wheel structure | |
| CN215666525U (en) | Novel balancing block hanging rack | |
| CN216613643U (en) | Host installation structure of elevator without machine room | |
| CN212900785U (en) | Intelligent security device for hospital building elevator | |
| CN219259505U (en) | Advertisement board dismantling auxiliary frame of flexible buffer supporting structure | |
| CN221255828U (en) | Outer curtain wall mounting device for super high-rise building | |
| CN218539064U (en) | Dedicated bridge crane of short factory building | |
| CN219603097U (en) | Lifting hook bridge type metallurgical crane | |
| CN219489321U (en) | Transverse layout counterweight wheel suspension device | |
| CN219060804U (en) | Lifting platform with safety protection function for installing building curtain wall | |
| CN221141086U (en) | Guide rail type elevator installation mechanism | |
| CN215563266U (en) | Install elevator steel construction hinged joint device additional | |
| CN212101864U (en) | Elevator overhauls uses elevating platform |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |