CN221133894U - A construction frame for pre-buried steel bars of beam and slab guardrail - Google Patents
A construction frame for pre-buried steel bars of beam and slab guardrail Download PDFInfo
- Publication number
- CN221133894U CN221133894U CN202323016444.8U CN202323016444U CN221133894U CN 221133894 U CN221133894 U CN 221133894U CN 202323016444 U CN202323016444 U CN 202323016444U CN 221133894 U CN221133894 U CN 221133894U
- Authority
- CN
- China
- Prior art keywords
- steel bars
- support
- construction
- frame
- slab
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Butt Welding And Welding Of Specific Article (AREA)
Abstract
Description
技术领域Technical Field
本实用新型涉及护栏施工领域,具体涉及一种梁板护栏预埋钢筋施工胎架。The utility model relates to the field of guardrail construction, in particular to a construction frame for pre-embedded steel bars of beam and slab guardrails.
背景技术Background technique
随着中国经济的不断发展,特别是道路的发展也在逐渐加快,其中高速公路、高架桥的两侧均设置有混凝土的护栏,这种护栏内部设有钢筋骨架,钢筋骨架由横向钢筋和纵向钢筋焊接而成,最后通过混凝土的浇筑凝固形成护栏,该护栏具有结构稳定,强度大的优点。With the continuous development of China's economy, especially the development of roads is gradually accelerating. Concrete guardrails are installed on both sides of highways and viaducts. This guardrail has a steel frame inside, which is welded by transverse and longitudinal steel bars. Finally, the guardrail is formed by pouring and solidifying concrete. This guardrail has the advantages of stable structure and high strength.
在以往的护栏施工中,护栏钢筋采用拉线定位法,通过绑扎方式对钢筋进行预固定,然后通过焊接的方式对横向钢筋和纵向钢筋进行焊接,该操作工序繁琐,需要工人在桥梁边缘进行长期作业,安全风险很高;且在施工过程中,钢筋横向以及纵向之间的距离主要受施工人员的技术影响,不容易进行控制,施工效率低。In previous guardrail construction, the guardrail steel bars were positioned using the wire pulling method. The steel bars were pre-fixed by binding, and then the transverse and longitudinal steel bars were welded. This operation was cumbersome and required workers to work at the edge of the bridge for a long time, posing a high safety risk. During the construction process, the transverse and longitudinal distances between the steel bars were mainly affected by the construction workers' skills, which was not easy to control and resulted in low construction efficiency.
因此,提供一种梁板护栏预埋钢筋施工胎架,已是一个值得研究的问题。Therefore, providing a kind of beam and slab guardrail pre-embedded steel bar construction cradle has become an issue worthy of study.
实用新型内容Utility Model Content
为了解决上述现有技术中存在的不足,本实用新型的目的在于护栏施工整体安全性更好,施工速度更快,质量更好。In order to solve the deficiencies in the above-mentioned prior art, the purpose of the utility model is to improve the overall safety of guardrail construction, increase the construction speed and improve the quality.
本实用新型的目的是这样实现的:The purpose of the utility model is achieved in this way:
本实用新型提供的一种梁板护栏预埋钢筋施工胎架,包括两个支撑台,所述支撑台呈门型结构,两个所述支撑台的高端连接有限位挡架、定位架;The utility model provides a construction frame for pre-embedded steel bars of beam and slab guardrails, comprising two support platforms, the support platforms are in a door-shaped structure, and the high ends of the two support platforms are connected to a limited stop frame and a positioning frame;
所述限位挡架上设有对纵向钢筋限位的限位槽;The limit stop frame is provided with a limit groove for limiting the longitudinal steel bar;
所述定位架数量不小于两个,所述定位架上设有多个用于对横向钢筋限位的定位槽,所述定位槽沿着所述定位架的长度方向均匀分布。The number of the positioning frames is not less than two, and the positioning frames are provided with a plurality of positioning grooves for limiting the transverse steel bars, and the positioning grooves are evenly distributed along the length direction of the positioning frames.
进一步说明为,所述限位挡架呈门型结构,其两端与所述支撑台的高端固定连接,所述限位挡架靠近所述支撑台的一侧。It is further described that the limit stop frame is a door-shaped structure, both ends of which are fixedly connected to the high end of the support platform, and the limit stop frame is close to one side of the support platform.
进一步说明为,所述支撑台包括支撑立杆和支撑横杆,所述支撑立杆有两个,且焊接于在所述支撑横杆底面。It is further described that the support platform includes a support vertical rod and a support horizontal rod, and there are two support vertical rods, which are welded to the bottom surface of the support horizontal rod.
进一步说明为,两个所述支撑台之间连接有第二连接筋,位于同一个支撑台上的两个所述支撑立杆之间连接有第一连接筋。It is further described that a second connecting rib is connected between the two support platforms, and a first connecting rib is connected between the two support uprights located on the same support platform.
进一步说明为,所述定位架靠近所述支撑台远离所述限位挡架的一侧。It is further described that the positioning frame is close to a side of the support platform away from the limiting stop frame.
进一步说明为,所述定位槽的高度为20mm、长度为35mm。It is further described that the height of the positioning groove is 20 mm and the length is 35 mm.
进一步说明为,两个所述支撑台之间连接有限位件,所述限位件位于所述支撑台的高端,所述限位件用于对所述定位槽内的钢筋限位。It is further described that a limiting member is connected between the two support platforms, the limiting member is located at the high end of the support platform, and the limiting member is used to limit the steel bars in the positioning groove.
进一步说明为,所述限位件包括滑条,所述滑条与两个所述支撑横杆滑动配合,所述滑条外端穿出所述支撑横杆,且具有折线形限位结构,两个折线形限位结构上分别设有推力弹簧,所述滑条表面设有与所述定位槽对应的限位挡板。It is further described that the limiting member includes a sliding bar, which is slidably matched with the two supporting cross bars. The outer end of the sliding bar passes through the supporting cross bars and has a zigzag limiting structure. The two zigzag limiting structures are respectively provided with thrust springs, and the surface of the sliding bar is provided with a limiting baffle corresponding to the positioning groove.
进一步说明为,所述限位挡板呈折线形结构,其一端与所述滑条固定连接,所述推力弹簧位于远离所述限位挡板开口端的限位结构上。It is further described that the limit baffle is a broken line structure, one end of which is fixedly connected to the slide bar, and the thrust spring is located on the limit structure away from the open end of the limit baffle.
积极有益效果:Positive beneficial effects:
本装置无需施工人员长期位于桥梁边缘进行施工操作,通过预加工的方式进行施工,然后将焊接好的半成品钢筋架进行固定,安全性更好;This device does not require construction workers to be on the edge of the bridge for a long time to perform construction operations. The construction is carried out by pre-processing, and then the welded semi-finished steel bar frame is fixed, which is safer;
通过限位槽对纵向延伸的钢筋限位,通过定位槽能够对横向钢筋定位,辅助钢筋摆放整齐和均匀,使预制箱梁预埋钢筋间距更加均匀和垂直;The longitudinally extending steel bars are limited by the limiting grooves, and the transverse steel bars can be positioned by the positioning grooves, so that the auxiliary steel bars are arranged neatly and evenly, making the spacing of the embedded steel bars of the prefabricated box beam more uniform and vertical;
固定后的钢筋更加便于焊接操作,减轻钢筋焊接的操作难度,保证钢筋焊接时的均匀性,实现对预制箱梁防撞护栏钢筋结构形式的施工优化,提高施工效率;The fixed steel bars are easier to weld, which reduces the difficulty of steel bar welding and ensures the uniformity of steel bar welding, thus optimizing the construction of the steel bar structure of the prefabricated box girder anti-collision guardrail and improving construction efficiency.
在优选的实施方案中,通过限位件能够辅助横向钢筋进行限位,使钢筋能够靠近定位槽的一侧进行摆放和限位,方便钢筋焊接完成后进行取下,提高钢筋焊接以及取下的施工效率。In a preferred embodiment, the limiting member can assist in limiting the position of the transverse steel bars, so that the steel bars can be placed and limited close to one side of the positioning groove, which is convenient for removing the steel bars after welding is completed, thereby improving the construction efficiency of steel bar welding and removal.
附图说明BRIEF DESCRIPTION OF THE DRAWINGS
图1为本实用新型的结构示意图;Fig. 1 is a schematic diagram of the structure of the utility model;
图2为本实用新型的主视图;Figure 2 is a front view of the utility model;
图3为本实用新型的左视图;Fig. 3 is a left view of the utility model;
图4为本实用新型中支撑台的结构示意图;FIG4 is a schematic diagram of the structure of the support platform in the utility model;
图5为本实用新型中定位架的结构示意图;FIG5 is a schematic diagram of the structure of the positioning frame in the utility model;
图6为本实用新型中限位件的结构示意图;FIG6 is a schematic diagram of the structure of the position limiting member in the utility model;
图中为:支撑台1、支撑立杆101、支撑横杆102、第一连接筋103、第二连接筋104、限位挡架2、定位架3、定位槽301、限位件4、滑条401、限位挡板402、推力弹簧403;The figure shows: a support platform 1, a support vertical rod 101, a support horizontal rod 102, a first connecting rib 103, a second connecting rib 104, a limit stop frame 2, a positioning frame 3, a positioning groove 301, a limit member 4, a slide bar 401, a limit stop plate 402, and a thrust spring 403;
实施方式Implementation
以下结合附图和实施例对本实用新型作进一步说明。The utility model is further described below in conjunction with the accompanying drawings and embodiments.
实施例1Example 1
参见图1-图5所示,本实用新型提供的一种梁板护栏预埋钢筋施工胎架,包括两个支撑台1,支撑台1呈门型结构,两个支撑台1的高端连接有限位挡架2、定位架3;其中支撑台1的高度为800-900mm,用于支撑整个操作平台,辅助进行焊接钢筋的焊接工作;Referring to FIGS. 1 to 5 , the utility model provides a beam and slab guardrail pre-embedded steel bar construction frame, comprising two support platforms 1, the support platforms 1 are door-shaped structures, and the high ends of the two support platforms 1 are connected with a limited stop frame 2 and a positioning frame 3; wherein the height of the support platform 1 is 800-900 mm, and is used to support the entire operating platform and assist in the welding of welded steel bars;
限位挡架2上设有对纵向钢筋限位的限位槽201;The limit stop frame 2 is provided with a limit groove 201 for limiting the longitudinal steel bar;
位架3数量不小于两个,定位架3上设有多个用于对横向钢筋限位的定位槽301,定位槽301沿着定位架3的长度方向均匀分布,通过定位槽301能够起到对钢筋的定位;The number of the positioning frames 3 is not less than two, and the positioning frames 3 are provided with a plurality of positioning grooves 301 for limiting the transverse steel bars. The positioning grooves 301 are evenly distributed along the length direction of the positioning frames 3, and the steel bars can be positioned through the positioning grooves 301;
将护栏钢筋放置在定位槽301以及限位槽201内部,通过限位槽201对纵向延伸的钢筋限位,通过定位槽301能够对横向钢筋定位,当钢筋在定位槽301和限位槽201内部摆放整齐后,钢筋之间的距离更为均匀,且方便进行焊接操作,使其变成半成品预埋件,则焊接后相邻的钢筋之间距离相同,保证钢筋焊接时的均匀性,使预制箱梁预埋钢筋间距更加均匀和垂直,从而减轻钢筋焊接的操作难度,实现对预制箱梁防撞护栏钢筋结构形式的施工优化,提高施工效率。The guardrail steel bars are placed inside the positioning groove 301 and the limiting groove 201. The longitudinally extending steel bars are limited by the limiting groove 201, and the transverse steel bars can be positioned by the positioning groove 301. When the steel bars are neatly arranged inside the positioning groove 301 and the limiting groove 201, the distance between the steel bars is more uniform, and it is convenient to perform welding operations, making it a semi-finished embedded part. Then, the distance between adjacent steel bars after welding is the same, ensuring the uniformity of steel bar welding, making the spacing of the embedded steel bars of the prefabricated box beam more uniform and vertical, thereby reducing the difficulty of steel bar welding operations, realizing the construction optimization of the prefabricated box beam anti-collision guardrail steel bar structure, and improving construction efficiency.
其中,定位架3的数量优选为三个,且沿着支撑台1的长度方向分布。The number of the positioning frames 3 is preferably three, and they are distributed along the length direction of the support platform 1 .
进一步的,限位挡架2呈门型结构,其两端与支撑台1的高端固定连接,限位挡架2靠近支撑台1的一侧,且定位架3远离限位挡架2,其中限位挡架2包括一个水平设置的等边角钢以及两个竖直设置的等边角钢,水平设置的等边角钢长度为2100mm,竖直设置的等边角钢长度为30mm,其中限位槽201位于水平设置的等边角钢的水平侧壁上,其与定位槽301相互对应,两种长度的角钢截面尺寸为L50×5,两个竖直角钢与水平角钢焊接固定,能够起到对钢筋支撑作用,通过限位挡架2的竖直角钢能够对钢筋竖向进行定位,且可以对护栏连接钢筋起到定位作用,起到双保险支撑,更加稳妥。Furthermore, the limit stop frame 2 is a door-shaped structure, and its two ends are fixedly connected to the high end of the support platform 1. The limit stop frame 2 is close to one side of the support platform 1, and the positioning frame 3 is away from the limit stop frame 2, wherein the limit stop frame 2 includes a horizontally arranged equilateral angle steel and two vertically arranged equilateral angle steels, the length of the horizontally arranged equilateral angle steel is 2100mm, and the length of the vertically arranged equilateral angle steel is 30mm, wherein the limit groove 201 is located on the horizontal side wall of the horizontally arranged equilateral angle steel, which corresponds to the positioning groove 301, and the cross-sectional dimensions of the two lengths of angle steel are L50×5, and the two vertical angle steels are welded and fixed to the horizontal angle steel, which can play a supporting role for the steel bars. The vertical angle steel of the limit stop frame 2 can vertically position the steel bars, and can also position the steel bars connected to the guardrail, thereby playing a double insurance support and being more secure.
实施例2,与实施例1不同的特征在于:参见图1、图4所示,支撑台1包括支撑立杆101和支撑横杆102,支撑立杆101有两个,且焊接于在支撑横杆102底面,两个支撑台1之间连接有第二连接筋104,位于同一个支撑台1上的两个支撑立杆101之间连接有第一连接筋103,第一连接筋103距离支撑立杆101底端距离为200mm,支撑立杆101为高度为800mm的镀锌钢管,通过支撑横杆102能够辅助限位挡架2和定位架3的连接与安装,通过第一连接筋103和第二连接筋104能够提高支撑台1整体的支撑强度,使其更加平稳。Embodiment 2 is different from Embodiment 1 in that: as shown in Figures 1 and 4, the support platform 1 includes a support vertical pole 101 and a support cross bar 102. There are two support vertical poles 101, which are welded to the bottom surface of the support cross bar 102. A second connecting rib 104 is connected between the two support platforms 1. A first connecting rib 103 is connected between the two support vertical poles 101 located on the same support platform 1. The first connecting rib 103 is 200 mm away from the bottom end of the support vertical pole 101. The support vertical pole 101 is a galvanized steel pipe with a height of 800 mm. The support cross bar 102 can assist in the connection and installation of the limit stop frame 2 and the positioning frame 3. The first connecting rib 103 and the second connecting rib 104 can improve the overall supporting strength of the support platform 1 to make it more stable.
实施例3,与实施例1不同的特征在于:参见图5所示,定位槽301的高度为20mm、长度为35mm,在1号预埋钢筋与2号预埋钢筋放置在定位槽301内部时,均靠向定位槽301长度一侧摆放,并进行焊接,在需要移除时,向另一侧轻轻移动,因定位槽301的开口较焊接钩的钢筋大3-5mm,方便将钢筋取出,定位架3为长度为2100mm的L50×5的等边角钢,相邻两个定位槽301之间的距离为150mm,通过2100mm长度的定位架3主要方便工人直接将焊接好的半成品放在顶板钢筋上。Embodiment 3 is different from Embodiment 1 in that: as shown in FIG. 5 , the height of the positioning groove 301 is 20 mm and the length is 35 mm. When the No. 1 embedded steel bar and the No. 2 embedded steel bar are placed inside the positioning groove 301, they are placed on one side of the length of the positioning groove 301 and welded. When they need to be removed, they are gently moved to the other side. Since the opening of the positioning groove 301 is 3-5 mm larger than the steel bar of the welding hook, it is convenient to take out the steel bar. The positioning frame 3 is an equilateral angle steel of L50×5 with a length of 2100 mm. The distance between two adjacent positioning grooves 301 is 150 mm. The 2100 mm long positioning frame 3 is mainly convenient for workers to directly place the welded semi-finished products on the top plate steel bars.
实施例4,与实施例1不同的特征在于:参见图1、图6所示,两个支撑台1之间连接有限位件4,限位件4位于支撑台1的高端,限位件4用于对定位槽301内的钢筋限位;具体实施时,限位件4包括滑条401,滑条401与两个支撑横杆102滑动配合,滑条401外端穿出支撑横杆102,且具有折线形限位结构,滑条401整体呈板状结构,滑条401与两个支撑台1上的支撑横杆102滑动配合,两个折线形限位结构上分别设有推力弹簧403,滑条401表面设有与定位槽301对应的限位挡板402,则利用推力弹簧403的弹性推动滑条401,使滑条401在支撑横杆102之间滑动,从而通过滑条401表面的限位挡板402对定位槽301内的钢筋限位;Embodiment 4 is different from Embodiment 1 in that: as shown in Figures 1 and 6, a limiting member 4 is connected between the two support platforms 1, the limiting member 4 is located at the high end of the support platform 1, and the limiting member 4 is used to limit the steel bars in the positioning groove 301; in specific implementation, the limiting member 4 includes a slide bar 401, the slide bar 401 is slidably matched with the two support cross bars 102, the outer end of the slide bar 401 passes through the support cross bar 102, and has a broken line limiting structure, the slide bar 401 is a plate-shaped structure as a whole, the slide bar 401 is slidably matched with the support cross bars 102 on the two support platforms 1, and the two broken line limiting structures are respectively provided with thrust springs 403, and the surface of the slide bar 401 is provided with a limiting baffle 402 corresponding to the positioning groove 301, and the elasticity of the thrust spring 403 is used to push the slide bar 401 to make the slide bar 401 slide between the support cross bars 102, so that the steel bars in the positioning groove 301 are limited by the limiting baffle 402 on the surface of the slide bar 401;
在优选的实施方式中,限位挡板402呈折线形结构,其一端与滑条401焊接固定,推力弹簧403安装于限位挡板402开口端的限位结构上,利用推力弹簧403的弹性能够推动滑条401移动,从而使限位挡板402对定位槽301内的螺栓限位,且在滑条401上的另一限位结构上设有螺纹孔,在螺纹孔内部连接有螺栓,则螺栓的内端能够与支撑横杆102表面接触,旋拧螺栓,能够使滑条401的位置调节,在通过螺栓调节滑条401的位置后,则在定位槽301内部放置钢筋时,就无需对另外其他人克服推力弹簧403的弹性持续推动滑条401,就能够保持定位槽301的持续性开启,在螺栓旋拧出来之后,利用推力弹簧403的弹性,能够使限位挡板402对定位槽301内的钢筋限位。In a preferred embodiment, the limit baffle 402 is a zigzag structure, one end of which is welded and fixed to the slide bar 401, and the thrust spring 403 is installed on the limit structure at the open end of the limit baffle 402. The elasticity of the thrust spring 403 can be used to push the slide bar 401 to move, so that the limit baffle 402 limits the bolt in the positioning groove 301, and a threaded hole is provided on another limit structure on the slide bar 401, and a bolt is connected inside the threaded hole. The inner end of the bolt can contact the surface of the supporting cross bar 102, and the position of the slide bar 401 can be adjusted by screwing the bolt. After the position of the slide bar 401 is adjusted by the bolt, when the steel bar is placed inside the positioning groove 301, there is no need for other people to overcome the elasticity of the thrust spring 403 and continue to push the slide bar 401, so that the positioning groove 301 can be kept continuously open. After the bolt is screwed out, the elasticity of the thrust spring 403 can be used to limit the steel bar in the positioning groove 301.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202323016444.8U CN221133894U (en) | 2023-11-08 | 2023-11-08 | A construction frame for pre-buried steel bars of beam and slab guardrail |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202323016444.8U CN221133894U (en) | 2023-11-08 | 2023-11-08 | A construction frame for pre-buried steel bars of beam and slab guardrail |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN221133894U true CN221133894U (en) | 2024-06-14 |
Family
ID=91383570
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202323016444.8U Active CN221133894U (en) | 2023-11-08 | 2023-11-08 | A construction frame for pre-buried steel bars of beam and slab guardrail |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN221133894U (en) |
-
2023
- 2023-11-08 CN CN202323016444.8U patent/CN221133894U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110820561A (en) | Large cantilever prestress bent cap support device and construction method | |
| CN211849246U (en) | Reverse hoisting system suitable for high-pile wharf | |
| CN204690596U (en) | Viaduct bent cap sizing bed die support | |
| CN208202271U (en) | A kind of spliced steel bar truss floor support plate structure | |
| CN213867376U (en) | A construction device for the hollow cover beam of the gemstone of the heterosexual pier | |
| CN221133894U (en) | A construction frame for pre-buried steel bars of beam and slab guardrail | |
| CN107386119A (en) | A kind of variable cross-section beam sections type variable framework of steel reinforcement construction moulding bed device | |
| CN207227958U (en) | Variable cross-section beam sections type variable framework of steel reinforcement construction moulding bed device | |
| CN107186878B (en) | Adjustable prefabricated U-shaped beam steel bar binding clamping fixture and construction method | |
| CN208039060U (en) | A kind of steel box arch rib bowstring arch bridge binder steel skeleton external wrapping concrete hangs die body system | |
| CN113481852A (en) | Bridge wet joint formwork system capable of being continuously constructed | |
| CN205521875U (en) | Whole shaping die carrier of case breast web reinforcing bar | |
| CN110565864B (en) | Inclined roof truss floor plate and construction method thereof | |
| CN115070935B (en) | High pile wharf precast bridge approach box girder steel bar binding and positioning device | |
| CN209873586U (en) | A position adjustment device for prestressed tensioning of finish-rolled threaded steel bars | |
| CN209277403U (en) | Fixing clamp for beam steel reinforcement framework | |
| CN204385626U (en) | Case beam steel bar colligation fetal membrane support | |
| CN215038576U (en) | Combined type steel pedestal module unit structure suitable for different precast beam sizes | |
| CN212078686U (en) | Turnover type high-low grade concrete separation tool | |
| CN205576746U (en) | A new support for U type flange board is cast -in -place | |
| CN115613461A (en) | Construction technology of base formwork floor bearing plate suitable for steel-concrete composite beam cast-in-place bridge deck construction | |
| CN218596930U (en) | Cantilever arm suspension supporting device for steel-concrete composite beam cast-in-place bridge deck construction | |
| CN217924898U (en) | House steel construction building plane template support supporting device | |
| CN211074114U (en) | Integral reinforcing bar of T type roof beam preparation standard frame | |
| CN112571593A (en) | Combined type steel pedestal module unit structure suitable for different precast beam sizes |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |