CN221097721U - Pipeline installation construction laying device - Google Patents

Pipeline installation construction laying device Download PDF

Info

Publication number
CN221097721U
CN221097721U CN202322569708.6U CN202322569708U CN221097721U CN 221097721 U CN221097721 U CN 221097721U CN 202322569708 U CN202322569708 U CN 202322569708U CN 221097721 U CN221097721 U CN 221097721U
Authority
CN
China
Prior art keywords
plate
sliding
bottom plate
pipeline
threaded rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322569708.6U
Other languages
Chinese (zh)
Inventor
张朋朋
陈明娴
公衍锋
刘善彬
王天一
王钦
周良杰
王大发
王磊
骆昆峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianyuan Construction Group Co Ltd
Veterans Shandong Construction Group Co Ltd
Original Assignee
Tianyuan Construction Group Co Ltd
Veterans Shandong Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianyuan Construction Group Co Ltd, Veterans Shandong Construction Group Co Ltd filed Critical Tianyuan Construction Group Co Ltd
Priority to CN202322569708.6U priority Critical patent/CN221097721U/en
Application granted granted Critical
Publication of CN221097721U publication Critical patent/CN221097721U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model relates to the technical field of pipeline installation and paving, in particular to a pipeline installation and construction and paving device, which comprises two sleeves, wherein supporting rods are connected inside the two sleeves in a sliding manner, one ends of the two supporting rods, which are far away from the sleeves, are fixedly provided with bearing plates, the surface of a bottom plate is provided with sliding grooves, the interiors of the sliding grooves are connected with two sliding blocks in a sliding manner, the surfaces of one ends of the two sliding blocks, which are far away from the sliding grooves, are hinged with hinge plates, two supporting plates are fixedly arranged on the side surfaces of the bottom plate, threaded rods are connected between the two supporting plates in a rotating manner, rotating wheels are fixedly arranged on the surfaces of the threaded rods, grooves are formed in the side surfaces of the bottom plate, two movable blocks are connected with the surfaces of the threaded rods in a threaded manner, and connecting rods are fixedly arranged between the movable blocks and the sliding blocks. The utility model solves the problem that when the pipeline is assembled, the conventional pipeline installation construction laying device needs operators to lift the pipeline for a long time, and further increases the labor intensity of the operators.

Description

Pipeline installation construction laying device
Technical Field
The utility model relates to the technical field of pipeline installation and paving, in particular to a pipeline installation construction paving device.
Background
The pipeline laying is a time-consuming and labor-consuming project, and the pipelines are connected and laid, so that the aim of connecting and communicating all the pipelines is fulfilled.
When the existing pipeline installation construction laying device is used for assembling pipelines, the pipelines are lifted by an operator and are fixedly connected, and because a certain time is needed for fixedly connecting the two pipelines, the pipelines are required to be lifted by the operator for a long time, and the labor intensity of the operator is further increased.
Disclosure of utility model
The utility model aims to solve the technical problems in the background and provides a pipeline installation construction laying device.
In order to achieve the above purpose, the present utility model adopts the following technical scheme: the utility model provides a pipeline installation construction laying device, includes the bottom plate, the bottom surface fixed mounting of bottom plate has four pulleys, the surface of bottom plate is equipped with elevating gear, elevating gear includes two sleeves, two sleeve symmetric distribution is on the surface of bottom plate, two the equal sliding connection of telescopic inside has the bracing piece, two telescopic one end fixed mounting is kept away from to the bracing piece has the loading board. The sleeve and the supporting rod have the effect of enabling the bearing plate to be more stable in moving.
Preferably, the surface of bottom plate has seted up the spout, the inside sliding connection of spout has two sliders, and two the slider is kept away from the one end surface of spout and is all articulated to have the articulated slab, the articulated slab is kept away from the one end of slider and is articulated with the loading board. The arrangement of the hinged plate has the effect of driving the bearing plate to move.
Preferably, the side fixed mounting of bottom plate has two backup pads, two rotate between the backup pad and be connected with the threaded rod, the fixed surface of threaded rod installs the runner, the screw thread on threaded rod surface uses the runner as the center and is reverse screw thread each other, the recess has been seted up to the side of bottom plate, the surface threaded connection of threaded rod has two movable blocks, the movable block is with the help of threaded rod and recess sliding connection, fixed mounting has the connecting rod between movable block and the slider. The setting of runner has played and has driven threaded rod pivoted effect, and the setting of threaded rod has played the effect that drives movable block at the inside removal of recess, and the setting of connecting rod has played the effect that drives the slider and remove at the inside of spout.
Preferably, the surface of loading board is equipped with adjusting device, adjusting device includes four pole setting, four every two of pole setting is a set of symmetric distribution at the surface of loading board, the one end fixed mounting that the loading board was kept away from to the pole setting has the arc bracket, the side fixed mounting of loading board has U type support, vertical groove has been seted up to the inner wall of U type support, vertical groove's inside sliding connection has the connecting plate, the one end fixed mounting that vertical groove was kept away from to the connecting plate has the arc splint. The arrangement of the arc clamping plates and the arc brackets has the effect of clamping and limiting the pipeline.
Preferably, a long groove is formed in the surface of one end, far away from the vertical groove, of the U-shaped support, a displacement plate is connected inside the long groove in a sliding mode, and one end, far away from the long groove, of the displacement plate is fixedly connected with the connecting plate. The arrangement of the displacement plate has the effect of driving the connecting plate to move in the long groove.
Preferably, the surface thread of displacement board is connected with the bolt, a plurality of screw holes have been seted up to the side of U type support. The arrangement of the bolt and the threaded hole has the effect of limiting the position of the displacement plate in the long groove.
Compared with the prior art, the utility model has the advantages and positive effects that:
1. In the utility model, when the pipeline is required to be lifted, the pipeline is firstly placed into the arc-shaped bracket, then the rotating wheel is rotated, the rotating wheel drives the threaded rod to rotate, as the threads on the surface of the threaded rod are opposite to each other by taking the rotating wheel as the center, two movable blocks which are in threaded connection with the surfaces of the threaded rod can move in the direction of approaching or separating from each other in the groove when the threaded rod rotates, the two movable blocks move in the direction of approaching or separating from each other in the groove to drive the two connecting rods to move in the direction of approaching or separating from each other, the two connecting rods move in the direction of approaching or separating from each other to drive the two sliding blocks to move in the direction of approaching or separating from each other in the sliding groove, two sliders move to the direction that is close to each other or keep away from at the inside of spout and drive the hinged plate and remove, and the hinged plate removes and drives the loading board and remove, and the loading board removes and drives the bracing piece and move towards telescopic inside or upwards remove in telescopic inside, and the loading board removes still and drives the arc bracket simultaneously and remove, and the arc bracket removes and then realizes lifting to the pipeline, when the pipeline removes to suitable height, stop rotate the runner can, through the cooperation of above-mentioned structure, can realize the lift of loading board to help pipeline installer installation pipeline, very big reduction pipeline installer's work load has improved work efficiency greatly.
2. According to the utility model, when a pipeline is required to be fixed, the pipeline is firstly placed in the arc bracket, then the distance between the arc clamping plate and the arc bracket is adjusted according to the diameter of the pipeline, when the distance between the arc clamping plate and the arc bracket is required to be adjusted, the bolt is firstly unscrewed, the bolt is moved out of the bolt hole, the bolt is separated from the threaded hole, the displacement plate is lost to limit, at the moment, the displacement plate moves in the long groove to drive the connecting plate to move in the vertical groove, the connecting plate moves in the vertical groove to drive the arc clamping plate to move, when the moving position of the arc clamping plate can cover the other side of the pipeline, the corresponding threaded hole is screwed up again to fix the position in the groove at the moment, and at the moment, the pipeline can be clamped and fixed through the cooperation of the arc bracket and the arc clamping plate, and the distance between the arc bracket and the arc clamping plate can be adjusted through the cooperation of the structure, so that the pipeline clamping limit of different diameters is met, and the applicability of the device is improved.
Drawings
Fig. 1 is a schematic perspective view of a pipeline installation construction paving device according to the present utility model;
FIG. 2 is a schematic left-hand view of a pipeline installation construction paving device according to the present utility model;
FIG. 3 is a schematic view showing the construction of a pipeline installation and laying device at A in FIG. 1;
FIG. 4 is a schematic view showing the construction of a pipeline installation and laying device at B in FIG. 2;
Legend description:
1. A bottom plate; 2. a pulley; 3. a lifting device; 301. a sleeve; 302. a support rod; 303. a carrying plate; 304. a chute; 305. a slide block; 306. a hinged plate; 307. a support plate; 308. a threaded rod; 309. a rotating wheel; 310. a groove; 311. a movable block; 312. a connecting rod; 4. an adjusting device; 401. a vertical rod; 402. an arc-shaped bracket; 403. a U-shaped bracket; 404. a vertical groove; 405. a connecting plate; 406. an arc clamping plate; 407. a long groove; 408. a displacement plate; 409. a bolt; 410. and (3) a threaded hole.
Detailed Description
In order that the above objects, features and advantages of the utility model will be more clearly understood, a further description of the utility model will be rendered by reference to the appended drawings and examples. It should be noted that, without conflict, the embodiments of the present utility model and features in the embodiments may be combined with each other.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present utility model, but the present utility model may be practiced otherwise than as described herein, and therefore the present utility model is not limited to the specific embodiments of the disclosure that follow.
Referring to fig. 1-4, the present utility model provides a technical solution: the pipeline installation construction laying device comprises a bottom plate 1, and four pulleys 2 are fixedly arranged on the bottom surface of the bottom plate 1.
The specific arrangement and function of the lifting device 3 and the adjusting device 4 will be described in detail below.
In this embodiment: the surface of the bottom plate 1 is provided with a lifting device 3, the lifting device 3 comprises two sleeves 301, the two sleeves 301 are symmetrically distributed on the surface of the bottom plate 1, support rods 302 are slidably connected in the two sleeves 301, and one ends, far away from the sleeves 301, of the two support rods 302 are fixedly provided with a bearing plate 303.
In this embodiment: the arrangement of the sleeve 301 and the support bar 302 has the effect of making the carrier plate 303 more stable when moving.
Specifically, a chute 304 is formed on the surface of the bottom plate 1, two sliding blocks 305 are slidably connected in the chute 304, hinge plates 306 are hinged to the surfaces of one ends of the two sliding blocks 305 away from the chute 304, and one ends of the hinge plates 306 away from the sliding blocks 305 are hinged to the bearing plate 303.
In this embodiment: the arrangement of the hinge plate 306 has the effect of driving the carrier plate 303 to move.
Specifically, two support plates 307 are fixedly installed on the side surface of the bottom plate 1, a threaded rod 308 is rotatably connected between the two support plates 307, a rotating wheel 309 is fixedly installed on the surface of the threaded rod 308, threads on the surface of the threaded rod 308 are mutually reverse threads with the rotating wheel 309 as the center, a groove 310 is formed in the side surface of the bottom plate 1, two movable blocks 311 are connected with the surface of the threaded rod 308 in a threaded manner, the movable blocks 311 are in sliding connection with the grooves 310 through the threaded rod 308, and a connecting rod 312 is fixedly installed between the movable blocks 311 and the sliding blocks 305. The setting of runner 309 has played the effect of driving threaded rod 308 pivoted, and the setting of threaded rod 308 has played the effect of driving movable block 311 to remove in recess 310's inside, and the setting of connecting rod 312 has played the effect of driving slider 305 to remove in spout 304's inside.
In this embodiment: the surface of loading board 303 is equipped with adjusting device 4, adjusting device 4 includes four pole setting 401, and every two of four pole setting 401 are a set of symmetric distribution on the surface of loading board 303, and the one end fixed mounting that the loading board 303 was kept away from to pole setting 401 has arc bracket 402, and the side fixed mounting of loading board 303 has U type support 403, and vertical groove 404 has been seted up to the inner wall of U type support 403, and the inside sliding connection of vertical groove 404 has connecting plate 405, and the one end fixed mounting that vertical groove 404 was kept away from to connecting plate 405 has arc splint 406. When the pipeline needs to be fixed, the pipeline is firstly placed in the arc bracket 402, then the distance between the arc clamping plate 406 and the arc bracket 402 is adjusted according to the diameter of the pipeline, when the distance between the arc clamping plate 406 and the arc bracket 402 needs to be adjusted, the bolt 409 is firstly unscrewed, the bolt 409 is moved out of the hole of the bolt 409, the displacement plate 408 which is separated from the threaded hole 410 and is used for limiting is lost, at this time, the displacement plate 408 slides, the displacement plate 408 moves in the long groove 407 to drive the connecting plate 405 to move in the vertical groove 404, the connecting plate 405 moves in the vertical groove 404 to drive the arc clamping plate 406, when the position where the arc clamping plate 406 moves can cover the other side of the pipeline, the corresponding threaded hole 410 is screwed down again in the bolt 409 to fix the position in the groove 310 at this time through the cooperation of the arc bracket 402 and the arc clamping plate 406, and the pipeline can be clamped and fixed through the cooperation of the structure, the distance between the arc bracket 402 and the arc clamping plate 406 is adjustable, and therefore the applicability of the pipeline clamping device with different diameters is improved.
Specifically, a long slot 407 is formed on a surface of one end of the U-shaped bracket 403 away from the vertical slot 404, a displacement plate 408 is slidably connected in the long slot 407, and one end of the displacement plate 408 away from the long slot 407 is fixedly connected with the connecting plate 405.
In this embodiment: the displacement plate 408 is provided to move the connection plate 405 inside the long slot 407.
Specifically, the surface of the displacement plate 408 is screwed with a bolt 409, and a plurality of threaded holes 410 are formed in the side surface of the u-shaped bracket 403.
In this embodiment: the arrangement of the bolt 409 and the screw hole 410 has the effect of restricting the position of the displacement plate 408 inside the long groove 407.
Working principle: by arranging the lifting device 3, when the pipeline needs to be lifted, the pipeline is firstly placed in the arc-shaped bracket 402, then the rotating wheel 309 is rotated, the rotating wheel 309 rotates to drive the threaded rod 308 to rotate, because the threads on the surface of the threaded rod 308 are opposite threads around the rotating wheel 309, when the threaded rod 308 rotates, two movable blocks 311 which are in threaded connection with the surface of the threaded rod 308 move in the direction of approaching or separating from each other in the groove 310, the two movable blocks 311 move in the direction of approaching or separating from each other in the groove 310 to drive the two connecting rods 312 to move in the direction of approaching or separating from each other, the two connecting rods 312 move in the direction of approaching or separating from each other to drive the two sliding blocks 305 to move in the direction of approaching or separating from each other in the sliding groove 304, two sliders 305 move in the direction that spout 304 is close to or keeps away from each other and drive the hinged plate 306 to move, hinged plate 306 moves and drives the loading board 303 to move, the loading board 303 moves and drives the bracing piece 302 to move towards the inside of sleeve 301 or upwards move in the inside of sleeve 301, simultaneously the loading board 303 moves and also drives the arc bracket 402 to move, and the arc bracket 402 moves and then realizes lifting to the pipeline, when the pipeline moves to suitable height, the rotating wheel 309 stops rotating, through the cooperation of the structure, the lifting of the loading board 303 can be realized, thereby helping pipeline installers install the pipeline, the workload of the pipeline installers is greatly reduced, and the work efficiency is greatly improved. When the pipeline needs to be fixed, the pipeline is firstly placed in the arc bracket 402, then the distance between the arc clamping plate 406 and the arc bracket 402 is adjusted according to the diameter of the pipeline, when the distance between the arc clamping plate 406 and the arc bracket 402 needs to be adjusted, the bolt 409 is firstly unscrewed, the bolt 409 is moved out of the hole of the bolt 409, the displacement plate 408 which is separated from the threaded hole 410 and is used for limiting is lost, at this time, the displacement plate 408 slides, the displacement plate 408 moves in the long groove 407 to drive the connecting plate 405 to move in the vertical groove 404, the connecting plate 405 moves in the vertical groove 404 to drive the arc clamping plate 406, when the position where the arc clamping plate 406 moves can cover the other side of the pipeline, the corresponding threaded hole 410 is screwed down again in the bolt 409 to fix the position in the groove 310 at this time through the cooperation of the arc bracket 402 and the arc clamping plate 406, and the pipeline can be clamped and fixed through the cooperation of the structure, the distance between the arc bracket 402 and the arc clamping plate 406 is adjustable, and therefore the applicability of the pipeline clamping device with different diameters is improved.
While the utility model has been described in terms of what are presently considered to be the most practical and preferred embodiments, it is to be understood that the utility model is not limited to the disclosed embodiments, but is intended to cover various modifications and equivalent arrangements included within the spirit and scope of the utility model, as defined by the appended claims, as long as the scope of the utility model is defined by the following claims, and by the following claims, unless otherwise specified and limited by the context of the utility model; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present utility model can be understood by those of ordinary skill in the art in a specific case.

Claims (6)

1. The utility model provides a pipeline installation construction laying device, includes bottom plate (1), the bottom surface fixed mounting of bottom plate (1) has four pulleys (2), its characterized in that: the lifting device is characterized in that the lifting device (3) is arranged on the surface of the bottom plate (1), the lifting device (3) comprises two sleeves (301), the sleeves (301) are symmetrically distributed on the surface of the bottom plate (1), supporting rods (302) are slidably connected in the sleeves (301), and one ends, far away from the sleeves (301), of the supporting rods (302) are fixedly provided with bearing plates (303).
2. A pipe installation construction laying apparatus according to claim 1, wherein: the sliding chute (304) is formed in the surface of the bottom plate (1), two sliding blocks (305) are connected inside the sliding chute (304) in a sliding mode, hinge plates (306) are hinged to the surface of one end, away from the sliding chute (304), of each sliding block (305), and hinge plates (306) are hinged to one end, away from the sliding blocks (305), of each hinge plate and each bearing plate (303).
3. A pipe installation construction laying apparatus according to claim 1, wherein: the side fixed mounting of bottom plate (1) has two backup pad (307), two rotate between backup pad (307) and be connected with threaded rod (308), the fixed surface of threaded rod (308) installs runner (309), the screw thread on threaded rod (308) surface uses runner (309) as the center each other to be reverse screw thread, recess (310) have been seted up to the side of bottom plate (1), the surface threaded connection of threaded rod (308) has two movable blocks (311), movable block (311) are with the help of threaded rod (308) and recess (310) sliding connection, fixed mounting has connecting rod (312) between movable block (311) and slider (305).
4. A pipe installation construction laying apparatus according to claim 1, wherein: the surface of loading board (303) is equipped with adjusting device (4), adjusting device (4) are including four pole setting (401), four every two of pole setting (401) are a set of symmetric distribution at the surface of loading board (303), the one end fixed mounting that loading board (303) was kept away from to pole setting (401) has arc bracket (402), the side fixed mounting of loading board (303) has U type support (403), perpendicular groove (404) have been seted up to the inner wall of U type support (403), the inside sliding connection in perpendicular groove (404) has connecting plate (405), the one end fixed mounting that perpendicular groove (404) was kept away from to connecting plate (405) has arc splint (406).
5. A pipe installation construction laying apparatus according to claim 4, wherein: the U-shaped bracket (403) is provided with a long groove (407) on the surface of one end far away from the vertical groove (404), a displacement plate (408) is connected inside the long groove (407) in a sliding manner, and one end of the displacement plate (408) far away from the long groove (407) is fixedly connected with the connecting plate (405).
6. A pipe installation construction laying apparatus according to claim 5, wherein: the surface thread connection of displacement board (408) has bolt (409), a plurality of screw holes (410) have been seted up to the side of U type support (403).
CN202322569708.6U 2023-09-21 2023-09-21 Pipeline installation construction laying device Active CN221097721U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322569708.6U CN221097721U (en) 2023-09-21 2023-09-21 Pipeline installation construction laying device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322569708.6U CN221097721U (en) 2023-09-21 2023-09-21 Pipeline installation construction laying device

Publications (1)

Publication Number Publication Date
CN221097721U true CN221097721U (en) 2024-06-07

Family

ID=91328757

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322569708.6U Active CN221097721U (en) 2023-09-21 2023-09-21 Pipeline installation construction laying device

Country Status (1)

Country Link
CN (1) CN221097721U (en)

Similar Documents

Publication Publication Date Title
CN116014633B (en) A multi-directional cable laying bracket
CN211998460U (en) Suspension wire device for building construction
CN208703275U (en) A power device for pipe jacking
CN113639102A (en) Positioning bracket for water supply and drainage engineering pipelines
CN220702835U (en) Paying-off device for laying cable
CN219678011U (en) Connecting assembly of prefabricated cable bridge
CN217984364U (en) Cable bridge capable of finely adjusting fixed position
CN118054349A (en) Power supply hanging wire rack
CN113800403B (en) Movable subway door installation aid for rail transit
CN215516418U (en) Positioning instrument for mounting electromechanical equipment
CN215300025U (en) Auxiliary mounting bracket for electromechanical mounting engineering
CN219106917U (en) Auxiliary frame for electric power construction
CN222229674U (en) Ground pipe mounting bracket
CN223595210U (en) A pipeline laying device for water conservancy construction
CN223034916U (en) Auxiliary device for horizontal directional drilling machine construction
CN222085356U (en) An adjustable integrated support and hanger device for installing electromechanical pipelines
CN223039607U (en) Assembled light thin-wall cable trench
CN222410463U (en) A transmission line construction laying device
CN112010109A (en) Hydraulic and hydroelectric engineering is with device of sunkening cord
CN222877387U (en) Cable paying-off bracket
CN222953668U (en) A cable trench cable support for easy cable installation
CN219341471U (en) Ground heat supply pipeline installation lifting appliance
CN221543847U (en) A lifting device for prefabricated components of assembled buildings
CN221762807U (en) A building water supply and drainage pipe positioning bracket
CN217108499U (en) Pipeline fixing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant