Novel water supply pipeline
Technical Field
The utility model relates to the technical field of water supply pipelines, in particular to a novel water supply pipeline.
Background
The water supply pipeline is suitable for urban tap water delivery water supply engineering, internal and external water supply engineering of buildings, water supply engineering of industrial and mining enterprises, buried fire water supply Ding Cheng, water supply irrigation engineering of farmland water delivery, water supply and drainage engineering of garden greening water supply engineering and aquaculture industry, and the like. The hydrostatic pressure in the water supply pipeline of the high building is high, so that the requirements on pipeline brackets, pipe joints and the like are very strict.
The prior water supply pipeline pipe joint sealing structure is simpler, and is generally a flange plate matched with a sealing ring or a jacket matched with a sealing ring connecting pipe, and once the sealing ring is aged and corroded, the two connecting pipes are easy to leak.
Therefore, a novel water supply pipeline is provided for solving the problems.
Disclosure of utility model
The utility model aims to provide that: a novel water supply pipeline is used for solving the problems in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a novel water supply pipeline, includes a plurality of water supply pipelines, first joint and second joint, first joint one end rigid coupling has the great diameter of toper rubber circle one end, first joint recess has been seted up to first joint, first joint recess bottom rigid coupling has the bottom of two locating pieces, first joint recess bottom is located and has seted up threaded hole one between two locating pieces, first joint surface is located and has seted up threaded hole two between two locating pieces, first joint is kept away from the one end rigid coupling of toper rubber circle has two first auxiliary block one ends, first auxiliary block has seted up first auxiliary block through-hole;
Two sliding grooves are formed in one end of the second connector, a fixing hole is formed in the position, located between the two sliding grooves, of the surface of the second connector, one end, away from the sliding grooves, of the second connector is fixedly connected with one end of two second auxiliary blocks, and second auxiliary block through holes are formed in the second auxiliary blocks.
Preferably, one end of the water supply pipeline is fixedly connected with one end with a smaller diameter of the conical connector, and one end with a larger diameter of the conical connector is fixedly connected with one end of the second connector, which is close to the second auxiliary block.
Preferably, a water supply pipeline groove is formed in the other end of the water supply pipeline, and a water supply pipeline rubber ring is fixedly installed on the water supply pipeline through the water supply pipeline groove.
Preferably, the outer diameter of the water supply pipeline rubber ring is larger than the minimum inner diameter of the conical connector, and the minimum inner diameter of the conical connector is the same as the inner diameter of the water supply pipeline.
Preferably, the maximum outer diameter of the conical rubber ring is larger than the maximum inner diameter of the conical joint, and the minimum outer diameter of the conical rubber ring is larger than the minimum inner diameter of the conical joint.
Preferably, the conical rubber ring is inserted with a conical interface, the two positioning blocks are connected with two sliding grooves in a sliding mode, and one end, far away from the second auxiliary block, of the second joint is inserted with a first joint groove.
Compared with the prior art, the utility model has the beneficial effects that: the water supply pipeline is sealed through setting up the water supply pipeline rubber circle, the water supply pipeline rubber circle and toper interface reach the second and says toper is sealed, can make convenient location when pegging graft through the cooperation of locating piece and spout, can help better grafting fastening through first auxiliary block and second auxiliary block setting, can help the fastening after pegging graft the completion through screw hole one, screw hole two and fixed orifices's setting, it is comparatively simple to have solved current water supply pipeline tubular product interface seal structure, generally for ring flange cooperation sealing washer or press from both sides the cover cooperation sealing washer takeover, above two kinds of takeover are in case sealing washer ageing and corrosion, the problem of seepage phenomenon appears very easily.
Drawings
FIG. 1 is a perspective view of the overall structure of a water supply pipeline according to the present utility model;
FIG. 2 is a perspective view showing the insertion of two water supply pipelines according to the present utility model;
FIG. 3 is a perspective view of a first connector according to the present utility model;
FIG. 4 is a perspective view of a second connector according to the present utility model;
FIG. 5 is a perspective view of a water supply pipe groove of the present utility model;
FIG. 6 is a perspective view of a rubber ring of the water supply pipeline of the present utility model;
Fig. 7 is a perspective view of a tapered interface of the present utility model.
In the figure: 1. a water supply pipe; 101. a water supply pipe groove; 102. a water supply pipeline rubber ring; 2. a conical interface; 3. a first joint; 301. a conical rubber ring; 302. a first joint groove; 303. a positioning block; 304. a first threaded hole; 305. a threaded hole II; 306. a first auxiliary block; 307. a first auxiliary block through hole; 4. a second joint; 401. a fixing hole; 402. a chute; 403. a second auxiliary block; 404. and a second auxiliary block through hole.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Example 1
Referring to fig. 1-7, in a first embodiment of the present utility model, a novel water supply pipe is provided, which includes a plurality of water supply pipes 1, a first joint 3 and a second joint 4, wherein one end of the first joint 3 is fixedly connected with one end of a larger diameter of a conical rubber ring 301, a first joint groove 302 is provided in the first joint 3, the bottom of the first joint groove 302 is fixedly connected with the bottoms of two positioning blocks 303, a threaded hole one 304 is provided between the two positioning blocks 303 in the bottom of the first joint groove 302, a threaded hole two 305 is provided between the two positioning blocks 303 in the surface of the first joint 3, one end of the first joint 3, which is far away from the conical rubber ring 301, is fixedly connected with one end of two first auxiliary blocks 306, a first auxiliary block through hole 307 is provided in the first auxiliary block 306, and the water supply pipe 1 and related metal pipe fittings are glass reinforced composite pipe fittings;
Two spouts 402 have been seted up to second joint 4 one end, the fixed orifices 401 have been seted up to second joint 4 surface between two spouts 402, the one end rigid coupling that the spout 402 was kept away from to second joint 4 has two second auxiliary block 403's one end, second auxiliary block 403 has been seted up second auxiliary block through-hole 404, two first auxiliary block 306 and second auxiliary block 403 can pass second auxiliary block through-hole 404 and first auxiliary block through-hole 307 in the cooperation bolt and nut when one of them water supply pipeline 1 pegging graft another water supply pipeline 1, bolt and nut fastening help two water supply pipelines 1 better fastens.
Example 2
Referring to fig. 1-7, in a second embodiment of the present utility model, based on the previous embodiment, specifically, one end of the water supply pipe 1 is fixedly connected with one end with a smaller diameter of the conical connector 2, and one end with a larger diameter of the conical connector 2 is fixedly connected with one end, close to the second auxiliary block 403, of the second joint 4.
The water supply pipeline groove 101 is formed in the other end of the water supply pipeline 1, the water supply pipeline 1 is fixedly provided with the water supply pipeline rubber ring 102 through the water supply pipeline groove 101, and the water supply pipeline rubber ring 102 can provide sealing when one water supply pipeline 1 is inserted into the other water pipeline 1.
The outer diameter of the water pipeline rubber ring 102 is larger than the minimum inner diameter of the conical connector 2, and the minimum inner diameter of the conical connector 2 is the same as the inner diameter of the water supply pipeline 1.
The largest outer diameter of the conical rubber ring 301 is larger than the largest inner diameter of the conical connector 2, and the smallest outer diameter of the conical rubber ring 301 is larger than the smallest inner diameter of the conical connector 2.
The conical rubber ring 301 is inserted with a conical connector 2, two positioning blocks 303 are connected with two sliding grooves 402 in a sliding manner, one end, away from the second auxiliary block 403, of the second joint 4 is inserted with a first joint groove 302, and the two positioning blocks 303 can be positioned when one water supply pipeline 1 is inserted with the other water supply pipeline 1, so that the center of the first auxiliary threaded hole 304 and the center of the second threaded hole 305 are horizontally vertical to the center of the fixed hole 401, and the center of the first auxiliary block through hole 307 is horizontally parallel to the center of the second auxiliary block through hole 404.
Example 3
Referring to fig. 1 to 7, in a third embodiment of the present utility model, based on the above two embodiments, in use, a non-corrosive lubricant is smeared on the surfaces of the tapered rubber ring 301 and the water feeding pipe rubber ring 102, one end of the first joint 3 of one water feeding pipe 1 is plugged into one end of the second joint 4 of the other water feeding pipe 1, along with the plugging of two water feeding pipes 1, two positioning blocks 303 on one water feeding pipe 1 are slidably connected with two sliding grooves 402 of the other water feeding pipe 1, the tapered rubber ring 301 on one water feeding pipe 1 enters the tapered interface 2 of the other water feeding pipe 1, at this time, the center of the through hole 307 of the first auxiliary block on one water feeding pipe 1 is horizontally parallel to the center of the through hole 404 of the other second auxiliary block, when two water supply pipelines 1 are plugged into a certain degree, due to the friction force of the conical rubber ring 301 and the water supply pipeline rubber ring 102, the manpower is limited, the plugging cannot be continued, at this time, bolts and nuts can be used, the bolts and nuts penetrate through the second auxiliary block through holes 404 and the first auxiliary block through holes 307, the bolts and nuts are fastened to help the better fastening of the two water supply pipelines 1, when the water supply pipelines 1 are fastened to a certain degree, the circle center of the threaded hole 304 and the circle center of the threaded hole 305 on one water supply pipeline 1 are horizontally perpendicular to the circle center of the fixed hole 401 on the other water supply pipeline 1, at this time, the bolts and nuts penetrate through the threaded hole 304, the threaded hole 305 and the fixed hole 401 to be fastened, and so on, and finally the water supply pipeline 1 is connected.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.