CN221052596U - A verticality control device for steel pipe pile - Google Patents

A verticality control device for steel pipe pile Download PDF

Info

Publication number
CN221052596U
CN221052596U CN202323077875.5U CN202323077875U CN221052596U CN 221052596 U CN221052596 U CN 221052596U CN 202323077875 U CN202323077875 U CN 202323077875U CN 221052596 U CN221052596 U CN 221052596U
Authority
CN
China
Prior art keywords
pipe pile
steel pipe
control
adjusting
screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202323077875.5U
Other languages
Chinese (zh)
Inventor
王鹏
孙跟安
王晨
姜志鹏
王润华
李俊辰
王新元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Engineering Group Co Ltd
China Railway Construction Engineering Group Second Construction Co Ltd
Original Assignee
China Railway Construction Engineering Group Co Ltd
China Railway Construction Engineering Group Second Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Engineering Group Co Ltd, China Railway Construction Engineering Group Second Construction Co Ltd filed Critical China Railway Construction Engineering Group Co Ltd
Priority to CN202323077875.5U priority Critical patent/CN221052596U/en
Application granted granted Critical
Publication of CN221052596U publication Critical patent/CN221052596U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The application relates to a steel pipe pile verticality control device which comprises a working base arranged around a foundation pit, two clamping mechanisms arranged on the working base in an opposite mode and two control mechanisms arranged between the two clamping mechanisms, wherein an installation space for installing a steel pipe pile body is formed between the two clamping mechanisms and the two control mechanisms in an enclosing mode, the two clamping mechanisms are clamped on the steel pipe pile body, and the two control mechanisms can synchronously move upwards and/or downwards along the axial direction of the foundation pit and abut against at least four directions of the steel pipe pile body to enable the steel pipe pile body to adjust verticality up and down. The control device can accurately control the perpendicularity of the steel pipe pile in the steel pipe pile installation process, reduce the shaking amplitude of the steel pipe pile and improve the safety and stability of the steel pipe pile installation.

Description

Steel-pipe pile straightness controlling means that hangs down
Technical Field
The application relates to the technical field of steel pipe pile construction, in particular to a steel pipe pile verticality control device.
Background
The reverse construction technology is based on the principle that the underground structure of the high-rise building is constructed layer by layer from top to bottom, namely continuous walls or close piles are constructed along the periphery of the basement of the building to serve as the enclosure structure of the outer wall or foundation pit of the basement, meanwhile, the piles are supported in the middle of the construction floors at relevant positions in the building, so that a reverse vertical bearing system is formed, a layer of earthwork is excavated from top to bottom, a layer of basement beam plate structure is poured with a soil mold, and after certain strength is achieved, the underground beam plate structure can serve as the inner horizontal support of the enclosure structure to meet the safety requirement of continuous downward construction.
The reverse construction method mainly adopts a column-pile process, and the construction key of the reverse construction method is the construction quality of the steel pipe pile, wherein the perpendicularity of the steel pipe pile is controlled as a construction heavy difficulty. In the related art, correction is generally performed using a correction frame, but correction is performed using a correction frame, resulting in a large degree of wobble of the steel pipe pile during correction.
Disclosure of utility model
The application aims to provide a steel pipe pile verticality control device which can accurately control the verticality of a steel pipe pile in the installation process of the steel pipe pile, reduce the shaking amplitude of the steel pipe pile and improve the safety and stability of the installation of the steel pipe pile.
The application provides a steel pipe pile verticality control device, which adopts the following technical scheme:
The utility model provides a steel-pipe pile straightness controlling means that hangs down, including setting up in the work base around the foundation ditch, install two clamping mechanism that set up relatively on the work base and set up two control mechanism between two clamping mechanism, enclose into the installation space of installing the steel-pipe pile body between two clamping mechanism and the two control mechanism, two clamping mechanism clamp on the steel-pipe pile body, two control mechanism homoenergetic simultaneously along the axial upward and/or downward movement of foundation ditch, at least four directions of butt steel-pipe pile body, make the steel-pipe pile body adjust the straightness from top to bottom.
As a preferable technical scheme of the application, the working base comprises a rectangular outer frame and reinforcing struts fixedly arranged on the inner sides of four vertex angles of the rectangular outer frame, and the clamping mechanism and the control mechanism are connected to the reinforcing struts.
As a preferable technical scheme of the application, the clamping mechanism comprises a fixed seat, an adjusting screw rod in threaded connection with the fixed seat and a fixed clamping plate in rotary connection with the front end of the adjusting screw rod, and the two clamping mechanisms are clamped on the steel pipe pile body through the fixed clamping plate.
As a preferable technical scheme of the application, the control mechanism comprises a guide rod vertically fixed on the reinforcing support rod, a mounting plate fixed on the end part of the guide rod, a control screw rotationally connected to the mounting plate and an adjusting component connected to the control screw, wherein the adjusting component is in threaded connection with the control screw and is driven by the control screw to move upwards or downwards, the adjusting component is in sliding connection with the guide rod, and at least two contact points are arranged between the adjusting component and the steel pipe pile body and used for pushing the steel pipe pile body to swing.
As a preferable technical scheme of the application, the adjusting assembly comprises a connecting plate sleeved on the guide rod, two connecting rods fixed at the same end of the connecting plate and adjusting wheels connected to the end parts of the connecting rods, the adjusting wheels are used for rolling contact with the steel pipe pile body, the connecting plate is connected to the control screw rod in a threaded manner, and the rotating shafts of the two adjusting wheels are vertical.
As a preferable technical scheme of the application, the guide rod is provided with lengths at the upper side and the lower side of the reinforcing support rod, the control screw rod is respectively provided with a forward thread and a reverse thread at a part higher than the reinforcing support rod and a part lower than the reinforcing support rod, and a group of adjusting components are connected to the forward thread and the reverse thread.
As a preferable technical scheme of the application, the control screw is provided with a control turntable at a position between the forward thread and the reverse thread.
As a preferable technical scheme of the application, the concave surface of the fixed splint is provided with an elastic protection layer.
In summary, the present application includes at least one of the following beneficial technical effects:
1. The working base is placed on a plane to serve as a vertical plane, the clamping mechanism clamps the steel pipe pile body, the clamped position serves as a rotating fulcrum of the steel pipe pile body, the upper end and the lower end of the steel pipe pile body are corrected by means of up-and-down movement of the adjusting component on the control mechanism, the offset part of the upper end or the lower end is gradually corrected, and the steel pipe pile body is returned to a state parallel to the guide rod and the control screw rod, so that the verticality of the steel pipe pile body is controlled.
2. The adjusting assembly is provided with four adjusting wheels which are contacted with the steel pipe pile body, when the four adjusting wheels are contacted with the steel pipe pile body, the state that the steel pipe pile body is vertical to the working base is achieved, and the correction of the verticality of the steel pipe pile body is achieved.
Drawings
FIG. 1 is a schematic diagram of the overall structure of a control device according to an embodiment of the present application;
FIG. 2 is a top view showing a use state of the control device according to the embodiment of the present application;
In the figure, 1, a working base; 11. a rectangular outer frame; 12. reinforcing the strut; 2. a clamping mechanism; 21. a fixing seat; 22. adjusting a screw; 23. a fixed clamping plate; 24. an elastic protective layer; 3. a control mechanism; 31. a guide rod; 32. a mounting plate; 33. a control screw; 34. a connecting plate; 35. a connecting rod; 36. an adjusting wheel; 37. a control turntable; 4. and a steel pipe pile body.
Detailed Description
The present application will be described in further detail with reference to fig. 1 to 2.
Examples: the present embodiment proposes a steel pipe pile verticality control apparatus, referring to fig. 1 and 2, which includes a working base 1, a clamping mechanism 2 and a control mechanism 3 to adjust and control the verticality of a steel pipe pile body.
The work base 1 is installed around the foundation ditch, and the centre exposes the space of foundation ditch and installation steel-pipe pile body 4, and work base 1 includes rectangle frame 11 and reinforcing strut 12, and rectangle frame 11 in this embodiment sets up to the square, and reinforcing strut 12 is provided with four, and the fixed setting is inboard at four apex angles of rectangle frame 11 respectively, strengthens the structural strength of rectangle frame 11. When the working base 1 is used, the working base is horizontally placed on the ground surface, and the plane is kept vertical to the axial direction of the foundation pit.
Clamping mechanism 2 and control mechanism 3 all install on strengthening branch 12, clamping mechanism 2 is provided with two sets ofly, install on two relative strengthening branches 12, control mechanism 3 also is provided with two sets ofly, install on two other relative strengthening branches 12, enclose into the installation space of installing steel-pipe pile body 4 between two clamping mechanisms 2 and two control mechanism 3, two clamping mechanisms 2 clamp and lie in the position of foundation ditch export at steel-pipe pile body 4, two control mechanism 3 homoenergetic are synchronous along the axial upward and/or downward movement of foundation ditch, the butt is in the upper end and/or the lower extreme of steel-pipe pile body 4, adjust the straightness that hangs down of steel-pipe pile body 4.
The clamping mechanism 2 comprises a fixed seat 21, an adjusting screw 22, a fixed clamping plate 23 and an elastic protection layer 24, wherein the fixed seat 21 is a rectangular metal block and is fixed on the upper surface of the reinforcing support rod 12, the adjusting screw 22 is in threaded connection with the fixed seat 21, the adjusting screws 22 of the two clamping mechanisms 2 are coaxially arranged, the fixed clamping plate 23 is rotationally connected with the front end of the adjusting screw 22, the rear end of the adjusting screw 22 is provided with a rotating hand wheel for rotating the adjusting screw 22, and the fixed clamping plates 23 of the two clamping mechanisms 2 are clamped on the steel pipe pile body 4 and serve as rotating fulcra of the steel pipe pile body 4. In order to protect the steel pipe pile body 4, an elastic protection layer 24 made of rubber is arranged on the concave surface of the fixing clamp plate 23, so that deformation caused by overlarge pressure of the steel pipe pile body 4 is avoided, friction can be increased, and the steel pipe pile body 4 is clamped tightly by the fixing clamp plate 23. The fixing clamp plate 23 is provided in an arc shape or a rectangular shape, and is used for clamping the circular steel pipe pile body 4 when in an arc shape, and is used for clamping the square steel pipe pile body 4 when in a rectangular shape, and in this embodiment, the arc shape is taken as an example for illustration.
The control mechanism 3 includes a guide bar 31, a mounting plate 32, a control screw 33, and an adjustment assembly coupled to the guide bar 31. The guide rod 31 is vertically fixed on the reinforced supporting rod 12, the guide rod 31 can be fixed on the upper side of the reinforced supporting rod 12, the adjusting components can move towards the upper side of the foundation pit, the guide rod 31 can also be fixed on the lower side of the reinforced supporting rod 12, the adjusting components can move towards the inner side of the foundation pit, the guide rod 31 can also have lengths on the upper side and the lower side of the reinforced supporting rod 12, two groups of adjusting components can be installed, the two groups of adjusting components can move towards the upper side of the foundation pit and the inner side of the foundation pit respectively, in the embodiment, the guide rod 31 is divided into two equal-length sections, and the guide rod 31 is coaxially fixed on the upper side and the lower side of the reinforced supporting rod 12.
The upper and lower ends of the guide rods 31 are vertically fixed with mounting plates 32, a control screw 33 is rotatably connected between the two mounting plates 32 and rotates along an axis between the two mounting plates 32, and the control screw 33 is arranged at a position between the guide rods 31 of the two groups of control mechanisms 3 and is positioned on the same plane with the two guide rods 31. The control screw 33 is provided with a forward thread and a reverse thread at a part higher than the reinforcing strut 12 and a part lower than the reinforcing strut 12 respectively, a group of adjusting components are connected to the forward thread and the reverse thread, a control turntable 37 is arranged at a position horizontally opposite to the reinforcing strut 12 between the forward thread and the reverse thread, and the control turntable 37 can adopt a turntable with a handle for convenient rotation.
The adjusting assembly comprises a connecting plate 34, connecting rods 35 and adjusting wheels 36, wherein the connecting plate 34 is arranged as a rectangular plate, one end of the connecting plate is slidably sleeved on the guide rod 31, the other end of the connecting plate is in threaded connection with the control screw 33, the control screw 33 rotates to control the lifting or descending of the connecting plate 34, two connecting rods 35 with the same height are fixed on the end face of one end, connected with the control screw 33, of the connecting plate 34, the included angle between the two connecting rods 35 is a right angle, the end part of each connecting rod 35 is rotationally connected with one adjusting wheel 36, the axis of each adjusting wheel 36 is horizontal, the rotating axes of the two adjusting wheels 36 are vertical, four adjusting wheels 36 on the two groups of control mechanisms 3 are positioned at the four vertex angle positions of a square, the axes of the two adjusting wheels 36 on the diagonal are the same, the four adjusting wheels 36 are used for abutting against the outer surface of the steel pipe pile body 4, and the steel pipe pile body 4 is controlled to swing to the state parallel to the axis of the guide rod 31, and the control of the verticality of the steel pipe pile body 4 is realized.
The embodiments of the present application are all preferred embodiments of the present application, and are not intended to limit the scope of the present application, wherein like reference numerals are used to refer to like elements throughout. Therefore: all equivalent changes in structure, shape and principle of the application should be covered in the scope of protection of the application.

Claims (8)

1. The utility model provides a steel-pipe pile straightness controlling means that hangs down, a serial communication port, including setting up work base (1) around the foundation ditch, install clamping mechanism (2) of two relative settings on work base (1) and set up two control mechanism (3) between two clamping mechanism (2), enclose into the installation space of installing steel-pipe pile body (4) between two clamping mechanism (2) and two control mechanism (3), two clamping mechanism (2) clamp on steel-pipe pile body (4), two control mechanism (3) all can be synchronous along the axial upward and/or the downward movement of foundation ditch, at least four directions of butt steel-pipe pile body (4), make steel-pipe pile body (4) adjust the straightness from top to bottom.
2. The steel pipe pile verticality control device according to claim 1, wherein the working base (1) comprises a rectangular outer frame (11) and reinforcing struts (12) fixedly arranged on the inner sides of four vertex angles of the rectangular outer frame (11), and the clamping mechanism (2) and the control mechanism (3) are connected to the reinforcing struts (12).
3. The steel pipe pile verticality control device according to claim 2, wherein the clamping mechanism (2) comprises a fixed seat (21), an adjusting screw (22) in threaded connection with the fixed seat (21) and a fixed clamping plate (23) in rotary connection with the front end of the adjusting screw (22), and the two clamping mechanisms (2) are clamped on the steel pipe pile body (4) through the fixed clamping plate (23).
4. A steel pipe pile verticality control apparatus according to claim 2, wherein the control mechanism (3) comprises a guide rod (31) vertically fixed on the reinforcing strut (12), a mounting plate (32) fixed on the end of the guide rod (31), a control screw (33) rotatably connected to the mounting plate (32), and an adjusting component connected to the control screw (33), the adjusting component is in threaded connection with the control screw (33), the adjusting component is driven by the control screw (33) to move upwards or downwards, the adjusting component is slidingly connected with the guide rod (31), and at least two contact points are arranged between the adjusting component and the steel pipe pile (4) for pushing the steel pipe pile (4) to swing.
5. The steel pipe pile verticality control device according to claim 4, wherein the adjusting assembly comprises a connecting plate (34) sleeved on the guide rod (31), two connecting rods (35) fixed at the same end of the connecting plate (34), and an adjusting wheel (36) connected to the end part of the connecting rod (35), the adjusting wheel (36) is used for being in rolling contact with the steel pipe pile body (4), the connecting plate (34) is in threaded connection with the control screw (33), and rotation shafts of the two adjusting wheels (36) are vertical.
6. The steel pipe pile verticality control device according to claim 4, wherein the guide rod (31) has lengths on upper and lower sides of the reinforcing strut (12), the control screw (33) is provided with a forward thread and a reverse thread at a portion higher than the reinforcing strut (12) and a portion lower than the reinforcing strut (12), respectively, and a group of adjusting components are connected to the forward thread and the reverse thread.
7. The steel pipe pile verticality control apparatus according to claim 6, wherein the control screw (33) is provided with a control dial (37) at a position intermediate the forward screw and the reverse screw.
8. A steel pipe pile verticality control apparatus according to claim 3, wherein an elastic protection layer (24) is provided on a concave surface of the fixing clamp plate (23).
CN202323077875.5U 2023-11-14 2023-11-14 A verticality control device for steel pipe pile Expired - Fee Related CN221052596U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202323077875.5U CN221052596U (en) 2023-11-14 2023-11-14 A verticality control device for steel pipe pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202323077875.5U CN221052596U (en) 2023-11-14 2023-11-14 A verticality control device for steel pipe pile

Publications (1)

Publication Number Publication Date
CN221052596U true CN221052596U (en) 2024-05-31

Family

ID=91197898

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202323077875.5U Expired - Fee Related CN221052596U (en) 2023-11-14 2023-11-14 A verticality control device for steel pipe pile

Country Status (1)

Country Link
CN (1) CN221052596U (en)

Similar Documents

Publication Publication Date Title
CN211924067U (en) Constructional engineering pile device
CN210687447U (en) Municipal administration is fixed bolster for heating power pipeline
CN220133594U (en) Can have enough to meet need interim truss girder split heads of adjustable
CN211114797U (en) Hydraulic climbing formwork device and system with adjustable climbing angle
CN221537726U (en) Bending device for iron tower steel plate machining
CN220944244U (en) Automatic tapping and drilling equipment for tubular pile die
CN112554011A (en) Equipment is used in road bed stone construction
CN219196719U (en) Cantilever support template for water inlet tower construction
CN218029115U (en) Positioner is used in installation of earthquake-resistant support for building
CN217811022U (en) Tubular pile plane position and verticality control device
CN216041167U (en) Auxiliary construction device for stiff composite pile
CN216839438U (en) Permanent steel protects a guiding orientation device
CN215482245U (en) Force transferring and pressure reducing stabilizing device at top of bridge and culvert
CN214089894U (en) Pit foundation supporting device for municipal works
CN215631887U (en) Building structure design roof beam reinforced structure
CN117684642A (en) A kind of concrete prefabricated part positioning and installation construction equipment
CN221276358U (en) Adjustable assembled triangular bracket
CN222512764U (en) Foundation pit side tower crane
CN220645856U (en) Frame base type emulsion drilling machine fixing support
CN220150120U (en) Bridge and culvert supporting seat
CN221399086U (en) Foundation structure of embedded pile steel platform tower crane
CN113944345A (en) Building construction support equipment
CN213805464U (en) Tree root-shaped foundation bearing platform
CN221169560U (en) Reinforced structure is received to shield constructs quick-witted steel sleeve
CN220886812U (en) Adjustable split heads structure of pre-buried landing leg of tower crane basis

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20240531