CN221030123U - Wind-powered electricity generation foundation construction crab-bolt subassembly installation positioner - Google Patents
Wind-powered electricity generation foundation construction crab-bolt subassembly installation positioner Download PDFInfo
- Publication number
- CN221030123U CN221030123U CN202322742286.8U CN202322742286U CN221030123U CN 221030123 U CN221030123 U CN 221030123U CN 202322742286 U CN202322742286 U CN 202322742286U CN 221030123 U CN221030123 U CN 221030123U
- Authority
- CN
- China
- Prior art keywords
- sleeve
- displacement
- connecting rod
- horizontal pole
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a wind power foundation construction anchor bolt assembly mounting and positioning device which comprises two construction frames, a construction platform, a first cross rod, a second cross rod and U-shaped limiting plates, wherein the two construction frames are symmetrically distributed on two sides of an anchor bolt, the first cross rod and the second cross rod are respectively arranged on the inner side of each construction frame, a first displacement sleeve is connected to the first cross rod and the second cross rod in a sliding manner, the U-shaped limiting plates are arranged on the inner side of the first displacement sleeve, a support is arranged above the first cross rod, and the U-shaped supporting plates are arranged at the end parts of the support. According to the utility model, the U-shaped limiting plate is arranged on the construction frame, so that large floating shaking of the anchor cage sleeve in the upward moving process is avoided, the U-shaped support is arranged on the third displacement sleeve, and the U-shaped support is arranged at the end part of the U-shaped support, so that the cross beam at the bottom of the sleeve can be supported, the rapid opening operation of workers is facilitated, the stability of the anchor cage sleeve in the high lifting process is ensured, and the anchor cage sleeve is convenient to use and simple to operate.
Description
Technical Field
The utility model relates to an anchor cage sleeve installation auxiliary device, in particular to an anchor bolt assembly installation positioning device for wind power foundation construction, and belongs to the technical field of wind power construction.
Background
When wind power foundation construction is carried out, anchor cage sleeves are required to be installed on the anchor rods, the anchor cage sleeves are distributed in a ladder shape and are long in whole, and when the wind power foundation construction is installed, at least two workers are required to lift the anchor cage sleeves through the tops of the anchor rods in a matching mode, and then the anchor cage sleeves are placed down while being aligned; in the process, as the anchor cage sleeve is heavier, the anchor cage sleeve is easy to shake under the condition of indefinite in the process of lifting the anchor cage sleeve by high speed by workers, thereby being not beneficial to the workers to quickly perform opposite opening and having the potential safety hazard of tipping the anchor cage sleeve.
Disclosure of utility model
The technical problems to be solved by the utility model are as follows: overcomes the defects of the prior art, provides a wind power foundation construction anchor bolt assembly installation positioning device, which enables an anchor cage sleeve to be in a stable state, is convenient for workers to perform opposite-mouth lowering operation, and avoids potential safety hazards.
The technical scheme adopted by the utility model for solving the technical problems is as follows:
The utility model provides a wind-powered electricity generation basis construction crab-bolt subassembly installation positioner, includes scaffold, construction platform, first horizontal pole, second horizontal pole and U type limiting plate, the scaffold is two, is the symmetry form and distributes in the both sides of stock, every the inboard of scaffold is provided with first horizontal pole and second horizontal pole respectively, sliding connection has first displacement cover on first horizontal pole and the second horizontal pole, the inboard of first displacement cover is provided with the U type limiting plate, the top of first horizontal pole is provided with the second connecting rod, sliding connection has the third displacement cover on the second connecting rod, it has the support to run through on the third displacement cover, the tip of support is provided with the U type extension board.
The top of the construction frame is provided with a construction platform.
The first cross rod and the second cross rod are distributed in an upper-lower parallel mode, a first connecting rod is arranged between first displacement sleeves on the first cross rod and the second cross rod, a second displacement sleeve is connected to the first connecting rod in a sliding mode, the second displacement sleeves are fixedly connected with the first connecting rod through bolts, and a U-shaped limiting plate is arranged on the inner side of the second displacement sleeve.
The second connecting rod is fixedly connected with the first displacement sleeve on the first cross rod, the third displacement sleeve is fixedly connected with the second connecting rod through a bolt, the second displacement sleeve is connected to the second connecting rod in a sliding mode, the U-shaped limiting plate is arranged on the inner side of the second displacement sleeve, the second displacement sleeve is fixedly connected with the second connecting rod through a bolt, and the second displacement sleeve is located at the upper position of the third displacement sleeve.
The support is L-shaped, and the support is fixedly connected with the third displacement sleeve through bolts.
The utility model has the positive beneficial effects that:
1. According to the utility model, the U-shaped limiting plates are arranged on the construction frames on the two sides of the anchor rod, so that large floating shaking of the anchor cage sleeve in the upward moving process is avoided, the U-shaped support is arranged on the third displacement sleeve, and the U-shaped support is arranged at the end part of the U-shaped support, so that the cross beam at the bottom of the sleeve can be supported, and convenience is brought to workers for carrying out opposite operation.
2. According to the utility model, the struts are arranged on the back sides of the first cross rod and the second cross rod, when the anchor cage sleeve is used, through moving the struts, the anchor cage sleeve can be placed between the U-shaped limiting plates on two sides by enlarging the distance between the U-shaped limiting plates on two sides, and the shaking space of the anchor cage sleeve when moving upwards can be reduced by reducing the distance between the U-shaped limiting plates on two sides, so that the stability of the anchor cage sleeve in the lifting process is ensured, and the anchor cage sleeve is convenient to use and simple to operate.
Drawings
FIG. 1 is a state diagram of the present utility model;
FIG. 2 is a schematic view of a construction frame on one side of the present utility model;
Wherein: 1-construction frame, 2-construction platform, 3-first horizontal pole, 4-second horizontal pole, 5-head rod, 6-first displacement cover, 7-second displacement cover, 8-U limiting plate, 9-third displacement cover, 10-support, 11-U type extension board, 12-second connecting rod, 13-pillar, A-anchor cage sleeve pipe.
Detailed Description
The utility model is further explained and illustrated below with reference to the drawings:
1-2, a wind-powered electricity generation basis construction crab-bolt subassembly installs positioner, including scaffold 1, construction platform 2, first horizontal pole 3, second horizontal pole 4 and U type limiting plate 8, scaffold 1 is two, be the symmetry form and distribute in the both sides of stock, the inboard of every scaffold 1 is provided with first horizontal pole 3 and second horizontal pole 4 respectively, sliding connection has first displacement cover 6 on first horizontal pole 3 and the second horizontal pole 4, the inboard of first displacement cover 6 is provided with U type limiting plate 8, the top of first horizontal pole 3 is provided with second connecting rod 12, sliding connection has third displacement cover 9 on the second connecting rod 12, run through on the third displacement cover 9 has support 10, the tip of support 10 is provided with U type extension board 11.
The top of the construction frame 1 is provided with a construction platform 2.
The first cross rod 3 and the second cross rod 4 are distributed in an upper and lower parallel mode, a first connecting rod 5 is arranged between the first displacement sleeve 6 on the first cross rod 3 and the second cross rod 4, a second displacement sleeve 7 is connected to the first connecting rod 5 in a sliding mode, the second displacement sleeve 7 is fixedly connected with the first connecting rod 5 through bolts, and a U-shaped limiting plate 8 is arranged on the inner side of the second displacement sleeve 7.
The second connecting rod 12 is fixedly connected with the first displacement sleeve 6 on the first cross rod 3, the third displacement sleeve 9 is fixedly connected with the second connecting rod 12 through a bolt, the second connecting rod 12 is slidably connected with the second displacement sleeve 7, the inner side of the second displacement sleeve 7 is provided with the U-shaped limiting plate 8, the second displacement sleeve 7 is fixedly connected with the second connecting rod 12 through a bolt, and the second displacement sleeve 7 is positioned above the third displacement sleeve 9.
The brackets 10 are distributed in an L shape, and the brackets 10 are fixedly connected with the third displacement sleeve 9 through bolts.
The back of the first cross rod 3 and the second cross rod 4 is provided with through holes corresponding to the position of the construction frame 1, sleeves are arranged at the through holes, the sleeves are provided with jacking bolts, the positions of the back of the first cross rod 3 and the second cross rod 4 corresponding to the through holes are provided with support posts 13, and the support posts 13 penetrate through the through holes and the sleeves and are fixed through the jacking bolts.
In the above description, the U-shaped limiting plate above the U-shaped supporting plate and the U-shaped limiting plate below the U-shaped supporting plate can be made to correspond up and down by moving the support.
In the above description, the first displacement sleeve may move horizontally along the first cross bar and the second cross bar, and the second displacement sleeve may move on the first connecting bar or the second connecting bar.
In the above description, the first connecting rod is provided between the upper (first cross bar) and lower (second cross bar) two first displacement sleeves, and the second connecting rod is vertically provided above the upper first displacement sleeve.
In the above description, the dimension of the inner wall of the U-shaped support plate is larger than the width of the cross beam at the bottom of the anchor cage sleeve.
Working principle:
before use, building construction frames on two sides of the anchor rod, and installing a construction platform and the device on the construction frames;
According to the installation position of the anchor cage sleeve, the position of the U-shaped limiting plate is adjusted; the distance between the U-shaped limiting plates between the construction frames at two sides is larger than the width of the anchor cage sleeve by moving the support posts;
The anchor cage sleeve is placed at the position between the U-shaped limiting plates at two sides, then the distance between the U-shaped limiting plates at two sides is shortened by moving the support, a worker moves the anchor hole sleeve upwards on a construction platform until the top of the anchor hole sleeve exceeds the top of the anchor rod, then the worker rotates the support (by 90 degrees) to enable the support to be in a state shown in fig. 1, and then a cross beam at the bottom of the anchor hole sleeve is placed in the U-shaped supporting plate, at the moment, the sleeve is in a stable state, and the burden of the two arms of the worker is relieved due to the existence of the U-shaped supporting plate; the staff is through removing the position of second connecting rod to carry out sheathed tube accurate counterpoint, when the sleeve pipe is transferred down, through moving down the third sleeve pipe along the second connecting rod, can establish the upper end of stock with sleeve pipe lower extreme cover, then rethread rotates U type support, can transfer the sleeve pipe completely.
According to the utility model, the U-shaped limiting plate is arranged on the construction frame, so that large floating shaking of the anchor cage sleeve in the upward moving process is avoided, the U-shaped support is arranged on the third displacement sleeve, and the U-shaped support is arranged at the end part of the U-shaped support, so that the cross beam at the bottom of the sleeve can be supported, the rapid opening operation of workers is facilitated, the stability of the anchor cage sleeve in the high lifting process is ensured, and the anchor cage sleeve is convenient to use and simple to operate.
Claims (7)
1. Wind-powered electricity generation basis construction crab-bolt subassembly installation positioner, including scaffold (1), construction platform (2), first horizontal pole (3), second horizontal pole (4) and U type limiting plate (8), its characterized in that: the construction frame (1) is two, is the symmetry form and distributes in the both sides of stock, every the inboard of construction frame (1) is provided with first horizontal pole (3) and second horizontal pole (4) respectively, sliding connection has first displacement cover (6) on first horizontal pole (3) and second horizontal pole (4), the inboard of first displacement cover (6) is provided with U type limiting plate (8), the top of first horizontal pole (3) is provided with second connecting rod (12), sliding connection has third displacement cover (9) on second connecting rod (12), run through on third displacement cover (9) have support (10), the tip of support (10) is provided with U type extension board (11).
2. The wind power foundation construction anchor bolt assembly installation positioning device according to claim 1, wherein: the top of the construction frame (1) is provided with a construction platform (2).
3. The wind power foundation construction anchor bolt assembly installation positioning device according to claim 1, wherein: the novel horizontal movable support is characterized in that the first horizontal rod (3) and the second horizontal rod (4) are distributed in an upper-lower parallel mode, a first connecting rod (5) is arranged between a first displacement sleeve (6) on the first horizontal rod (3) and the second horizontal rod (4), a second displacement sleeve (7) is connected to the first connecting rod (5) in a sliding mode, the second displacement sleeve (7) is fixedly connected with the first connecting rod (5) through bolts, and a U-shaped limiting plate (8) is arranged on the inner side of the second displacement sleeve (7).
4. The wind power foundation construction anchor bolt assembly installation positioning device according to claim 1, wherein: the second connecting rod (12) is fixedly connected with the first displacement sleeve (6) on the first cross rod (3), the third displacement sleeve (9) is fixedly connected with the second connecting rod (12) through a bolt, the second displacement sleeve (7) is connected to the second connecting rod (12) in a sliding mode, the U-shaped limiting plate (8) is arranged on the inner side of the second displacement sleeve (7), the second displacement sleeve (7) is fixedly connected with the second connecting rod (12) through a bolt, and the second displacement sleeve (7) is located at the upper position of the third displacement sleeve (9).
5. The wind power foundation construction anchor bolt assembly installation positioning device according to claim 1, wherein: the brackets (10) are distributed in an L shape, and the brackets (10) are fixedly connected with the third displacement sleeve (9) through bolts.
6. The wind power foundation construction anchor bolt assembly installation positioning device according to claim 1, wherein: the back of first horizontal pole (3) and second horizontal pole (4) is corresponding the position department of scaffold (1) and is dug and is equipped with the through-hole to be provided with the sleeve in through-hole department, be provided with the jack-up bolt on the sleeve, the position department that corresponds the through-hole in first horizontal pole (3) and second horizontal pole (4) back is provided with pillar (13), pillar (13) run through-hole, sleeve to fix through the jack-up bolt.
7. The wind power foundation construction anchor bolt assembly installation positioning device according to claim 1, wherein: the third displacement sleeve (9) is fixedly connected with the second connecting rod (12) through bolts.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202322742286.8U CN221030123U (en) | 2023-10-12 | 2023-10-12 | Wind-powered electricity generation foundation construction crab-bolt subassembly installation positioner |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202322742286.8U CN221030123U (en) | 2023-10-12 | 2023-10-12 | Wind-powered electricity generation foundation construction crab-bolt subassembly installation positioner |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN221030123U true CN221030123U (en) | 2024-05-28 |
Family
ID=91166187
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202322742286.8U Active CN221030123U (en) | 2023-10-12 | 2023-10-12 | Wind-powered electricity generation foundation construction crab-bolt subassembly installation positioner |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN221030123U (en) |
-
2023
- 2023-10-12 CN CN202322742286.8U patent/CN221030123U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN212802707U (en) | Floor support plate supporting device | |
| CN221030123U (en) | Wind-powered electricity generation foundation construction crab-bolt subassembly installation positioner | |
| CN204752010U (en) | Wind power generation tower is from jacking translation hoist and mount system | |
| CN216180314U (en) | Solar photovoltaic flexible support maintenance device | |
| CN117430018B (en) | Lifting equipment for wind power equipment installation | |
| CN221116897U (en) | Photovoltaic module overhauls device | |
| CN218734029U (en) | Install photovoltaic board support of photovoltaic board fast | |
| CN208310204U (en) | Base for supporting and arranging elevator shaft coupling beam template | |
| CN221442306U (en) | Photovoltaic power plant wind-break wall net piece installation device | |
| CN217076739U (en) | Lifting point adjustable hydraulic turbine overhead hoist | |
| CN117800266A (en) | Photovoltaic panel auxiliary installation device for photovoltaic bracket and installation method thereof | |
| CN213509662U (en) | A diamond-shaped device that can be used for the overall lifting of large-span structures | |
| CN216613815U (en) | Derrick mast device is used in TYD installation | |
| CN215419406U (en) | Plug-in type cable bridge | |
| CN216109628U (en) | Quick mounting platform in narrow and small space of extensible | |
| CN209603180U (en) | A kind of flexible internal model with connect frame carriage | |
| CN219622208U (en) | Bearing frame for building construction | |
| CN216613758U (en) | Hoist device is used in TYD installation | |
| CN218290167U (en) | Safe hoisting high-precision hovering positioning installation equipment of movable gantry crane | |
| CN223087485U (en) | Small-sized rotary lifting appliance for erecting hydraulic turbine runner overhaul bent frame and base thereof | |
| CN222410799U (en) | A kind of lifting tool suitable for main transformer reactor cooler | |
| CN220664557U (en) | Tool capable of rapidly accommodating and extracting thick cable | |
| CN222822513U (en) | A steel structure column that is easy to install | |
| CN114232969B (en) | Building construction protection frame | |
| CN214350771U (en) | A device for quick alignment of chemical tower equipment |