CN221001728U - Assembled wallboard with tight lap joint - Google Patents
Assembled wallboard with tight lap joint Download PDFInfo
- Publication number
- CN221001728U CN221001728U CN202323054688.5U CN202323054688U CN221001728U CN 221001728 U CN221001728 U CN 221001728U CN 202323054688 U CN202323054688 U CN 202323054688U CN 221001728 U CN221001728 U CN 221001728U
- Authority
- CN
- China
- Prior art keywords
- wall panel
- clamping
- bracket
- embedded
- groove
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 235000001674 Agaricus brunnescens Nutrition 0.000 claims abstract description 30
- 238000007789 sealing Methods 0.000 claims description 32
- 238000010586 diagram Methods 0.000 description 4
- 239000003292 glue Substances 0.000 description 4
- 238000009434 installation Methods 0.000 description 4
- 239000000853 adhesive Substances 0.000 description 2
- 230000001070 adhesive effect Effects 0.000 description 2
- 238000004880 explosion Methods 0.000 description 2
- 101001121408 Homo sapiens L-amino-acid oxidase Proteins 0.000 description 1
- 102100026388 L-amino-acid oxidase Human genes 0.000 description 1
- 101100233916 Saccharomyces cerevisiae (strain ATCC 204508 / S288c) KAR5 gene Proteins 0.000 description 1
- 239000002390 adhesive tape Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000011449 brick Substances 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 239000004567 concrete Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 239000011513 prestressed concrete Substances 0.000 description 1
- 239000011241 protective layer Substances 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Landscapes
- Finishing Walls (AREA)
Abstract
Description
技术领域Technical Field
本实用新型涉及墙板技术领域,具体为一种搭接严密的装配式墙板。The utility model relates to the technical field of wall panels, in particular to an assembled wall panel with tight overlap.
背景技术Background technique
由墙和楼板组成承重体系的房屋结构,墙既作承重构件,又作房间的隔断,是居住建筑中最常用且较经济的结构形式,缺点是室内平面布置的灵活性较差,为克服这一缺点,目前正在向大开间方向发展,墙板结构多用于住宅、公寓、也可用于办公楼、学校等公用建筑,墙板结构的承重墙可用砖、砌块、预制或现浇混凝土做成,楼板用预制钢筋混凝土或预应力混凝土空心板、槽形板、实心板;预制与现浇叠合式楼板;全现浇式楼板;The house structure is composed of a load-bearing system of walls and floor slabs. The wall is used as both a load-bearing component and a room partition. It is the most commonly used and economical structural form in residential buildings. The disadvantage is that the flexibility of the indoor plane layout is poor. In order to overcome this disadvantage, it is currently developing in the direction of large bays. The wall panel structure is mostly used in residential buildings, apartments, and can also be used in public buildings such as office buildings and schools. The load-bearing walls of the wall panel structure can be made of bricks, blocks, prefabricated or cast-in-place concrete, and the floor slabs are made of prefabricated reinforced concrete or prestressed concrete hollow slabs, trough slabs, and solid slabs; prefabricated and cast-in-place composite floor slabs; fully cast-in-place floor slabs;
墙板安装方式多数是通过在墙板背面刷胶,再粘在墙面上,但是单个墙板损坏时,需要将墙板拆除,墙板在墙面严丝合缝,不仅仅墙板难以拆除,而且拆除后墙板会残留较厚的胶水,难以清理。Most wall panels are installed by applying glue on the back of the panel and then sticking it to the wall. However, when a single wall panel is damaged, the panel needs to be removed. The wall panels fit tightly to the wall, which makes it difficult to remove the panels. After removal, thick glue will remain on the panels, making them difficult to clean.
实用新型内容Utility Model Content
本实用新型的目的在于提供一种搭接严密的装配式墙板,以解决上面的问题。The utility model aims to provide a prefabricated wall panel with tight overlap to solve the above problems.
为实现上述目的,本实用新型提供如下技术方案:一种搭接严密的装配式墙板,包括;In order to achieve the above-mentioned purpose, the utility model provides the following technical solutions: a tightly overlapped assembled wall panel, comprising;
墙板本体,墙板本体上具有卡接结构,卡接结构包括托架、蘑菇钉、连接件、卡件;The wall panel body has a clamping structure, which includes a bracket, a mushroom nail, a connector, and a clamping member;
墙板本体的正面以及背面分别开设有背面凹槽与正面凹槽,其中背面凹槽为十字形状,背面凹槽的每一端开设有一个直孔;The front and back of the wall panel body are respectively provided with a back groove and a front groove, wherein the back groove is in a cross shape, and each end of the back groove is provided with a straight hole;
托架为十字形状,托架的每一端具有一个蘑菇钉,托架嵌入背面凹槽的内部与其嵌合,蘑菇钉穿过直孔嵌入正面凹槽的内部;The bracket is in a cross shape, and each end of the bracket has a mushroom nail. The bracket is embedded in the inside of the back groove and is engaged with it, and the mushroom nail passes through the straight hole and is embedded in the inside of the front groove;
连接件位于正面凹槽的内部,卡件的数量具有多个,卡件与连接件一体固定,卡件上开设有导轨,蘑菇钉嵌入导轨的内部与卡件滑动连接,托架嵌入背面凹槽的内部,蘑菇钉穿过直孔嵌入正面凹槽的内部,将连接件放置于正面凹槽内的圆心处,逆时针旋转连接件使得卡件同步旋转,蘑菇钉由卡件上贯穿的一端向内滑动,从而对蘑菇钉限位固定,使得墙板本体与托架连接成一体,再将密封盖嵌入正面凹槽的内部,连接件的外侧嵌入卡槽内限位固定,密封盖内侧的卡块卡在卡件的两端对其限位固定,卡块嵌入正面凹槽内部的通槽内对密封盖限位固定,从而安装完毕,密封盖的表面与墙板本体的表面齐平,严丝合缝,使其保持美观。The connecting piece is located inside the front groove, and there are multiple clips. The clips are fixed together with the connecting piece. A guide rail is provided on the clip, and the mushroom nail is embedded in the inside of the guide rail and slidably connected with the clip. The bracket is embedded in the inside of the back groove, and the mushroom nail passes through the straight hole and is embedded in the inside of the front groove. The connecting piece is placed at the center of the circle in the front groove, and the connecting piece is rotated counterclockwise to make the clip rotate synchronously. The mushroom nail slides inward from one end passing through the clip, thereby limiting and fixing the mushroom nail, so that the wall panel body and the bracket are connected as a whole, and then the sealing cover is embedded in the inside of the front groove, and the outer side of the connecting piece is embedded in the card slot for limiting and fixing. The card blocks on the inside of the sealing cover are clamped at both ends of the card to limit and fix it, and the card blocks are embedded in the through groove inside the front groove to limit and fix the sealing cover. When the installation is completed, the surface of the sealing cover is flush with the surface of the wall panel body, and fits tightly to keep it beautiful.
优选的,卡件为圆弧状,卡件与正面凹槽处于同一圆心。Preferably, the clamp is arc-shaped, and the clamp and the front groove are at the same center.
优选的,导轨为圆弧状,导轨贯穿卡件的一端。Preferably, the guide rail is arc-shaped and passes through one end of the clamp.
优选的,墙板本体的正面具有密封盖,密封盖嵌入正面凹槽的内部,密封盖的外侧与墙板本体外壁表面齐平。Preferably, the front side of the wall panel body is provided with a sealing cover, the sealing cover is embedded in the interior of the front groove, and the outer side of the sealing cover is flush with the outer wall surface of the wall panel body.
优选的,密封盖的内侧开设有卡槽,连接件的外侧嵌入卡槽内限位固定。Preferably, a slot is provided on the inner side of the sealing cover, and the outer side of the connecting piece is embedded in the slot to be fixed in position.
优选的,密封盖的内侧具有多个一体固定的卡块,卡件的两端与卡块贴合。Preferably, the inner side of the sealing cover has a plurality of integrally fixed clamping blocks, and both ends of the clamping piece are fitted with the clamping blocks.
优选的,托架的外侧具有一体固定的支柱,支柱远离托架的一端具有一体固定的安装架,且安装架的外侧具有双面胶。Preferably, the outer side of the bracket has an integrally fixed support, the end of the support away from the bracket has an integrally fixed mounting frame, and the outer side of the mounting frame has double-sided tape.
与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the utility model are:
托架嵌入背面凹槽的内部,蘑菇钉穿过直孔嵌入正面凹槽的内部,将连接件放置于正面凹槽内的圆心处,逆时针旋转连接件使得卡件同步旋转,蘑菇钉由卡件上贯穿的一端向内滑动,从而对蘑菇钉限位固定,使得墙板本体与托架连接成一体,再将密封盖嵌入正面凹槽的内部,连接件的外侧嵌入卡槽内限位固定,密封盖内侧的卡块卡在卡件的两端对其限位固定,卡块嵌入正面凹槽内部的通槽内对密封盖限位固定,从而安装完毕,密封盖的表面与墙板本体的表面齐平,严丝合缝,使其保持美观;在墙板本体维护时,可单独拆卸一块墙板本体,无需大面积拆除,每个墙板本体采用卡接的形式固定,无需多次在墙面刷胶,本实用新型只需将固定墙板的托架固定于墙面,通过卡接的形式对墙板进行固定,在墙板进行更换时可单独拆除。The bracket is embedded in the interior of the back groove, and the mushroom nail is embedded in the interior of the front groove through the straight hole. The connecting piece is placed at the center of the circle in the front groove, and the connecting piece is rotated counterclockwise to make the clamp rotate synchronously. The mushroom nail slides inward from one end passing through the clamp, thereby limiting and fixing the mushroom nail, so that the wall panel body and the bracket are connected as a whole, and then the sealing cover is embedded in the interior of the front groove, and the outer side of the connecting piece is embedded in the clamping groove for limiting and fixing. The clamping blocks on the inner side of the sealing cover are clamped at both ends of the clamping piece to limit and fix it, and the clamping blocks are embedded in the through groove inside the front groove to limit and fix the sealing cover. After the installation is completed, the surface of the sealing cover is flush with the surface of the wall panel body, and it fits tightly to keep it beautiful. When the wall panel body is maintained, a wall panel body can be removed separately without large-scale removal. Each wall panel body is fixed in the form of clamping, and there is no need to apply glue on the wall surface many times. The utility model only needs to fix the bracket for fixing the wall panel to the wall surface, fix the wall panel by clamping, and can be removed separately when the wall panel is replaced.
附图说明BRIEF DESCRIPTION OF THE DRAWINGS
图1为本实用新型立体结构示意图;FIG1 is a schematic diagram of the three-dimensional structure of the utility model;
图2为本实用新型正面爆炸结构示意图;Figure 2 is a schematic diagram of the front explosion structure of the utility model;
图3为本实用新型背面爆炸结构示意图;FIG3 is a schematic diagram of the back explosion structure of the utility model;
图4为本实用新型图3中A部放大结构示意图。FIG. 4 is an enlarged structural schematic diagram of part A in FIG. 3 of the present invention.
图中:100、墙板本体;101、背面凹槽;102、直孔;103、正面凹槽;200、托架;201、蘑菇钉;202、支柱;203、安装架;204、双面胶;300、连接件;301、卡件;302、导轨;400、密封盖;401、卡块;402、卡槽。In the figure: 100, wall panel body; 101, back groove; 102, straight hole; 103, front groove; 200, bracket; 201, mushroom nail; 202, pillar; 203, mounting frame; 204, double-sided tape; 300, connector; 301, clamp; 302, guide rail; 400, sealing cover; 401, clamp block; 402, clamp slot.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
在本实用新型的描述中,需要说明的是,术语“竖直”、“上”、“下”、“水平”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。In the description of the present invention, it should be noted that the terms "vertical", "up", "down", "horizontal", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
在本实用新型的描述中,还需要说明的是,除非另有明确的规定和限定,术语“设置”、“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本实用新型中的具体含义。In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
请参阅图1-4,本实用新型提供一种技术方案:一种搭接严密的装配式墙板,包括;Please refer to Figures 1-4. The utility model provides a technical solution: a tightly overlapped assembled wall panel, comprising;
墙板本体100,墙板本体100上具有卡接结构,卡接结构包括托架200、蘑菇钉201、连接件300、卡件301;The wall panel body 100 has a clamping structure, which includes a bracket 200, a mushroom nail 201, a connecting piece 300, and a clamping piece 301;
墙板本体100的正面以及背面分别开设有背面凹槽101与正面凹槽103,其中背面凹槽101为十字形状,背面凹槽101的每一端开设有一个直孔102;The front and back of the wall panel body 100 are respectively provided with a back groove 101 and a front groove 103, wherein the back groove 101 is in a cross shape, and each end of the back groove 101 is provided with a straight hole 102;
托架200为十字形状,托架200的每一端具有一个蘑菇钉201,托架200嵌入背面凹槽101的内部与其嵌合,蘑菇钉201穿过直孔102嵌入正面凹槽103的内部;The bracket 200 is in a cross shape, and each end of the bracket 200 has a mushroom nail 201. The bracket 200 is embedded in the back groove 101 and is engaged therewith. The mushroom nail 201 passes through the straight hole 102 and is embedded in the front groove 103.
连接件300位于正面凹槽103的内部,卡件301的数量具有多个,卡件301与连接件300一体固定,卡件301上开设有导轨302,蘑菇钉201嵌入导轨302的内部与卡件301滑动连接,托架200嵌入背面凹槽101的内部,蘑菇钉201穿过直孔102嵌入正面凹槽103的内部,将连接件300放置于正面凹槽103内的圆心处,逆时针旋转连接件300使得卡件301同步旋转,蘑菇钉201由卡件301上贯穿的一端向内滑动,从而对蘑菇钉201限位固定,使得墙板本体100与托架200连接成一体,再将密封盖400嵌入正面凹槽103的内部,连接件300的外侧嵌入卡槽402内限位固定,密封盖400内侧的卡块401卡在卡件301的两端对其限位固定,卡块401嵌入正面凹槽103内部的通槽内对密封盖400限位固定,从而安装完毕,密封盖400的表面与墙板本体100的表面齐平,严丝合缝,使其保持美观。The connecting piece 300 is located inside the front groove 103, and there are multiple clamping pieces 301. The clamping piece 301 is fixed integrally with the connecting piece 300. The clamping piece 301 is provided with a guide rail 302. The mushroom nail 201 is embedded in the guide rail 302 and slidably connected with the clamping piece 301. The bracket 200 is embedded in the back groove 101. The mushroom nail 201 passes through the straight hole 102 and is embedded in the front groove 103. The connecting piece 300 is placed at the center of the circle in the front groove 103. The connecting piece 300 is rotated counterclockwise to make the clamping piece 301 rotate synchronously. The mushroom nail 201 is inserted into the guide rail 302 and connected to the clamping piece 301 by sliding. The end that passes through the upper part slides inward, thereby limiting and fixing the mushroom nail 201, so that the wall panel body 100 and the bracket 200 are connected as one, and then the sealing cover 400 is embedded in the interior of the front groove 103, and the outer side of the connecting piece 300 is embedded in the card groove 402 to limit and fix it, and the card block 401 on the inner side of the sealing cover 400 is clamped at both ends of the card member 301 to limit and fix it, and the card block 401 is embedded in the through groove inside the front groove 103 to limit and fix the sealing cover 400, so that the installation is completed, and the surface of the sealing cover 400 is flush with the surface of the wall panel body 100, and fits tightly to keep it beautiful.
进一步的,卡件301为圆弧状,卡件301与正面凹槽103处于同一圆心。Furthermore, the clamping member 301 is in an arc shape, and the clamping member 301 and the front groove 103 are at the same center.
进一步的,导轨302为圆弧状,导轨302贯穿卡件301的一端。Furthermore, the guide rail 302 is arc-shaped, and passes through one end of the clamp 301 .
进一步的,墙板本体100的正面具有密封盖400,密封盖400嵌入正面凹槽103的内部,密封盖400的外侧与墙板本体100外壁表面齐平。Furthermore, a sealing cover 400 is provided on the front side of the wall panel body 100 . The sealing cover 400 is embedded in the interior of the front groove 103 , and the outer side of the sealing cover 400 is flush with the outer wall surface of the wall panel body 100 .
进一步的,密封盖400的内侧开设有卡槽402,连接件300的外侧嵌入卡槽402内限位固定。Furthermore, a slot 402 is provided on the inner side of the sealing cover 400 , and the outer side of the connecting member 300 is embedded in the slot 402 to be fixed in position.
进一步的,密封盖400的内侧具有多个一体固定的卡块401,卡件301的两端与卡块401贴合。Furthermore, the inner side of the sealing cover 400 has a plurality of integrally fixed clamping blocks 401 , and both ends of the clamping member 301 are in contact with the clamping blocks 401 .
进一步的,托架200的外侧具有一体固定的支柱202,支柱202远离托架200的一端具有一体固定的安装架203,且安装架203的外侧具有双面胶204。Furthermore, the outer side of the bracket 200 has an integrally fixed support 202 , and one end of the support 202 away from the bracket 200 has an integrally fixed mounting frame 203 , and the outer side of the mounting frame 203 has a double-sided adhesive tape 204 .
工作原理:使用时,将双面胶204外层的保护层撕下,将安装架203通过双面胶204粘贴在墙面,再进行按压固定,将托架200嵌入背面凹槽101的内部,蘑菇钉201穿过直孔102嵌入正面凹槽103的内部,将连接件300放置于正面凹槽103内的圆心处,逆时针旋转连接件300使得卡件301同步旋转,蘑菇钉201由卡件301上贯穿的一端向内滑动,从而对蘑菇钉201限位固定,使得墙板本体100与托架200连接成一体,再将密封盖400嵌入正面凹槽103的内部,连接件300的外侧嵌入卡槽402内限位固定,密封盖400内侧的卡块401卡在卡件301的两端对其限位固定,卡块401嵌入正面凹槽103内部的通槽内对密封盖400限位固定,从而安装完毕,密封盖400的表面与墙板本体100的表面齐平,严丝合缝,使其保持美观;Working principle: When in use, tear off the outer protective layer of the double-sided adhesive 204, stick the mounting frame 203 on the wall through the double-sided adhesive 204, and then press and fix it. Insert the bracket 200 into the back groove 101, insert the mushroom nail 201 through the straight hole 102 into the front groove 103, place the connecting piece 300 at the center of the circle in the front groove 103, rotate the connecting piece 300 counterclockwise to make the clamping piece 301 rotate synchronously, and the mushroom nail 201 slides inward from the end penetrating the clamping piece 301, thereby fixing the mushroom nail 201. 01 limit fixation, so that the wall panel body 100 and the bracket 200 are connected as one, and then the sealing cover 400 is embedded in the front groove 103, the outer side of the connecting piece 300 is embedded in the card groove 402 for limit fixation, the clamping block 401 on the inner side of the sealing cover 400 is clamped at both ends of the clamping piece 301 to limit fixation, and the clamping block 401 is embedded in the through groove inside the front groove 103 to limit fixation of the sealing cover 400, so that the installation is completed, the surface of the sealing cover 400 is flush with the surface of the wall panel body 100, and the seams are tightly fitted to keep it beautiful;
进一步的,在墙板本体100维护时,可单独拆卸一块墙板本体100,无需大面积拆除,每个墙板本体100采用卡接的形式固定,无需多次在墙面刷胶。Furthermore, when the wall panel body 100 is maintained, one wall panel body 100 can be removed individually without large-scale demolition. Each wall panel body 100 is fixed in a snap-fit manner, and there is no need to apply glue to the wall surface multiple times.
尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202323054688.5U CN221001728U (en) | 2023-11-13 | 2023-11-13 | Assembled wallboard with tight lap joint |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202323054688.5U CN221001728U (en) | 2023-11-13 | 2023-11-13 | Assembled wallboard with tight lap joint |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN221001728U true CN221001728U (en) | 2024-05-24 |
Family
ID=91127265
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202323054688.5U Active CN221001728U (en) | 2023-11-13 | 2023-11-13 | Assembled wallboard with tight lap joint |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN221001728U (en) |
-
2023
- 2023-11-13 CN CN202323054688.5U patent/CN221001728U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107700711A (en) | A kind of Multifunctional splicing partition wall body and its construction method | |
| CN110359599A (en) | Connector, ALC batten installation node structure and assembled installation method | |
| CN112443096A (en) | Wall ceramic tile installation structure and installation method | |
| CN110512789A (en) | A double-glass magnesia rock wool color steel plate room in the purification area and its construction method | |
| CN221001728U (en) | Assembled wallboard with tight lap joint | |
| CN112127523A (en) | Assembled decorates integration partition wall nonstandard device | |
| CN110984408B (en) | A sealing device between external wall panels for assembled buildings | |
| CN205857509U (en) | Acoustic board mounting structure | |
| CN107419827A (en) | A kind of non-bearing assembled sound insulation partition wall suitable for steel building | |
| CN214498156U (en) | Wall body ceramic tile mounting structure | |
| CN214994961U (en) | Cleanliness factor room wallboard fixing device | |
| CN112554412B (en) | Suspended ceiling closing-in structure convenient to install and installation method thereof | |
| CN113175125B (en) | A split partition wall and its installation process | |
| CN108661212B (en) | Partition plate installation connecting piece | |
| CN210767683U (en) | Flue mounting frame body and flue mounting structure applying same | |
| CN112814216A (en) | Horizontal clamping type wall capable of accommodating pipeline and construction method | |
| CN212001696U (en) | Sound insulation type light steel keel partition wall | |
| CN213509203U (en) | Steel construction assembled wallboard is built in room | |
| CN222101213U (en) | A modular wall with dual-purpose hanging and embedded wall panels | |
| CN210659076U (en) | Bottom rod, bottom box device and wall panel installation assembly | |
| KR101478306B1 (en) | Manufacturing method of dual side integrated unit wall and connecting structure of unit wall using the same | |
| CN210857822U (en) | Shingle nail concatenation subassembly and shingle nail installation assembly | |
| CN221702752U (en) | A kind of assembled wall panel connection node fixing structure for building | |
| CN114703995A (en) | Integrated integration partition wall structure of assembled pipeline of unilateral ripples tile board | |
| CN222044594U (en) | A unit assembled partition wall system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20241125 Address after: No. 149 Majiazhuang, Boli Town, Huangdao District, Qingdao City, Shandong Province, China 266000 Patentee after: An Fengtian Country or region after: China Address before: No. 139, Yujia Guanzhuang Village, Yuli Town, Wulian County, Qingdao City, Shandong Province, 262300 Patentee before: Qingdao Heda Bofeng Industrial Co.,Ltd. Country or region before: China |
|
| TR01 | Transfer of patent right |