CN220954529U - Scaffold for building engineering - Google Patents
Scaffold for building engineering Download PDFInfo
- Publication number
- CN220954529U CN220954529U CN202322728780.9U CN202322728780U CN220954529U CN 220954529 U CN220954529 U CN 220954529U CN 202322728780 U CN202322728780 U CN 202322728780U CN 220954529 U CN220954529 U CN 220954529U
- Authority
- CN
- China
- Prior art keywords
- frame body
- scaffold
- vertical
- pole
- vertical ladder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 claims abstract description 19
- 230000009194 climbing Effects 0.000 abstract description 14
- 238000012423 maintenance Methods 0.000 abstract description 3
- 206010034701 Peroneal nerve palsy Diseases 0.000 abstract 1
- 229910000831 Steel Inorganic materials 0.000 description 4
- 239000010959 steel Substances 0.000 description 4
- 230000005484 gravity Effects 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 238000005034 decoration Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000001174 ascending effect Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000000452 restraining effect Effects 0.000 description 1
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model discloses a scaffold for constructional engineering. Scaffold for construction engineering, comprising: the frame body, the frame body is the frame construction that many poles constitute, the frame body lower extreme is equipped with the vertical pole, the vertical pole both ends are installed on the pole of frame body, the frame body is equipped with the vertical ladder, the frame body lower extreme is equipped with the horizontal pole, the horizontal pole upper end also is equipped with the vertical ladder. Compared with the prior art, the scaffold for the building engineering provided by the utility model has the advantages that the vertical ladders are arranged to facilitate workers to go up and down, a climbing channel can be formed between the two vertical ladders by installing the vertical ladders parallel to the frame body on the cross rod, and compared with a climbing mode of a single vertical ladder, the two vertical ladders form a maintenance structure of the workers, so that foot drop points and force points are more, and the climbing is more labor-saving.
Description
Technical Field
The utility model relates to the technical field of scaffolds, in particular to a scaffold for constructional engineering.
Background
The scaffold refers to various supports which are erected for workers to operate and solve the problem of vertical and horizontal transportation on a construction site, and the general term of the construction field refers to places which cannot be directly constructed when the scaffold is used on an outer wall, an interior decoration or a high floor height on the construction site, and mainly aims at the upper and lower activities of constructors or surrounding safety net enclosure, high-altitude installation components and the like.
The movable scaffold is one of common scaffold types, is mainly applied to indoor decoration, electric installation and the like, has wide use scene, and is characterized by being movable compared with other scaffolds, so that the stability and the use standard requirements of the movable scaffold in the use process are more strict than those of the fixed-installation scaffold, when the existing movable scaffold is used for people, the movable scaffold is realized by a simple escalator arranged on a scaffold body, and because staff climbs on the outer side of the scaffold body, the staff is easy to fall in the climbing process when the scaffold is unstable or does not stand stably, thereby causing danger.
Accordingly, it is necessary to provide a scaffold for construction engineering to solve the above-mentioned problems.
Disclosure of utility model
Aiming at the situation, in order to overcome the defects of the prior art, the utility model provides the scaffold for the construction engineering, which can provide reliable foothold for staff in the process of climbing the scaffold, is convenient to climb and improves the safety of operation.
In order to achieve the above purpose, the technical scheme adopted by the utility model is as follows:
Scaffold for construction engineering, comprising: the frame body, the frame body is the frame construction that many poles constitute, the frame body lower extreme is equipped with the vertical pole, the vertical pole both ends are installed on the pole of frame body, the frame body is equipped with the vertical ladder, the frame body lower extreme is equipped with the horizontal pole, the horizontal pole upper end also is equipped with the vertical ladder.
Preferably, the vertical ladder at the upper end of the cross rod is parallel to the vertical ladder at the upper end of the vertical rod.
Preferably, the lower end of the frame body is also provided with a plurality of moving wheels, and the moving wheels are provided with brakes.
Preferably, the upper end of the frame body is a working platform, a channel is formed in the working platform, a cover plate is hinged to the channel, an arc-shaped plate is arranged at the end of the cover plate, and a handle is arranged at the lower end of the cover plate.
Preferably, the lower end of the vertical rod is provided with a fixed rod, the lower end of the fixed rod is in threaded connection with a threaded rod, the lower end of the threaded rod is provided with a base, and the lower end of the base is provided with a rubber sheet.
Compared with the prior art, the utility model has the following beneficial effects:
(1) Compared with the prior art, the vertical ladder is arranged on the cross rod, a climbing channel can be formed between the two vertical ladders, compared with a climbing mode of a single vertical ladder, the two vertical ladders form a maintenance structure of the staff on one hand, the foothold and the acting point are more, the climbing is more labor-saving, on the other hand, the center of gravity of the staff is positioned between the two vertical ladders instead of one side of the single vertical ladder during climbing, and thus the pulling force of arms of the staff is reduced, and the upper scaffold and the lower scaffold are more stable and safer;
(2) The utility model can facilitate the staff to go up and down the scaffold from the passage through arranging the cover plate, and can cover the passage opening after the staff enters the working platform, thereby preventing the staff from falling from the passage opening.
Drawings
Fig. 1 is a schematic view of a scaffold for construction engineering according to the present utility model;
Fig. 2 is a schematic structural view of a first embodiment of the scaffold for construction engineering according to the present utility model;
fig. 3 is a schematic structural view of a second embodiment of the scaffold for construction engineering according to the present utility model;
FIG. 4 is an enlarged view of FIG. 3 at A;
fig. 5 is an enlarged view at B in fig. 3.
Wherein, the names corresponding to the reference numerals are: 101. a frame body; 102. a longitudinal bar; 103. erecting a ladder; 104. a moving wheel; 105. a cross bar; 106. a cover plate; 107. a handle; 108. an arc-shaped plate; 109. a fixed rod; 110. a threaded rod; 111. and (5) a base.
Detailed Description
The utility model will be further illustrated by the following description and examples, which include but are not limited to the following examples.
As shown in fig. 1 to 4, the scaffold for construction engineering provided by the present utility model comprises: the frame body 101, the frame body 101 is the main frame part of the portable scaffold among the prior art, the frame structure that comprises a plurality of steel pipes, the frame body 101 lower extreme is equipped with vertical pole 102, vertical pole 102 both ends weld on the steel pipe of frame body 101, the frame body 101 is equipped with vertical ladder 103, current portable scaffold locates vertical ladder 103 in one side of frame body 101, vertical ladder 103 supplies the staff to use up and down the scaffold, vertical ladder 103 is the frame structure that is welded by the steel pipe too, install in one side of frame body 101, the frame body 101 lower extreme is equipped with horizontal pole 105, unlike prior art, the horizontal pole 105 upper end also is equipped with vertical ladder 103, the specification of vertical ladder 103 and the vertical ladder 103 on horizontal pole 105 on the frame body 101 is the same, and be parallel to each other, this forms a climbing passageway between two vertical ladders 103, during the use, staff is with the vertical ladder 103 of hand at first, then one pedal on another vertical ladder 103, then pedal on another vertical ladder 103 is stepped on by foot, make the ascending alternately in turn, the effect of making the body upwards moves.
The vertical ladder 103 is convenient for workers to climb up and down by arranging the scaffold, compared with the prior art, the vertical ladder 103 which is parallel to the frame body 101 is arranged on the transverse rod 105, a climbing channel can be formed between the two vertical ladders 103, compared with the climbing mode of a single vertical ladder 103, the two vertical ladders 103 form a maintenance structure of the workers on one hand, the foothold and the force points are more, the climbing is more labor-saving, on the other hand, the gravity center of the workers is positioned between the two vertical ladders 103 during climbing, and the gravity center of the workers is not one side of the single vertical ladder 103, so that the pulling force of arms of the workers is reduced, and the upper scaffold and the lower scaffold are more stable and safer.
Second embodiment:
As shown in fig. 1-5, the lower end of the frame 101 is further provided with a plurality of moving wheels 104, the moving wheels 104 are provided with brakes, the brakes at the positions are devices for braking the moving wheels 104 in the prior art, the moving wheels 104 are restrained to rotate, the scaffold is stopped at the designated positions, the upper end of the frame 101 is a working platform (for clear expression, the scaffold working platform in fig. 1-3 is not fully drawn, a foot stop plate and a guardrail at the upper end of the working platform are not drawn), the working platform is provided with a channel, a cover plate 106 is hinged at the channel position, the end of the cover plate 106 is provided with an arc plate 108, the lower end of the cover plate 106 is provided with a handle 107, after the worker climbs from the vertical ladder 103 to the lower end of the cover plate 106, the handle 107 is held and pushed upwards, then the cover plate 106 is rotated to the other side, the channel is opened, the worker enters the working platform from the channel, and finally covers the cover plate 106 on the upper end of the channel, at the moment, the arc plate 108 is buckled on a steel tube of the frame 101, the function of the restraining cover plate 106 is performed, the stability of the moving scaffold is not further improved, the lower end of the longitudinal rod 102 is provided with a fixed threaded rod 109, the lower end of the longitudinal rod 109 is provided with a threaded rod 109, the threaded rod 111 is connected with the threaded rod 111, and the threaded rod 111 is screwed to the lower end of the moving rod 110 is connected with the threaded rod 110 in a mode, and the threaded rod 110 is screwed to the lower end of the frame 110.
The scaffold can be made things convenient for the staff to follow passageway department through setting up apron 106, after the staff gets into on the work platform, can cover in the passway mouth department again, prevent that the staff from falling from the passway mouth department, in addition, the stability when scaffold work can be increased in the connection between threaded rod 110 and the ground.
The above embodiment is only one of the preferred embodiments of the present utility model, and should not be used to limit the scope of the present utility model, but all the insubstantial modifications or color changes made in the main design concept and spirit of the present utility model are still consistent with the present utility model, and all the technical problems to be solved are included in the scope of the present utility model.
Claims (5)
1. A scaffold for construction engineering, comprising: the frame body (101), the frame body (101) is the frame construction that many poles constitute, frame body (101) lower extreme is equipped with vertical pole (102), install on the pole of frame body (101) at vertical pole (102) both ends, frame body (101) are equipped with vertical ladder (103), frame body (101) lower extreme is equipped with horizontal pole (105), horizontal pole (105) upper end also is equipped with vertical ladder (103).
2. The scaffold for construction according to claim 1, wherein the vertical ladder (103) at the upper end of the crossbar (105) is parallel to the vertical ladder (103) at the upper end of the vertical bar (102).
3. Scaffolding for construction work according to claim 1, characterized in that the lower end of the frame body (101) is further provided with a number of moving wheels (104), the moving wheels (104) having a brake.
4. The scaffold for construction engineering according to claim 2, wherein the upper end of the scaffold body (101) is a working platform, a channel is formed in the working platform, a cover plate (106) is hinged to the channel, an arc-shaped plate (108) is arranged at the end of the cover plate (106), and a handle (107) is arranged at the lower end of the cover plate (106).
5. The scaffold for construction engineering according to claim 2, wherein the lower end of the vertical rod (102) is provided with a fixing rod (109), the lower end of the fixing rod (109) is in threaded connection with a threaded rod (110), the lower end of the threaded rod (110) is provided with a base (111), and the lower end of the base (111) is provided with a rubber sheet.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202322728780.9U CN220954529U (en) | 2023-10-11 | 2023-10-11 | Scaffold for building engineering |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202322728780.9U CN220954529U (en) | 2023-10-11 | 2023-10-11 | Scaffold for building engineering |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN220954529U true CN220954529U (en) | 2024-05-14 |
Family
ID=90976916
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202322728780.9U Active CN220954529U (en) | 2023-10-11 | 2023-10-11 | Scaffold for building engineering |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN220954529U (en) |
-
2023
- 2023-10-11 CN CN202322728780.9U patent/CN220954529U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN100590277C (en) | Overhead bridge type suspension scaffold | |
| CN106437130A (en) | Inner roof external climbing type formwork construction platform for super high-rise building construction | |
| CN212802428U (en) | Portable lifting scaffold | |
| CN213418443U (en) | Self-climbing type elevator shaft operation platform | |
| CN220954529U (en) | Scaffold for building engineering | |
| CN202416823U (en) | Aerial work platform | |
| CN213626818U (en) | Frame type safety ladder cage | |
| CN114961214A (en) | Aluminum alloy steel combined attached lifting scaffold | |
| CN215254436U (en) | Scaffold with adjustable height | |
| CN215167838U (en) | Movable overhung suspension type operating platform | |
| CN213539818U (en) | Modular square tube safety ladder cage | |
| CN210947672U (en) | Inclined lifting climbing frame with triple anti-falling mechanisms and adjustable angle | |
| JP3950800B2 (en) | Suspension scaffold | |
| CN219585686U (en) | Safe telescopic channel for suspended tower crane driver | |
| CN216471868U (en) | Tower crane-free building assembled component hoisting platform | |
| CN216552977U (en) | Obliquely-folded outer vertical surface climbing frame obliquely-climbing device | |
| CN214246528U (en) | Scaffold for building construction | |
| CN214003869U (en) | Attached lifting tower crane runway | |
| CN2209702Y (en) | Saffold | |
| CN213297080U (en) | Temporary attachment assembly for climbing frame in free area | |
| CN215670887U (en) | Outdoor protection type stair | |
| CN211473336U (en) | Attached lifting scaffold with stable stress | |
| CN212802413U (en) | Combined multifunctional scaffold for building construction | |
| CN211644382U (en) | Tower crane attached stay bar walkway platform system | |
| CN223469053U (en) | Novel movable climbing type unloading platform |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |