CN220953420U - Concrete placement device for hydraulic engineering building - Google Patents
Concrete placement device for hydraulic engineering building Download PDFInfo
- Publication number
- CN220953420U CN220953420U CN202322702692.1U CN202322702692U CN220953420U CN 220953420 U CN220953420 U CN 220953420U CN 202322702692 U CN202322702692 U CN 202322702692U CN 220953420 U CN220953420 U CN 220953420U
- Authority
- CN
- China
- Prior art keywords
- engineering construction
- water conservancy
- concrete pouring
- pouring device
- sides
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
Description
技术领域Technical Field
本实用新型属于浇筑技术领域,尤其是一种水利工程建筑用混凝土浇筑装置。The utility model belongs to the technical field of pouring, in particular to a concrete pouring device for water conservancy engineering construction.
背景技术Background technique
混凝土浇筑指的是将混凝土浇筑入模直至塑化的过程,在土木建筑工程中把混凝土等材料到模子里制成预定形体。在水利建设作业中,所使用到的浇筑设备通过管道将混凝土原料倒入固定的框架内部,在凝固成型之后,即形成所需的建筑(主要指堤坝),现有的浇筑过程中,导料管只能定点的机械能浇筑,导致混凝土易堆积在一处而导致浇筑不均匀,增大后期人员摊平的难度。Concrete pouring refers to the process of pouring concrete into a mold until it is plasticized. In civil engineering, concrete and other materials are poured into a mold to form a predetermined shape. In water conservancy construction operations, the pouring equipment used pours the concrete raw materials into a fixed frame through a pipe. After solidification, the required building (mainly dams) is formed. In the existing pouring process, the guide pipe can only be used for mechanical pouring at a fixed point, which makes it easy for concrete to accumulate in one place, resulting in uneven pouring and increasing the difficulty of leveling for later personnel.
专利申请号为CN202320834156.4的一种建设工程用混凝土浇筑装置,通过浇筑管、齿轮、齿板、横移板、驱动杆、转盘、竖轴、传动蜗轮、蜗杆和伺服电机的设置,方便驱动浇筑管进行前后摆动式的进行浇筑,避免混凝土堆积在一处而导致浇筑不均,便于后期人员对混凝土摊平工作。但其浇筑时的范围依旧有限,距离浇筑点较远的区域依旧与浇筑点存在较高的浇筑差,依旧存在浇筑不均的情况。Patent application number CN202320834156.4 is a concrete pouring device for construction projects. Through the setting of pouring pipes, gears, toothed plates, transverse plates, drive rods, turntables, vertical shafts, transmission worm wheels, worms and servo motors, it is convenient to drive the pouring pipe to swing back and forth for pouring, so as to avoid uneven pouring caused by concrete accumulation in one place, and facilitate the later personnel to level the concrete. However, the pouring range is still limited, and the areas far away from the pouring point still have a high pouring difference with the pouring point, and there is still uneven pouring.
实用新型内容Utility Model Content
本实用新型的目的在于提供一种水利工程建筑用混凝土浇筑装置,以解决背景技术中提出的问题。The utility model aims to provide a concrete pouring device for water conservancy engineering construction to solve the problems raised in the background technology.
为实现上述目的,本实用新型提供如下技术方案:一种水利工程建筑用混凝土浇筑装置,包括多个延接底座,多个所述延接底座的顶部均开设有滑动槽,且多个滑动槽的两侧为贯穿并连通形成一个整体,所述延接底座的两边侧均连接有连接块,且对应的连接块之间使用螺栓螺母固定,其中一个所述滑动槽的内周限位滑动有滑动座,且滑动座的两侧均连接有牵引往复移动的牵移钢绳,所述滑动座的顶部连接有侧板,且侧板的一侧设置有两个固定浇筑管的半弧箍。To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a concrete pouring device for water conservancy engineering construction, comprising a plurality of extended bases, a plurality of extended bases having sliding grooves on their tops, and both sides of the plurality of sliding grooves are penetrated and connected to form a whole, connecting blocks are connected to both sides of the extended bases, and the corresponding connecting blocks are fixed with bolts and nuts, a sliding seat is provided on the inner periphery of one of the sliding grooves for limited sliding, and both sides of the sliding seat are connected to traction steel ropes for reciprocating movement, a side plate is connected to the top of the sliding seat, and two semi-arc hoops for fixing the pouring pipe are provided on one side of the side plate.
在进一步的实施例中,两个边侧的所述延接底座顶部连接有两个固定板,且固定板之间转动连接有卷绕柱。In a further embodiment, two fixing plates are connected to the top of the extension base on two sides, and a winding column is rotatably connected between the fixing plates.
在进一步的实施例中,所述卷绕柱的外周与对应的牵移钢绳一端卷绕连接,且卷绕柱的一端通过联轴器连接有卷绕电机。In a further embodiment, the outer periphery of the winding column is wound and connected to one end of the corresponding traction steel rope, and one end of the winding column is connected to the winding motor through a coupling.
在进一步的实施例中,所述侧板的一侧连接有凹壳,且凹壳的一侧设置有侧移板。In a further embodiment, one side of the side plate is connected to a concave shell, and one side of the concave shell is provided with a side shift plate.
在进一步的实施例中,所述凹壳的内周中心转动连接有双纹螺杆,且双纹螺杆外周的两端设置有方向相反的螺纹。In a further embodiment, a double-thread screw is rotatably connected to the center of the inner periphery of the concave shell, and threads in opposite directions are arranged at both ends of the outer periphery of the double-thread screw.
在进一步的实施例中,所述双纹螺杆的外周两端均套设有螺纹套,且螺纹套的外周与凹壳的内周相适配。In a further embodiment, threaded sleeves are sleeved on both ends of the outer circumference of the double-thread screw, and the outer circumference of the threaded sleeves is matched with the inner circumference of the concave shell.
在进一步的实施例中,所述螺纹套的一端与侧移板之间设置有铰杆,且两个铰杆为对称的分布。In a further embodiment, a hinge rod is provided between one end of the threaded sleeve and the side shift plate, and the two hinge rods are symmetrically distributed.
在进一步的实施例中,所述凹壳的一侧安装有旋转电机,且旋转电机的输出端贯穿凹壳并通过联轴器与双纹螺杆的一端连接。In a further embodiment, a rotating motor is installed on one side of the concave shell, and the output end of the rotating motor passes through the concave shell and is connected to one end of the double-thread screw through a coupling.
在进一步的实施例中,所述侧板的顶部连接有支撑架,且支撑架的顶部设有限位管体的弧形槽。In a further embodiment, a support frame is connected to the top of the side plate, and an arc-shaped groove for limiting the pipe body is provided on the top of the support frame.
与现有技术相比,本实用新型的技术效果和优点:Compared with the prior art, the technical effects and advantages of the utility model are as follows:
多个延接底座的自由连接的设计,使其能够对浇筑范围进行调节,适应不同浇筑建筑,牵移钢绳一端与滑动座的连接设计以及牵移钢绳一端与卷绕柱的卷绕,再通过卷绕电机与卷绕柱的连接设计,当卷绕电机运行时,能够对牵移钢绳进行卷绕和放卷,进一步实现往复的移动实现较为均匀的浇筑;The free connection design of multiple extended bases enables the casting range to be adjusted to adapt to different casting buildings. The connection design of one end of the traction steel rope and the sliding seat and the winding of one end of the traction steel rope with the winding column, and the connection design of the winding motor and the winding column, when the winding motor is running, the traction steel rope can be wound and unwound, further realizing reciprocating movement to achieve more uniform casting;
双纹螺杆与螺纹套的螺纹连接以及螺纹套与凹壳的适配设计,通过螺纹套的对称设计以及铰杆之间的铰接设计,再通过旋转电机与双纹螺杆一端的连接,当旋转电机运行时,能够驱动螺纹套移动进一步使侧移板的半弧箍移动,进一步使其伸展至浇筑区域进行浇筑和收缩至平台,便于对管体进行拆装;The threaded connection between the double-thread screw and the threaded sleeve and the matching design between the threaded sleeve and the concave shell, through the symmetrical design of the threaded sleeve and the hinged design between the hinge rods, and then through the connection between the rotary motor and one end of the double-thread screw, when the rotary motor is running, it can drive the threaded sleeve to move and further move the semi-arc hoop of the side shift plate, further extending it to the casting area for casting and shrinking it to the platform, so as to facilitate the disassembly and assembly of the pipe body;
该水利工程建筑用混凝土浇筑装置,不仅能够进行循环的移动,实现较为均匀的浇筑,且便于对管体进行拆装。The concrete pouring device for water conservancy engineering construction can not only move in a cycle to achieve relatively uniform pouring, but also facilitates disassembly and assembly of the pipe body.
附图说明BRIEF DESCRIPTION OF THE DRAWINGS
为了更清楚地说明本实用新型具体实施方式或现有技术中的技术方案,下面将对具体实施方式或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图是本实用新型的一些实施方式,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the specific implementation methods of the utility model or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
图1为本实用新型的结构示意图;Fig. 1 is a schematic diagram of the structure of the utility model;
图2为本实用新型的卷绕柱的连接结构示意图;FIG2 is a schematic diagram of the connection structure of the winding column of the utility model;
图3为本实用新型的半弧箍的结构示意图;FIG3 is a schematic structural diagram of a semi-arc hoop of the utility model;
图4为本实用新型的凹壳的剖视图。FIG. 4 is a cross-sectional view of the concave shell of the present invention.
附图标记说明:Description of reference numerals:
1、延接底座;2、滑动座;3、侧板;4、凹壳;5、侧移板;6、半弧箍;7、支撑架;8、连接块;1. Extended base; 2. Sliding seat; 3. Side plate; 4. Concave shell; 5. Side shift plate; 6. Half arc hoop; 7. Support frame; 8. Connecting block;
21、固定板;22、卷绕柱;23、卷绕电机;24、牵移钢绳;21. Fixed plate; 22. Winding column; 23. Winding motor; 24. Pulling steel rope;
31、双纹螺杆;32、螺纹套;33、铰杆;34、旋转电机。31. Double-thread screw; 32. Threaded sleeve; 33. Hinge rod; 34. Rotating motor.
具体实施方式Detailed ways
请参阅图1至图4,装置本体的大体结构为,多个延接底座1,多个延接底座1的两侧底部均连接有连接块8,对应的两个连接块8相互贴合并通过螺栓和螺母实现固定,延接底座1的侧边可再通过上述方式,使用螺栓与地面进行固定,实现位置的固定;Please refer to Figures 1 to 4. The general structure of the device body is that a plurality of extension bases 1 are connected to the bottoms of both sides of the plurality of extension bases 1 with connection blocks 8. The corresponding two connection blocks 8 are attached to each other and fixed by bolts and nuts. The side of the extension base 1 can be fixed to the ground by bolts in the above-mentioned manner to achieve the fixed position.
多个延接底座1的顶部开设有滑动槽,多个滑动槽两侧贯穿形成一个整体的设计,其中一个滑动槽的内周设置有滑动座2,滑动座2的顶部连接有侧板3,侧板3的一侧设置有两个半弧箍6,两个半弧箍6能够对浇筑管道进行固定,两个半弧箍6之间为螺栓固定。A plurality of extended bases 1 are provided with sliding grooves on the top, and the two sides of the plurality of sliding grooves penetrate to form an integral design, wherein a sliding seat 2 is provided on the inner periphery of one of the sliding grooves, a side plate 3 is connected to the top of the sliding seat 2, and two semi-arc hoops 6 are provided on one side of the side plate 3, and the two semi-arc hoops 6 can fix the casting pipe, and the two semi-arc hoops 6 are fixed with bolts.
请参阅图1和图2,为了实现往复的移动,处于两侧的延接底座1的顶部均连接有固定板21,固定板21之间转动连接有卷绕柱22,其中一个固定板21的一侧中心安装有卷绕电机23;Please refer to FIG. 1 and FIG. 2 . In order to realize reciprocating movement, the tops of the extension bases 1 on both sides are connected with fixed plates 21 . Winding posts 22 are rotatably connected between the fixed plates 21 . A winding motor 23 is installed at the center of one side of one of the fixed plates 21 .
卷绕电机23的输出端贯穿固定板21并通过联轴器与卷绕柱22连接,卷绕柱22的外周卷绕连接有牵移钢绳24,牵移钢绳24的一端与滑动座2的一侧系接;The output end of the winding motor 23 passes through the fixed plate 21 and is connected to the winding column 22 through a coupling. A traction steel rope 24 is wound around the outer periphery of the winding column 22, and one end of the traction steel rope 24 is connected to one side of the sliding seat 2.
为了便于对管体进行辅助移动,侧板3的顶部连接有支撑架7,支撑架7的顶部设为弧形槽,弧形槽的内周与浇筑管体的外周相适配,支撑架7能够对浇筑管体进行架起减少与侧板3的摩擦。In order to facilitate the auxiliary movement of the pipe body, a support frame 7 is connected to the top of the side plate 3. The top of the support frame 7 is set as an arc groove. The inner periphery of the arc groove is adapted to the outer periphery of the cast pipe body. The support frame 7 can support the cast pipe body to reduce friction with the side plate 3.
请参阅图1、图3和图4,为了实现便于拆装的目的,侧板3的一侧连接有凹壳4,凹壳4的一侧安装有旋转电机34,旋转电机34的输出端贯穿凹壳4并通过联轴器连接有双纹螺杆31;Please refer to FIG. 1 , FIG. 3 and FIG. 4 . In order to facilitate disassembly and assembly, a concave shell 4 is connected to one side of the side plate 3 . A rotary motor 34 is installed on one side of the concave shell 4 . The output end of the rotary motor 34 passes through the concave shell 4 and is connected to a double-thread screw 31 through a coupling.
双纹螺杆31外周的两端设有方向相反的螺纹,双纹螺杆31的外周对称套设有螺纹套32,凹壳4的一侧设置有侧移板5,两个螺纹套32的一侧与侧移板5之间铰接有铰杆33;The two ends of the outer circumference of the double-thread screw 31 are provided with threads in opposite directions, and the outer circumference of the double-thread screw 31 is symmetrically sleeved with thread sleeves 32, and a side shift plate 5 is provided on one side of the concave shell 4, and a hinge rod 33 is hinged between one side of the two thread sleeves 32 and the side shift plate 5;
铰杆33的两端均为弧面结构的设计,铰杆33的两端中心开设有中心孔,中心孔的两侧均设有连接的接块。Both ends of the hinge rod 33 are designed with arc surface structures. Center holes are opened at the centers of both ends of the hinge rod 33, and connecting blocks are provided on both sides of the center hole.
旋转电机34和卷绕电机23均为能够正反向旋转的设计。The rotating motor 34 and the winding motor 23 are both designed to be capable of forward and reverse rotation.
上述部件和电气设备均为现有技术或现有可实现的技术,工作原理、尺寸和型号与本申请的功能无关,故不多做叙述,且均由遥控开关进行控制。The above-mentioned components and electrical equipment are all existing technologies or existing feasible technologies. The working principles, sizes and models are irrelevant to the functions of this application, so they are not described in detail, and they are all controlled by remote control switches.
工作原理working principle
该水利工程建筑用混凝土浇筑装置,需要使用时,根据堤坝的长度,选用适量的延接底座1,再使用螺栓与螺母将多个延接底座1进行连接;When the concrete pouring device for water conservancy engineering construction is needed, an appropriate number of extension bases 1 are selected according to the length of the dam, and then multiple extension bases 1 are connected using bolts and nuts;
将滑动座2滑动入滑动槽的内周,再连接固定板21并使牵移钢绳24的一端与滑动座2的一侧系接;Slide the sliding seat 2 into the inner periphery of the sliding groove, then connect the fixing plate 21 and tie one end of the pulling steel rope 24 to one side of the sliding seat 2;
再将浇筑管体的端口部放置于两个半弧箍6之间,再使用螺栓对端口进行固定并使管体架设于支撑架7的顶部;Then place the port of the cast pipe body between the two semi-arc hoops 6, and then use bolts to fix the port and place the pipe body on the top of the support frame 7;
固定完成后,启动旋转电机34,带动双纹螺杆31旋转,使螺纹套32相向移动,使铰杆33同步移动,进一步使侧移板5向浇筑的框架处移动;After the fixation is completed, the rotating motor 34 is started to drive the double-thread screw 31 to rotate, so that the threaded sleeves 32 move toward each other, and the hinge rods 33 move synchronously, and further the side shift plate 5 moves toward the cast frame;
再启动两个卷绕电机23,带动两个卷绕柱22转动,分别使牵移钢绳24进行卷绕和放卷,进一步使滑动座2往复的移动,再启动外部的浇筑设备,即可实现均匀的浇筑。Then start the two winding motors 23 to drive the two winding columns 22 to rotate, respectively winding and unwinding the traction steel rope 24, further making the sliding seat 2 move back and forth, and then start the external pouring equipment to achieve uniform pouring.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202322702692.1U CN220953420U (en) | 2023-10-09 | 2023-10-09 | Concrete placement device for hydraulic engineering building |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202322702692.1U CN220953420U (en) | 2023-10-09 | 2023-10-09 | Concrete placement device for hydraulic engineering building |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN220953420U true CN220953420U (en) | 2024-05-14 |
Family
ID=90980475
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202322702692.1U Active CN220953420U (en) | 2023-10-09 | 2023-10-09 | Concrete placement device for hydraulic engineering building |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN220953420U (en) |
-
2023
- 2023-10-09 CN CN202322702692.1U patent/CN220953420U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN109826117B (en) | Electric sliding formwork formwork trolley without tie-rod integral culvert wall pouring | |
| CN115319909A (en) | Pre-tensioning method prestressed precast pile manufacturing equipment and method | |
| CN220953420U (en) | Concrete placement device for hydraulic engineering building | |
| CN212428862U (en) | An integral flexible steel mandrel trolley for the central water ditch of the tunnel | |
| CN108756070A (en) | A method of it improving building and builds efficiency | |
| CN118342639B (en) | Mould is used in processing of precast cement square pile | |
| CN118563793B (en) | A casing device for foundation pit retaining pile construction | |
| CN118771193A (en) | A shield segment turning hoist and turning machine thereof | |
| CN211447893U (en) | Strutting arrangement for civil engineering | |
| CN211221186U (en) | Production system of concrete member | |
| CN218802974U (en) | A template subassembly for overpass mound is pour | |
| CN112123559A (en) | Cement pipe production device convenient for discharging and using method thereof | |
| CN219618124U (en) | Cement pipe socket forming device | |
| CN212554387U (en) | Concrete tubular pile cast molding auxiliary device | |
| CN114800789B (en) | A PC component mold holder | |
| CN218227116U (en) | Auxiliary device is used in installation of concrete structure reinforcing bar protective layer | |
| CN215920858U (en) | Concrete tubular pile casting molding device | |
| CN219930874U (en) | A sliding form trolley | |
| CN218053230U (en) | A high-strength pipe pile steel formwork | |
| CN222972464U (en) | Auxiliary demoulding device for production of reinforced concrete drainage pipes | |
| CN208250924U (en) | A kind of bridge coxopodite pier shaft pours leakproof sizing device | |
| CN218861374U (en) | Under wear railway frame box culvert top and advance construction equipment | |
| CN217812336U (en) | High formwork of building with reinforced connection structure | |
| CN221681752U (en) | A slipform device for slope protection construction of water conservancy projects | |
| CN222632245U (en) | Positioning device is pour to power transmission and transformation circuit shaft tower basis |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20250806 Address after: 537100 Guangxi Zhuang Autonomous Region Guigang City Qintang District Qintang Town Land Office West Side 30 # Patentee after: Guangxi Donghai Construction Engineering Group Co.,Ltd. Country or region after: China Address before: 537200 Guangxi Zhuang Autonomous Region Guigang City Qintang District Qintang Town Longling Village Liucun Tun 226 Hao Patentee before: Chen Haidong Country or region before: China Patentee before: Chen Shengyao |