CN220919559U - Dust and smoke collecting and treating device - Google Patents
Dust and smoke collecting and treating device Download PDFInfo
- Publication number
- CN220919559U CN220919559U CN202322212019.XU CN202322212019U CN220919559U CN 220919559 U CN220919559 U CN 220919559U CN 202322212019 U CN202322212019 U CN 202322212019U CN 220919559 U CN220919559 U CN 220919559U
- Authority
- CN
- China
- Prior art keywords
- dust
- chamber
- electrode plates
- water
- collecting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Electrostatic Separation (AREA)
Abstract
Description
技术领域Technical Field
本实用新型涉及粉尘烟气处理技术领域,特别是一种粉尘烟气收集处理装置。The utility model relates to the technical field of dust and fume treatment, in particular to a dust and fume collection and treatment device.
背景技术Background technique
在工业生产过程中往往会产生很多空气污染物,这种空气污染物一般形式为带有粉尘的烟气,这种烟气一旦排放至空气中,不但会与空气中的成分发生反应生产更多有害的物质,而且会导致空气的透明度,干扰视线,为了解决烟气排放问题,现有技术提供了粉尘烟气处理装置来过滤烟气中的粉尘,使烟气能够达到排放的标准;In the process of industrial production, a lot of air pollutants are often generated. Such air pollutants are generally in the form of dusty flue gas. Once such flue gas is discharged into the air, it will not only react with the components in the air to produce more harmful substances, but also cause the transparency of the air and interfere with vision. In order to solve the problem of flue gas emission, the prior art provides a dusty flue gas treatment device to filter the dust in the flue gas so that the flue gas can meet the emission standards;
但是现有的粉尘烟气处理装置通过筛网的方式将烟气中的粉尘进行过滤,但是当筛网过滤的粉尘过多时容易将筛网本身发生堵塞,而为了方便清理筛网通过将筛网设置成可拆卸的结构,但是筛网只能够在烟气停止流入倒处理装置内时才能够拆卸,当烟气一直在往处理装置内流动时筛网就不方便拆卸,而筛网表面的粉尘堆积过多就容易发生堵塞,因此解决以上问题提供一种粉尘烟气收集处理装置。However, the existing dust and flue gas treatment device filters the dust in the flue gas by means of a screen. However, when the screen filters too much dust, the screen itself is prone to get clogged. In order to facilitate the cleaning of the screen, the screen is set to a detachable structure. However, the screen can only be removed when the flue gas stops flowing into the treatment device. When the flue gas is still flowing into the treatment device, the screen is inconvenient to remove. If too much dust accumulates on the surface of the screen, it is prone to get clogged. Therefore, a dust and flue gas collection and treatment device is provided to solve the above problems.
实用新型内容Utility Model Content
本实用新型的目的在于克服现有技术的不足,提供一种粉尘烟气收集处理装置,其针对粉尘烟气收集处理装置而设计,该种粉尘烟气收集处理装置解决了上述背景技术中提到的问题。The purpose of the utility model is to overcome the deficiencies of the prior art and provide a dust and fume collecting and processing device, which is designed for a dust and fume collecting and processing device and solves the problems mentioned in the above background technology.
本实用新型的目的是通过以下技术方案来实现的:The purpose of this utility model is achieved through the following technical solutions:
一种粉尘烟气收集处理装置,包括:A dust and fume collection and treatment device, comprising:
除尘室以及连接至所述除尘室一端并用于吸收烟气有害物质的吸收剂反应室,除尘室的底面连通有用于收集废水的第一收集室;A dust removal chamber and an absorbent reaction chamber connected to one end of the dust removal chamber and used to absorb harmful substances in flue gas, wherein the bottom surface of the dust removal chamber is connected to a first collecting chamber for collecting waste water;
所述除尘室内间隔设置设有多组放电电极板和用于吸收粉尘的集尘电极板,所述集尘电极板的两侧顶端均连接有喷管,喷管的底面设有若干个喷口,除尘室的顶面设有用于与外部水连接的第一水泵,所述第一水泵外连接有第一水管,所述第一水管的一端设有若干个第一连接管,每个所述第一连接管依次与喷管连接。A plurality of groups of discharge electrode plates and dust collecting electrode plates for absorbing dust are arranged at intervals in the dust removal chamber, the top ends of both sides of the dust collecting electrode plates are connected with nozzles, the bottom surface of the nozzles is provided with a plurality of nozzle openings, the top surface of the dust removal chamber is provided with a first water pump for connecting to external water, the first water pump is externally connected to a first water pipe, one end of the first water pipe is provided with a plurality of first connecting pipes, and each of the first connecting pipes is connected to the nozzle in turn.
上述实用新型内容中,进一步的,所述除尘室内设有若干个连接杆,多组放电电极板和集尘电极板均设在连接杆上,多组放电电极板和集尘电极板的顶端和底端依次连接有上绝缘板和下绝缘板。In the above utility model, further, a plurality of connecting rods are provided in the dust removal chamber, and a plurality of groups of discharge electrode plates and dust collecting electrode plates are arranged on the connecting rods, and the top and bottom ends of the plurality of groups of discharge electrode plates and dust collecting electrode plates are connected with upper insulating plates and lower insulating plates in sequence.
上述实用新型内容中,进一步的,所述上绝缘板设有若干个穿线孔,每个穿线孔分别与多组放电电极板和集尘电极板的顶端对应,所述除尘室设有继电器,多组放电电极板和集尘电极板与继电器之间电性连接,所述下绝缘板设有若干个用于排放废水的排孔。In the above-mentioned utility model, further, the upper insulating plate is provided with a plurality of threading holes, each threading hole corresponds to the top of multiple groups of discharge electrode plates and dust collecting electrode plates respectively, the dust removal chamber is provided with a relay, and the multiple groups of discharge electrode plates and dust collecting electrode plates are electrically connected to the relay, and the lower insulating plate is provided with a plurality of drainage holes for discharging wastewater.
上述实用新型内容中,进一步的,所述第一收集室的内部倾斜设置有第一过滤网,第一收集室的底面设有排水口,第一收集室的一侧面设有排污口。In the above utility model, further, a first filter screen is obliquely arranged inside the first collecting chamber, a drainage outlet is arranged on the bottom surface of the first collecting chamber, and a sewage outlet is arranged on one side surface of the first collecting chamber.
上述实用新型内容中,进一步的,所述吸收剂反应室外设有存储箱,所述存储箱设有注入口,存储箱外通过输出管连接有第二水泵,所述第二水泵的出水端连接有第二水管,所述吸收剂反应室的内壁顶端设有若干个喷洒器,所述第二水管的一端设有若干个第二连接管,每个所述第二连接管依次与喷洒器连接。In the above utility model, further, a storage box is provided outside the absorbent reaction chamber, the storage box is provided with an injection port, a second water pump is connected to the outside of the storage box through an output pipe, the water outlet of the second water pump is connected to a second water pipe, a plurality of sprayers are provided at the top of the inner wall of the absorbent reaction chamber, a plurality of second connecting pipes are provided at one end of the second water pipe, and each of the second connecting pipes is connected to the sprayer in turn.
上述实用新型内容中,进一步的,所述吸收剂反应室的底端连接有第二收集室,所述吸收剂反应室的内壁底端设有导流板,所述导流板的底端设有用于排出吸收剂并与第二收集室连通的回收孔。In the above utility model, further, the bottom end of the absorbent reaction chamber is connected to a second collection chamber, the bottom end of the inner wall of the absorbent reaction chamber is provided with a guide plate, and the bottom end of the guide plate is provided with a recovery hole for discharging the absorbent and communicating with the second collection chamber.
上述实用新型内容中,进一步的,所述第二收集室内倾斜设置有第二过滤网,第二收集室外设有回收管,所述回收管的一端与存储箱连通。In the above utility model, further, a second filter screen is obliquely arranged in the second collecting chamber, a recovery pipe is arranged outside the second collecting chamber, and one end of the recovery pipe is connected to the storage box.
上述实用新型内容中,进一步的,所述除尘室设有烟气进入的入口,所述吸收剂反应室设有用于排放烟气的出口。In the above utility model, further, the dust removal chamber is provided with an inlet for smoke to enter, and the absorbent reaction chamber is provided with an outlet for discharging smoke.
本实用新型的有益效果是:The beneficial effects of the utility model are:
本实用新型通过将烟气排入除尘室内,然后烟气通过放电电极板和集尘电极板的间隙时,通过静电捕获烟气中的烟尘,使粉尘附着在集尘电极板的两侧,接着让第一水泵与外部水连接,通过第一水管和第一连接管将水依次带入到喷管内,通过喷口进行喷洒将集尘电极板上附着的粉尘进行冲刷,使冲刷后的水分流入到第一收集室内进水收集,让烟气中的粉尘处理效果能够更好,同时拦截的粉尘便于进行收集。The utility model discharges smoke into a dust removal chamber, and then when the smoke passes through the gap between the discharge electrode plate and the dust collecting electrode plate, the smoke dust in the smoke is captured by static electricity, so that the dust adheres to both sides of the dust collecting electrode plate, and then a first water pump is connected to external water, and water is brought into the nozzle in sequence through a first water pipe and a first connecting pipe, and the dust attached to the dust collecting electrode plate is flushed by spraying through the nozzle, so that the flushed water flows into the first collecting chamber for water collection, so that the dust treatment effect in the smoke can be better, and the intercepted dust is easy to collect.
附图说明BRIEF DESCRIPTION OF THE DRAWINGS
图1为本实用新型的整体结构正视示意图;FIG1 is a schematic front view of the overall structure of the utility model;
图2为本实用新型的整体结构正视剖面示意图;FIG2 is a front cross-sectional schematic diagram of the overall structure of the utility model;
图3为本实用新型的除尘室侧视剖面示意图;FIG3 is a schematic side cross-sectional view of the dust removal chamber of the present invention;
图4为本实用新型的图3中A处放大示意图。FIG. 4 is an enlarged schematic diagram of point A in FIG. 3 of the present invention.
图中,1-除尘室,101-入口,102-放电电极板,103-集尘电极板,104-连接杆,105-上绝缘板,106-穿线孔,107-下绝缘板,108-排孔,109-喷管,110-第一水管,111-第一水泵,112-继电器,2-吸收剂反应室,201-存储箱,202-第二水泵,203-第二水管,204-喷洒器,205-导流板,206-回收孔,207-回收管,208-出口,3-第一收集室,301-第一过滤网,302-第二收集室,303-第二过滤网。In the figure, 1-dust removal chamber, 101-inlet, 102-discharging electrode plate, 103-dust collecting electrode plate, 104-connecting rod, 105-upper insulating plate, 106-threading hole, 107-lower insulating plate, 108-row holes, 109-nozzle, 110-first water pipe, 111-first water pump, 112-relay, 2-absorbent reaction chamber, 201-storage box, 202-second water pump, 203-second water pipe, 204-sprinkler, 205-guide plate, 206-recovery hole, 207-recovery pipe, 208-outlet, 3-first collecting chamber, 301-first filter screen, 302-second collecting chamber, 303-second filter screen.
具体实施方式Detailed ways
以下通过特定的具体实例说明本实用新型的实施方式,本领域技术人员可由本说明书所揭露的内容轻易地了解本实用新型的其他优点与功效。本实用新型还可以通过另外不同的具体实施方式加以实施或应用,本说明书中的各项细节也可以基于不同观点与应用,在没有背离本实用新型的精神下进行各种修饰或改变。需说明的是,在不冲突的情况下,以下实施例及实施例中的特征可以相互组合。The following describes the implementation of the present invention through specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific implementations, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention. It should be noted that the following embodiments and features in the embodiments can be combined with each other without conflict.
实施例:Example:
请参照图1-3,一种粉尘烟气收集处理装置包括除尘室1和吸收剂反应室2;1-3 , a dust and fume collection and treatment device includes a dust removal chamber 1 and an absorbent reaction chamber 2;
除尘室1设有烟气进入的入口101,除尘室1内间隔设置设有多组放电电极板102和用于吸收粉尘的集尘电极板103,除尘室1内设有若干个连接杆104,多组放电电极板102和集尘电极板103均设在连接杆104上,多组放电电极板102和集尘电极板103的顶端依次连接有上绝缘板105和下绝缘板107,集尘电极板103的两侧顶端均连接有喷管109,喷管109的底面设有若干个喷口,除尘室1的顶面设有用于与外部水连接的第一水泵111,第一水泵111外连接有第一水管110,第一水管110的一端设有若干个第一连接管,每个第一连接管依次与喷管109连接,上绝缘板105设有若干个穿线孔106,每个穿线孔106分别与多组放电电极板102和集尘电极板103的顶端对应,除尘室1设有继电器112,多组放电电极板102和集尘电极板103与继电器112之间电性连接,下绝缘板107设有若干个用于排放废水的排孔108,除尘室1的底面连通有用于收集废水的第一收集室3,第一收集室3的内部倾斜设置有第一过滤网301,第一收集室3的底面设有排水口,第一收集室3的一侧面设有排污口,首先通过穿线孔106让线路的一端依次与多组放电电极板102和集尘电极板103连接另一端与继电器112连接,通过继电器112将多组放电电极板102和集尘电极板103启动,然后烟气通过入口101进入到除尘室1内,烟气通过放电电极板102和集尘电极板103的间隙时,通过静电捕获烟气中的烟尘,使粉尘附着在集尘电极板103的两侧,接着让第一水泵111与外部水连接,通过第一水管110和第一连接管将水依次带入到喷管109内,通过喷口进行喷洒将集尘电极板103上附着的粉尘进行冲刷,使冲刷后的水分通过排孔108流入到第一收集室3内,通过第一筛网将废水中的粉尘拦截出来并通过排污口排出,而水通过排水口排出。The dust removal chamber 1 is provided with an inlet 101 for smoke to enter, and multiple groups of discharge electrode plates 102 and dust collecting electrode plates 103 for absorbing dust are arranged at intervals in the dust removal chamber 1. A plurality of connecting rods 104 are provided in the dust removal chamber 1, and the multiple groups of discharge electrode plates 102 and dust collecting electrode plates 103 are arranged on the connecting rods 104. The tops of the multiple groups of discharge electrode plates 102 and dust collecting electrode plates 103 are connected with upper insulating plates 105 and lower insulating plates 107 in sequence. The tops of both sides of the dust collecting electrode plates 103 are connected with nozzles 109, and the bottom surface of the nozzles 109 is provided with a plurality of nozzles. The top surface of the dust removal chamber 1 is provided with A first water pump 111 for connecting to external water is provided, and a first water pipe 110 is connected to the first water pump 111. One end of the first water pipe 110 is provided with a plurality of first connecting pipes, and each first connecting pipe is connected to the nozzle 109 in sequence. The upper insulating plate 105 is provided with a plurality of threading holes 106, and each threading hole 106 corresponds to the top of the plurality of discharge electrode plates 102 and the dust collecting electrode plates 103, respectively. The dust removal chamber 1 is provided with a relay 112, and the plurality of discharge electrode plates 102 and the dust collecting electrode plates 103 are electrically connected to the relay 112. The lower insulating plate 107 is provided with a plurality of The bottom surface of the dust removal chamber 1 is connected with a first collection chamber 3 for collecting waste water, and a first filter screen 301 is arranged obliquely inside the first collection chamber 3. A drainage port is arranged on the bottom surface of the first collection chamber 3, and a sewage port is arranged on one side of the first collection chamber 3. First, one end of the line is connected to multiple groups of discharge electrode plates 102 and dust collecting electrode plates 103 in sequence through the threading hole 106, and the other end is connected to the relay 112. The multiple groups of discharge electrode plates 102 and dust collecting electrode plates 103 are started through the relay 112, and then the flue gas enters the dust removal chamber 1 through the inlet 101. When the flue gas passes through the gap between the discharge electrode plate 102 and the dust collecting electrode plate 103, the smoke dust in the flue gas is captured by static electricity, so that the dust adheres to both sides of the dust collecting electrode plate 103. Then the first water pump 111 is connected to the external water, and the water is brought into the nozzle 109 in turn through the first water pipe 110 and the first connecting pipe. The dust attached to the dust collecting electrode plate 103 is flushed by spraying through the nozzle, and the flushed water flows into the first collecting chamber 3 through the discharge hole 108. The dust in the wastewater is intercepted by the first screen and discharged through the sewage outlet, and the water is discharged through the drain outlet.
除尘室1的一端连接有吸收剂反应室2,吸收剂反应室2外设有存储箱201,存储箱201设有注入口101,存储箱201外通过输出管连接有第二水泵202,第二水泵202的出水端连接有第二水管203,吸收剂反应室2的内壁顶端设有若干个喷洒器204,第二水管203的一端设有若干个第二连接管,每个第二连接管依次与喷洒器204连接,吸收剂反应室2的底端连接有第二收集室302,吸收剂反应室2的内壁底端设有导流板205,导流板205的底端设有用于排出吸收剂并与第二收集室302连通的回收孔206,第二收集室302内倾斜设置有第二过滤网303,第二收集室302外设有回收管207,回收管207的一端与存储箱201连通,通过注入口101往存储箱201内注入吸收剂,当烟气进入吸收剂反应室2内时启动第二水泵202将存储箱201内的吸收剂通过第二水管203和第二连接管将吸收剂依次带入喷洒器204进行喷洒,让烟气在经过吸收剂反应室2内时烟气中的有害物质会被吸收剂反应并吸收掉,而吸收后的吸收剂通过导流板205往下流动并通过回收孔206流入到第二收集箱内,通过第二过滤网303将回收的吸收剂中混合的杂质拦截出来,而第二过滤网303下的吸收剂便于再次通过回收管207流入到存储箱201内进行收集。One end of the dust removal chamber 1 is connected to the absorbent reaction chamber 2, a storage box 201 is provided outside the absorbent reaction chamber 2, the storage box 201 is provided with an injection port 101, a second water pump 202 is connected to the outside of the storage box 201 through an output pipe, the water outlet of the second water pump 202 is connected to a second water pipe 203, a plurality of sprayers 204 are provided at the top of the inner wall of the absorbent reaction chamber 2, a plurality of second connecting pipes are provided at one end of the second water pipe 203, each second connecting pipe is connected to the sprayer 204 in sequence, the bottom end of the absorbent reaction chamber 2 is connected to the second collecting chamber 302, a guide plate 205 is provided at the bottom end of the inner wall of the absorbent reaction chamber 2, a recovery hole 206 for discharging the absorbent and communicating with the second collecting chamber 302 is provided at the bottom end of the guide plate 205, a second filter screen 303 is obliquely arranged in the second collecting chamber 302, and the second collecting A recovery pipe 207 is provided outside the chamber 302, and one end of the recovery pipe 207 is connected to the storage box 201. The absorbent is injected into the storage box 201 through the injection port 101. When the flue gas enters the absorbent reaction chamber 2, the second water pump 202 is started to bring the absorbent in the storage box 201 into the sprayer 204 through the second water pipe 203 and the second connecting pipe for spraying. When the flue gas passes through the absorbent reaction chamber 2, the harmful substances in the flue gas will be reacted and absorbed by the absorbent, and the absorbed absorbent flows downward through the guide plate 205 and flows into the second collection box through the recovery hole 206, and the impurities mixed in the recovered absorbent are intercepted by the second filter screen 303, and the absorbent under the second filter screen 303 is convenient to flow into the storage box 201 through the recovery pipe 207 again for collection.
工作原理;该装置首先通过穿线孔106让线路的一端依次与多组放电电极板102和集尘电极板103连接另一端与继电器112连接,通过继电器112将多组放电电极板102和集尘电极板103启动,然后烟气通过入口101进入到除尘室1内,烟气通过放电电极板102和集尘电极板103的间隙时,通过静电捕获烟气中的烟尘,使粉尘附着在集尘电极板103的两侧,接着让第一水泵111与外部水连接,通过第一水管110和第一连接管将水依次带入到喷管109内,通过喷口进行喷洒将集尘电极板103上附着的粉尘进行冲刷,使冲刷后的水分通过排孔108流入到第一收集室3内,通过第一筛网将废水中的粉尘拦截出来并通过排污口排出,而水通过排水口排出,然后通过注入口101往存储箱201内注入吸收剂,当烟气进入吸收剂反应室2内时启动第二水泵202将存储箱201内的吸收剂通过第二水管203和第二连接管将吸收剂依次带入喷洒器204进行喷洒,让烟气在经过吸收剂反应室2内时烟气中的有害物质会被吸收剂反应并吸收掉,而吸收后的吸收剂通过导流板205往下流动并通过回收孔206流入到第二收集箱内,通过第二过滤网303将回收的吸收剂中混合的杂质拦截出来,而第二过滤网303下的吸收剂便于再次通过回收管207流入到存储箱201内进行收集。Working principle: The device first connects one end of the line to multiple groups of discharge electrode plates 102 and dust collecting electrode plates 103 in sequence through the threading hole 106, and the other end is connected to the relay 112. The multiple groups of discharge electrode plates 102 and dust collecting electrode plates 103 are started through the relay 112, and then the flue gas enters the dust removal chamber 1 through the inlet 101. When the flue gas passes through the gap between the discharge electrode plate 102 and the dust collecting electrode plate 103, the smoke in the flue gas is captured by static electricity, so that the dust adheres to both sides of the dust collecting electrode plate 103. Then the first water pump 111 is connected to the external water, and water is brought into the nozzle 109 in sequence through the first water pipe 110 and the first connecting pipe. The dust attached to the dust collecting electrode plate 103 is flushed by spraying through the nozzle, so that the flushed water flows into the first collecting chamber 3 through the drainage hole 108, and then the dust is discharged from the first collecting chamber 3. The first screen intercepts the dust in the wastewater and discharges it through the sewage outlet, while the water is discharged through the drain outlet, and then the absorbent is injected into the storage box 201 through the injection port 101. When the flue gas enters the absorbent reaction chamber 2, the second water pump 202 is started to bring the absorbent in the storage box 201 into the sprayer 204 through the second water pipe 203 and the second connecting pipe for spraying. When the flue gas passes through the absorbent reaction chamber 2, the harmful substances in the flue gas will be reacted and absorbed by the absorbent, and the absorbed absorbent flows downward through the guide plate 205 and flows into the second collection box through the recovery hole 206, and the impurities mixed in the recovered absorbent are intercepted by the second filter 303, and the absorbent under the second filter 303 is convenient to flow into the storage box 201 through the recovery pipe 207 again for collection.
在本实用新型的描述中,需要理解的是,术语“上”、“下”、“左”、“右”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具备特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。In the description of the present invention, it is necessary to understand that the terms "up", "down", "left", "right", etc., indicating directions or positional relationships are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present invention.
以上实施例仅表达了本实用新型的具体实施方式,其描述较为具体和详细,但并不能因此而理解为对本实用新型专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本实用新型构思的前提下,还可以做出若干变形和改进,这些都属于本实用新型的保护范围。The above embodiments only express the specific implementation methods of the utility model, and the description is relatively specific and detailed, but it cannot be understood as limiting the scope of the patent of the utility model. It should be pointed out that for ordinary technicians in this field, several modifications and improvements can be made without departing from the concept of the utility model, which all belong to the protection scope of the utility model.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202322212019.XU CN220919559U (en) | 2023-08-16 | 2023-08-16 | Dust and smoke collecting and treating device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202322212019.XU CN220919559U (en) | 2023-08-16 | 2023-08-16 | Dust and smoke collecting and treating device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN220919559U true CN220919559U (en) | 2024-05-10 |
Family
ID=90967025
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202322212019.XU Active CN220919559U (en) | 2023-08-16 | 2023-08-16 | Dust and smoke collecting and treating device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN220919559U (en) |
-
2023
- 2023-08-16 CN CN202322212019.XU patent/CN220919559U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN209828566U (en) | Environmental protection machinery is with spraying dust collector | |
| CN109127138A (en) | A kind of Wet-type electric dust removal system for capacitor production | |
| CN205948626U (en) | Denitration dust collector | |
| CN220919559U (en) | Dust and smoke collecting and treating device | |
| CN214635114U (en) | Waste gas purification device capable of filtering and collecting dust | |
| CN207654875U (en) | Dust-extraction unit and cleaner | |
| CN213314210U (en) | Be suitable for full-automatic exhaust gas collection device who sprays paint | |
| CN205032037U (en) | Water curtain formula smog dust collector | |
| CN107583385A (en) | A kind of multiple dust arrester | |
| CN209423304U (en) | A kind of novel and multifunctional waste gas purification environmental protection equipment | |
| CN215983073U (en) | Air purification device with automatic cleaning function | |
| CN211025616U (en) | A kind of air purification equipment for collecting waste silk in textile workshop | |
| CN208975433U (en) | A kind of waste mineral oil purification plant air purification device | |
| CN205549973U (en) | High -efficient dust removal, drip washing integrated device | |
| CN210905500U (en) | Cyclone dust removal membrane type separation device for treating tail gas of fertilizer granulation high tower | |
| CN210522146U (en) | Environment-friendly dust remover | |
| CN211676855U (en) | Environmental protection equipment with reduce flue gas dust | |
| CN216062548U (en) | Exhaust treatment device with multi-stage filtering structure | |
| CN206911124U (en) | One kind is applied to demisting dust pelletizing system after catalytic cracking tail gas desulfurization | |
| CN213101369U (en) | High-efficiency flue gas purification device | |
| CN221889517U (en) | Air purification device with improved filtering effect | |
| CN217979158U (en) | A new type of air purification device for purging the filter | |
| CN215742625U (en) | Purifying device | |
| CN106139854A (en) | A kind of wet-dry change combines except multiple exhaust purifier | |
| CN219602199U (en) | Waste gas treatment device for oil product storage tank |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20250522 Address after: 150000 Heilongjiang Province, Harbin City, Xiangfang District, Qunle Street No. 38, Unit 1, 3rd Floor, Room 18 Patentee after: Qiu Guoxiao Country or region after: China Address before: 610000 Sichuan Province, Mianyang City, Youxian High-tech Industrial Park, Wuli Liang Industrial Park, Kaimei Road No. 1 Patentee before: Sichuan Youpu Environmental Protection Technology Co.,Ltd. Country or region before: China |
|
| TR01 | Transfer of patent right |