CN220868763U - Stabilizing device for building construction and construction platform thereof - Google Patents

Stabilizing device for building construction and construction platform thereof Download PDF

Info

Publication number
CN220868763U
CN220868763U CN202322711938.1U CN202322711938U CN220868763U CN 220868763 U CN220868763 U CN 220868763U CN 202322711938 U CN202322711938 U CN 202322711938U CN 220868763 U CN220868763 U CN 220868763U
Authority
CN
China
Prior art keywords
rod assembly
screw rod
adjusting
screw
handed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202322711938.1U
Other languages
Chinese (zh)
Inventor
计诚
唐林林
周琴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhonghong Jinye Chengdu Construction Development Co ltd
Original Assignee
Suqian Xuanchen Intelligent Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suqian Xuanchen Intelligent Equipment Co ltd filed Critical Suqian Xuanchen Intelligent Equipment Co ltd
Priority to CN202322711938.1U priority Critical patent/CN220868763U/en
Application granted granted Critical
Publication of CN220868763U publication Critical patent/CN220868763U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model discloses a stabilizing device for building construction and a construction platform thereof, and relates to the technical field of building construction. According to the utility model, the triangular stable structure is molded between the bottom of the base body and the wall body through the matching of the left-handed rod assembly, the right-handed rod assembly, the spiral sleeve rod assembly and the adjusting assembly, so that the stability and the safety of the construction platform are improved.

Description

Stabilizing device for building construction and construction platform thereof
Technical Field
The utility model relates to the technical field of building construction, in particular to a stabilizing device for building construction and a construction platform thereof.
Background
When the house is constructed, different construction operations can use different building materials and construction tools, such as scaffolds and the like, when the building materials and the construction tools are transferred to different floors, a construction platform is arranged on the outer side wall of the building in advance so as to be used for placing the building materials and the construction tools, the construction platform is suspended and moved to the required floor through a tower crane, and the construction platform is mainly used as a base by channel steel and is fixed by pulling related tools such as steel ropes and the like so as to reduce the downward hanging stress of the platform.
Because traditional construction platform only relies on instrument such as wire rope to fix, leads to construction platform's bearing pressure lower, and construction platform generally hangs in the sky, leads to its steadiness and security to all be comparatively less good, and on the other hand, the length difference when different construction platforms encorbelment, the longer pressure that receives of length of hanging is bigger, only draws by wire rope to hang can't guarantee the security and the steadiness of platform, consequently need to improve.
Disclosure of utility model
The utility model provides a stabilizing device for building construction and a construction platform thereof, which are used for solving the problem that the longer the overhanging length of the construction platform is, the larger the pressure is, so that the safety and stability of the platform are poor.
In order to solve the technical problems, the utility model adopts the following technical scheme:
The utility model provides a stabilizer for construction and construction platform thereof, includes the base member, the one end and the wall body of base member are connected, and the other end encorbelments outside the wall body, the stay cord mechanism that is not less than one is installed respectively to the both sides of base member, the one end that the stay cord mechanism kept away from the base member is connected with the wall body respectively, the one end bottom both sides that the base member encorbelments outside the wall body are installed stabilizing mechanism respectively;
The stabilizing mechanism comprises a left-handed rod assembly and a right-handed rod assembly, and further comprises a spiral sleeve rod assembly for driving the left-handed rod assembly and the right-handed rod assembly to move oppositely or reversely, wherein an adjusting assembly is arranged at one end, far away from the spiral sleeve rod assembly, of the right-handed rod assembly, and the adjusting assembly is arranged on a wall body.
The technical scheme of the utility model is further improved as follows: the left-handed rod assembly comprises a left screw rod and a first hinging seat, one end of the left screw rod is in threaded connection with the screw sleeve rod assembly, the other end of the left screw rod is hinged with the first hinging seat, and the first hinging seat is mounted to the bottom of the base body through a bolt.
The technical scheme of the utility model is further improved as follows: the right-handed rod assembly comprises a right screw rod and a second hinging seat, one end of the right screw rod is in threaded connection with the screw sleeve rod assembly, the other end of the right screw rod is hinged with the second hinging seat, and the second hinging seat is mounted to the bottom of the base body through a bolt.
The technical scheme of the utility model is further improved as follows: the screw sleeve rod assembly comprises a hollow inner screw rod, two adjusting handles are symmetrically arranged on the outer circle of the hollow inner screw rod, two ends of the hollow inner screw rod are respectively connected with a first limit screw rod in a threaded mode, and one end of the first limit screw rod extends to the inside of the hollow inner screw rod and is respectively contacted with the left-handed rod assembly and the right-handed rod assembly.
The technical scheme of the utility model is further improved as follows: the adjusting component comprises an installation seat, a T-shaped groove is formed in the installation seat, a T-shaped sliding block is connected in the T-shaped groove in a sliding mode, the T-shaped sliding block is connected with a second hinging seat, an adjusting screw is installed in the T-shaped groove and is in threaded connection with the T-shaped sliding block, one end of the adjusting screw is rotationally connected with the bottom wall of the T-shaped groove, the other end of the adjusting screw extends to the outside of the installation seat and is fixedly connected with an adjusting hand wheel, and a limiting screw is connected with the second hinging seat on the adjusting hand wheel in a threaded mode.
The technical scheme of the utility model is further improved as follows: the pull rope mechanism comprises a steel wire rope, two ends of the steel wire rope are respectively connected with a fixed ring, one fixed ring is connected with the base body, and the other fixed ring is connected with the wall body.
The technical scheme of the utility model is further improved as follows: the base member is including two channel-section steel of symmetry installation, a plurality of crossbeam is installed to the interval between the channel-section steel, the fixed cassette that is not less than one is installed respectively to the one end that the crossbeam was kept away from to the channel-section steel, fixed cassette passes through the bolt fastening to the wallboard on, the one end that the fixed cassette was kept away from to the channel-section steel is connected with the connecting plate.
The utility model also provides a construction platform: the fixing device for building construction comprises a bottom plate and a fixing device for building construction, wherein the bottom plate is arranged at the top of a base body and is arranged at the position, overhanging the base body, outside a wall body, of the base body, and the top of the bottom plate is provided with a U-shaped baffle.
By adopting the technical scheme, compared with the prior art, the utility model has the following technical progress:
1. The utility model provides a stabilizing device for building construction and a construction platform thereof.
2. The utility model provides a stabilizing device for building construction and a construction platform thereof.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic view of a construction platform according to the present utility model;
FIG. 3 is a schematic view of a stabilizing mechanism according to the present utility model;
Fig. 4 is a schematic structural view of an adjusting assembly according to the present utility model.
In the figure: 10. a base; 20. a pull rope mechanism; 30. a stabilizing mechanism; 4. a bottom plate; 5. a U-shaped baffle;
11. channel steel; 12. a cross beam; 13. a fixing clamping seat; 14. a connecting plate;
21. a wire rope; 22. a fixing ring;
31. a left-handed rod assembly; 32. a right-handed lever assembly; 33. a screw rod assembly; 34. an adjustment assembly;
311. a left screw rod; 312. a hinge seat I;
321. a right screw rod; 322. a hinge seat II;
331. a hollow inner screw; 332. adjusting the handle; 333. a first limit screw;
341. A mounting base; 342. a T-shaped groove; 343. a T-shaped slider; 344. adjusting a screw; 345. an adjusting hand wheel; 346. and a limit screw II.
Detailed Description
The utility model is further illustrated by the following examples:
Example 1
As shown in fig. 1-4, the utility model provides a stabilizing device for building construction and a construction platform thereof, the stabilizing device comprises a base body 10, the base body 10 comprises two channel steel 11 which are symmetrically arranged, a plurality of cross beams 12 are arranged between the channel steel 11 at intervals, one end of each channel steel 11 far away from each cross beam 12 is respectively provided with at least one fixing clamping seat 13, the fixing clamping seats 13 are fixed to a wallboard through bolts, one end of each channel steel 11 far away from each fixing clamping seat 13 is connected with a connecting plate 14, one end of the base body 10 is connected with a wall body, the other end of each channel steel 11 is overhung outside the wall body, two sides of the base body 10 are respectively provided with at least one stay rope mechanism 20, one end of each stay rope mechanism 20 far away from the base body 10 is respectively connected with the wall body, each stay wire rope mechanism 20 comprises a steel wire rope 21, two ends of each steel wire rope 21 are respectively connected with a fixing ring 22, one fixing ring 22 is connected with the base body 10, one fixing ring 22 is connected with the wall body, two sides of one end of the base body 10 which overhung outside the wall body are respectively provided with a stabilizing mechanism 30, each stabilizing mechanism 30 comprises a left-handed rod assembly 31 and a right-handed rod assembly 32, the other end of the base body 10 is overhung, the stabilizing mechanism comprises a left-handed rod assembly 33 and a right-handed rod assembly 33, the right-handed rod assembly 33, and an adjusting sleeve assembly 33 is arranged on the wall body, and the end of the adjusting assembly 33, far away from the wall, and the adjusting assembly 34.
Furthermore, the channel steel 11 is preferably an i-shaped channel steel, the channel steel 11 is respectively connected with the cross beam 12 and the connecting plate 14 through bolts, the fixing clamping seat 13 is connected with the wallboard through bolts, and a wooden wedge can be installed between the fixing clamping seat 13 and the channel steel 11 to reduce the stress between the two, the fixing ring 22 is connected with the channel steel 11 in a bolt connection or welding mode, and the connection mode of the fixing ring 22 and the wall is preferably a bolt connection.
Example 2
As shown in fig. 1-4, on the basis of embodiment 1, the present utility model provides a technical solution: preferably, the left-handed rod assembly 31 comprises a left-handed rod 311 and a first hinge seat 312, one end of the left-handed rod 311 is in threaded connection with the screw sleeve assembly 33, the other end of the left-handed rod 311 is hinged with the first hinge seat 312, the first hinge seat 312 is mounted to the bottom of the base body 10 through a bolt, the right-handed rod assembly 32 comprises a right-handed rod 321 and a second hinge seat 322, one end of the right-handed rod 321 is in threaded connection with the screw sleeve assembly 33, the other end of the right-handed rod assembly is hinged with the second hinge seat 322, the second hinge seat 322 is mounted to the bottom of the base body 10 through a bolt, the screw sleeve assembly 33 comprises a hollow inner screw 331, two adjusting handles 332 are symmetrically mounted on the outer circle of the hollow inner screw 331, two ends of the hollow inner screw 331 are respectively in threaded connection with a first limit screw 333, one end of the limit screw 333 extends into the hollow inner screw 331, and is respectively in contact with the left-handed rod assembly 31 and the right-handed rod assembly 32, the adjusting assembly 34 comprises a mounting seat 341, a T-shaped groove 342 is formed in the mounting seat 341, the T-shaped groove 342 is slidably connected with the T-shaped slider 343, the T-shaped slider is connected with the second hinge seat 322, the adjusting screw 344 is rotatably connected with the outer end of the T-shaped screw 344, and the adjusting screw 344 is fixedly connected with the other end of the screw 344.
Further, the bottom of the channel steel 11 is provided with a plurality of mounting holes matched with the first hinge seat 312 in advance, so that the first hinge seat 312 is mounted through bolts, meanwhile, the first hinge seat 312 is mounted and adjusted through bolts according to the distance between the platforms, in addition, the mounting seat 341 is connected with the wall body through bolts, a worker rotates the hollow inner screw 331 through the adjusting handle 332 under the cooperation of the protection devices such as the scaffold on the outer side of the wall body, the left screw 311 and the right screw 321 are adjusted in opposite directions, when the length of the left screw 311 and the right screw 321 matched with the cantilever of the construction platform is to be adjusted, the left screw 311 and the right screw 321 are limited under the action of the limiting screw 333, so that the stability of the bottom of the platform is further improved, meanwhile, the worker drives the adjusting hand wheel 345 to rotate, and the adjusting screw 344 drives the T-shaped slide block 343 and the second hinge seat 322 to move up and down, so that the left screw assembly 31 and the base body 10 are assembled.
Example 3
As shown in fig. 1-4, on the basis of embodiment 1 or 2, the utility model also provides a construction platform, which comprises a bottom plate 4 and a stabilizing device for building construction, wherein the bottom plate 4 is arranged on the top of a base body 10 and is arranged at a position of the base body 10 overhanging the wall body, and a U-shaped baffle 5 is arranged on the top of the bottom plate 4.
Further, the bottom plate 4 is connected with the U-shaped baffle 5 by adopting a welding or bolting mode, and the bottom plate 4 is connected with the base body 10 by adopting a bolting mode, so that the disassembly is convenient, and the transportation of the tower crane is convenient.
The working principle of the stabilizing device for building construction and the construction platform thereof is specifically described below.
As shown in fig. 1 to 4, a constructor fits the tower crane to mount the channel steel 11 on the laminate of the corresponding floor, fix the end of the channel steel 11 under the action of the fixing clamping seat 13, mount the fixing ring 22 and the steel wire rope 21 to the corresponding position and height, then assemble the cross beam 12 and the connecting plate 14 one by one, then fit the protection devices such as the scaffold outside the wall body by the constructor, mount the stabilizing mechanism 30, mount the hinging seat one 312 and the prefabricated hole through the bolt according to the length of the channel steel 11, but the bolt needs to be in a semi-loose state, then rotate the hollow inner screw 331 through the adjusting handle 332, so that the left screw 311 and the right screw 321 are opposite or opposite to be adjusted, so that the mounting seat 341 is mounted to a proper height, after the mounting seat 341 is mounted, fine-adjust the hollow inner screw 331 and the adjusting screw 344, fasten the untwisted bolts, so as to adapt to the length of the stabilizing mechanism 30, form the triangle-shaped stabilizing structure at the bottom of the channel steel 11, finally mount the bottom plate 4 and the U-shaped baffle 5 to the inner tower crane, preferentially mount the bottom plate 4 and the cross beam 11, 12 and the U-shaped baffle 5, and mount the pull rope 20, and then mount the floor-shaped baffle 20 firmly.
The foregoing utility model has been generally described in great detail, but it will be apparent to those skilled in the art that modifications and improvements can be made thereto. Accordingly, it is intended to cover modifications or improvements within the spirit of the inventive concepts.

Claims (8)

1. The utility model provides a stabilizer for construction, includes base member (10), the one end and the wall connection of base member (10), the other end encorbelments outside the wall body, its characterized in that: the two sides of the base body (10) are respectively provided with at least one stay rope mechanism (20), one end, far away from the base body (10), of the stay rope mechanism (20) is respectively connected with a wall body, and two sides of the bottom of one end, overhanging the base body (10) outside the wall body, are respectively provided with a stabilizing mechanism (30);
The stabilizing mechanism (30) comprises a left-handed rod assembly (31) and a right-handed rod assembly (32), and further comprises a spiral sleeve rod assembly (33) for driving the left-handed rod assembly (31) and the right-handed rod assembly (32) to move oppositely or reversely, wherein an adjusting assembly (34) is installed at one end, far away from the spiral sleeve rod assembly (33), of the right-handed rod assembly (32), and the adjusting assembly (34) is installed on a wall body.
2. A stabilizer for building construction according to claim 1, wherein: the left-handed rod assembly (31) comprises a left screw rod (311) and a first hinging seat (312), one end of the left screw rod (311) is in threaded connection with the screw sleeve rod assembly (33), the other end of the left screw rod is hinged with the first hinging seat (312), and the first hinging seat (312) is mounted to the bottom of the base body (10) through a bolt.
3. A stabilizer for building construction according to claim 2, wherein: the right-handed rod assembly (32) comprises a right screw rod (321) and a second hinging seat (322), one end of the right screw rod (321) is in threaded connection with the screw sleeve rod assembly (33), the other end of the right screw rod is hinged with the second hinging seat (322), and the second hinging seat (322) is mounted to the bottom of the base body (10) through a bolt.
4. A stabilizer for building construction according to any of claim 1, wherein: the spiral sleeve rod assembly (33) comprises a hollow inner screw rod (331), two adjusting handles (332) are symmetrically arranged on the outer circle of the hollow inner screw rod (331), two ends of the hollow inner screw rod (331) are respectively connected with a first limiting screw rod (333) in a threaded mode, one end of the first limiting screw rod (333) extends to the inside of the hollow inner screw rod (331), and the first limiting screw rod is respectively contacted with the left-handed rod assembly (31) and the right-handed rod assembly (32).
5. A stabilizer for building construction according to claim 1, wherein: the adjusting component (34) comprises an installing seat (341), a T-shaped groove (342) is formed in the installing seat (341), a T-shaped sliding block (343) is connected in the T-shaped groove (342) in a sliding mode, the T-shaped sliding block (343) is connected with a hinge seat II (322), an adjusting screw (344) is installed in the T-shaped groove (342), the adjusting screw (344) is in threaded connection with the T-shaped sliding block (343), one end of the adjusting screw (344) is in rotary connection with the bottom wall of the T-shaped groove (342), the other end of the adjusting screw (344) extends to the outside of the installing seat (341) and is fixedly connected with an adjusting hand wheel (345), and a limiting screw II (346) is in threaded connection with the adjusting hand wheel (345).
6. A stabilizer for building construction according to claim 1, wherein: the stay cord mechanism (20) comprises a steel wire rope (21), two ends of the steel wire rope (21) are respectively connected with a fixed ring (22), one fixed ring (22) is connected with the base body (10), and the other fixed ring (22) is connected with a wall body.
7. A stabilizer for building construction according to claim 1, wherein: the base member (10) is including two channel-section steel (11) of symmetry installation, a plurality of crossbeam (12) are installed to interval between channel-section steel (11), fixed cassette (13) that is not less than one are installed respectively to the one end that crossbeam (12) were kept away from to channel-section steel (11), fixed cassette (13) are fixed to the wallboard through the bolt, the one end that fixed cassette (13) was kept away from to channel-section steel (11) is connected with connecting plate (14).
8. A construction platform, its characterized in that: a stabilizing device for building construction, comprising a bottom plate (4) and the stabilizing device for building construction according to any one of claims 1-7, wherein the bottom plate (4) is arranged at the top of a base body (10) and is arranged at a position of the base body (10) overhanging the wall body, and a U-shaped baffle (5) is arranged at the top of the bottom plate (4).
CN202322711938.1U 2023-10-10 2023-10-10 Stabilizing device for building construction and construction platform thereof Expired - Fee Related CN220868763U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322711938.1U CN220868763U (en) 2023-10-10 2023-10-10 Stabilizing device for building construction and construction platform thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322711938.1U CN220868763U (en) 2023-10-10 2023-10-10 Stabilizing device for building construction and construction platform thereof

Publications (1)

Publication Number Publication Date
CN220868763U true CN220868763U (en) 2024-04-30

Family

ID=90814495

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322711938.1U Expired - Fee Related CN220868763U (en) 2023-10-10 2023-10-10 Stabilizing device for building construction and construction platform thereof

Country Status (1)

Country Link
CN (1) CN220868763U (en)

Similar Documents

Publication Publication Date Title
US7021606B2 (en) Vertical panel lift
CN114517523B (en) Multi-layer air corridor for high-rise steel structure building and construction method thereof
CN105776092A (en) Stretching type basket device and construction method thereof
CN113931431B (en) Construction hanging basket for outdoor operation
CN220790180U (en) Externally hung wallboard connecting node
CN113309339B (en) Frame beam lower scaffold structure with complex structure
CN109779223B (en) Assembly type building external hanging platform
CN218124155U (en) Draw gear for laying indoor high-place cable
CN210013553U (en) Holding pole suitable for assembling transmission line iron tower
CN210237032U (en) Single inclined pulling type lifter
CN221165506U (en) Construction elevator beam structure and construction elevator
CN216471692U (en) Safety device
CN221168613U (en) Manual release lever operating means of hanging flower basket
CN222576102U (en) Cantilever balcony climbing frame reinforcement support device
CN113738130A (en) Large-inclined-plane curtain wall keel mounting device and construction method thereof
CN218375128U (en) Hanging flower basket for construction
CN215331325U (en) Lifting type scaffold for plastering exterior wall of house
CN223661326U (en) Be suitable for different slope sloping roof hanging flower basket installing support
CN223824568U (en) Adjustable front bracket rear drawknot hanging basket
CN220827124U (en) Cage of construction elevator
CN222797100U (en) ALC wall panel adjustment auxiliary installation tool
CN221070772U (en) Aerial disassembly device for crane boom of tower crane
CN222009561U (en) A lifting scaffolding wall support extension piece connection structure
CN222962433U (en) Mobile operating platform for high-altitude operations
CN223497521U (en) Steel construction building construction frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240419

Address after: No. 87, Rising, Huangjiaxi Village (19), Shengze Town, Wujiang District, Suzhou City, Jiangsu Province, 215000

Patentee after: Ji Cheng

Country or region after: China

Patentee after: Tang Linlin

Address before: No. 726, Shengde Business Building, Sucheng District, Suqian City, Jiangsu Province, 223800

Patentee before: Suqian Xuanchen Intelligent Equipment Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240606

Address after: No. 555, South Section of Fengxi Avenue, Jiangqu District, Chengdu City, Sichuan Province, 611130, Building 59, Annex 307

Patentee after: Zhonghong Jinye (Chengdu) Construction Development Co.,Ltd.

Country or region after: China

Address before: No. 87, Rising, Huangjiaxi Village (19), Shengze Town, Wujiang District, Suzhou City, Jiangsu Province, 215000

Patentee before: Ji Cheng

Country or region before: China

Patentee before: Tang Linlin

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20240430

CF01 Termination of patent right due to non-payment of annual fee