- CN220813671U CN220813671U CN202322184111.XU CN202322184111U CN220813671U CN 220813671 U CN220813671 U CN 220813671U CN 202322184111 U CN202322184111 U CN 202322184111U CN 220813671 U CN220813671 U CN 220813671U
- Authority
- CN
- China
- Prior art keywords
- layer
- section
- river
- system structure
- gabion
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Revetment (AREA)
Abstract
Description
技术领域Technical Field
本申请涉及河岸护坡技术领域,特别涉及一种用于河道治理的护岸系统结构。The present application relates to the technical field of river bank slope protection, and in particular to a bank protection system structure for river channel management.
背景技术Background technique
在城市周边的河道治理案例中,通常采用梯形断面和矩形断面来设计河道,通过该方式进行建设容易存在以下几点问题:In the case of river management around cities, trapezoidal and rectangular sections are usually used to design the river. The following problems are prone to occur when constructing in this way:
第一、河道空间较小,过水能力差,特别是当处于洪水期时,无法有效解决洪水灾害;First, the river channel is small and has poor water-passing capacity, especially during flood season, which makes it impossible to effectively solve flood disasters;
第二、该河道设计过于单调,人们无法亲近河道。Second, the design of the river is too monotonous, making it difficult for people to get close to the river.
因此,现有技术仍有待于改进。Therefore, the prior art still needs to be improved.
实用新型内容Utility Model Content
本申请的目的在于提供一种用于河道治理的护岸系统结构,以解决现有周边的河道治理通常采用梯形断面和矩形断面来设计河道,造成河道空间小,过水能力差,无法有效解决洪水期的洪水灾害,且人们无法亲近河道的问题。The purpose of this application is to provide a bank protection system structure for river management, so as to solve the problem that the existing surrounding river management usually adopts trapezoidal sections and rectangular sections to design the river, resulting in small river space and poor water-passing capacity, which cannot effectively solve flood disasters during flood season and people cannot get close to the river.
为实现上述目的,本申请实施例提供了一种用于河道治理的护岸系统结构,用于设置在河道边侧上,其特征在于,所述护岸系统结构包括沿河道边侧面向背离河道的方向上依次首尾连接的护脚段、干砌护坡段、亲水人行道段、景观绿化放坡段和人行慢行道段,所述护脚段、干砌护坡段、亲水人行道段、景观绿化放坡段和人行慢行道段呈阶梯状上升设置。To achieve the above-mentioned purpose, an embodiment of the present application provides a bank protection system structure for river channel management, which is used to be set on the side of the river channel, and is characterized in that the bank protection system structure includes a foot protection section, a dry-stone slope protection section, a hydrophilic sidewalk section, a landscape greening slope section and a pedestrian walkway section which are connected end to end in sequence along the side of the river channel in a direction facing away from the river channel, and the foot protection section, the dry-stone slope protection section, the hydrophilic sidewalk section, the landscape greening slope section and the pedestrian walkway section are arranged in a stepped ascending manner.
根据以上所述的用于河道治理的护岸系统结构,所述护脚段包括第一固定桩栏、第一碎石层和抛石层,所述第一固定桩栏固定于河道边侧面上,所述第一碎石层设置于所述第一固定桩栏的底部,所述抛石层设置于所述第一碎石层上,并覆盖所述第一固定桩栏。According to the bank protection system structure for river channel management described above, the toe protection section includes a first fixed pile fence, a first crushed stone layer and a riprap layer, the first fixed pile fence is fixed on the side surface of the river channel, the first crushed stone layer is arranged at the bottom of the first fixed pile fence, and the riprap layer is arranged on the first crushed stone layer and covers the first fixed pile fence.
根据以上所述的用于河道治理的护岸系统结构,所述干砌护坡段包括第二碎石层和干砌石层,所述第二碎石层设置于河道边侧面上,所述干砌石层设置于所述第二碎石层上。According to the bank protection system structure for river channel management described above, the dry-laid slope protection section includes a second crushed stone layer and a dry-laid stone layer, the second crushed stone layer is arranged on the side surface of the river channel, and the dry-laid stone layer is arranged on the second crushed stone layer.
根据以上所述的用于河道治理的护岸系统结构,所述亲水人行道段包括依次连接的第一石笼层和第二石笼层,所述第一石笼层和第二石笼层均设置于所述河道边侧面上,所述第一石笼层和所述第二石笼层呈阶梯状设置,所述第一石笼层和第二石笼层之间设置有第二固定桩栏。According to the above-mentioned bank protection system structure for river management, the hydrophilic sidewalk section includes a first gabion layer and a second gabion layer connected in sequence, the first gabion layer and the second gabion layer are both arranged on the side surface of the river channel, the first gabion layer and the second gabion layer are arranged in a stepped manner, and a second fixed pile fence is arranged between the first gabion layer and the second gabion layer.
根据以上所述的用于河道治理的护岸系统结构,所述景观绿化放坡段包括坡道固土复绿带,所述坡道固土复绿带包括植草格土层、草皮层,所述植草格土层设置于所述河道边侧面上,所述草皮层设置于所述植草格土层上,所述坡道固土复绿带与所述亲水人行道段之间设置有第三固定桩栏。According to the above-mentioned bank protection system structure for river channel management, the landscape greening slope section includes a slope soil consolidation and greening belt, and the slope soil consolidation and greening belt includes a grass grid soil layer and a turf layer. The grass grid soil layer is arranged on the side surface of the river channel, and the turf layer is arranged on the grass grid soil layer. A third fixed pile fence is arranged between the slope soil consolidation and greening belt and the hydrophilic sidewalk section.
根据以上所述的用于河道治理的护岸系统结构,所述人行慢行道段包括人行慢行带,所述人行慢行带包括第三碎石层、第一混凝土基层和透水沥青层,所述第三碎石层设置于所述河道边侧面上,所述第一混凝土基层设置于所述第三碎石层上,所述透水沥青层设置于所述第一混凝土基层上。According to the above-mentioned bank protection system structure for river management, the pedestrian slow lane section includes a pedestrian slow lane, and the pedestrian slow lane includes a third crushed stone layer, a first concrete base layer and a permeable asphalt layer. The third crushed stone layer is arranged on the side surface of the river channel, the first concrete base layer is arranged on the third crushed stone layer, and the permeable asphalt layer is arranged on the first concrete base layer.
根据以上所述的用于河道治理的护岸系统结构,所述干砌护坡段与所述护脚段之间的角度为145-165°。According to the bank protection system structure for river management described above, the angle between the dry-laid slope protection section and the foot protection section is 145-165°.
根据以上所述的用于河道治理的护岸系统结构,所述干砌护坡段与所述亲水人行道段之间的角度为195-215°。According to the above-mentioned bank protection system structure for river management, the angle between the dry-laid slope protection section and the hydrophilic sidewalk section is 195-215°.
根据以上所述的用于河道治理的护岸系统结构,所述亲水人行道段与所述坡道固土复绿带之间的角度为145-160°。According to the bank protection system structure for river management described above, the angle between the hydrophilic sidewalk section and the slope soil consolidation and greening belt is 145-160°.
根据以上所述的用于河道治理的护岸系统结构,所述景观绿化放坡段与所述人行慢行带之间的角度为225-245°。According to the above-mentioned bank protection system structure for river management, the angle between the landscape greening slope section and the pedestrian slow-moving zone is 225-245°.
本申请提供的用于河道治理的护岸系统结构的有益效果至少在于:The beneficial effects of the bank protection system structure for river management provided by the present application are at least:
本申请通过在河道的两个边侧上均设置护岸系统结构,并将护岸系统结构设计成依次连接、且呈阶梯状设置的护脚段、干砌护坡段、亲水人行道段、景观绿化放坡段和人行慢行道段,大大扩大了河道的容纳空间,提高了河道的过水能力,从而使得该河道能够有效解决洪水灾害,并且,本申请通过设置亲水人行道段,在避开洪水期时,人可以通过亲水人行道段与河道的水接触,提高了护岸系统结构的实用性,并且设置景观绿化放坡段,用于种植绿植,采用生态环保措施改善水环境,美化水景观,符合低碳、经济、人水和谐治理理念。The present application sets up a bank protection system structure on both sides of the river channel, and designs the bank protection system structure into a foot protection section, a dry-laid slope protection section, a hydrophilic sidewalk section, a landscape greening slope section and a pedestrian slow lane section that are connected in sequence and arranged in a stepped manner, thereby greatly expanding the accommodation space of the river channel and improving the water-passing capacity of the river channel, so that the river channel can effectively solve flood disasters. In addition, the present application sets up a hydrophilic sidewalk section, so that people can come into contact with the water of the river channel through the hydrophilic sidewalk section when avoiding flood periods, thereby improving the practicality of the bank protection system structure, and sets up a landscape greening slope section for planting green plants, adopts ecological and environmental protection measures to improve the water environment and beautify the water landscape, which is in line with the low-carbon, economic, and harmonious management concepts of man and water.
附图说明BRIEF DESCRIPTION OF THE DRAWINGS
为了更清楚地说明本申请实施例中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本申请的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
图1为本申请实施例提供的用于河道治理的护岸系统结构的结构示意图。FIG1 is a schematic structural diagram of a bank protection system structure for river management provided in an embodiment of the present application.
图2为图1的A处放大图。FIG. 2 is an enlarged view of point A in FIG. 1 .
图3为图1的B处放大图。FIG3 is an enlarged view of point B in FIG1 .
图4为图1的C处放大图。FIG. 4 is an enlarged view of point C in FIG. 1 .
图5为图1的D处放大图。FIG. 5 is an enlarged view of point D in FIG. 1 .
其中,图中各附图标记:Among them, the reference numerals in the figure are:
1、护脚段;11、第一固定桩栏;111、第一固定桩;12、第一碎石层;13、抛石层;2、干砌护坡段;21、第二碎石层;22、干砌石层;3、亲水人行道段;31、第一石笼层;311、立方体金属网格笼;312、石头;32、第二石笼层;33、第二固定桩栏;34、防漏布袋;35、沙子-砾石混合物;36、生根木本植物;4、景观绿化放坡段;41、坡道固土复绿带;411、植草格土层;412、草皮层;42、景观带;421、地被层;422、灌木;423、乔木;43、第三固定桩栏;5、人行慢行道段;51、人行慢行带;511、第三碎石层;512、第一混凝土基层;513、透水沥青层;52、临边带;521、勒杜鹃;53、斜坡带;531、银边草;54、安全防护带;541、第四固定桩栏;542、第四碎石层;543、第二混凝土基层;544、安全围栏;55、平道牙层;551、第三混凝土基层;552、道牙层。1. Foot protection section; 11. First fixed pile fence; 111. First fixed pile; 12. First crushed stone layer; 13. Riprap layer; 2. Dry-laid slope protection section; 21. Second crushed stone layer; 22. Dry-laid stone layer; 3. Water-friendly sidewalk section; 31. First gabion layer; 311. Cubic metal grid cage; 312. Stone; 32. Second gabion layer; 33. Second fixed pile fence; 34. Leak-proof cloth bag; 35. Sand-gravel mixture; 36. Rooted woody plants; 4. Landscape greening slope section; 41. Slope soil consolidation and greening belt; 411. Grass grid soil layer; 412. Turf layer; 42 , landscape belt; 421, ground cover layer; 422, shrubs; 423, trees; 43, third fixed stakes; 5, pedestrian slow lane section; 51, pedestrian slow lane; 511, third crushed stone layer; 512, first concrete base layer; 513, permeable asphalt layer; 52, edge strip; 521, rhododendron; 53, slope strip; 531, silver-edged grass; 54, safety protection belt; 541, fourth fixed stakes; 542, fourth crushed stone layer; 543, second concrete base layer; 544, safety fence; 55, flat curb layer; 551, third concrete base layer; 552, curb layer.
具体实施方式Detailed ways
为了使本申请所要解决的技术问题、技术方案及有益效果更加清楚明白,以下结合附图及实施例,对本申请进行进一步详细说明。应当理解,此处所描述的具体实施例仅用以解释本申请,并不用于限定本申请。In order to make the technical problems, technical solutions and beneficial effects to be solved by the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
需要说明的是,当部件被称为“固定于”或“设置于”另一个部件,它可以直接或者间接位于该另一个部件上。当一个部件被称为“连接于”另一个部件,它可以是直接或者间接连接至该另一个部件上。术语“上”、“下”、“左”、“右”、“前”、“后”、“竖直”、“水平”、“顶”、“底”、“内”、“外”等指示的方位或位置为基于附图所示的方位或位置,仅是为了便于描述,不能理解为对本技术方案的限制。术语“第一”、“第二”仅用于便于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明技术特征的数量。“多个”的含义是两个或两个以上,除非另有明确具体的限定。It should be noted that when a component is referred to as being "fixed on" or "disposed on" another component, it may be directly or indirectly located on the other component. When a component is referred to as being "connected to" another component, it may be directly or indirectly connected to the other component. The directions or positions indicated by the terms "upper", "lower", "left", "right", "front", "back", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc. are based on the directions or positions shown in the accompanying drawings and are only for the convenience of description and cannot be understood as limitations on the present technical solution. The terms "first" and "second" are only used for the convenience of description and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features. "Multiple" means two or more, unless otherwise clearly and specifically defined.
参阅图1,本实施例提供了一种用于河道治理的护岸系统结构,用于设置在河道边侧上,所述护岸系统结构包括沿河道边侧面向背离河道的方向上依次首尾连接的护脚段1、干砌护坡段2、亲水人行道段3、景观绿化放坡段4和人行慢行道段5,所述护脚段1、干砌护坡段2、亲水人行道段3、景观绿化放坡段4和人行慢行道段5呈阶梯状上升设置;Referring to FIG. 1 , this embodiment provides a bank protection system structure for river channel management, which is used to be arranged on the side of the river channel. The bank protection system structure includes a foot protection section 1, a dry slope protection section 2, a hydrophilic sidewalk section 3, a landscape greening slope section 4 and a pedestrian slow path section 5 which are sequentially connected end to end along the side of the river channel in a direction facing away from the river channel. The foot protection section 1, the dry slope protection section 2, the hydrophilic sidewalk section 3, the landscape greening slope section 4 and the pedestrian slow path section 5 are arranged in a stepped ascending manner;
本实施例通过在河道的两个边侧上均设置护岸系统结构,并将护岸系统结构设计成依次连接、且呈阶梯状设置的护脚段1、干砌护坡段2、亲水人行道段3、景观绿化放坡段4和人行慢行道段5,大大扩大了河道的容纳空间,提高了河道的过水能力,从而使得该河道能够有效解决洪水灾害,并且,本实施例通过设置亲水人行道段3,在避开洪水期时,人可以通过亲水人行道段3与河道的水接触,提高了护岸系统结构的实用性,并且设置景观绿化放坡段4,用于种植绿植,采用生态环保措施改善水环境,美化水景观,符合低碳、经济、人水和谐治理理念。This embodiment greatly expands the accommodation space of the river channel and improves the water-passing capacity of the river channel by setting up a bank protection system structure on both sides of the river channel, and designs the bank protection system structure to be a foot protection section 1, a dry-laid slope protection section 2, a hydrophilic sidewalk section 3, a landscape greening slope section 4 and a pedestrian slow lane section 5 which are connected in sequence and arranged in a stepped manner, so that the river channel can effectively solve flood disasters. In addition, this embodiment sets up a hydrophilic sidewalk section 3, so that people can contact the water of the river channel through the hydrophilic sidewalk section 3 when avoiding flood periods, thereby improving the practicality of the bank protection system structure, and sets up a landscape greening slope section 4 for planting green plants, adopts ecological and environmental protection measures to improve the water environment and beautify the water landscape, which is in line with the low-carbon, economic, and harmonious management concepts of human and water.
可选的,参阅图1和图2,所述护脚段1包括第一固定桩栏11、第一碎石层12和抛石层13,所述第一固定桩栏11是由多根第一固定桩111依次竖向排列并固定于河道边侧面上,所述第一固定桩111之间间隔设置,所述第一固定桩111可以为松木桩,所述第一碎石层12是通过多个级配碎石堆叠而成,所述第一碎石层12设置于所述第一固定桩栏11的底部,所述抛石层13的截面呈倒梯形,其是通过多个抛石堆叠而成,所述抛石层13设置于所述第一碎石层12上,并覆盖所述第一固定桩栏11;Optionally, referring to FIG. 1 and FIG. 2 , the foot guard section 1 includes a first fixed pile fence 11, a first crushed stone layer 12 and a riprap layer 13, the first fixed pile fence 11 is composed of a plurality of first fixed piles 111 arranged vertically in sequence and fixed on the side surface of the river channel, the first fixed piles 111 are arranged at intervals, the first fixed piles 111 can be pine piles, the first crushed stone layer 12 is formed by stacking a plurality of graded crushed stones, the first crushed stone layer 12 is arranged at the bottom of the first fixed pile fence 11, the cross section of the riprap layer 13 is inverted trapezoidal, which is formed by stacking a plurality of ripraps, the riprap layer 13 is arranged on the first crushed stone layer 12, and covers the first fixed pile fence 11;
其中,所述第一固定桩111的桩长可以为5m,其尾径不小于60mm,横向间距可以为500mm,纵向间距可以为600mm,所述第一碎石层12厚度可以为300mm,所述抛石层13的厚度可以为1000mm。The first fixed piles 111 may have a length of 5 m, a tail diameter of not less than 60 mm, a lateral spacing of 500 mm, a longitudinal spacing of 600 mm, a thickness of the first crushed stone layer 12 of 300 mm, and a thickness of the riprap layer 13 of 1000 mm.
可选的,参阅图1,所述干砌护坡段2与所述护脚段1之间的角度可以为145-165°。Optionally, referring to FIG. 1 , the angle between the dry-laid slope protection section 2 and the foot protection section 1 may be 145-165°.
可选的,参阅图1,所述干砌护坡段2包括第二碎石层21和干砌石层22,所述第二碎石层21是通过多个级配碎石堆叠而成,所述第二碎石层21设置于河道边侧面上,所述干砌石层22是通过多个干砌石堆叠而成,所述干砌石层22设置于所述第二碎石层21上;Optionally, referring to FIG1 , the dry-laid slope protection section 2 includes a second crushed stone layer 21 and a dry-laid stone layer 22, wherein the second crushed stone layer 21 is formed by stacking a plurality of graded crushed stones, and the second crushed stone layer 21 is arranged on the side surface of the river channel, and the dry-laid stone layer 22 is formed by stacking a plurality of dry-laid stones, and the dry-laid stone layer 22 is arranged on the second crushed stone layer 21;
其中,所述第二碎石层21的厚度可以为300mm,所述干砌石层22可以为600mm。The thickness of the second crushed stone layer 21 may be 300 mm, and the thickness of the dry stone layer 22 may be 600 mm.
可选的,参阅图1和图3,所述亲水人行道段3包括依次连接的第一石笼层31和第二石笼层32,所述第一石笼层31和第二石笼层32均是由多个石头312的立方体金属网格笼311依次并排连接而成,所述第一石笼层31和第二石笼层32均设置于所述河道边侧靠近干砌护坡段2的第一平面上,所述第一石笼层31和第二石笼层32呈阶梯状设置,其中,所述第一石笼层31的顶部到所述第一平面的距离大于所述第二石笼层32的顶部到所述第一平面的距离,所述第一石笼层31和第二石笼层32之间设置有第二固定桩栏33,所述第二固定桩栏33是由多根第二固定桩依次竖向排列并固定于河道边侧面上,所述第二固定桩可以为松木桩;Optionally, referring to Figures 1 and 3, the hydrophilic sidewalk section 3 includes a first gabion layer 31 and a second gabion layer 32 connected in sequence, the first gabion layer 31 and the second gabion layer 32 are both formed by a plurality of cubic metal mesh cages 311 of stones 312 connected in sequence side by side, the first gabion layer 31 and the second gabion layer 32 are both arranged on a first plane near the dry-laid slope protection section 2 on the side of the river channel, the first gabion layer 31 and the second gabion layer 32 are arranged in a stepped manner, wherein the distance from the top of the first gabion layer 31 to the first plane is greater than the distance from the top of the second gabion layer 32 to the first plane, a second fixed pile fence 33 is arranged between the first gabion layer 31 and the second gabion layer 32, the second fixed pile fence 33 is composed of a plurality of second fixed piles arranged vertically in sequence and fixed on the side surface of the river channel, and the second fixed piles can be pine piles;
其中,所述立方体金属网格笼311可以采用直径4-5mm,抗张强度450N/㎡,网格密度100*100mm,维度为1000*1000*1000mm,并由镀锌钢丝制成的网格笼,石头312可以选择当地自然石块或者混凝土碎块,石头312的平均粒径可以为150-200mm。The cubic metal mesh cage 311 may be a mesh cage made of galvanized steel wire with a diameter of 4-5 mm, a tensile strength of 450 N/㎡, a mesh density of 100*100 mm, a dimension of 1000*1000*1000 mm, and a stone 312 may be selected from local natural stones or concrete fragments, and the average particle size of the stone 312 may be 150-200 mm.
进一步的,参阅图3,所述第一石笼层31和所述第二石笼层32内均设置有种植槽(图中未示出),所述种植槽内设置有防漏布袋34,所述防漏布袋34可以为土工布袋,所述防漏布袋34设置有沙子-砾石混合物35,本实施例可以通过该种植槽种植绿植,例如可以种植生根木本植物36,其中,沙子-砾石混合物35的粒径可以为0-200mm,土工布袋选择聚丙烯土工布袋,生根木本植物36可以选择绿萝/合果芋/龟背竹等。Further, referring to Figure 3, planting troughs (not shown in the figure) are provided in the first gabion layer 31 and the second gabion layer 32, and leak-proof bags 34 are provided in the planting troughs. The leak-proof bags 34 can be geotextile bags, and the leak-proof bags 34 are provided with sand-gravel mixture 35. In this embodiment, green plants can be planted through the planting troughs, for example, rooted woody plants 36 can be planted, wherein the particle size of the sand-gravel mixture 35 can be 0-200mm, and the geotextile bag is a polypropylene geotextile bag, and the rooted woody plant 36 can select Pothos/Syngonium/Monstera, etc.
可选的,参阅图1和图3,所述干砌护坡段2与所述亲水人行道段3之间的角度可以为195-215°。Optionally, referring to FIG. 1 and FIG. 3 , the angle between the dry-laid slope protection section 2 and the hydrophilic sidewalk section 3 may be 195-215°.
可选的,参阅图1和图3,所述景观绿化放坡段4包括坡道固土复绿带41,所述坡道固土复绿带41包括植草格土层411、草皮层412,所述植草格土层411是将植草格装满土而形成的,所述植草格设置于所述河道边侧面上,所述草皮层412是由植物草皮种植形成,所述草皮层412设置于所述植草格土层411上,草皮层412的植物草皮可以选择大叶油草/马尼拉草/台湾草满铺,植草格可以选择规格为1000*1000*30mm满铺,所述景观绿化放坡段4与所述亲水人行道段3之间设置有第三固定桩栏43,所述第三固定桩栏43是由多根第三固定桩依次竖向排列并固定于河道边侧面上,所述第三固定桩可以为松木桩,其露土可以为300-500mm,桩长可以为1000mm。Optionally, referring to Figures 1 and 3, the landscape greening slope section 4 includes a slope soil consolidation and greening belt 41, and the slope soil consolidation and greening belt 41 includes a grass grid soil layer 411 and a turf layer 412. The grass grid soil layer 411 is formed by filling the grass grid with soil, and the grass grid is arranged on the side of the river channel. The turf layer 412 is formed by planting plant turf, and the turf layer 412 is arranged on the grass grid soil layer 411. The plant turf of the turf layer 412 can be You can choose to fully spread large-leaf oil grass/Manila grass/Taiwan grass, and the grass grid can choose a specification of 1000*1000*30mm. A third fixed pile fence 43 is arranged between the landscape greening slope section 4 and the hydrophilic sidewalk section 3. The third fixed pile fence 43 is composed of multiple third fixed piles arranged vertically in sequence and fixed on the side of the river channel. The third fixed pile can be a pine pile, the exposed soil can be 300-500mm, and the pile length can be 1000mm.
进一步的,参阅图1和图4,所述景观绿化放坡段4还包括景观带42,所述景观带42设置于所述坡道固土复绿带41背离所述亲水人行道段3的一侧,并与所述坡道固土复绿带41连接,所述景观带42包括地被层421,灌木422和乔木423,所述灌木422和乔木423均设置于所述地被层421上,其中,所述灌木422可以选择品种为勒杜鹃521/大红花/软枝黄婵/红花檵木,规格600*600*500mm,地被层421的地被可以选择品种鸢尾/蜘蛛兰,所述乔木423可以选择品种为串钱柳/黄花风铃木,单排种植,株间距≥3000mm。Further, referring to Figures 1 and 4, the landscape greening slope section 4 also includes a landscape belt 42, which is arranged on the side of the slope soil consolidation and greening belt 41 away from the hydrophilic sidewalk section 3 and is connected to the slope soil consolidation and greening belt 41. The landscape belt 42 includes a ground cover layer 421, shrubs 422 and trees 423. The shrubs 422 and trees 423 are all arranged on the ground cover layer 421, wherein the shrubs 422 can be selected from varieties such as Rhododendron 521/Big Red Flower/Soft-branched Yellow Chan/Red Flowered Loropetalum, with specifications of 600*600*500mm, the ground cover of the ground cover layer 421 can be selected from varieties such as Iris/Spider Orchid, and the trees 423 can be selected from varieties such as Salix babylonica/Yellow Bell Tree, planted in a single row, with a plant spacing of ≥3000mm.
可选的,参阅图3,所述亲水人行道段3与所述坡道固土复绿带41之间的角度可以为145-160°。Optionally, referring to FIG. 3 , the angle between the hydrophilic sidewalk section 3 and the slope soil consolidation and greening belt 41 may be 145-160°.
可选的,参阅图1和图5,所述人行慢行道段5包括人行慢行带51,所述人行慢行带51设置于所述河道边侧靠近景观带42的第二平面上,所述人行慢行带51包括第三碎石层511、第一混凝土基层512和透水沥青层513,所述第三碎石层511是通过多个级配碎石堆叠而成,所述第三碎石层511设置于所述河道边侧面上,所述第一混凝土基层512设置于所述第三碎石层511上,所述透水沥青层513设置于所述第一混凝土基层512上;Optionally, referring to FIG. 1 and FIG. 5 , the pedestrian slow lane section 5 includes a pedestrian slow lane 51, and the pedestrian slow lane 51 is arranged on the second plane near the landscape belt 42 on the side of the river channel, and the pedestrian slow lane 51 includes a third crushed stone layer 511, a first concrete base layer 512 and a permeable asphalt layer 513, and the third crushed stone layer 511 is formed by stacking a plurality of graded crushed stones, and the third crushed stone layer 511 is arranged on the side of the river channel, and the first concrete base layer 512 is arranged on the third crushed stone layer 511, and the permeable asphalt layer 513 is arranged on the first concrete base layer 512;
其中,所述第三碎石层511的厚度可以为300mm,所述第一混凝土基层512的厚度可以为350mm,所述透水沥青层513的厚度可以为100mm。The thickness of the third crushed stone layer 511 may be 300 mm, the thickness of the first concrete base layer 512 may be 350 mm, and the thickness of the permeable asphalt layer 513 may be 100 mm.
可选的,参阅图1和图5,所述人行慢行道段5还包括临边带52和斜坡带53,所述临边带52设置于所述河道边侧靠近人行慢行带51的第三平面上,所述临边带52种植有绿植,例如可以种植勒杜鹃521,所述斜坡带53设置于所述临边带52背离所述人行慢行带51的一侧,所述斜坡带53可以为不大于1:2.5的自然放坡,其临边用粘土回填,并在粘土上种植银边草531用于固土。Optionally, referring to Figures 1 and 5, the pedestrian slow lane section 5 also includes an edge strip 52 and a slope strip 53. The edge strip 52 is arranged on a third plane on the side of the river channel close to the pedestrian slow lane 51. The edge strip 52 is planted with green plants, for example, Rhododendron 521 can be planted. The slope strip 53 is arranged on the side of the edge strip 52 away from the pedestrian slow lane 51. The slope strip 53 can be a natural slope of not more than 1:2.5, and its edge is backfilled with clay, and silver grass 531 is planted on the clay for soil consolidation.
可选的,参阅图1和图4,所述人行慢行带51与所述景观带42之间设置有安全防护带54,所述安全防护带54包括第四固定桩栏541、第四碎石层542、第二混凝土基层543和安全围栏544,所述第四固定桩栏541是由多根第四固定桩依次竖向排列并固定于河道边侧面上,所述第四固定桩可以为管桩,所述第四碎石层542是通过多个级配碎石堆叠而成,其设置于第四固定桩栏541上,所述第二混凝土基层543设置于所述第四碎石层542上,所述安全围栏544设置于所述第二混凝土基层543上;Optionally, referring to FIG. 1 and FIG. 4 , a safety belt 54 is provided between the pedestrian slow-moving belt 51 and the landscape belt 42, and the safety belt 54 includes a fourth fixed pile fence 541, a fourth crushed stone layer 542, a second concrete base layer 543 and a safety fence 544, the fourth fixed pile fence 541 is composed of a plurality of fourth fixed piles arranged vertically in sequence and fixed on the side surface of the river channel, the fourth fixed piles can be pipe piles, the fourth crushed stone layer 542 is formed by stacking a plurality of graded crushed stones, which is arranged on the fourth fixed pile fence 541, the second concrete base layer 543 is arranged on the fourth crushed stone layer 542, and the safety fence 544 is arranged on the second concrete base layer 543;
其中,所述第四固定桩的桩长可以为6000mm,所述第四碎石层542的厚度可以为300mm,所述第二混凝土基层543的厚度可以为500mm,所述安全围栏544的高度可以为1000mm。The length of the fourth fixed pile may be 6000 mm, the thickness of the fourth gravel layer 542 may be 300 mm, the thickness of the second concrete base layer 543 may be 500 mm, and the height of the safety fence 544 may be 1000 mm.
可选的,参阅图1和图5,所述人行慢行带51与所述临边带52之间设置有平道牙层55,所述平道牙层55包括第三混凝土基层551和道牙层552,所述第三混凝土基层551设置于所述河道边侧面上,所述道牙层552设置于所述第三混凝土基层551上,其中,所述道牙层552可以为花岗岩层,其规格可以为300*600*600mm,所述第三混凝土基层551可以采用C20混凝土建造而成。Optionally, referring to Figures 1 and 5, a flat curb layer 55 is arranged between the pedestrian slow-moving belt 51 and the adjacent belt 52, and the flat curb layer 55 includes a third concrete base layer 551 and a curb layer 552. The third concrete base layer 551 is arranged on the side surface of the river channel, and the curb layer 552 is arranged on the third concrete base layer 551, wherein the curb layer 552 can be a granite layer, and its specifications can be 300*600*600mm, and the third concrete base layer 551 can be constructed of C20 concrete.
本实施例利用竖向支撑的桩类结构(第一固定桩栏11等)与刚性护坡结构相结合,并建设为护脚段1、干砌护坡段2、亲水人行道段3、景观绿化放坡段4和人行慢行道段5,其中,人行慢行道段5形成了第一级竖向加固安全防护带54,景观绿化放坡段4形成了第二级竖向加固安全防护带54,亲水人行道段3形成了加固阶梯风光带,干砌护坡段2形成了水生物和两栖动物生长带,护脚段1形成了河道底部加固带,本实施例通过分段分层布置,既提高了河道的过水能力和防冲能力,又满足河道护岸的坚固性,从生态修复角度来说,本实施例使用的级配碎石能够更好地融入自然保护河道的水生态环境;级配碎石之间的间隙有利于河道水生植物、苔藓和草木植物的生长,改善河道的自净能力,维护水生态环境。整体来说,本复式断面的设计有利于河道中水生物和两栖动物的生长,具有一定的生态性且河滩地也能开发为景观休闲区域,具有较强的景观性。The present embodiment utilizes a combination of a vertically supported pile structure (a first fixed pile fence 11, etc.) and a rigid slope protection structure, and is constructed into a foot protection section 1, a dry-laid slope protection section 2, a hydrophilic sidewalk section 3, a landscape greening slope section 4 and a pedestrian and slow sidewalk section 5, wherein the pedestrian and slow sidewalk section 5 forms a first-level vertical reinforcement safety protection belt 54, the landscape greening slope section 4 forms a second-level vertical reinforcement safety protection belt 54, the hydrophilic sidewalk section 3 forms a reinforced stepped scenery belt, the dry-laid slope protection section 2 forms a growth belt for aquatic organisms and amphibians, and the foot protection section 1 forms a river bottom reinforcement belt. The present embodiment improves the water-passing capacity and anti-scouring capacity of the river channel and satisfies the firmness of the river bank through segmented and layered arrangement. From the perspective of ecological restoration, the graded gravel used in the present embodiment can better integrate into the water ecological environment of the naturally protected river channel; the gaps between the graded gravel are conducive to the growth of aquatic plants, mosses and herbaceous plants in the river channel, improves the self-purification capacity of the river channel, and maintains the water ecological environment. In general, the design of this complex section is conducive to the growth of aquatic organisms and amphibians in the river, has certain ecological characteristics, and the river beach can also be developed into a landscape leisure area with strong landscape characteristics.
综上所述,本申请提供了一种用于河道治理的护岸系统结构,用于设置在河道边侧上,所述护岸系统结构包括沿河道边侧面向背离河道的方向上依次首尾连接的护脚段1、干砌护坡段2、亲水人行道段3、景观绿化放坡段4和人行慢行道段5,所述护脚段1、干砌护坡段2、亲水人行道段3、景观绿化放坡段4和人行慢行道段5呈阶梯状上升设置,本申请通过在河道的两个边侧上均设置护岸系统结构,并将护岸系统结构设计成依次连接、且呈阶梯状设置的护脚段1、干砌护坡段2、亲水人行道段3、景观绿化放坡段4和人行慢行道段5,大大扩大了河道的容纳空间,提高了河道的过水能力,从而使得该河道能够有效解决洪水灾害,并且,本申请通过设置亲水人行道段3,在避开洪水期时,人可以通过亲水人行道段3与河道的水接触,提高了护岸系统结构的实用性,并且设置景观绿化放坡段4,用于种植绿植,采用生态环保措施改善水环境,美化水景观,符合低碳、经济、人水和谐治理理念。In summary, the present application provides a bank protection system structure for river channel management, which is used to be arranged on the side of the river channel. The bank protection system structure includes a foot protection section 1, a dry-laid slope protection section 2, a hydrophilic sidewalk section 3, a landscape greening slope section 4 and a pedestrian slow path section 5, which are sequentially connected end to end along the side of the river channel in a direction facing away from the river channel. The foot protection section 1, the dry-laid slope protection section 2, the hydrophilic sidewalk section 3, the landscape greening slope section 4 and the pedestrian slow path section 5 are arranged in a stepped ascending manner. The present application arranges the bank protection system structure on both sides of the river channel, and designs the bank protection system structure to be sequentially connected and in a stepped manner. The foot protection section 1, dry-laid slope protection section 2, hydrophilic sidewalk section 3, landscape greening slope section 4 and pedestrian slow lane section 5 have greatly expanded the accommodation space of the river channel and improved the water-passing capacity of the river channel, so that the river channel can effectively solve flood disasters. In addition, the present application has improved the practicality of the bank protection system structure by setting up the hydrophilic sidewalk section 3, so that people can come into contact with the water of the river channel through the hydrophilic sidewalk section 3 when avoiding flood periods, and has set up the landscape greening slope section 4 for planting green plants, adopting ecological and environmental protection measures to improve the water environment and beautify the water landscape, which is in line with the low-carbon, economic and harmonious management concepts of man and water.
以上所述仅为本申请的较佳实施例而已,并不用以限制本申请,凡在本申请的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本申请的保护范围之内。The above description is only a preferred embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present application should be included in the protection scope of the present application.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202322184111.XU CN220813671U (en) | 2023-08-14 | 2023-08-14 | A bank protection system structure for river management |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202322184111.XU CN220813671U (en) | 2023-08-14 | 2023-08-14 | A bank protection system structure for river management |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN220813671U true CN220813671U (en) | 2024-04-19 |
Family
ID=90706909
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202322184111.XU Active CN220813671U (en) | 2023-08-14 | 2023-08-14 | A bank protection system structure for river management |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN220813671U (en) |
-
2023
- 2023-08-14 CN CN202322184111.XU patent/CN220813671U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR100917790B1 (en) | Grid-shaped hollow block for ecological restoration of dike and construction method of dike using them | |
| CN101649608B (en) | Ecological slope protection structure | |
| CN113737723A (en) | Ecological bank protection device and ecological bank protection method | |
| CN202989856U (en) | Ecological riverway system of hydraulic engineering | |
| CN105248385B (en) | A kind of ecological catching method of mountain stream small fishes | |
| CN207633300U (en) | A kind of Gullied Rolling Loess Region mud-stone flow disaster recycling control structure | |
| CN220813671U (en) | A bank protection system structure for river management | |
| CN202148529U (en) | Novel rubber turf slope-protecting device | |
| KR200461490Y1 (en) | Vegetation Mat | |
| CN210049195U (en) | Revetment bank protection module device | |
| CN107585866A (en) | An underwater sand-retaining ridge constructed with porous concrete and a method for intercepting and controlling algae | |
| CN218060149U (en) | Coastal zone ecological remediation bank protection structure | |
| CN214301547U (en) | A kind of ecological slope protection for soil slope self-dissipation and orderly drainage | |
| CN215925860U (en) | A composite structure of landfill straw and grain workshop for ecological management of erosion ditch | |
| CN215562318U (en) | Ecological bank protection | |
| CN215593889U (en) | Ecological revetment structure suitable for urban river | |
| CN213358503U (en) | Natural bank slope protective structure based on sponge city idea | |
| CN213061572U (en) | Landscape road bed course | |
| CN1200172C (en) | Composite silt dam engineering technology | |
| CN210507515U (en) | A greening gravity retaining wall | |
| CN208235679U (en) | The landscape effect lifting system of falling zone | |
| RU2373329C1 (en) | Culvert under bank | |
| CN220813664U (en) | Ecological frame of artificial fish reef and ecological transformation system of seawall | |
| CN115162269B (en) | Ecological box applied to reconstruction of vertical hard revetment and ecological restoration method of hard revetment | |
| CN110424424A (en) | Debris Flow on Slope Surface control structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| PP01 | Preservation of patent right | ||
| PP01 | Preservation of patent right |