CN220772610U - Wisdom mine geological survey sampling device - Google Patents

Wisdom mine geological survey sampling device Download PDF

Info

Publication number
CN220772610U
CN220772610U CN202322147858.8U CN202322147858U CN220772610U CN 220772610 U CN220772610 U CN 220772610U CN 202322147858 U CN202322147858 U CN 202322147858U CN 220772610 U CN220772610 U CN 220772610U
Authority
CN
China
Prior art keywords
plate
mine geological
geological survey
survey sampling
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322147858.8U
Other languages
Chinese (zh)
Inventor
袁涛
王国义
吕成梅
张润
刘世坤
李思雨
陈浩然
程昊
张勋胜
王慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Haisuanchengfeng Technology Co ltd
Original Assignee
Anhui Technical College of Mechanical and Electrical Engineering
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Technical College of Mechanical and Electrical Engineering filed Critical Anhui Technical College of Mechanical and Electrical Engineering
Priority to CN202322147858.8U priority Critical patent/CN220772610U/en
Application granted granted Critical
Publication of CN220772610U publication Critical patent/CN220772610U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sampling And Sample Adjustment (AREA)

Abstract

本实用新型涉及矿山地质勘查辅助设备技术领域,尤其涉及一种智慧矿山地质勘查取样装置。其技术方案包括:第一侧板,所述第一侧板通过连接板与第二侧板连接,且第一侧板和第二侧板分别安装在支撑板的上表面两侧,所述连接板的表面开设有螺纹孔,所述螺纹孔内安装有中空转轴,所述中空转轴的顶端贯穿升降板表面中心位置上的第二密封轴承,所述中空转轴的内部从上到下依次设置有第一密封轴承、出料罩和第二螺旋叶片,所述出料罩的顶端设置有出料管,且出料管的另一端贯穿第一密封轴承并延伸到外部。本实用新型不仅便于工作人员控制矿山地质勘查取样的深度,还便于收集矿山地质钻取所出的物料,便于后续工作人员对物料进行勘查,实用性强。

The utility model relates to the technical field of mine geological exploration auxiliary equipment, and in particular to a smart mine geological exploration sampling device. Its technical solution includes: a first side plate, the first side plate is connected to the second side plate through a connecting plate, and the first side plate and the second side plate are respectively installed on both sides of the upper surface of the support plate, the surface of the connecting plate is provided with a threaded hole, a hollow shaft is installed in the threaded hole, the top end of the hollow shaft passes through the second sealed bearing at the center position of the lifting plate surface, the interior of the hollow shaft is sequentially provided with a first sealed bearing, a discharge cover and a second spiral blade from top to bottom, the top of the discharge cover is provided with a discharge pipe, and the other end of the discharge pipe passes through the first sealed bearing and extends to the outside. The utility model is not only convenient for the staff to control the depth of mine geological exploration sampling, but also convenient for collecting materials produced by mine geological drilling, and convenient for subsequent staff to explore the materials, and has strong practicality.

Description

Wisdom mine geological survey sampling device
Technical Field
The utility model relates to the technical field of auxiliary equipment for mine geological exploration, in particular to a sampling device for intelligent mine geological exploration.
Background
The mine geological sampling refers to the general term that a certain sample is collected from ore bodies, surrounding rocks and mine products according to certain specification requirements, and the whole work such as testing, testing or identifying is performed after the sample is processed. The rock sampling device aims at researching mineral quality, physical and chemical properties of ores and surrounding rocks, adding technical properties to ores, mining conditions of deposits and the like, providing data for mineral deposit evaluation, calculation of reserves, and comprehensive utilization of geology, mining, ore dressing, minerals and the like, and using the sampling device when sampling the geology of the mine, so that the existing rock sampling device is continuously innovated and developed.
Through retrieving, patent publication number CN217878376U discloses a mining geology is with investigation sampling device in the soil, including the diaphragm, four angles in the bottom of diaphragm are fixed with the urceolus, the inside sliding connection of urceolus has the guide arm, the bottom of guide arm is fixed with the base, be fixed with the barrel in the middle of the top of base, the top of barrel rotates and is connected with first helical gear, the inside of barrel is equipped with the lead screw, fixedly connected with crossbearer between the barrel at both ends, the top both ends of crossbearer are fixed with the pedestal, the inner wall surface rotation of pedestal is connected with the second helical gear, fixedly connected with axostylus axostyle between the second helical gear, wherein the outer wall rotation of one end pedestal is connected with the commentaries on classics handle, the staff has been solved and is needed constantly to strike rock to it in geological rock sampling process, then take a sample, this kind of sampling mode is long in time consuming time, meet the rock that hardness is higher rock sample is just very difficult, can consume a large amount of time's problem.
When current mine geology investigation sampling equipment carries out the sample operation to the mine geology, the degree of depth of the difficult control mine geology investigation sample of staff, and the material that equipment bore out is scattered all around, is inconvenient for collecting the material that the mine geology bore out, causes the material of different degree of depth to scatter, is inconvenient for follow-up staff to carry out the investigation operation to the material, and for this reason we propose an wisdom mine geology investigation sampling device and solve current problem.
Disclosure of Invention
The utility model aims to provide an intelligent mine geological exploration sampling device, which aims to solve the problems in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a wisdom mine geological survey sampling device, includes first curb plate, first curb plate passes through the connecting plate and is connected with the second curb plate, and first curb plate and second curb plate are installed respectively in the upper surface both sides of backup pad, threaded hole has been seted up on the surface of connecting plate, hollow shaft is installed to the screw hole, the top of hollow shaft runs through the second sealed bearing on the lifter plate surface central point put, the inside from the top down of hollow shaft has set gradually first sealed bearing, ejection of compact cover and second helical blade, the top of ejection of compact cover is provided with the discharging pipe, and the other end of discharging pipe runs through first sealed bearing and extends to outside, lower surface one side of lifter plate is provided with infrared ranging sensor, gear motor is installed to upper surface one side of lifter plate, the bottom of hollow shaft is connected with the drill bit through the connecting rod, install first helical blade on the outer wall of drill bit.
When a worker performs investigation sampling on mine geology, the worker enables the utility model to be fixed at a position to be subjected to investigation sampling, the worker starts the utility model, the gear motor can indirectly drive the hollow rotating shaft to rotate, the hollow rotating shaft rotates to drive the drill bit, the first helical blade and the second helical blade to rotate, the external threads on the outer wall of the hollow rotating shaft are in threaded engagement connection with the threaded holes on the connecting plate, so that the hollow rotating shaft can make the hollow rotating shaft move upwards or downwards when the hollow rotating shaft rotates forwards or reversely, the hollow rotating shaft moves upwards or downwards to drive the drill bit to drill the position to be subjected to investigation sampling, in the drilling process, the infrared ranging sensor detects the distance between the lifting plate and the connecting plate in real time, and the worker can confirm the depth of the drill bit to the position to be subjected to investigation sampling according to the distance between the lifting plate and the connecting plate.
Preferably, an external thread is arranged on the outer wall of the hollow rotating shaft, and the external thread on the outer wall of the hollow rotating shaft is in threaded engagement connection with the threaded hole on the connecting plate.
Preferably, the sliding blocks are arranged on the outer walls of two sides of the lifting plate, the other ends of the sliding blocks are arranged on the sliding rails, the sliding blocks are in sliding connection with the sliding rails, and the sliding rails are arranged on the outer walls of one sides of the first side plate and the second side plate.
Preferably, a driving gear is mounted on the output shaft of the gear motor, the driving gear is connected with a driven gear in a meshed mode, and the driven gear is mounted above the outer wall of the hollow rotating shaft.
Preferably, through holes are formed in the center of the surface of the supporting plate, and fixed inserting rods are arranged at four corners of the lower surface of the supporting plate.
Preferably, a control box and a U-shaped handle are arranged on the outer wall of the other side of the second side plate, and the control box is positioned above the U-shaped handle.
Preferably, the front end face of the control box is provided with a USB charging interface and a power indicator, and the USB charging interface is located above the power indicator.
Preferably, a display screen and a control panel are arranged on the outer wall of one side of the control box, the display screen is positioned above the control panel, a control button is arranged on the control panel, and an A/D conversion module, a controller and a storage battery are arranged in the control box.
Preferably, the output end of the infrared ranging sensor is electrically connected with the input end of the A/D conversion module, the output end of the A/D conversion module is electrically connected with the input end of the controller, and the output end of the controller is electrically connected with the input ends of the speed reducing motor and the display screen respectively.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the utility model, through the cooperation arrangement of a series of structures, when a worker performs investigation sampling on mine geology, the worker enables the utility model to be fixed at a position to be investigated sampling, the worker starts the utility model, the gear motor can indirectly drive the hollow rotating shaft to rotate, the hollow rotating shaft rotates to drive the drill bit, the first helical blade and the second helical blade to rotate, and because the external threads on the outer wall of the hollow rotating shaft are in threaded engagement connection with the threaded holes on the connecting plate, the hollow rotating shaft can be enabled to move upwards or downwards when the hollow rotating shaft performs forward rotation or reverse rotation, the hollow rotating shaft is enabled to move upwards or downwards to drive the drill bit to drill the position to be investigated sampling, in the drilling process, the infrared ranging sensor can detect the distance between the lifting plate and the connecting plate in real time, and the worker can confirm the depth of the drill bit to be investigated for the position to be investigated sampling according to the distance between the lifting plate and the connecting plate, so that the utility model is convenient for the worker to control the depth of the mine geology sampling.
2. According to the utility model, through the matching arrangement of a series of structures such as the first helical blade, the second helical blade and the like, when the drill bit drills a position to be surveyed and sampled, the first helical blade and the second helical blade rotate to enable drilled materials to be conveyed into the hollow rotating shaft and discharged to the outside from the discharging pipe, and workers can collect the discharged materials through the collecting structure to enable the discharged materials to form layering, so that the mining geological drilling device is convenient for collecting the materials obtained by mining geological drilling, is convenient for subsequent workers to survey the materials, avoids inconvenience for the subsequent workers to survey the materials due to scattering of the materials at different depths, and has strong practicability.
Drawings
FIG. 1 is a schematic diagram of a first embodiment of the present utility model;
FIG. 2 is a schematic diagram of a second embodiment of the present utility model;
FIG. 3 is a schematic view of the internal structure of the present utility model;
FIG. 4 is a schematic view of the connection structure between the hollow shaft and the drill bit according to the present utility model;
fig. 5 is a schematic structural view of the control box of the present utility model.
In the figure: 1. a first sealed bearing; 2. a driven gear; 3. a hollow rotating shaft; 4. a lifting plate; 5. a second sealed bearing; 6. a slide rail; 7. a first side plate; 8. a connecting plate; 9. a first helical blade; 10. a drill bit; 11. a through hole; 12. a discharge pipe; 13. a drive gear; 14. a speed reducing motor; 15. a second side plate; 16. a control box; 17. a U-shaped handle; 18. a support plate; 19. fixing the inserted link; 20. an infrared ranging sensor; 21. a connecting rod; 22. a discharge cover; 23. an A/D conversion module; 24. a controller; 25. a storage battery; 26. a threaded hole; 27. a second helical blade; 28. a slide block; 29. a USB charging interface; 30. a power indicator light; 31. a display screen; 32. a control button; 33. and a control panel.
Detailed Description
The technical scheme of the utility model is further described below with reference to the attached drawings and specific embodiments.
Example 1
As shown in fig. 1-5, the intelligent mine geological survey sampling device provided by the utility model comprises a first side plate 7, wherein the first side plate 7 is connected with a second side plate 15 through a connecting plate 8, the first side plate 7 and the second side plate 15 are respectively arranged on two sides of the upper surface of a supporting plate 18, a threaded hole 26 is formed in the surface of the connecting plate 8, a hollow rotating shaft 3 is arranged in the threaded hole 26, the top end of the hollow rotating shaft 3 penetrates through a second sealing bearing 5 on the central position of the surface of a lifting plate 4, a first sealing bearing 1, a discharging cover 22 and a second spiral blade 27 are sequentially arranged in the hollow rotating shaft 3 from top to bottom, a discharging pipe 12 is arranged at the top end of the discharging cover 22, the other end of the discharging pipe 12 penetrates through the first sealing bearing 1 and extends to the outside, an infrared ranging sensor 20 is arranged on one side of the lower surface of the lifting plate 4, a speed reducing motor 14 is arranged on one side of the upper surface of the lifting plate 4, the bottom end of the hollow rotating shaft 3 is connected with a drill bit 10 through a connecting rod 21, and a first spiral blade 9 is arranged on the outer wall of the drill bit 10.
The intelligent mine geological survey sampling device based on the first embodiment has the working principle that: when the utility model is used, when a worker performs investigation sampling on mine geology, the worker enables the utility model to be fixed at the position to be investigated and sampled, the gear motor 14 is started to indirectly drive the hollow rotating shaft 3 to rotate, the hollow rotating shaft 3 rotates to drive the drill bit 10, the first helical blade 9 and the second helical blade 27 to rotate, the external threads on the outer wall of the hollow rotating shaft 3 are in threaded engagement with the threaded holes 26 on the connecting plate 8, so that the hollow rotating shaft 3 can be enabled to move upwards or downwards when the hollow rotating shaft 3 positively rotates or reversely rotates, the hollow rotating shaft 3 can be enabled to move upwards or downwards to drive the drill bit 10 to drill the position to be investigated and sampled, in the drilling process, the infrared ranging sensor 20 can detect the distance between the lifting plate 4 and the connecting plate 8 in real time, and the worker can confirm the depth of the drill bit 10 to be drilled at the position to be investigated and sampled according to the distance between the lifting plate 4 and the connecting plate 8, the utility model is convenient for the worker to control the depth of the mine geology sampling, the drill bit 10 can be enabled to drill the position to be drilled upwards or downwards when the hollow rotating shaft 3 positively rotates or reversely rotates, the first helical blade 9 and the second helical blade 27 can be enabled to rotate to be enabled to be convenient for the second helical blade 27 to be located at the position to be not convenient for the position to be formed to be separated from the position and sampled by the hole to be formed into the position and the position to be required to be separated and sampled by the hole and the material is convenient for the material and the material can be discharged and the material can not conveniently removed.
Example two
As shown in fig. 1-5, the intelligent mine geological survey sampling device according to the present utility model further includes: external threads are arranged on the outer wall of the hollow rotating shaft 3, the external threads on the outer wall of the hollow rotating shaft 3 are in threaded engagement with threaded holes 26 on the connecting plate 8, sliding blocks 28 are arranged on the outer walls of the two sides of the lifting plate 4, the other ends of the sliding blocks 28 are arranged on the sliding rails 6, the sliding blocks 28 are in sliding connection with the sliding rails 6, the sliding rails 6 are arranged on the outer walls of one sides of the first side plate 7 and the second side plate 15, a driving gear 13 is arranged on the output shaft of the gear motor 14, the driving gear 13 is in engagement connection with the driven gear 2, the driven gear 2 is arranged above the outer wall of the hollow rotating shaft 3, a through hole 11 is arranged at the center of the surface of the supporting plate 18, fixed inserting rods 19 are arranged at four corners of the lower surface of the supporting plate 18, a control box 16 and a U-shaped handle 17 are arranged on the outer wall of the other side of the second side plate 15, and control box 16 is located the top of U type handle 17, the front end face of control box 16 is provided with USB interface 29 and power indicator 30 that charges, and USB interface 29 is located the top of power indicator 30, be provided with display screen 31 and control panel 33 on the outer wall of one side of control box 16, and display screen 31 is located the top of control panel 33, be provided with control button 32 on the control panel 33, the inside of control box 16 is provided with AD conversion module 23, controller 24 and battery 25, the output of infrared ranging sensor 20 and the input electric connection of AD conversion module 23, the output of AD conversion module 23 and the input electric connection of controller 24, the output of controller 24 and gear motor 14 and the input electric connection of display screen 31 respectively.
In this embodiment, since the outer walls of two sides of the lifting plate 4 are both provided with the sliding blocks 28, the other ends of the sliding blocks 28 are mounted on the sliding rails 6, and the sliding blocks 28 are in sliding connection with the sliding rails 6, so that the movement of the lifting plate 4 can be limited and guided, the stability of the lifting plate 4 during movement is enhanced, the fixing inserting rod 19 is arranged, the lifting device can be fixed on the ground through the fixing inserting rod 19, the U-shaped handle 17 is arranged, a worker can carry the lifting device through the U-shaped handle 17, the USB charging interface 29 is arranged, the worker can charge the storage battery 25 through the USB charging interface 29, and the electric energy in the storage battery 25 can provide electric energy for the lifting device.
The above-described embodiments are merely a few preferred embodiments of the present utility model, and many alternative modifications and combinations of the above-described embodiments will be apparent to those skilled in the art based on the technical solutions of the present utility model and the related teachings of the above-described embodiments.

Claims (9)

1. Wisdom mine geological survey sampling device, including first curb plate (7), its characterized in that: the utility model discloses a drill bit, including connecting plate (8), first curb plate (7), second curb plate (15), first curb plate (7) and second curb plate (15) are connected through connecting plate (8), and first curb plate (7) and second curb plate (15) are installed respectively in the upper surface both sides of backup pad (18), screw hole (26) are seted up on the surface of connecting plate (8), install cavity pivot (3) in screw hole (26), second sealed bearing (5) on elevating plate (4) surface central point put are run through on the top of cavity pivot (3), the inside from the top down of cavity pivot (3) has set gradually first sealed bearing (1), ejection of compact cover (22) and second helical blade (27), the top of ejection of compact cover (22) is provided with discharging pipe (12), and the other end of discharging pipe (12) runs through first sealed bearing (1) and extends to outside, lower surface one side of elevating plate (4) is provided with infrared range sensor (20), gear motor (14) are installed on upper surface one side of elevating plate (4), the bottom of cavity pivot (3) is connected with drill bit (10) through connecting rod (21) on the outer wall (10).
2. An intelligent mine geological survey sampling apparatus according to claim 1, wherein: external threads are arranged on the outer wall of the hollow rotating shaft (3), and the external threads on the outer wall of the hollow rotating shaft (3) are in threaded engagement connection with threaded holes (26) on the connecting plate (8).
3. An intelligent mine geological survey sampling apparatus according to claim 1, wherein: the lifting plate is characterized in that sliding blocks (28) are arranged on the outer walls of two sides of the lifting plate (4), the other ends of the sliding blocks (28) are arranged on the sliding rails (6), the sliding blocks (28) are in sliding connection with the sliding rails (6), and the sliding rails (6) are arranged on the outer walls of one sides of the first side plate (7) and the second side plate (15).
4. An intelligent mine geological survey sampling apparatus according to claim 1, wherein: the driving gear (13) is arranged on the output shaft of the gear motor (14), the driving gear (13) is connected with the driven gear (2) in a meshed mode, and the driven gear (2) is arranged above the outer wall of the hollow rotating shaft (3).
5. An intelligent mine geological survey sampling apparatus according to claim 1, wherein: through holes (11) are formed in the center of the surface of the supporting plate (18), and fixed inserting rods (19) are arranged at four corners of the lower surface of the supporting plate (18).
6. An intelligent mine geological survey sampling apparatus according to claim 1, wherein: a control box (16) and a U-shaped handle (17) are arranged on the outer wall of the other side of the second side plate (15), and the control box (16) is positioned above the U-shaped handle (17).
7. The intelligent mine geological survey sampling device of claim 6, wherein: the front end face of the control box (16) is provided with a USB charging interface (29) and a power indicator lamp (30), and the USB charging interface (29) is located above the power indicator lamp (30).
8. The intelligent mine geological survey sampling device of claim 6, wherein: a display screen (31) and a control panel (33) are arranged on the outer wall of one side of the control box (16), the display screen (31) is located above the control panel (33), a control button (32) is arranged on the control panel (33), and an A/D conversion module (23), a controller (24) and a storage battery (25) are arranged in the control box (16).
9. An intelligent mine geological survey sampling apparatus according to claim 1, wherein: the output end of the infrared ranging sensor (20) is electrically connected with the input end of the A/D conversion module (23), the output end of the A/D conversion module (23) is electrically connected with the input end of the controller (24), and the output end of the controller (24) is electrically connected with the input ends of the speed reduction motor (14) and the display screen (31) respectively.
CN202322147858.8U 2023-08-10 2023-08-10 Wisdom mine geological survey sampling device Active CN220772610U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322147858.8U CN220772610U (en) 2023-08-10 2023-08-10 Wisdom mine geological survey sampling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322147858.8U CN220772610U (en) 2023-08-10 2023-08-10 Wisdom mine geological survey sampling device

Publications (1)

Publication Number Publication Date
CN220772610U true CN220772610U (en) 2024-04-12

Family

ID=90619377

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322147858.8U Active CN220772610U (en) 2023-08-10 2023-08-10 Wisdom mine geological survey sampling device

Country Status (1)

Country Link
CN (1) CN220772610U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN120721426A (en) * 2025-09-01 2025-09-30 中煤地华盛水文地质勘察有限公司 A sampling device for hydrogeological exploration

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN120721426A (en) * 2025-09-01 2025-09-30 中煤地华盛水文地质勘察有限公司 A sampling device for hydrogeological exploration

Similar Documents

Publication Publication Date Title
CN211553370U (en) A device for soil sampling for geological exploration
CN209724219U (en) A kind of drilling equipment for engineering geological prospecting
CN114718559B (en) Geological exploration drilling device
CN208109457U (en) A kind of sampler used for geological prospecting
CN215004355U (en) Engineering geology reconnaissance sampling device
CN208091756U (en) A kind of ground quality detection sampler
CN111879551A (en) Portable sampling device for mine downhole operation
CN222184756U (en) A mining exploration underground sampling device
CN115541296A (en) Sampling device based on hydraulic ring geological survey
CN108871849A (en) A kind of soil collecting device with storage and detection function
CN216955219U (en) Portable soil sampling device for geological exploration
CN218271470U (en) Mineral geology investigation sampling device
CN213867743U (en) Geological survey is with device that fetches earth
CN210741972U (en) Coal mine geological survey device convenient to use
CN212844463U (en) Portable sampling device for geological mineral exploration
CN209525126U (en) A kind of geologic prospect sampler
CN213068291U (en) Mineral product geological survey device
CN223400645U (en) Electric rotary sampler for geological exploration
CN210603991U (en) Ecological environment geological survey sampling device
CN215525133U (en) A soil sample collection device for hydraulic ring geological exploration
CN221925678U (en) Sampling device for geological exploration
CN221038110U (en) Reconnaissance sampling device
CN219319799U (en) An environmental geological sampling device
CN215443925U (en) Portable mining survey is with mining equipment
CN213121298U (en) Geological survey cavern gas detection collecting device convenient to carry

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20241106

Address after: Unit 502, 5th Floor, Building 104, Baiziwan Xili, Chaoyang District, Beijing 100000

Patentee after: Beijing HaiSuan Intelligent System Co.,Ltd.

Country or region after: China

Address before: 241003 Wenjin West Road, Yijiang District, Wuhu City, Anhui Province

Patentee before: ANHUI TECHNICAL College OF MECHANICAL AND ELECTRICAL ENGINEERING

Country or region before: China

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20241206

Address after: 1601, 14th Floor, No. 18 Zhongguancun Street, Haidian District, Beijing 100000

Patentee after: HaiSuan Technology (Beijing) Co.,Ltd.

Country or region after: China

Address before: Unit 502, 5th Floor, Building 104, Baiziwan Xili, Chaoyang District, Beijing 100000

Patentee before: Beijing HaiSuan Intelligent System Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20251029

Address after: 310000 Zhejiang Province Hangzhou City Yuhang District Wuchang Street Xixi Letian Cheng Building 2 Room 2029

Patentee after: Hangzhou HaiSuanchengfeng Technology Co.,Ltd.

Country or region after: China

Address before: 1601, 14th Floor, No. 18 Zhongguancun Street, Haidian District, Beijing 100000

Patentee before: HaiSuan Technology (Beijing) Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right