CN220769358U - Adjustable rig sets up platform movable support - Google Patents
Adjustable rig sets up platform movable support Download PDFInfo
- Publication number
- CN220769358U CN220769358U CN202322753842.1U CN202322753842U CN220769358U CN 220769358 U CN220769358 U CN 220769358U CN 202322753842 U CN202322753842 U CN 202322753842U CN 220769358 U CN220769358 U CN 220769358U
- Authority
- CN
- China
- Prior art keywords
- bracket
- construction
- upper bracket
- lower bracket
- adjustable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000007246 mechanism Effects 0.000 claims abstract description 20
- 230000000149 penetrating effect Effects 0.000 claims abstract description 4
- 238000010276 construction Methods 0.000 abstract description 23
- 238000005553 drilling Methods 0.000 abstract description 23
- 238000000034 method Methods 0.000 abstract description 6
- 238000004873 anchoring Methods 0.000 abstract description 3
- 239000000463 material Substances 0.000 abstract description 3
- 230000008569 process Effects 0.000 abstract description 2
- 239000002699 waste material Substances 0.000 abstract description 2
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 7
- 235000017491 Bambusa tulda Nutrition 0.000 description 7
- 241001330002 Bambuseae Species 0.000 description 7
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 7
- 239000011425 bamboo Substances 0.000 description 7
- 239000011120 plywood Substances 0.000 description 7
- 229910000831 Steel Inorganic materials 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005056 compaction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model relates to the technical field of roadbed engineering side slope drilling construction, and particularly discloses an adjustable drilling machine erecting platform moving support, which comprises: the upper support is arranged above the lower support, the plurality of extending mechanisms are arranged between the lower support and the upper support, the extending mechanisms comprise extending supports fixedly arranged at the bottom of the upper support and moving grooves formed in the top of the lower support, and the adjusting mechanisms comprise a plurality of bolt holes penetrating through one side of the extending supports and connecting bolts arranged in the moving grooves; the utility model well solves the problems of complex procedures, time and labor waste and material consumption caused by the traditional construction method of slope anchoring and drilling by arranging the upper bracket, the lower bracket and the extension mechanism, well ensures the construction safety, greatly improves the construction speed, obtains better economic benefit, simplifies the construction process, greatly accelerates the construction progress and improves the work efficiency.
Description
Technical Field
The utility model belongs to the technical field of roadbed engineering side slope drilling construction, and particularly relates to an adjustable drilling machine erecting platform moving support.
Background
Along with the rapid development of the road traffic industry, more and more road new construction and reconstruction projects are provided, the application of the slope drilling anchoring in the roadbed protection project is promoted, the effect of roadbed slope reinforcement can be achieved, and the road construction can be achieved by matching with slope greening, so that the purpose of environmental protection and comfort is achieved.
The traditional construction method comprises the following steps: constructing by adopting a scaffold erection method, erecting a fastener type steel pipe, erecting a combination by using a cross bar matched with the vertical rod, transporting a drilling machine to a construction site, and lifting to a designed drilling position for drilling;
the foundation treatment is needed before the construction, then scaffold erection is carried out on the construction site, the number of upright rods is large during erection, the working procedure is complex, the time is long, the construction efficiency is low, and the material consumption is large; and the interval of drilling position is different with the length of pole setting, horizontal pole, probably in the middle of two horizontal poles after the drilling design position, probably appear unsettled phenomenon after lifting the rig in place, need fix temporarily with the rope, cause the scaffold frame to collapse very easily, causes safety, quality accident.
Disclosure of Invention
The utility model aims to provide an adjustable drilling machine erecting platform moving support so as to solve the problems in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions:
an adjustable rig up platform mobile stand comprising:
the upper bracket is arranged above the lower bracket;
the extending mechanisms are arranged between the lower bracket and the upper bracket and comprise extending brackets fixedly arranged at the bottom of the upper bracket and moving grooves formed in the top of the lower bracket;
the adjusting mechanism comprises a plurality of bolt holes penetrating through one side of the extending bracket and connecting bolts arranged in the moving groove, one ends of the connecting bolts penetrate through the bolt holes, and the other ends of the connecting bolts extend to the outer part of the lower bracket;
and the limiting mechanisms are arranged on the outer surface of the upper bracket.
Preferably, a plurality of universal wheels with brakes are arranged on two sides of the bottom of the lower bracket.
Preferably, the limiting mechanism comprises a sliding frame which is in sliding connection with the upper bracket, and the two sides of the sliding frame are rotatably provided with rotating plates.
Preferably, a short thread column is mounted on one side of the sliding frame in a threaded manner, and one end of the short thread column extends to the inside of the sliding frame.
Preferably, long thread columns are arranged in the two rotating plates in a threaded mode, and knobs are fixedly arranged at one ends of the short thread columns and one end of the long thread column.
Preferably, a pressing gasket is fixedly arranged at the other end of the long thread column.
Compared with the prior art, the utility model has the beneficial effects that:
(1) Through the arrangement of the upper bracket, the lower bracket and the extension mechanism, the problems of complex procedures, time and labor waste and material consumption caused by the traditional construction method of slope anchoring and drilling are well solved, the construction safety is well ensured, the construction speed is greatly improved, good economic benefits are obtained, the construction process is simplified, the construction progress is greatly accelerated, and the work efficiency is improved.
(2) Through stop gear's setting, make it carry out effectual spacing to backup pad and the rig in the backup pad of placing on the upper bracket, effectual reduction backup pad and the phenomenon that the rig took place to drop on it, the security when further guaranteeing to construct.
Drawings
FIG. 1 is a schematic view of the external structure of the present utility model;
FIG. 2 is a cross-sectional view of the internal structure of the present utility model;
FIG. 3 is a schematic view of a limiting mechanism according to the present utility model;
FIG. 4 is a second overall schematic view of the limiting mechanism of the present utility model;
in the figure: 1. a lower bracket; 2. an upper bracket; 3. an extension bracket; 4. a moving groove; 5. bolt holes; 6. a connecting bolt; 7. universal wheels with brakes; 8. a sliding frame; 9. a rotating plate; 10. a short threaded post; 11. a long threaded column; 12. a knob; 13. pressing the pad.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Embodiment one:
referring to fig. 1-4, an adjustable rig-up platform mobile stand includes:
the upper bracket 2 is arranged above the lower bracket 1, the upper bracket 2 and the lower bracket 1 are formed by welding 48 x 3.5 steel pipes, the length of the bracket can be adjusted according to the construction length, the length of the bracket can be set to be 6-8 m according to the requirement of the designed hole spacing, the bracket can also be adjusted according to the actual condition of the site, and the height of the lower bracket 1 is 1.2m;
the extending mechanisms are arranged between the lower bracket 1 and the upper bracket 2 and comprise an extending bracket 3 fixedly arranged at the bottom of the upper bracket 2 and a moving groove 4 arranged at the top of the lower bracket 1;
the adjusting mechanism comprises a plurality of bolt holes 5 penetrating through one side of the extension bracket 3 and connecting bolts 6 arranged in the movable groove 4, one ends of the connecting bolts 6 penetrate through the bolt holes 5, and the other ends of the connecting bolts 6 extend to the outside of the lower bracket 1;
and a plurality of limiting mechanisms are arranged on the outer surface of the upper bracket 2.
As can be seen from fig. 1-2, a plurality of universal wheels 7 with brakes are arranged on both sides of the bottom of the lower bracket 1.
From the above, it can be seen that the compaction treatment is performed according to the foundation condition of the working surface before construction, the surface is smooth, the lower bracket 1 and the upper bracket 2 are pushed by the universal wheel 7 with brake, the lower bracket 1 and the upper bracket 2 are moved to the appointed position, the universal wheel 7 with brake is trampled to fix the lower bracket 1 and the upper bracket 2, the connecting bolt 6 is controlled to be inserted into the bolt holes 5 different from the extending bracket 3 according to the height of the drilled holes, the height of the upper bracket 2 is adjusted, the prepared steel pipe scaffold is heightened and fixed on the upper bracket 2 after the lowermost drilling task is completed, the square timber or bamboo plywood is placed between the frames of the upper bracket 2 after the bracket assembly is completed, the drilling machine is placed on the square timber or bamboo plywood, the drilling machine is fixed by the limiting mechanism, the drilling construction operation can be performed by the drilling machine, and then the fixing of the universal wheel 7 with brake is released, the movable bracket is pushed, and the next group of drilling construction is performed.
Embodiment two:
referring to fig. 3 and 4, the limiting mechanism includes a sliding frame 8 slidably connected with the upper bracket 2, two sides of the sliding frame 8 are rotatably provided with rotating plates 9, one side of the sliding frame 8 is provided with a short threaded column 10 in a threaded manner, one end of the short threaded column 10 extends to the inside of the sliding frame 8, two rotating plates 9 are internally provided with long threaded columns 11 in a threaded manner, one ends of the short threaded column 10 and the long threaded columns 11 are fixedly provided with knobs 12, and the other ends of the long threaded columns 11 are fixedly provided with pressing gaskets 13.
From the above, after placing square timber or bamboo plywood between the frames of the upper bracket 2 and placing a drilling machine on the square timber or bamboo plywood, the short threaded column 10 can be rotated, so that the short threaded column 10 is not contacted with the upper bracket 2, the position of the sliding frame 8 is moved, then the short threaded column 10 is rotated, so that the short threaded column 10 is propped against the surface of the upper bracket 2, the position of the sliding frame 8 is fixed, the rotating plates 9 on two sides are rotated, the angle of the long threaded column 11 is controlled, the pressing gasket 13 on one of the long threaded columns 11 is aligned with the square timber or bamboo plywood placed on the upper bracket, the other long threaded column 11 is aligned with the outer surface of the drilling machine, one of the pressing gaskets 13 is rotated to press the square timber or bamboo plywood, and the other pressing gasket 13 is pressed against the outer surface of the drilling machine, so that the square timber or bamboo plywood and the drilling machine are effectively fixed.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. An adjustable rig up platform mobile support, comprising:
the device comprises a lower bracket (1), wherein an upper bracket (2) is arranged above the lower bracket (1);
the extending mechanisms are arranged between the lower bracket (1) and the upper bracket (2) and comprise an extending bracket (3) fixedly arranged at the bottom of the upper bracket (2) and a moving groove (4) arranged at the top of the lower bracket (1);
the adjusting mechanism comprises a plurality of bolt holes (5) which are formed in one side of the extension bracket (3) in a penetrating mode and connecting bolts (6) which are arranged in the movable groove (4), one ends of the connecting bolts (6) penetrate through the bolt holes (5), and the other ends of the connecting bolts (6) extend to the outer portion of the lower bracket (1);
and the limiting mechanisms are arranged on the outer surface of the upper bracket (2).
2. The adjustable drill rig up platform mobile stand of claim 1, wherein: both sides of the bottom of the lower bracket (1) are provided with a plurality of universal wheels (7) with brakes.
3. The adjustable drill rig up platform mobile stand of claim 1, wherein: the limiting mechanism comprises a sliding frame (8) which is in sliding connection with the upper bracket (2), and rotating plates (9) are rotatably arranged on two sides of the sliding frame (8).
4. An adjustable rig up platform mobile stand according to claim 3, wherein: a short threaded column (10) is arranged on one side of the sliding frame (8) in a threaded mode, and one end of the short threaded column (10) extends to the inside of the sliding frame (8).
5. The adjustable drill rig up platform mobile stand of claim 4, wherein: the inside of two rotating plates (9) is provided with long thread columns (11) in a threaded manner, and knobs (12) are fixedly arranged at one ends of the short thread columns (10) and the long thread columns (11).
6. The adjustable drill rig up platform mobile stand of claim 5, wherein: the other end of the long thread column (11) is fixedly provided with a pressing gasket (13).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322753842.1U CN220769358U (en) | 2023-10-13 | 2023-10-13 | Adjustable rig sets up platform movable support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322753842.1U CN220769358U (en) | 2023-10-13 | 2023-10-13 | Adjustable rig sets up platform movable support |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220769358U true CN220769358U (en) | 2024-04-12 |
Family
ID=90600931
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202322753842.1U Active CN220769358U (en) | 2023-10-13 | 2023-10-13 | Adjustable rig sets up platform movable support |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220769358U (en) |
-
2023
- 2023-10-13 CN CN202322753842.1U patent/CN220769358U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212534174U (en) | Raft foundation steel bar supporting tool | |
CN204982673U (en) | Continuous steel of high mound of hollow thin wall structure 0# section binds and pre -compaction support in 100 -meter dash | |
CN220769358U (en) | Adjustable rig sets up platform movable support | |
CN111794267A (en) | Construction method for foundation of construction elevator | |
CN211818592U (en) | Warning fence for construction site of constructional engineering | |
CN206635780U (en) | A kind of soil nailed wall retaining structure | |
CN206280081U (en) | A kind of tunnel reinforcement trolley | |
CN211817847U (en) | Builder's jack is encorbelmented to building engineering construction | |
CN213038845U (en) | Support system | |
CN211660985U (en) | Binding and shaping jig frame for reinforcing cage of bored pile | |
CN211524129U (en) | Reinforcing bar normal position ligature support frame | |
CN203531348U (en) | Self-stability elevator shaft construction operation frame | |
CN108775016B (en) | Concrete support horizontal movement adjustable hanging basket | |
CN221002757U (en) | Operation platform device for small-span tunnel construction | |
CN217975281U (en) | Platform structure for assembly type building construction | |
CN218522185U (en) | Special simple and easy inserted scaffold frame of land photovoltaic engineering | |
CN218346722U (en) | Door type scaffold for building construction | |
CN220705131U (en) | Base structure of construction scaffold | |
CN109898541A (en) | Steel tower column foot construction technology and piling machine applied to the construction technology | |
CN216445991U (en) | Foundation pit supporting cast-in-place pile | |
CN221002254U (en) | Foundation pit protection guardrail | |
CN215670100U (en) | Prefabricated assembled steel structure house | |
CN220666966U (en) | Self-stabilizing support | |
CN220521906U (en) | Building support | |