CN220745257U - Auxiliary positioning equipment for hydropower construction - Google Patents
Auxiliary positioning equipment for hydropower construction Download PDFInfo
- Publication number
- CN220745257U CN220745257U CN202321785018.8U CN202321785018U CN220745257U CN 220745257 U CN220745257 U CN 220745257U CN 202321785018 U CN202321785018 U CN 202321785018U CN 220745257 U CN220745257 U CN 220745257U
- Authority
- CN
- China
- Prior art keywords
- pipeline
- wall
- screw rod
- bidirectional screw
- fixedly mounted
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 22
- 230000002457 bidirectional effect Effects 0.000 claims description 33
- 230000001681 protective effect Effects 0.000 claims description 3
- 238000009434 installation Methods 0.000 abstract description 16
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 6
- 230000005611 electricity Effects 0.000 abstract description 3
- 238000011900 installation process Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Landscapes
- Transmission Devices (AREA)
Abstract
Description
技术领域Technical Field
本实用新型涉及水电施工技术领域,具体为一种水电施工辅助定位设备。The utility model relates to the technical field of hydropower construction, in particular to auxiliary positioning equipment for hydropower construction.
背景技术Background technique
公开号为CN217713933U的一种水利水电管道施工辅助定位设备,通过万向轮将整体装置移动至需要施工的位置后,将管道放置在第一夹持板和第二夹持板之间,启动第二电机,此时主动皮带轮和从动皮带轮分别带动两个第二丝杆进行转动,第一夹持板向第二夹持板处进行移动,直至对管道进行夹紧定位,然后可以方便多段管道的拼接固定,进而实现管道的定位安装,并且此装置可以对不同尺寸的管道进行辅助夹持定位,适用性较强。2、一种水利水电管道施工辅助定位设备,管道固定后,启动第一电机,此时第一移动座通过连接板带动安装板进行上下移动,可以根据使用者的需求进行高度调节,方便在管道拼接安装过程中,灵活调节管道的高度,提高管道拼接安装的效率,具有灵活性,此装置具有自动化,减少工作人员的劳动量,提高整体工作效率。A water conservancy and hydropower pipeline construction auxiliary positioning device with a publication number of CN217713933U, after the whole device is moved to the position where construction is required by the universal wheel, the pipeline is placed between the first clamping plate and the second clamping plate, and the second motor is started. At this time, the active pulley and the driven pulley respectively drive the two second screws to rotate, and the first clamping plate moves toward the second clamping plate until the pipeline is clamped and positioned, and then it can facilitate the splicing and fixing of multiple sections of pipelines, thereby realizing the positioning and installation of pipelines, and this device can assist in the clamping and positioning of pipelines of different sizes, and has strong applicability. 2. A water conservancy and hydropower pipeline construction auxiliary positioning device, after the pipeline is fixed, the first motor is started, and at this time the first moving seat drives the installation plate to move up and down through the connecting plate, and the height can be adjusted according to the needs of the user, which is convenient for the flexible adjustment of the height of the pipeline during the pipeline splicing and installation process, and improves the efficiency of pipeline splicing and installation. It has flexibility, and this device is automated, reduces the workload of staff, and improves overall work efficiency.
上述一种水利水电管道施工辅助定位设备,在使用时,虽然能够根据管道安装的需要使管道在安装时将管道进行升降处理,但是在管道安装的过程中,难以将管道的进行旋转,导致管道安装较为局限,实用性较差。The above-mentioned auxiliary positioning equipment for water conservancy and hydropower pipeline construction can lift and lower the pipeline according to the needs of pipeline installation during installation. However, it is difficult to rotate the pipeline during the pipeline installation process, resulting in limited pipeline installation and poor practicality.
实用新型内容Utility Model Content
本实用新型的目的在于提供一种水电施工辅助定位设备,能够解决在管道安装的过程中,难以将管道的进行旋转,导致管道安装较为局限,实用性较差的问题。The purpose of the utility model is to provide a hydropower construction auxiliary positioning device, which can solve the problem that it is difficult to rotate the pipeline during the pipeline installation process, resulting in limited pipeline installation and poor practicality.
为实现上述目的,本实用新型提供如下技术方案:一种水电施工辅助定位设备,包括活动车体、调节组件和固定组件;To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a hydropower construction auxiliary positioning device, comprising a movable vehicle body, an adjustment component and a fixing component;
调节组件设于所述活动车体上,所述调节组件包括减速电机和安装板,减速电机用于驱使安装板进行转动;The adjusting assembly is arranged on the movable vehicle body, and the adjusting assembly comprises a reduction motor and a mounting plate, wherein the reduction motor is used to drive the mounting plate to rotate;
固定组件设于所述调节组件上,所述固定组件包括驱动电机和夹持块,驱动电机用于驱使夹持块进行移动。The fixing assembly is arranged on the adjusting assembly, and the fixing assembly comprises a driving motor and a clamping block, wherein the driving motor is used for driving the clamping block to move.
优选的,所述调节组件还包括转动柱、转动盘、皮带轮、皮带、电动推杆和伸缩杆,活动车体的顶部转动安装有转动柱,转动柱的顶部固定安装有转动盘,活动车体的顶部固定安装有减速电机,减速电机的转轴与转动柱的外壁均固定安装有皮带轮,皮带轮的数量为两组,两组皮带轮通过皮带传动连接,转动盘的顶部固定安装有电动推杆,电动推杆的自由端固定安装有安装板,转动盘的顶部固定安装有伸缩杆,伸缩杆的伸缩端与安装板的底部固定安装。Preferably, the adjustment assembly also includes a rotating column, a rotating disk, a pulley, a belt, an electric push rod and a telescopic rod. The rotating column is rotatably installed on the top of the movable body, the rotating disk is fixedly installed on the top of the rotating column, a reduction motor is fixedly installed on the top of the movable body, and pulleys are fixedly installed on the rotating shaft of the reduction motor and the outer wall of the rotating column. There are two groups of pulleys, and the two groups of pulleys are connected by belt transmission. An electric push rod is fixedly installed on the top of the rotating disk, a mounting plate is fixedly installed on the free end of the electric push rod, and a telescopic rod is fixedly installed on the top of the rotating disk, and the telescopic end of the telescopic rod is fixedly installed on the bottom of the mounting plate.
优选的,所述固定组件还包括第一双向丝杆、第一移动块、连接块、第二双向丝杆、第二移动块和支撑座,安装板的顶部固定安装有支撑座,安装板的内部开设有两组开口,其中一组开口的前侧内壁与后侧内壁转动安装有第一双向丝杆,第一双向丝杆的外壁螺纹安装有第一移动块,另一组开口的前侧内壁与后侧内壁转动安装有第二双向丝杆,第二双向丝杆的外壁螺纹安装有第二移动块,第二移动块的顶部与第一移动块的顶部均固定安装有连接块,连接块的顶部固定安装有夹持块,安装板的前侧固定安装有驱动电机,驱动电机的数量为两组,其中一组驱动电机的转轴与第一双向丝杆的一端固定安装,另一组驱动电机的转轴与第二双向丝杆的一端固定安装。Preferably, the fixing assembly also includes a first bidirectional screw rod, a first moving block, a connecting block, a second bidirectional screw rod, a second moving block and a support seat, the support seat is fixedly installed on the top of the mounting plate, and two groups of openings are opened inside the mounting plate, one of which is a front inner wall and a rear inner wall of one group of openings, and the first bidirectional screw rod is rotatably installed, and the first moving block is threadedly installed on the outer wall of the first bidirectional screw rod, and the second bidirectional screw rod is rotatably installed on the front inner wall and the rear inner wall of the other group of openings, and the second moving block is threadedly installed on the outer wall of the second bidirectional screw rod, the top of the second moving block and the top of the first moving block are both fixedly installed with a connecting block, and the top of the connecting block is fixedly installed with a clamping block, and a driving motor is fixedly installed on the front side of the mounting plate, and the number of driving motors is two groups, one of which is a rotating shaft of a driving motor of a group and is fixedly installed on one end of the first bidirectional screw rod, and the other is a rotating shaft of a driving motor of a group and is fixedly installed on one end of the second bidirectional screw rod.
优选的,所述支撑座的顶部呈弧形设置且粘贴固定有防滑垫,这样设置能够增加管道夹持后的稳定性。Preferably, the top of the support seat is arranged in an arc shape and a non-slip pad is glued and fixed thereto, so that the stability of the pipe after clamping can be increased.
优选的,所述夹持块的数量为四个,每两个夹持块为一组,每组夹持块的相对面均呈弧形设置且每组夹持块的相对面均粘贴固定有防护垫,这样设置便于将管道进行固定。Preferably, the number of the clamping blocks is four, with two clamping blocks forming a group, the opposite surfaces of each group of clamping blocks are arc-shaped and protective pads are adhered and fixed to the opposite surfaces of each group of clamping blocks, so that the pipeline can be easily fixed.
优选的,所述活动车体的底部活动安装有万向轮,万向轮的数量为四组,四组万向轮分别分布于活动车体的四角,万向轮的设置便于工人移动活动车体。Preferably, universal wheels are movably mounted on the bottom of the movable vehicle body. There are four sets of universal wheels, which are respectively distributed at the four corners of the movable vehicle body. The arrangement of the universal wheels facilitates workers to move the movable vehicle body.
与现有技术相比,本实用新型的有益效果是:该水电施工辅助定位设备,通过减速电机、转动柱、转动盘、皮带轮、皮带、电动推杆和伸缩杆的配合使用,能够在对水电管道施工时,将管道进行旋转处理,这样不仅能够对管道进行纵向或者横向安装,还能够将管道进行多角度安装处理,减少管道安装时的局限性,降低工人移动活动车体的频率,在增加装置实用性的同时,还能够降低工人的工作强度,再通过驱动电机、第一双向丝杆、第一移动块、连接块和夹持块的配合使用,能够在对管道安装时,将管道进行夹持处理,避免管道在升降或者旋转时掉落的情况,同时也能够增加管道安装时的稳定性。Compared with the prior art, the beneficial effects of the utility model are as follows: the auxiliary positioning equipment for hydropower construction, through the coordinated use of a reduction motor, a rotating column, a rotating disk, a pulley, a belt, an electric push rod and a telescopic rod, can rotate the pipeline during the construction of the hydropower pipeline, so that not only the pipeline can be installed longitudinally or transversely, but also the pipeline can be installed at multiple angles, reducing the limitations during pipeline installation, reducing the frequency of workers moving the movable vehicle body, and while increasing the practicality of the device, it can also reduce the work intensity of the workers, and then through the coordinated use of a driving motor, a first bidirectional screw rod, a first moving block, a connecting block and a clamping block, the pipeline can be clamped during installation to prevent the pipeline from falling during lifting or rotation, and the stability of the pipeline during installation can also be increased.
附图说明BRIEF DESCRIPTION OF THE DRAWINGS
图1为本实用新型的立面图;Fig. 1 is a vertical view of the utility model;
图2为本实用新型的主视图;Figure 2 is a front view of the utility model;
图3为本实用新型的俯视图。FIG. 3 is a top view of the utility model.
图中:1、活动车体;2、调节组件;201、减速电机;202、转动柱;203、转动盘;204、皮带轮;205、皮带;206、电动推杆;207、伸缩杆;208、安装板;3、固定组件;301、驱动电机;302、第一双向丝杆;303、第一移动块;304、连接块;305、夹持块;306、第二双向丝杆;307、第二移动块;308、支撑座。In the figure: 1. movable body; 2. adjustment component; 201. reduction motor; 202. rotating column; 203. rotating disk; 204. pulley; 205. belt; 206. electric push rod; 207. telescopic rod; 208. mounting plate; 3. fixing component; 301. driving motor; 302. first bidirectional screw rod; 303. first moving block; 304. connecting block; 305. clamping block; 306. second bidirectional screw rod; 307. second moving block; 308. supporting seat.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
请参阅图1-3,本实用新型提供一种技术方案:一种水电施工辅助定位设备,包括活动车体1、调节组件2和固定组件3,调节组件2设于活动车体1上,调节组件2包括减速电机201和安装板208,减速电机201用于驱使安装板208进行转动,固定组件3设于调节组件2上,固定组件3包括驱动电机301和夹持块305,驱动电机301用于驱使夹持块305进行移动,活动车体1的底部活动安装有万向轮,万向轮的数量为四组,四组万向轮分别分布于活动车体1的四角。Please refer to Figures 1-3. The utility model provides a technical solution: an auxiliary positioning device for hydropower construction, including a movable body 1, an adjusting component 2 and a fixing component 3. The adjusting component 2 is arranged on the movable body 1, and the adjusting component 2 includes a reduction motor 201 and a mounting plate 208. The reduction motor 201 is used to drive the mounting plate 208 to rotate. The fixing component 3 is arranged on the adjusting component 2, and the fixing component 3 includes a driving motor 301 and a clamping block 305. The driving motor 301 is used to drive the clamping block 305 to move. Universal wheels are movably installed at the bottom of the movable body 1. There are four groups of universal wheels, and the four groups of universal wheels are respectively distributed at the four corners of the movable body 1.
进一步的,调节组件2还包括转动柱202、转动盘203、皮带轮204、皮带205、电动推杆206和伸缩杆207,活动车体1的顶部转动安装有转动柱202,转动柱202的顶部固定安装有转动盘203,活动车体1的顶部固定安装有减速电机201,减速电机201的转轴与转动柱202的外壁均固定安装有皮带轮204,皮带轮204的数量为两组,两组皮带轮204通过皮带205传动连接,转动盘203的顶部固定安装有电动推杆206,电动推杆206的自由端固定安装有安装板208,转动盘203的顶部固定安装有伸缩杆207,伸缩杆207的伸缩端与安装板208的底部固定安装,控制减速电机201启动,减速电机201启动通过皮带轮204和皮带205带动转动柱202转动,转动柱202转动带动转动盘203转动,能够在对水电管道施工时,将管道进行旋转处理,这样不仅能够对管道进行纵向或者横向安装,还能够将管道进行多角度安装处理,减少管道安装时的局限性,降低工人移动活动车体1的频率,在增加装置实用性的同时,还能够降低工人的工作强度。Furthermore, the adjustment component 2 also includes a rotating column 202, a rotating disk 203, a pulley 204, a belt 205, an electric push rod 206 and a telescopic rod 207. The rotating column 202 is rotatably installed on the top of the movable body 1, and the rotating disk 203 is fixedly installed on the top of the rotating column 202. A reduction motor 201 is fixedly installed on the top of the movable body 1. The rotating shaft of the reduction motor 201 and the outer wall of the rotating column 202 are fixedly installed with pulleys 204. The number of pulleys 204 is two groups, and the two groups of pulleys 204 are connected by belts 205. The top of the rotating disk 203 is fixedly installed with an electric push rod 206, and the free end of the electric push rod 206 is fixedly installed with a mounting plate 208, a telescopic rod 207 is fixedly installed on the top of the rotating disk 203, and the telescopic end of the telescopic rod 207 is fixedly installed on the bottom of the mounting plate 208, and the reduction motor 201 is controlled to start. The reduction motor 201 starts and drives the rotating column 202 to rotate through the pulley 204 and the belt 205. The rotation of the rotating column 202 drives the rotating disk 203 to rotate, which can rotate the pipeline during the construction of the water and electricity pipeline. In this way, not only can the pipeline be installed longitudinally or horizontally, but also the pipeline can be installed at multiple angles, reducing the limitations during pipeline installation and reducing the frequency of workers moving the movable vehicle body 1. While increasing the practicality of the device, it can also reduce the work intensity of workers.
再进一步的,固定组件3还包括第一双向丝杆302、第一移动块303、连接块304、第二双向丝杆306、第二移动块307和支撑座308,安装板208的顶部固定安装有支撑座308,安装板208的内部开设有两组开口,其中一组开口的前侧内壁与后侧内壁转动安装有第一双向丝杆302,第一双向丝杆302的外壁螺纹安装有第一移动块303,另一组开口的前侧内壁与后侧内壁转动安装有第二双向丝杆306,第二双向丝杆306的外壁螺纹安装有第二移动块307,第二移动块307的顶部与第一移动块303的顶部均固定安装有连接块304,连接块304的顶部固定安装有夹持块305,安装板208的前侧固定安装有驱动电机301,驱动电机301的数量为两组,其中一组驱动电机301的转轴与第一双向丝杆302的一端固定安装,另一组驱动电机301的转轴与第二双向丝杆306的一端固定安装,支撑座308的顶部呈弧形设置且粘贴固定有防滑垫,夹持块305的数量为四个,每两个夹持块305为一组,每组夹持块305的相对面均呈弧形设置且每组夹持块305的相对面均粘贴固定有防护垫,控制驱动电机301启动,驱动电机301启动带动第一双向丝杆302和第二双向丝杆306转动,进而带动第一移动块303和第二移动块307移动,第一移动块303和第二移动块307移动带动夹持块305进行能够将管道进行夹持,避免管道在升降或者旋转时掉落的情况,同时也能够增加管道安装时的稳定性。Furthermore, the fixing assembly 3 also includes a first bidirectional screw rod 302, a first moving block 303, a connecting block 304, a second bidirectional screw rod 306, a second moving block 307 and a support seat 308. The support seat 308 is fixedly installed on the top of the mounting plate 208. Two groups of openings are opened inside the mounting plate 208. The first bidirectional screw rod 302 is rotatably installed on the front inner wall and the rear inner wall of one group of openings, and the first moving block 303 is threadedly installed on the outer wall of the first bidirectional screw rod 302. The second bidirectional screw rod 306 is rotatably installed on the front inner wall and the rear inner wall of the other group of openings. The second moving block 307 is threadedly installed on the outer wall of the second bidirectional screw rod 306. The connecting block 304 is fixedly installed on the top of the connecting block 304. The clamping block 305 is fixedly installed on the front side of the mounting plate 208. The driving motor 301 is fixedly installed on the front side of the mounting plate 208. There are two groups, in which the shaft of the driving motor 301 of one group is fixedly installed with one end of the first bidirectional screw rod 302, and the shaft of the driving motor 301 of the other group is fixedly installed with one end of the second bidirectional screw rod 306. The top of the support seat 308 is arranged in an arc shape and a non-slip pad is pasted and fixed. The number of the clamping blocks 305 is four, and every two clamping blocks 305 form a group. The opposite surfaces of each group of clamping blocks 305 are arranged in an arc shape and a protective pad is pasted and fixed on the opposite surfaces of each group of clamping blocks 305. The driving motor 301 is controlled to start, and the driving motor 301 starts to drive the first bidirectional screw rod 302 and the second bidirectional screw rod 306 to rotate, thereby driving the first moving block 303 and the second moving block 307 to move. The movement of the first moving block 303 and the second moving block 307 drives the clamping block 305 to clamp the pipeline to prevent the pipeline from falling during lifting or rotation, and also to increase the stability of the pipeline during installation.
工作原理:使用时,先将活动车体1移动至合适位置后,在将管道放置于支撑座308上,使管道位于两组夹持块305之间,在控制驱动电机301启动,驱动电机301启动带动第一双向丝杆302和第二双向丝杆306转动,进而带动第一移动块303和第二移动块307移动,第一移动块303和第二移动块307移动带动夹持块305进行能够将管道进行夹持,夹持之后在控制电动推杆206启动,电动推杆206启动带动安装板208进行升降,安装板208升降带动管道升降,将管道调整至合适高度后,在控制减速电机201启动,减速电机201启动通过皮带轮204和皮带205带动转动柱202转动,转动柱202转动带动转动盘203转动,进而能够将管道的位置进行调节。Working principle: When in use, first move the movable body 1 to a suitable position, then place the pipeline on the support seat 308 so that the pipeline is located between the two sets of clamping blocks 305, and then control the drive motor 301 to start, the drive motor 301 starts to drive the first bidirectional screw rod 302 and the second bidirectional screw rod 306 to rotate, and then drive the first moving block 303 and the second moving block 307 to move, the first moving block 303 and the second moving block 307 move to drive the clamping block 305 to clamp the pipeline, after clamping, control the electric push rod 206 to start, the electric push rod 206 starts to drive the mounting plate 208 to rise and fall, the lifting of the mounting plate 208 drives the pipeline to rise and fall, after adjusting the pipeline to a suitable height, control the reduction motor 201 to start, the reduction motor 201 starts to drive the rotating column 202 to rotate through the pulley 204 and the belt 205, the rotating column 202 rotates to drive the rotating disk 203 to rotate, and then the position of the pipeline can be adjusted.
上面结合附图对本实用新型实施例作了详细说明,但是本实用新型不限于上述实施例,在所述技术领域普通技术人员所具备的知识范围内,还可以在不脱离本实用新型宗旨的前提下作出各种变化。The embodiments of the present invention are described in detail above in conjunction with the accompanying drawings, but the present invention is not limited to the above embodiments. Various changes can be made within the knowledge scope of ordinary technicians in the technical field without departing from the purpose of the present invention.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202321785018.8U CN220745257U (en) | 2023-07-10 | 2023-07-10 | Auxiliary positioning equipment for hydropower construction |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202321785018.8U CN220745257U (en) | 2023-07-10 | 2023-07-10 | Auxiliary positioning equipment for hydropower construction |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN220745257U true CN220745257U (en) | 2024-04-09 |
Family
ID=90564725
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202321785018.8U Active CN220745257U (en) | 2023-07-10 | 2023-07-10 | Auxiliary positioning equipment for hydropower construction |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN220745257U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118528043A (en) * | 2024-07-22 | 2024-08-23 | 山东威格特数控科技有限公司 | Clamping and feeding device of strip part machining machine tool |
-
2023
- 2023-07-10 CN CN202321785018.8U patent/CN220745257U/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118528043A (en) * | 2024-07-22 | 2024-08-23 | 山东威格特数控科技有限公司 | Clamping and feeding device of strip part machining machine tool |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN217713933U (en) | A kind of auxiliary positioning equipment for water conservancy and hydropower pipeline construction | |
| CN214192316U (en) | A concrete pipe lifting device | |
| CN206105213U (en) | Electric automatization's round piece welding machine | |
| CN214869319U (en) | Spiral steel pipe mouth of pipe grinding device | |
| CN215201224U (en) | Swing arm type electrode grinding machine | |
| CN213945575U (en) | Multi-size applicable threading pipe cutting device | |
| CN213923896U (en) | Back beam assembly installation is with supplementary lifting device convenient to adjust width | |
| CN212683002U (en) | Tool for welding hydraulic pipeline | |
| CN211385472U (en) | Anchor clamps priming paint spraying device | |
| CN211594825U (en) | Portable release mechanism of small-size ROV | |
| CN215807650U (en) | A installation device that is used for installing electromechanical device in factory building | |
| CN222345229U (en) | Grinding wheel replacement mechanism of vertical surface grinding machine | |
| CN221270537U (en) | Steel pipe surface polishing equipment applicable to different sizes | |
| CN221248153U (en) | Hub surface treatment device | |
| CN222471868U (en) | A deburring device for lead-calcium alloy production | |
| CN222493639U (en) | Electric rust removing device for pipeline | |
| CN224239075U (en) | Deburring device for ceramic production | |
| CN216564842U (en) | Assembly fixing table for motor production | |
| CN215700520U (en) | Adjustable fixed knot constructs is used in production of fan steel sheet | |
| CN214870660U (en) | Adjustable flexible joint clamping jaw | |
| CN220162395U (en) | Planet speed reducer positioning support | |
| CN224059392U (en) | Edging device is used in crane span structure production | |
| CN221659075U (en) | Multifunctional clamp for machining | |
| CN223000273U (en) | Automatic grinding device for metal hose for metallurgy | |
| CN216442308U (en) | Surface polishing device for machining of machine frame |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20250325 Address after: 235000 Building 1, Comprehensive Building 104, Xiangwang International Shopping Plaza Phase II, No. 58 Gucheng Road, Xiangshan District, Huaibei City, Anhui Province Patentee after: Huaibei Hexu Construction Engineering Co.,Ltd. Country or region after: China Address before: No. 321 Changxing Road, Daqing Street, Yuhui District, Bengbu City, Anhui Province, 233000, China, 8-7-102 Patentee before: Anhui Dongshui Construction Engineering Co.,Ltd. Country or region before: China |