CN220725767U - Movable high and large formwork support - Google Patents

Movable high and large formwork support Download PDF

Info

Publication number
CN220725767U
CN220725767U CN202321514480.4U CN202321514480U CN220725767U CN 220725767 U CN220725767 U CN 220725767U CN 202321514480 U CN202321514480 U CN 202321514480U CN 220725767 U CN220725767 U CN 220725767U
Authority
CN
China
Prior art keywords
rods
formwork
frame
layer bottom
vertical rods
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202321514480.4U
Other languages
Chinese (zh)
Inventor
熊家铭
曹珊
邱壮丰
钟远洛
杨蕾
褚运喜
陈晓康
姚寿朋
梁训杰
石小春
梁吉耀
韦振思
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN202321514480.4U priority Critical patent/CN220725767U/en
Application granted granted Critical
Publication of CN220725767U publication Critical patent/CN220725767U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

一种可移动式高大支模架A movable tall formwork frame

技术领域Technical Field

本实用新型涉及建筑施工设备领域,尤其涉及一种可移动式高大支模架。The utility model relates to the field of building construction equipment, in particular to a movable tall formwork frame.

背景技术Background technique

建筑支模架是在建筑施工中用于支撑、固定和保护建筑结构物的一种设备,其作用包括支撑临时结构物、加固建筑施工中暂时性的结构、分担和传递荷载、维护工作安全等,框架结构轴距排布均匀,梁板结构基本一致,具有可操作性,然而当项目工期紧、任务重,需要同时将多个支模架插入施工,且均为超高支模,一次投入周转材量大,并且后续拆模工作量大,导致场地清理移交慢,影响工序穿插施工进度,为此本领域技术人员提出一种可移动式高大支模架来解决上述问题。A building formwork frame is a device used to support, fix and protect building structures during construction. Its functions include supporting temporary structures, reinforcing temporary structures during construction, sharing and transferring loads, maintaining work safety, etc. The wheelbase of the frame structure is evenly arranged, the beam and slab structure is basically consistent, and it is operable. However, when the project schedule is tight and the task is heavy, it is necessary to insert multiple formwork frames into the construction at the same time, and all of them are super-high formworks. A large amount of turnover materials are invested at one time, and the subsequent workload of demolding is large, resulting in slow site cleaning and handover, affecting the progress of construction process interspersed. For this reason, technical personnel in this field have proposed a movable tall formwork frame to solve the above problems.

专利“CN214883859U”公开一种简易移动式支模架,包括支撑升降装置、移动装置和满堂盘扣支架;支撑升降装置和移动装置设于满堂盘扣支架的下方,支撑升降装置用于支撑升降满堂盘扣支架以支设模板,移动装置用于移动满堂盘扣支架;移动装置包括第一工字钢、第二工字钢、第三工字钢和承重轮架,第一工字钢设于满堂盘扣支架的下方,所述第三工字钢的一端与第一工字钢接触未连接,另一端与承重轮架固定连接,所述第三工字钢的两侧固定连接有第二工字钢,两侧的第二工字钢呈V字型结构,另一端连接第一工字钢。Patent "CN214883859U" discloses a simple movable formwork frame, including a supporting lifting device, a moving device and a full-height buckle bracket; the supporting lifting device and the moving device are arranged below the full-height buckle bracket, the supporting lifting device is used to support and lift the full-height buckle bracket to support the formwork, and the moving device is used to move the full-height buckle bracket; the moving device includes a first I-beam, a second I-beam, a third I-beam and a load-bearing wheel frame, the first I-beam is arranged below the full-height buckle bracket, one end of the third I-beam is in contact with the first I-beam but not connected, and the other end is fixedly connected to the load-bearing wheel frame, the second I-beams are fixedly connected to the two sides of the third I-beam, the second I-beams on both sides are in a V-shaped structure, and the other end is connected to the first I-beam.

上述移动式支模架的缺点是:The disadvantages of the above-mentioned mobile formwork are:

1、承重轮固定在满堂盘扣支架底部,平时满堂支架搭建与运输都是承重轮在承重,容易损坏;1. The load-bearing wheels are fixed at the bottom of the full-hall bracket. During the construction and transportation of the full-hall bracket, the load-bearing wheels are the ones that bear the weight, which are easy to be damaged;

2、通过千斤顶调节高度进行对模板支撑,千斤顶负载的情况下进行施工工作,不安全。公开于以上背景技术部分的信息仅仅皆在增加对本实用新型的总体背景的理解,而不应当被视为承认或以任何形式暗示该信息构成已为本领域一般技术人员所公知的现有技术。2. The formwork is supported by adjusting the height with a jack, and construction work is carried out under the load of the jack, which is unsafe. The information disclosed in the above background technology section is only to increase the understanding of the overall background of the utility model, and should not be regarded as admitting or suggesting in any form that the information constitutes the prior art known to ordinary technicians in the field.

实用新型内容Utility Model Content

本实用新型的目的是为了解决现有技术中存在的缺点,而提出的一种可移动式高大支模架。The utility model aims to solve the shortcomings in the prior art and proposes a movable tall formwork frame.

为实现上述实用新型目的,本实用新型的技术方案如下:In order to achieve the above utility model purpose, the technical solution of the utility model is as follows:

一种可移动式高大支模架,包括底座、满堂架以及承重轮,所述底座包括上层底梁、下层底梁,两个以上所述上层底梁与两个以上所述下层底梁相互层叠固定,所述上层底梁设置有安装孔,所述承重轮顶部固定连接有安装板,所述安装孔与安装板之间通过安装螺栓和安装螺母连接,使得所述承重轮可拆卸地安装在上层底梁与地面之间;所述满堂架包括立杆,两个以上所述立杆均布固定在下层底梁上,两个以上所述立杆的中部之间设置有脚手板,所述立杆顶部设置有可调顶托。A movable tall formwork frame comprises a base, a full-frame and load-bearing wheels, the base comprises an upper bottom beam and a lower bottom beam, two or more upper bottom beams and two or more lower bottom beams are stacked and fixed to each other, the upper bottom beam is provided with a mounting hole, the top of the load-bearing wheel is fixedly connected with a mounting plate, the mounting hole and the mounting plate are connected by mounting bolts and mounting nuts, so that the load-bearing wheel can be detachably installed between the upper bottom beam and the ground; the full-frame comprises vertical poles, two or more vertical poles are evenly fixed on the lower bottom beam, a scaffolding board is provided between the middle parts of the two or more vertical poles, and an adjustable top support is provided on the top of the vertical pole.

具体的,立杆上还设置有用于与满堂架外部固定物和/或移动物连接的连接钢管。Specifically, the vertical pole is also provided with a connecting steel pipe for connecting with external fixed objects and/or moving objects of the full-frame.

具体的,相邻两个所述立杆之间沿其高度方向均布固定有水平杆,上下相邻两个所述水平杆之间通过斜拉杆相连,上下相邻两个所述斜拉杆之间呈V字形设置。Specifically, horizontal rods are evenly distributed and fixed between two adjacent vertical rods along the height direction thereof, and two upper and lower adjacent horizontal rods are connected by diagonal rods, and the two upper and lower adjacent diagonal rods are arranged in a V shape.

具体的,所述立杆之间还设置有水平剪刀撑。Specifically, horizontal scissor braces are provided between the vertical poles.

具体的,满堂架的外侧设置有钢丝绳,所述钢丝绳两端分别与脚手板和立杆的连接节点、下层底梁斜拉结。Specifically, a steel wire rope is arranged on the outside of the full-height frame, and the two ends of the steel wire rope are respectively connected obliquely to the connection nodes of the scaffolding board and the vertical pole and the lower bottom beam.

具体的,位于脚手板外围的所述立杆的外部上侧固定连接有防护围栏。Specifically, a protective fence is fixedly connected to the outer upper side of the vertical pole located at the periphery of the scaffolding board.

本实用新型具有如下有益效果:The utility model has the following beneficial effects:

1、本实用新型通过设置上下层底梁底座,本身结构稳定,在支模施工中与底面面接触,且接触面积大,保证施工安全及施工精度;满堂架体采用可调顶托,在拆除支模和相关连杆件后通过调节下行高度范围获得顶升空间,然后即可使用顶升器对架体和底座整体顶升,通过安装承重轮本架体可实现移动式周转,拆除的物料可以堆放于脚手板上一同周转;1. The utility model has a stable structure by setting the upper and lower bottom beam bases. During the formwork construction, the base is in contact with the bottom surface with a large contact area, ensuring construction safety and construction accuracy. The full-frame frame adopts an adjustable top support. After removing the formwork and related connecting rods, the lifting space can be obtained by adjusting the downward height range. Then, the jacking device can be used to lift the frame and the base as a whole. By installing load-bearing wheels, the frame can be mobile and turned over. The removed materials can be stacked on the scaffolding board and turned over together.

2、本实用新型相对现有技术只需投入四分之一材料,大大减少周转材料一次投入量,提高周转率,降低成本,可减少搭拆架体工作量,减少材料周转时间,提高拆模效率,大大提高了场地移交效率,利于后续穿插施工,加快施工进度。2. Compared with the existing technology, the utility model only needs to invest one-fourth of the materials, which greatly reduces the one-time input of turnover materials, improves turnover rate, reduces costs, reduces the workload of erecting and dismantling frames, reduces material turnover time, improves demolding efficiency, greatly improves site handover efficiency, facilitates subsequent interlaced construction, and speeds up construction progress.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

图1为本实用新型提出的一种可移动式高大支模架的立体图;FIG1 is a perspective view of a movable tall formwork frame proposed by the utility model;

图2为本实用新型提出的一种可移动式高大支模架的侧面结构示意图。FIG. 2 is a schematic diagram of the side structure of a movable tall formwork frame proposed by the present invention.

图3为本实用新型可移动式高大支模架施工的俯视图。FIG. 3 is a top view of the construction of the movable tall formwork frame of the utility model.

图4为本实用新型钢丝绳投影图。FIG4 is a projection diagram of the steel wire rope of the present invention.

图5为本实用新型提出的一种可移动式高大支模架的承重轮结构示意图。FIG. 5 is a schematic diagram of the load-bearing wheel structure of a movable tall formwork frame proposed by the present invention.

图例说明:illustration:

1-下层底梁;2-钢丝绳;3-连接钢管;4-上层底梁;5-斜拉杆;6-立杆;7-承重轮;8-脚手板;9-防护围栏;10-安装孔,11-水平杆;12-安装板;13-安装螺母;14-安装螺栓,15-可调顶托,16-模板,17-水平剪刀撑。1-lower bottom beam; 2-steel wire rope; 3-connecting steel pipe; 4-upper bottom beam; 5-diagonal rod; 6-vertical pole; 7-load-bearing wheel; 8-scaffolding board; 9-protective fence; 10-installation hole, 11-horizontal rod; 12-installation plate; 13-installation nut; 14-installation bolt, 15-adjustable top support, 16-template, 17-horizontal scissors brace.

具体实施方式Detailed ways

为详细说明本实用新型的技术内容-所实现目的及效果,以下结合实施例并配合附图予以说明。在实施例的描述中,需要理解的是,指示方位或位置关系的术语为基于附图所示的方位或位置关系,仅是为了便于描述本实施例和简化描述,而不是指示或暗示所指的设备或元件必须具有特定的方位-以特定的方位构造和操作因此不能理解为对本实用新型的限制。In order to explain the technical content of the utility model in detail, the purpose and effect achieved are described below in combination with the embodiments and the accompanying drawings. In the description of the embodiments, it should be understood that the terms indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, which are only for the convenience of describing the embodiments and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of the utility model.

本实用新型提供的一种实施例:一种可移动式高大支模架,参考图1-5,主要包括底座、满堂架以及承重轮7。An embodiment provided by the utility model is a movable tall formwork frame, referring to FIGS. 1-5 , which mainly comprises a base, a full frame and load-bearing wheels 7 .

其中底座包括上层底梁4、下层底梁1,下层底梁1和多个上层底梁4相互层叠固定,本实施例的单个上层底梁4、下层底梁1为工字钢构件,工字钢长度6米,下层七根用于支撑立杆6,上层四根用于顶升受力支撑承重轮7,其中上层底梁4与地面之间形成有用于安装顶升器的空间。The base includes an upper bottom beam 4 and a lower bottom beam 1. The lower bottom beam 1 and multiple upper bottom beams 4 are stacked and fixed to each other. The single upper bottom beam 4 and the lower bottom beam 1 in this embodiment are I-beam components. The length of the I-beam is 6 meters. The seven lower beams are used to support the vertical poles 6, and the four upper beams are used to lift the load-bearing wheels 7. A space for installing a lifter is formed between the upper bottom beam 4 and the ground.

满堂架包括立杆6,立杆6可以为盘扣式立杆方便连接,立杆6间距900mm或1200mm,两个以上立杆6均布固定在下层底梁1上,两个以上立杆6的靠近立杆6顶部下两米处设置有脚手板8,立杆6顶部设置有用于支撑模板16的可调顶托15,可调顶托15设置有一定的下行高度范围,承重轮7以可拆卸的方式安装在上层底梁4的底部。The full-frame includes uprights 6, which can be disc-type uprights for easy connection. The distance between uprights 6 is 900mm or 1200mm. Two or more uprights 6 are evenly distributed and fixed on the lower bottom beam 1. Scaffolding boards 8 are provided two meters below the tops of the two or more uprights 6. Adjustable top supports 15 for supporting formwork 16 are provided on the tops of the uprights 6. The adjustable top supports 15 are provided with a certain downward height range. The load-bearing wheels 7 are detachably mounted on the bottom of the upper bottom beam 4.

通过设置上下层底梁式底座,底座本体结构稳定,底座在支模施工中与地面面接触,且接触面积大,保证施工安全及施工精度;满堂架体采用可调顶托15,在拆除支模和相关连杆件后通过调节下行高度范围获得顶升空间,然后即可使用顶升器对架体和底座整体顶升,通过安装承重轮7本架体可实现移动式周转,拆除的物料可以堆放于脚手板8上一同周转,相比现有技术中利用顶升装置和承重轮进行承重施工的过程,极大保障了人员设备安全和施工精度,且相对现有技术只需投入四分之一材料,大大减少周转材料一次投入量,提高周转率,降低成本,可减少搭拆架体工作量,减少材料周转时间,提高拆模效率,大大提高了场地移交效率,利于后续穿插施工,加快施工进度,综上达到本实施例的目的。By setting up the upper and lower bottom beam bases, the base body structure is stable, the base is in contact with the ground surface during the formwork construction, and the contact area is large, ensuring construction safety and construction accuracy; the full-floor frame adopts an adjustable top support 15, and after removing the formwork and related connecting rods, the jacking space is obtained by adjusting the downward height range, and then the jacking device can be used to jack up the frame and the base as a whole. By installing the load-bearing wheels 7, the frame can realize mobile turnover, and the removed materials can be stacked on the scaffolding board 8 for turnover together. Compared with the process of using the jacking device and the load-bearing wheels for load-bearing construction in the prior art, the safety of personnel and equipment and the construction accuracy are greatly guaranteed, and compared with the prior art, only one-quarter of the materials need to be invested, which greatly reduces the one-time input of turnover materials, improves the turnover rate, and reduces costs. It can reduce the workload of erecting and dismantling the frame, reduce the material turnover time, improve the efficiency of demoulding, greatly improve the efficiency of site handover, facilitate subsequent interlaced construction, and speed up the construction progress. In summary, the purpose of this embodiment is achieved.

具体的,参考图2所示,相邻两个立杆6之间沿其高度方向均布固定有水平杆11,上下相邻两个水平杆11之间通过斜拉杆5相连,具体的,架体外围一圈满设斜拉杆5,中部隔一拉一,上下相邻两个斜拉杆5之间呈V字形设置;立杆6之间还设置有水平剪刀撑17,具体如图3所示,本实施例具体设置两道水平剪刀撑17,扫地杆处一道,间隔4.5米一道;满堂架的外侧设置有钢丝绳2,钢丝绳2两端分别与脚手板8和立杆6的连接节点、下层底梁1斜拉结,拉结示意图如图4所示,位于脚手板8外围的立杆6的外部上侧固定连接有防护围栏9;如图1所示,立杆6上还设置有用于与满堂架外的固定架和/或移动架连接的连接钢管3,两个以上满堂架与移动架/固定架安装连接后一起用于形成厂房顶梁模板的整体支撑架,示意图如图3所示。Specifically, as shown in Figure 2, horizontal rods 11 are evenly distributed and fixed between two adjacent vertical rods 6 along their height direction, and the upper and lower adjacent horizontal rods 11 are connected by diagonal braces 5. Specifically, the outer periphery of the frame is fully equipped with diagonal braces 5, and one is pulled in the middle, and the upper and lower adjacent diagonal braces 5 are arranged in a V shape; horizontal scissors braces 17 are also provided between the vertical rods 6, as shown in Figure 3, and two horizontal scissors braces 17 are specifically provided in this embodiment, one at the sweeping rod, and one at an interval of 4.5 meters; a steel wire rope 2 is provided on the outside of the full-height frame, and the two ends of the steel wire rope 2 are respectively obliquely tied to the connection nodes of the scaffolding board 8 and the vertical rod 6 and the lower bottom beam 1, and the tying diagram is shown in Figure 4. A protective fence 9 is fixedly connected to the outer upper side of the vertical rod 6 located outside the scaffolding board 8; as shown in Figure 1, a connecting steel pipe 3 for connecting to a fixed frame and/or a mobile frame outside the full-height frame is also provided on the vertical rod 6. After more than two full-height frames are installed and connected with the mobile frame/fixed frame, they are used together to form an integral support frame for the factory roof beam template, as shown in Figure 3.

本实施例的工作流程为:The workflow of this embodiment is:

首先按排布图弹线定位上下两层垂直交错摆放工字钢,并焊接成底座,相交处双面满焊牢固,并在四个边角相交处采用加劲板对上层底梁4、下层底梁1的连接处进行焊接加强,然后在下层底梁1顶端上标记出架体外围一圈立杆6中心位置,在标记位置焊接直径20cm以上的钢筋头,高度不小于10cm,用于固定外排立杆6位置,防止架体滑移,将相邻两个立杆6之间通过水平杆11进行卡扣相连,并将上下两个相邻的水平杆11通过斜拉杆5进行插梢相连,最终形成满堂架体,单个架体搭设完成后再与周围架体连成整体,确保每个流水区域的架体形成整体稳定的受力体,并在架体顶部往下2米处满设一道脚手板8,并在脚手板8外部再设置一道防护围栏9,架体搭设完成后在四个方面均用钢丝绳2进行斜拉加固,钢丝绳2拉结位置为脚手板8四角立杆节点与下层底梁1四角节点处,并按照左上与右下及右上与左下对拉形式连接,且钢丝绳须拉结绷紧,架体每个面设置2道,共设置8道,与架体组合成整体,将立杆6的顶部通过可调顶托15安装水平模板,竖直模板之间则通过对拉螺杆固定,后面移交钢筋布置与浇筑混凝土施工,之后工作完成后需要移动本架体时,首先将木枋模板进行拆卸,并将木枋模板后的材料堆放在脚手板8,便于后续的整体移动,然后通过调节可调顶托15,将满堂架整体降低,拆除连接钢管3,后用四个千斤顶将上层底梁4向上顶升,使得整个架体移动到一定高度,此时工作人员将安装螺栓14分别插入对应的安装孔10中,此时将安装板12外部预留的安装孔穿过安装孔10的底端,此时将安装螺母13旋入安装螺栓14中,使得安装板12固定在上层底梁4上,此时松开并移除千斤顶,使架体临时落于承重轮7上,之后进行满堂架的整体移架,保证了使用过程中的稳定性。First, according to the layout diagram, the upper and lower layers of I-beams are positioned vertically and staggered, and welded into a base. The intersection is fully welded on both sides, and the connection between the upper bottom beam 4 and the lower bottom beam 1 is welded and strengthened with stiffening plates at the intersection of the four corners. Then, the center position of the vertical pole 6 of the outer circle of the frame is marked on the top of the lower bottom beam 1. At the marked position, a steel bar head with a diameter of more than 20 cm and a height of not less than 10 cm is welded to fix the position of the outer row of vertical poles 6 to prevent the frame from slipping. The adjacent vertical poles 6 are connected by snaps through the horizontal rod 11, and The upper and lower adjacent horizontal rods 11 are connected by diagonal rods 5 to finally form a full-frame frame. After the single frame is erected, it is connected to the surrounding frames to ensure that the frame in each water flow area forms an overall stable force-bearing body, and a scaffolding board 8 is fully installed 2 meters below the top of the frame, and a protective fence 9 is set outside the scaffolding board 8. After the frame is erected, it is reinforced with steel wire ropes 2 on four sides. The steel wire ropes 2 are tied at the four corner nodes of the scaffolding board 8 and the four corner nodes of the lower bottom beam 1, and are arranged according to the upper left and lower right. The upper right and lower left are connected in a pulling form, and the wire rope must be tied and tightened. Two wires are set on each surface of the frame, and a total of 8 wires are set, which are combined with the frame into a whole. The top of the vertical pole 6 is installed with a horizontal template through an adjustable top support 15, and the vertical templates are fixed by tension screws. The steel bar arrangement and concrete pouring construction are handed over later. When the work is completed and the frame needs to be moved, the wooden formwork is first disassembled, and the materials behind the wooden formwork are stacked on the scaffolding board 8 to facilitate the subsequent overall movement. Then, the adjustable top support 15 is adjusted to lower the full-hall frame as a whole. , remove the connecting steel pipe 3, and then use four jacks to lift the upper bottom beam 4 upwards, so that the entire frame moves to a certain height. At this time, the staff will insert the mounting bolts 14 into the corresponding mounting holes 10 respectively, and then pass the mounting holes reserved on the outside of the mounting plate 12 through the bottom ends of the mounting holes 10. At this time, screw the mounting nuts 13 into the mounting bolts 14 to fix the mounting plate 12 on the upper bottom beam 4. At this time, loosen and remove the jacks, so that the frame temporarily falls on the load-bearing wheels 7, and then the overall frame of the full-frame is moved to ensure stability during use.

虽然,上文中已经用具体实施方式,对本实用新型作了详尽的描述,但在本实用新型基础上,可以对之作一些修改或改进,这对本领域技术人员而言是显而易见的。因此,在不偏离本实用新型精神的基础上所做的这些修改或改进,均属于本实用新型要求保护的范围。Although the present invention has been described in detail above with specific implementation methods, it is obvious to those skilled in the art that some modifications or improvements can be made to the present invention. Therefore, these modifications or improvements made without departing from the spirit of the present invention are within the scope of protection claimed by the present invention.

Claims (6)

1. The utility model provides a movable high big die carrier which characterized in that: the bearing wheel comprises a base, a full hall frame and bearing wheels (7), wherein the base comprises an upper-layer bottom beam (4) and a lower-layer bottom beam (1), more than two upper-layer bottom beams (4) and more than two lower-layer bottom beams (1) are mutually overlapped and fixed, the upper-layer bottom beams (4) are provided with mounting holes (10), the tops of the bearing wheels (7) are fixedly connected with mounting plates (12), the mounting holes (10) are connected with the mounting plates (12) through mounting bolts (14) and mounting nuts (13), and the bearing wheels (7) are detachably arranged between the upper-layer bottom beams (4) and the ground; the full hall frame comprises upright rods (6), more than two upright rods (6) are uniformly distributed and fixed on a lower-layer bottom beam (1), a scaffold board (8) is arranged between the middle parts of the upright rods (6), and an adjustable jacking (15) is arranged at the top of each upright rod (6).
2. The movable high count formwork of claim 1 wherein: the upright rod (6) is also provided with a connecting steel pipe (3) used for being connected with a fixed object and/or a movable object outside the hall frame.
3. The movable high count formwork of claim 1 wherein: horizontal rods (11) are uniformly distributed and fixed between two adjacent vertical rods (6) along the height direction of the vertical rods, the upper adjacent vertical rods and the lower adjacent vertical rods (11) are connected through diagonal rods (5), and the upper adjacent vertical rods and the lower adjacent vertical rods are arranged in a V shape.
4. The movable high count formwork of claim 1 wherein: a horizontal scissor support (17) is also arranged between the vertical rods (6).
5. The movable high count formwork of claim 1 wherein: the outside of filling the hall frame is provided with wire rope (2), wire rope (2) both ends respectively with scaffold board (8) and pole setting (6) connected node, lower floor's floorpan (1) draw to one side and tie.
6. The movable high count formwork of claim 1 wherein: the upper side of the outer part of the upright rod (6) positioned at the periphery of the scaffold board (8) is fixedly connected with a protective fence (9).
CN202321514480.4U 2023-06-14 2023-06-14 Movable high and large formwork support Expired - Fee Related CN220725767U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321514480.4U CN220725767U (en) 2023-06-14 2023-06-14 Movable high and large formwork support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321514480.4U CN220725767U (en) 2023-06-14 2023-06-14 Movable high and large formwork support

Publications (1)

Publication Number Publication Date
CN220725767U true CN220725767U (en) 2024-04-05

Family

ID=90500952

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321514480.4U Expired - Fee Related CN220725767U (en) 2023-06-14 2023-06-14 Movable high and large formwork support

Country Status (1)

Country Link
CN (1) CN220725767U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116876818A (en) * 2023-06-14 2023-10-13 中国建筑第五工程局有限公司 Construction method of movable high and large formwork

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116876818A (en) * 2023-06-14 2023-10-13 中国建筑第五工程局有限公司 Construction method of movable high and large formwork

Similar Documents

Publication Publication Date Title
CN207974601U (en) A kind of large size earthing concrete tank dome steel support structure
CN220725767U (en) Movable high and large formwork support
CN107119576A (en) Pier body construction safety protection platform
CN219138459U (en) A device for dismantling and reinforcing Shikumen historical buildings
CN211736322U (en) Climb a fabricated wall auxiliary device
CN114856086A (en) Reinforced concrete double-limb bent frame column for heavy factory building and construction method thereof
CN207227957U (en) Pier body construction safety protection platform
CN213174700U (en) Building block type splicing operation frame
CN222990595U (en) Multifunctional portal for suspension bridge construction
CN106639303B (en) Elevator dedicated hydraulic creeping formwork frame body
CN204876577U (en) Building construction system
CN219863968U (en) Construction platform of prestressing force structure
CN208009267U (en) A kind of middle cross beam tensioning protective platform
CN117488647A (en) A kind of steel truss web rod composite beam suitable for the upper and lower floors of urban elevated highways and its construction method
CN214739896U (en) Ultrahigh-rise framework beam formwork system for ultrahigh-rise
CN213233106U (en) An arch bracket
CN211974259U (en) Adjustable scaffold bracket of encorbelmenting and scaffold structure of encorbelmenting
CN210685313U (en) Safe convenient house steel connection structure
CN209854576U (en) A trolley for the construction of slab culverts or passages
CN207904774U (en) The construction equipment of anticollision barrier casting concrete on a kind of bridge
CN214942292U (en) Stiff column operation platform
CN204754940U (en) Portable steel pipe framed bent of concrete construction
CN206940276U (en) A simple cantilever crane for high-speed railway shutters
CN204326526U (en) Concrete column cast-in-place structural traveling shuttering support system
CN220245206U (en) Heavy-duty externally hung type construction elevator transportation channel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20240405

CF01 Termination of patent right due to non-payment of annual fee