CN220692765U - Pre-buried formula of placing interim pipeline that combines with expansion joint passes a road box - Google Patents
Pre-buried formula of placing interim pipeline that combines with expansion joint passes a road box Download PDFInfo
- Publication number
- CN220692765U CN220692765U CN202322342344.8U CN202322342344U CN220692765U CN 220692765 U CN220692765 U CN 220692765U CN 202322342344 U CN202322342344 U CN 202322342344U CN 220692765 U CN220692765 U CN 220692765U
- Authority
- CN
- China
- Prior art keywords
- box body
- expansion joint
- placing
- cover plate
- box
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000000463 material Substances 0.000 claims description 5
- 229910000831 Steel Inorganic materials 0.000 claims description 3
- 239000010959 steel Substances 0.000 claims description 3
- 239000002344 surface layer Substances 0.000 claims description 3
- 230000007797 corrosion Effects 0.000 claims 1
- 238000005260 corrosion Methods 0.000 claims 1
- 238000005096 rolling process Methods 0.000 abstract description 5
- 238000004519 manufacturing process Methods 0.000 abstract description 2
- 238000010276 construction Methods 0.000 description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 229910001220 stainless steel Inorganic materials 0.000 description 2
- 239000010935 stainless steel Substances 0.000 description 2
- 238000009825 accumulation Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000003973 paint Substances 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model provides a pre-buried type passing box combined with an expansion joint and used for placing a temporary pipeline, which comprises a box body, a cover plate, handle holes, a hinge and expansion bolts, wherein the bottom of the box body is fixed with a concrete foundation through the expansion bolts, one end side of the cover plate is connected with the box body through the hinge, and a plurality of handle holes are arranged at intervals on the other end side of the cover plate. The embedded type road passing box combined with the expansion joint and capable of placing the temporary pipeline has the advantages of simple and compact structure, strong practicability and convenience for mass production; the pipeline is not damaged by rolling of the past non-motor vehicles and pedestrians, potential safety hazards caused to the passing of the non-motor vehicles and pedestrians are avoided, and the pipeline can be integrated with the environment of a district or a factory to the greatest extent, so that the influence on the environment appearance is avoided.
Description
Technical Field
The utility model relates to the technical field of pipeline laying protection and urban landscapes, in particular to a pre-buried road passing box combined with an expansion joint and used for placing temporary pipelines.
Background
In the built district or factory, temporary pipelines such as watering water pipes, cable wires and the like often pass through the road, and the pipelines are directly arranged on the road surface, so that the environment appearance of the district and factory is affected, rolling damage is caused to the district and factory by passing non-motor vehicles and pedestrians, and the traffic safety of the motor vehicles and pedestrians is also affected. Although the protection devices designed by some patent utility models (the issued publication number CN 207442412U) have a qualitative protection function, the landscape effect is poor, the surface is outstanding, and certain potential safety hazards exist for the passing of non-motor vehicles and pedestrians, so that the protection devices are not suitable for sidewalks and established environments. The utility model carries out integral construction on the temporary pipeline through-road box at the construction stage of the district or the factory, and is combined with the expansion joint, thereby not only ensuring that the pipeline is not damaged by rolling of the past non-motor vehicles and pedestrians and avoiding potential safety hazards to the passing of the non-motor vehicles and pedestrians, but also integrating the pipeline with the district or the factory to the greatest extent and avoiding influencing the environment appearance.
Disclosure of Invention
Aiming at the defects in the prior art, the utility model provides a pre-buried passing box combined with an expansion joint and used for placing a temporary pipeline, so as to solve the problems that the temporary passing pipeline influences the passing safety of non-motor vehicles and pedestrians, and the past non-motor vehicles and pedestrians crush and damage the temporary passing pipeline to influence the environmental aspects of a district or a factory.
The technical scheme adopted by the utility model is as follows:
a pre-buried formula of placing interim pipeline crossing box that combines with the expansion joint, wherein: the novel concrete box comprises a box body, a cover plate, handle holes, hinges and expansion bolts, wherein the expansion joints are tightly arranged on one side of the box body, the bottom of the box body is fixed with a concrete foundation through the expansion bolts, one end side of the cover plate is connected with the box body through the hinges, and a plurality of handle holes are formed in the other end side of the cover plate at intervals.
Preferably, the embedded road passing box combined with the expansion joint for placing the temporary pipeline, wherein: the box body material is selected from one of steel plate and stainless steel plate, the height of the box body is 150mm-200mm, the width is 150mm-200mm, and the length is the same as the width of a non-vehicle road.
Preferably, the embedded road passing box combined with the expansion joint for placing the temporary pipeline, wherein: after the box body is covered with the cover plate, the upper surface of the cover plate and the adjacent non-pavement surface layer are on the same horizontal plane.
Preferably, the embedded road passing box combined with the expansion joint for placing the temporary pipeline, wherein: the width, length and material of the cover plate are the same as those of the box body.
Preferably, the embedded road passing box combined with the expansion joint for placing the temporary pipeline, wherein: the handle hole is arranged on the openable end side of the cover plate, the distance between the handle hole and the openable end side of the cover plate is 20-50mm, the diameter of the handle hole is 10-15mm, and the interval is 0.5-0.8m.
Preferably, the embedded road passing box combined with the expansion joint for placing the temporary pipeline, wherein: the middle of the bottom of the box body is high, and the two sides of the bottom of the box body are low.
Preferably, the embedded road passing box combined with the expansion joint for placing the temporary pipeline, wherein: the box body is closely attached to the expansion joint.
The utility model has the advantages that:
(1) The embedded type road passing box combined with the expansion joint and capable of placing the temporary pipeline has the advantages of simple and compact structure, strong practicability and convenience for mass production; the pipeline is not damaged by rolling of the past non-motor vehicles and pedestrians, potential safety hazards caused to the passing of the non-motor vehicles and pedestrians are avoided, and the pipeline can be integrated with the environment of a district or a factory to the greatest extent, so that the influence on the environment appearance is avoided.
Drawings
Fig. 1 is a schematic structural view of the present utility model.
Detailed Description
The utility model will be further described with reference to the following specific drawings and examples.
As shown in fig. 1: the embodiment provides a pre-buried formula of placing temporary pipeline crossing box that combines with the expansion joint, wherein: the novel concrete box comprises a box body 1, a cover plate 2, handle holes 3, hinges 4 and expansion bolts 5, wherein the bottom of the box body 1 is fixed with a concrete foundation 6 through the expansion bolts 5, one end side of the cover plate 2 is connected with the box body 1 through the hinges 4, and a plurality of handle holes 3 are formed in the other end side of the cover plate 2 at intervals.
The box body 1 is installed and is carried out in step with the construction of non-car road, and non-car road is except that the car is current, because intensity can not satisfy the car and rolls, and expansion joint 7 is hugged closely to box body 1 and is installed, places on concrete foundation 6, and the bottom is fixed with concrete foundation 6 through expansion bolts 5.
The box body 1 is made of one of steel plates and stainless steel plates, the height of the box body 1 is 150mm-200mm, the width of the box body is 150mm-200mm, and the length of the box body is the same as the width of a non-vehicle road; after the box body 1 is covered with the cover plate 2, the upper surface of the cover plate 2 and surrounding roads are on the same horizontal plane; the width, the length and the material of the cover plate 2 are the same as those of the box body 1; the handle hole 3 is arranged on the openable end side of the cover plate 2, the distance between the handle hole 3 and the openable end side of the cover plate 2 is 20-50mm, the diameter of the handle hole is 10-15mm, and the interval is 0.5-0.8m; the middle of the bottom of the box body 1 is high, and the two sides of the bottom are low for draining water, so that water accumulation at the bottom is prevented.
The pipeline with temporary passing requirement is placed in the box body 1, the cover plate 2 is covered, the upper surface of the cover plate 2 and the upper surface of the adjacent non-pavement surface layer 8 are on the same horizontal plane, and the non-pavement is not affected.
The upper surface of the cover plate 2 can be subjected to beautifying treatment such as pattern pressing, paint spraying and the like, and the color of the pattern is determined according to the landscape requirements.
The embedded type passing box capable of placing the temporary pipeline is suitable for a district or a factory, and is integrally constructed in the construction stage of the district or the factory, and is combined with an expansion joint, so that the pipeline is not damaged by rolling of a past non-motor vehicle and a pedestrian, potential safety hazards to the passing of the non-motor vehicle and the pedestrian are avoided, and the pipeline can be integrated with the environment of the district or the factory to the greatest extent, and the influence on the environment appearance of the district or the factory is avoided.
Finally, it should be noted that the above-mentioned embodiments are only for illustrating the technical solution of the present utility model, and not for limiting the same, and although the present utility model has been described in detail with reference to examples, it should be understood by those skilled in the art that modifications and equivalents may be made to the technical solution of the present utility model without departing from the spirit and scope of the technical solution of the present utility model, and all such modifications and equivalents are intended to be encompassed in the scope of the claims of the present utility model.
Claims (6)
1. The utility model provides a pre-buried formula of placing temporary pipeline that combines with the expansion joint crossing box which characterized in that: including box body (1), apron (2), handle hole (3), hinge (4), expansion bolts (5), expansion joint (7) are hugged closely to box body (1) one side and are set up, box body (1) bottom is fixed with concrete foundation (6) through expansion bolts (5), apron (2) one end side is connected with box body (1) through hinge (4), other end side interval sets up a plurality of handle holes (3) on apron (2).
2. The pre-buried road passing box combined with the expansion joint for placing the temporary pipeline according to claim 1, wherein: the material of box body (1) is selected from one of steel sheet, corrosion resistant plate, the height of box body (1) is 150mm-200mm, and width is 150mm-200mm, and length is the same with non-lane width.
3. The pre-buried road passing box combined with the expansion joint for placing the temporary pipeline according to claim 1, wherein: after the box body (1) is covered with the cover plate (2), the upper surface of the cover plate (2) and the adjacent non-pavement surface layer (8) are on the same horizontal plane.
4. The pre-buried road passing box combined with the expansion joint for placing the temporary pipeline according to claim 1, wherein: the width, the length and the material of the cover plate (2) are the same as those of the box body (1).
5. The pre-buried road passing box combined with the expansion joint for placing the temporary pipeline according to claim 1, wherein: the handle hole (3) is arranged on the openable end side of the cover plate (2), the distance between the handle hole (3) and the openable end side of the cover plate (2) is 20-50mm, the diameter of the handle hole (3) is 10-15mm, and the interval is 0.5-0.8m.
6. The pre-buried road passing box combined with the expansion joint for placing the temporary pipeline according to claim 1, wherein: the middle of the bottom of the box body (1) is high, and the two sides of the bottom are low.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322342344.8U CN220692765U (en) | 2023-08-30 | 2023-08-30 | Pre-buried formula of placing interim pipeline that combines with expansion joint passes a road box |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322342344.8U CN220692765U (en) | 2023-08-30 | 2023-08-30 | Pre-buried formula of placing interim pipeline that combines with expansion joint passes a road box |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220692765U true CN220692765U (en) | 2024-03-29 |
Family
ID=90370653
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202322342344.8U Active CN220692765U (en) | 2023-08-30 | 2023-08-30 | Pre-buried formula of placing interim pipeline that combines with expansion joint passes a road box |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220692765U (en) |
-
2023
- 2023-08-30 CN CN202322342344.8U patent/CN220692765U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN220692765U (en) | Pre-buried formula of placing interim pipeline that combines with expansion joint passes a road box | |
CN205476655U (en) | Satisfy installation of extra -high voltage GIS device context with totally closed removal factory building track | |
CN206553994U (en) | A kind of road and bridge guardrail cleaning plant | |
CN104047247B (en) | Fixed central strip pier | |
CN211872617U (en) | Permanent isolation guardrail for urban bridge | |
CN219450824U (en) | Concrete invisible well lid device for permeable concrete pavement | |
CN210049130U (en) | Mountain area mountain-by-mountain highway bellows shed tunnel | |
CN205857095U (en) | Latch detachable chain structure highway guard rail base and guard rail thereof | |
CN211472026U (en) | Assembled sidewalk | |
CN111305351A (en) | Municipal works drainage pipe road junction device | |
CN220151258U (en) | Inspection shaft structure of marking time convenient to installation | |
CN216838913U (en) | Compromise U type beam structure of piping lane storehouse and footbridge function | |
CN213509964U (en) | Isolating device for municipal construction | |
KR100260313B1 (en) | Method for constructing fenses and construction thereof | |
CN221523299U (en) | Comprehensive bridge deck runoff collection system for bridge platform | |
CN220150124U (en) | Snow falling prevention device for totally-enclosed sound barrier | |
CN203977337U (en) | Fixed central strip pier | |
CN217380008U (en) | Municipal water conservancy project encloses fender device that punches a hole | |
CN210049126U (en) | Urban road safety island | |
CN112878191B (en) | Bridge deck asphalt pavement structure based on renewable energy conversion and paving process | |
CN212505942U (en) | Reflective upright pole with elastic part or flexible part | |
CN214069435U (en) | Prepackage type assembled power cable ditch | |
KR101519373B1 (en) | Smart solar way for separation from the damage as a collision of car | |
CN221589252U (en) | Expansion joint embedded bar protection device | |
CN213365970U (en) | Municipal works are with bridge cable wire winding warning device that can stretch |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |