CN220692747U - Cable bridge suspension hook - Google Patents

Cable bridge suspension hook Download PDF

Info

Publication number
CN220692747U
CN220692747U CN202322367229.6U CN202322367229U CN220692747U CN 220692747 U CN220692747 U CN 220692747U CN 202322367229 U CN202322367229 U CN 202322367229U CN 220692747 U CN220692747 U CN 220692747U
Authority
CN
China
Prior art keywords
bridge
rod
cable
suspension hook
shell
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322367229.6U
Other languages
Chinese (zh)
Inventor
田玲莉
邵亮
曹政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Hongchuwei Technology Co ltd
Original Assignee
Wuhan Hongchuwei Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Hongchuwei Technology Co ltd filed Critical Wuhan Hongchuwei Technology Co ltd
Priority to CN202322367229.6U priority Critical patent/CN220692747U/en
Application granted granted Critical
Publication of CN220692747U publication Critical patent/CN220692747U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a cable bridge suspension hook, which relates to the field of cable bridges and comprises the following components: the hanging assembly comprises a bridge assembly and a hook assembly, the bridge assembly comprises a bridge shell, a profile hole is formed in the surface of the bridge shell, a sliding plate is arranged inside the bridge shell, the lower end of the sliding plate is connected with a pressing block, a clamping block is arranged on the lower side of the pressing block, a mounting hole is formed in the bottom of the bridge shell, the hook assembly comprises a fixing frame, the upper end of the fixing frame is connected with a mounting rod, positioning holes are formed in the two sides of the fixing frame, an elastic assembly is arranged inside the fixing frame, the lower end of the elastic assembly is connected with a hook body, the hook body comprises a inserting rod, the lower end of the inserting rod is connected with a stop lever, and the lower end of the stop lever is connected with a sliding rod. The utility model solves the problems that the existing cable bridge relates to a hanging hook which is poor in stability and inconvenient to detach and adjust the distance, thereby affecting installation.

Description

Cable bridge suspension hook
Technical Field
The utility model relates to the technical field of cable bridges, in particular to a cable bridge suspension hook.
Background
The cable bridge frame is divided into a groove type structure, a tray type structure, a ladder frame type structure, a grid type structure and the like, and consists of a bracket, a bracket arm, an installation accessory and the like. Through retrieving, prior art (application number: CN 202222080886.8), the document describes "an assembled cable bridge with hang function, including assembled bridge, suspension board and reservation groove, assembled bridge bottom equidistance welding has the structure seat, the structure seat outside is connected with the suspension board through the axostylus axostyle, suspension board inside both ends have been seted up the reservation groove, the couple is installed through the axostylus axostyle at reservation inslot both ends, bottom equidistance welding has the stiffening beam in the assembled bridge, assembled bridge both sides welding has the strengthening rib. The utility model has the hanging function, and is convenient for hanging the cable after the assembly bridge frame is fully filled. "
However, the prior art fabricated cable tray has a hanging function, but still has some disadvantages: after the hook that current cable testing bridge involved outwards opens, the cable is directly hung in the upside arc wall, and the couple upside does not have any protective structure, consequently cable articulates the part and does not form the parcel effect of closure, lead to the cable to meet with the bottom collision from the position in the couple outside after, break away from the cable from the couple upside easily and drop, lead to the stability of hanging relatively poor, secondly, the position of couple is unadjustable, lead to the interval between the couple unadjustable, during the testing bridge installation, probably meet crossbeam (spandrel girder) of building, or fire control pipeline facility, lead to producing the conflict of installation space with the position of couple, and then influence the installation of testing bridge.
Disclosure of Invention
In order to overcome the defects existing in the prior art, the cable bridge suspension hook is provided at present, so that the problems that the stability of the existing cable bridge suspension hook is poor, the distance is inconvenient to detach and adjust, and the installation is affected are solved.
To achieve the above object, there is provided a cable bridge suspension hook comprising: the hanging assembly comprises a bridge assembly and a hook assembly, the bridge assembly comprises a bridge shell, a profile hole is formed in the surface of the bridge shell, a sliding plate is arranged inside the bridge shell, the lower end of the sliding plate is connected with a pressing block, a clamping block is arranged on the lower side of the pressing block, a mounting hole is formed in the bottom of the bridge shell, the hook assembly comprises a fixing frame, the upper end of the fixing frame is connected with a mounting rod, positioning holes are formed in the two sides of the fixing frame, an elastic assembly is arranged inside the fixing frame, the lower end of the elastic assembly is connected with a hook body, the hook body comprises a inserting rod, the lower end of the inserting rod is connected with a stop lever, and the lower end of the stop lever is connected with a sliding rod.
Further, the bridge shell is of a U-shaped structure, the inner wall of the bridge shell is provided with a sliding groove, a first spring is arranged in the sliding groove, two ends of the sliding plate are slidably connected in the sliding groove, and meanwhile the sliding plate is located at the lower end of the first spring.
Further, the briquetting is connected at the lower extreme middle part of slide through vertical pole, and the briquetting lower extreme is equipped with arc sphere structure.
Further, the clamping block is arranged at an included angle of the inner wall of the bridge frame shell, and the upper end of the clamping block is provided with a clamping groove.
Furthermore, clamping rods are symmetrically welded at the upper ends of the mounting rods, the clamping rods are matched and inserted with the clamping grooves, and the mounting rods are matched and inserted with the mounting holes.
Further, the elastic component is including being splayed articulated telescopic link, and telescopic link upper end articulates at the inboard top of mount to be connected with horizontal second spring between the telescopic link, and the telescopic link lower extreme articulates with the slide bar inboard end.
Furthermore, the sliding rod is horizontally and slidably inserted with the two side plates of the fixing frame, and the inserting rod is matched and inserted with the positioning hole.
The utility model has the beneficial effects that:
1. the telescopic rod and the second spring which are included by the elastic component, and the inserted link, the stop lever and the slide bar which are included by the hook body are utilized, so that the cable is conveniently placed behind the stop lever, the slide bar has a bearing effect on the cable, and then the slide bar is pulled inwards by the telescopic rod, so that the inserted link is inserted into the positioning hole, the cable is completely sealed and wrapped, and the stability of cable installation is enhanced;
2. utilize the bridge frame shell that the bridge frame subassembly includes to and the inside slide and the briquetting of shell for with the whole upward movement of couple subassembly, upwards push away the briquetting through the installation pole, and then break away from the draw-in groove with the draw-in bar, then rotatory draw-in bar direction, make unanimous with mounting hole length direction, can take out the couple subassembly downwards, then can install in another department and be equipped with the place of mounting hole and fixture block, and then realize dismantling the regulation interval, be convenient for install in complicated building environment.
Drawings
Fig. 1 is a schematic front view of an embodiment of the present utility model.
Fig. 2 is a schematic side view of a suspension assembly according to an embodiment of the present utility model.
Fig. 3 is a schematic side view of a bridge assembly according to an embodiment of the utility model.
Fig. 4 is a schematic side cross-sectional view of a hook assembly according to an embodiment of the utility model.
In the figure: 1. a shaped hole; 2. a suspension assembly; 21. a bridge assembly; 211. a bridge housing; 212. a chute; 213. a slide plate; 214. a first spring; 215. briquetting; 216. a mounting hole; 217. a clamping block; 218. a clamping groove; 22. a hook assembly; 221. a fixing frame; 2212. positioning holes; 222. a mounting rod; 2222. a clamping rod; 23. an elastic component; 231. a telescopic rod; 232. a second spring; 24. a hook body; 241. a rod; 242. a stop lever; 243. and a slide bar.
Detailed Description
Other advantages and effects of the present utility model will become apparent to those skilled in the art from the following disclosure, which describes the embodiments of the present utility model with reference to specific examples. The utility model may be practiced or carried out in other embodiments that depart from the specific details, and the details of the present description may be modified or varied from the spirit and scope of the present utility model.
Referring to fig. 1 to 4, the present utility model provides a cable bridge suspension hook comprising: and a suspension assembly 2.
Specifically, suspension assembly 2 includes bridge assembly 21 and couple subassembly 22, and bridge assembly 21 includes bridge housing 211, and the type hole 1 has been seted up on the bridge housing 211 surface, the inside slide 213 that is equipped with of bridge housing 211, and slide 213 lower extreme is connected with briquetting 215, briquetting 215 passes through vertical pole and connects in the lower extreme middle part of slide 213, and briquetting 215 lower extreme is equipped with the arc sphere structure, and the downside of briquetting 215 is equipped with fixture block 217, the contained angle department of bridge housing 211 inner wall is located to fixture block 217, and the draw-in groove 218 has been seted up to the fixture block 217 upper end, and install mounting hole 216 has been seted up to the bottom of bridge housing 211, couple subassembly 22 includes mount 221, and mount 221 upper end is connected with installation pole 222, and the locating hole 2212 has been seted up to the both sides of mount 221, the welding of installation pole 222 upper end symmetry has clamping pole 2222, and clamping pole 2222 and draw-in groove 218 matees grafting, and installation pole 222 and mounting hole 216 matees grafting, the inside elastic component 23 that is equipped with of mount 221, and elastic component 23 lower extreme is connected with couple body 24, couple body 24 includes the inserted bar 241, and inserted bar 241 lower extreme is connected with the catch 242, and bar 242 is connected with slide bar 242.
In this embodiment, the hook assemblies 22 are provided with a plurality of groups at the lower end of the bridge assembly 21.
In the present embodiment, the mounting hole 216 is provided in a rectangular hole structure, and the length of the mounting hole 216 is longer than the entire length of the clamp bar 2222.
By providing the slide plate 213 and the pressing block 215, downward pressure is conveniently applied to the clamping rod 2222 installed in the clamping block 217, so that the whole hook assembly 22 is stabilized, and the clamping groove 218 realizes position limitation of the clamping rod 2222.
Specifically, the bridge housing 211 is of a U-shaped structure, the inner wall of the bridge housing 211 is provided with a chute 212, a first spring 214 is disposed in the chute 212, and two ends of the sliding plate 213 are slidably connected in the chute 212 and are located at the lower end of the first spring 214.
As a preferred embodiment, the downward elastic pressure is applied to the slide plate 213 by the first spring 214 while the upward pressing of the slide plate 213 is facilitated when the card lever 2222 is detached.
Specifically, the elastic component 23 includes a splayed hinged telescopic rod 231, the upper end of the telescopic rod 231 is hinged to the top of the inner side of the fixing frame 221, a horizontal second spring 232 is connected between the telescopic rods 231, the lower end of the telescopic rod 231 is hinged to the inner side of the sliding rod 243, the sliding rod 243 is horizontally slidably inserted into two side plates of the fixing frame 221, and the inserting rod 241 is inserted into the positioning hole 2212 in a matched manner.
As a preferred embodiment, the telescopic rod 231 is in a contracted state when the insert rod 241 slides inward by providing the telescopic rod 231, whereas the telescopic rod 231 is in a stretched state when the insert rod 241 slides outward.
During the use, dismantle the time, with the whole upward movement of couple subassembly, upwards push away the briquetting through the installation pole, and then break away from the draw-in groove with the draw-in bar, then rotatory draw-in bar direction for unanimous with mounting hole length direction, can take out the couple subassembly downwards, then install in another department is equipped with the place of mounting hole and fixture block, and then realize dismantling the regulation interval, be convenient for install in complicated building environment.
The cable bridge suspension hook can effectively solve the problems that the existing cable bridge is poor in stability, the suspension hooks are inconvenient to detach and adjust the distance, and installation is affected, and the stability of the suspension hooks after the suspension of cables is improved on the basis of the existing cable bridge suspension hook technology, so that the cables are not easy to fall off when the construction engineering is touched from the bottom, and meanwhile, the distance between the suspension hooks is convenient to adjust, so that building fire-fighting facilities and spandrel girder structures are avoided conveniently.

Claims (7)

1. A cable tray suspension hook comprising: suspension assembly (2), characterized in that: suspension subassembly (2) are including bridge subassembly (21) and couple subassembly (22), and bridge subassembly (21) are including bridge shell (211), and bridge shell (211) surface has seted up hole (1), inside slide (213) that are equipped with of bridge shell (211), and slide (213) lower extreme is connected with briquetting (215), and the downside of briquetting (215) is equipped with fixture block (217), and mounting hole (216) have been seted up to the bottom of bridge shell (211), couple subassembly (22) include mount (221), and mount (221) upper end is connected with installation pole (222), and locating hole (2212) have been seted up to the both sides of mount (221), inside elastic component (23) that are equipped with of mount (221), and elastic component (23) lower extreme is connected with couple body (24), couple body (24) are including inserted bar (241), and inserted bar (241) lower extreme are connected with pin (242), and the pin (242) lower extreme is connected with slide bar (243).
2. The cable bridge suspension hook according to claim 1, wherein the bridge housing (211) is of a U-shaped structure, a chute (212) is formed in the inner wall of the bridge housing (211), a first spring (214) is arranged in the chute (212), and two ends of the sliding plate (213) are slidably connected in the chute (212) and are located at the lower end of the first spring (214).
3. The cable bridge suspension hook according to claim 1, wherein the pressing block (215) is connected to the middle of the lower end of the sliding plate (213) through a vertical rod, and the lower end of the pressing block (215) is provided with an arc-shaped spherical structure.
4. The cable bridge suspension hook according to claim 1, wherein the clamping block (217) is arranged at an included angle of the inner wall of the bridge shell (211), and the upper end of the clamping block (217) is provided with a clamping groove (218).
5. The cable bridge suspension hook according to claim 1, wherein the upper end of the mounting rod (222) is symmetrically welded with a clamping rod (2222), the clamping rod (2222) is matched and plugged with the clamping groove (218), and the mounting rod (222) is matched and plugged with the mounting hole (216).
6. The cable bridge suspension hook according to claim 1, characterized in that the elastic component (23) comprises a splayed hinged telescopic rod (231), the upper end of the telescopic rod (231) is hinged to the top of the inner side of the fixed frame (221), a horizontal second spring (232) is connected between the telescopic rods (231), and the lower end of the telescopic rod (231) is hinged to the inner side of the sliding rod (243).
7. The cable bridge suspension hook according to claim 1, wherein the sliding rod (243) is horizontally slidably inserted into two side plates of the fixing frame (221), and the inserting rod (241) is inserted into the positioning hole (2212) in a matching manner.
CN202322367229.6U 2023-09-01 2023-09-01 Cable bridge suspension hook Active CN220692747U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322367229.6U CN220692747U (en) 2023-09-01 2023-09-01 Cable bridge suspension hook

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322367229.6U CN220692747U (en) 2023-09-01 2023-09-01 Cable bridge suspension hook

Publications (1)

Publication Number Publication Date
CN220692747U true CN220692747U (en) 2024-03-29

Family

ID=90405707

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322367229.6U Active CN220692747U (en) 2023-09-01 2023-09-01 Cable bridge suspension hook

Country Status (1)

Country Link
CN (1) CN220692747U (en)

Similar Documents

Publication Publication Date Title
CN220692747U (en) Cable bridge suspension hook
CN207555154U (en) A kind of indoor instruction display screen hanger of fast demountable
CN114725804B (en) Low-voltage distribution cabinet takes precautions against earthquakes
CN209011408U (en) One kind is exempted to lift installation system
CN210197615U (en) Butt-clamp type air duct support
CN214958462U (en) Anti-static cable bridge bracket
CN217087403U (en) Suspension type cable support with antidetonation function
CN205296536U (en) Joint formula keel connecting piece
CN104295872A (en) Equipment installation support
CN211344250U (en) Mounting engineering synthesizes a gallows
CN220033782U (en) Hook anti-falling device and crown block hook with same
CN201635228U (en) Novel flash rack ceiling system
CN219101013U (en) Wind hook structure
CN216981431U (en) Firm type anti-wind antidetonation crane span structure
CN214227718U (en) Cable bridge structure
CN214850217U (en) Bridge support for weak current bridge
CN220203778U (en) Hook ladder convenient to limit
CN217233567U (en) Automatic adjusting type explosion-proof water shed device
CN218597489U (en) Aluminum plate installation device
CN215445763U (en) Monitoring equipment fixing frame convenient to install and fix
CN210326812U (en) Tray type arc-shaped cable bridge
CN212565211U (en) Wall-mounted hydraulic telescopic support
CN219120476U (en) Indicator lamp mounting bracket
CN216203184U (en) Suspension device for stage lighting
CN216428733U (en) Tensile integrated ceiling keel structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant