CN220599100U - A kind of building structure scaffolding that is easy to install - Google Patents

A kind of building structure scaffolding that is easy to install Download PDF

Info

Publication number
CN220599100U
CN220599100U CN202321720581.7U CN202321720581U CN220599100U CN 220599100 U CN220599100 U CN 220599100U CN 202321720581 U CN202321720581 U CN 202321720581U CN 220599100 U CN220599100 U CN 220599100U
Authority
CN
China
Prior art keywords
support mechanism
rod
positioning
installation
scaffolding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202321720581.7U
Other languages
Chinese (zh)
Inventor
刘振
李作东
胡世凯
闫梦礼
郭永强
李春霞
王刚
王旭阳
母飞龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202321720581.7U priority Critical patent/CN220599100U/en
Application granted granted Critical
Publication of CN220599100U publication Critical patent/CN220599100U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

本实用新型涉及脚手架技术领域,提出了一种便于安装的建筑结构脚手架,包括滚轮、底座、安装杆、定位杆、固定杆、立杆、站板、置物板以及支撑机构,滚轮与底座固定连接,定位块与底座固定连接,安装杆与底座固定连接,定位杆与定位块转动连接,立杆与安装杆可拆卸式固定连接,支撑机构与立杆可拆卸连接,站板与支撑机构可拆卸连接,置物板与站板滑移连接。通过上述技术方案,解决了现有技术中的脚手架安装不便问题。

The utility model relates to the technical field of scaffolding and proposes a building structure scaffolding that is easy to install, including rollers, a base, a mounting rod, a positioning rod, a fixed rod, a vertical pole, a standing board, a storage board and a support mechanism. The rollers are fixedly connected to the base. , the positioning block is fixedly connected to the base, the installation rod is fixedly connected to the base, the positioning rod is rotationally connected to the positioning block, the vertical pole and the installation rod are detachably fixedly connected, the support mechanism and the vertical pole are detachably connected, the standing plate and the support mechanism are detachable Connection, the storage board and the standing board are slidingly connected. Through the above technical solution, the problem of inconvenient installation of scaffolding in the prior art is solved.

Description

一种便于安装的建筑结构脚手架A kind of building structure scaffolding that is easy to install

技术领域Technical field

本实用新型涉及脚手架技术领域,具体的,涉及一种便于安装的建筑结构脚手架。The utility model relates to the technical field of scaffolding, specifically to a building structure scaffolding that is easy to install.

背景技术Background technique

脚手架是为了保证各施工过程顺利进行而搭建的工作平台,主要用于外墙、内部装修或层高较高无法直接施工的地方,方便施工人员作业,是一种临时性的建筑工具。Scaffolding is a working platform built to ensure the smooth progress of each construction process. It is mainly used for exterior walls, interior decoration or places with high floor heights that cannot be directly constructed to facilitate construction workers. It is a temporary construction tool.

现有脚手架一般是采用多跟钢管、钢架焊接或者使用扣件安装而成,搭建时不仅费时费力而且需要多人同时协同搭建,使得搭建较为麻烦。Existing scaffolding is generally made of multiple steel pipes and steel frames welded or installed using fasteners. The construction is not only time-consuming and labor-intensive, but also requires multiple people to work together at the same time, making the construction more troublesome.

因此,为了解决上述难题,需要设计一款便于安装的建筑结构脚手架。Therefore, in order to solve the above problems, it is necessary to design a building structure scaffolding that is easy to install.

实用新型内容Utility model content

本实用新型提出一种便于安装的建筑结构脚手架,解决了相关技术中的脚手架安装不便问题。The utility model proposes a building structure scaffold that is easy to install and solves the problem of inconvenient installation of the scaffold in related technologies.

本实用新型的技术方案如下:The technical solution of the present utility model is as follows:

一种便于安装的建筑结构脚手架,包括滚轮、底座、固定杆以及站板,所述滚轮与底座固定连接,包括安装杆、定位块、定位杆、立杆、置物板以及支撑机构,所述安装杆固定连接于底座,所述定位块固定连接于底座,所述定位杆与定位块转动连接,所述立杆一端设有安装套筒,立杆带有安装套筒一端与安装杆可拆卸连接,所述安装杆、定位块、定位杆、立杆均至少设有3个;A building structure scaffolding that is easy to install, including rollers, a base, a fixed rod and a standing board. The rollers are fixedly connected to the base and include a mounting rod, a positioning block, a positioning rod, a vertical rod, a storage board and a support mechanism. The installation The rod is fixedly connected to the base, the positioning block is fixedly connected to the base, the positioning rod is rotationally connected to the positioning block, one end of the vertical rod is provided with a mounting sleeve, and one end of the vertical rod has a mounting sleeve and is detachably connected to the mounting rod. , there are at least 3 installation rods, positioning blocks, positioning rods, and vertical rods;

所述立杆上设有第一支撑机构、第二支撑机构以及第三支撑机构,第一支撑机构、第二支撑机构以及第三支撑机构均与立杆可拆卸连接,所述第二支撑机构与第一支撑机构结构相同,所述第三支撑机构与第一支撑机构结构相同,所述第一支撑机构、第二支撑机构和第三支撑机构分别沿立杆轴线方向与立杆连接;The vertical pole is provided with a first support mechanism, a second support mechanism and a third support mechanism. The first support mechanism, the second support mechanism and the third support mechanism are all detachably connected to the vertical pole. The second support mechanism The structure of the third support mechanism is the same as that of the first support mechanism. The first support mechanism, the second support mechanism and the third support mechanism are respectively connected to the vertical pole along the axis direction of the vertical pole;

所述第一支撑机构和第二支撑机构之间连接有固定杆,所述固定杆交叉设置且固定杆与第一支撑机构和第二支撑机构可拆卸连接,所述站板两侧设有弧形槽,所述站板与第三支撑机构可拆卸连接,所述站板背面设有滑槽,置物板与所述滑槽滑移连接。A fixed rod is connected between the first support mechanism and the second support mechanism. The fixed rods are arranged crosswise and are detachably connected to the first support mechanism and the second support mechanism. Arcs are provided on both sides of the standing plate. shaped groove, the standing plate is detachably connected to the third support mechanism, a chute is provided on the back of the standing plate, and the storage plate is slidingly connected to the chute.

进一步的,所述第一支撑机构或第二支撑机构或第三支撑机构包括定位套筒、长横杆以及短横杆,所述定位套筒通过螺栓可拆卸连接于立杆上,定位套筒上设有用于连接长横杆的第一安装槽和用于连接短横杆的第二安装槽,所述长横杆两端设有用于插设在第一安装槽的第一安装头,所述短横杆两端设有用于插设在第二安装槽的第二安装头。Further, the first support mechanism or the second support mechanism or the third support mechanism includes a positioning sleeve, a long crossbar and a short crossbar. The positioning sleeve is detachably connected to the vertical pole through bolts. The positioning sleeve There is a first installation groove for connecting the long cross bar and a second installation groove for connecting the short cross bar. The two ends of the long cross bar are provided with first installation heads for inserting in the first installation groove. The two ends of the short crossbar are provided with second mounting heads for inserting into the second mounting slot.

进一步的,各所述立杆上均设有等距离分布的螺纹孔。Furthermore, each of the vertical poles is provided with equidistantly distributed threaded holes.

进一步的,所述置物板为长方体结构,置物板内部设有置物槽。Further, the storage board has a rectangular parallelepiped structure, and a storage slot is provided inside the storage board.

进一步的,所述定位杆一端焊接有定位尖头。Furthermore, a positioning tip is welded to one end of the positioning rod.

进一步的,所述固定杆两端焊接有固定锁扣。Further, fixed locks are welded to both ends of the fixed rod.

进一步的,所述长横杆两端的第一安装头为长方体结构。Furthermore, the first mounting heads at both ends of the long crossbar have a rectangular parallelepiped structure.

进一步的,所述短横杆两端的第二安装头为长方体结构。Furthermore, the second mounting heads at both ends of the short crossbar have a rectangular parallelepiped structure.

本实用新型的工作原理及有益效果为:The working principle and beneficial effects of this utility model are:

本实用新型中安装脚手架时首先将滚轮安装至底座下方,立杆安装至底座表面的安装杆上并使用螺栓固定防止脱落,立杆上连接有第一支撑机构、第二支撑机构以及第三支撑机构,立杆表面设有等距离分布的螺纹孔,第一支撑机构、第二支撑机构以及第三支撑机构与立杆可拆卸连接,定位杆连接至底座的定位块上,定位杆一端焊接的定位尖头置于地面固定底座,第一支撑机构和第二支撑机构之间连接有固定杆,固定杆交叉设置且固定杆与第一支撑机构和第二支撑机构可拆卸连接,站板背面设有滑道,置物板安装至站板背面滑道,站板与最上部支撑机构可拆卸连接。When installing the scaffolding in this utility model, the rollers are first installed under the base. The vertical pole is installed on the mounting rod on the surface of the base and fixed with bolts to prevent it from falling off. The vertical pole is connected with a first support mechanism, a second support mechanism and a third support. mechanism, the surface of the vertical pole is provided with equidistantly distributed threaded holes, the first support mechanism, the second support mechanism and the third support mechanism are detachably connected to the vertical pole, the positioning rod is connected to the positioning block of the base, one end of the positioning rod is welded The positioning tip is placed on the fixed base on the ground, and a fixed rod is connected between the first support mechanism and the second support mechanism. The fixed rods are arranged crosswise and are detachably connected to the first support mechanism and the second support mechanism. There is a fixed rod on the back of the station board. There are slides, the storage board is installed on the slide on the back of the standing board, and the standing board and the uppermost support mechanism are detachably connected.

立杆表面设置有等距离分布的螺纹孔,可以方便施工人员根据现场施工实际所需的高度来进行调节脚手架的高度,同时站板背面设置有置物板,展开后可以放置工具,可以扩大脚手架站板的空间,同时方便施工人员施工,加快施工速度,此外,本实用新型还设置有定位杆,可以提升脚手架的稳定性,防止脚手架施工时可能导致的晃动。The surface of the pole is provided with equidistantly distributed threaded holes, which can facilitate the construction workers to adjust the height of the scaffolding according to the actual height required for on-site construction. At the same time, there is a storage board on the back of the station board. After unfolding, tools can be placed and the scaffolding station can be expanded. The space of the board is convenient for construction workers and speeds up the construction. In addition, the utility model is also provided with a positioning rod, which can improve the stability of the scaffold and prevent possible shaking caused by the construction of the scaffold.

附图说明Description of the drawings

下面结合附图和具体实施方式对本实用新型作进一步详细的说明。The utility model will be described in further detail below in conjunction with the accompanying drawings and specific implementation modes.

图1为本实用新型的结构示意图;Figure 1 is a schematic structural diagram of the utility model;

图2为本实用新型的主视图;Figure 2 is a front view of the utility model;

图3为本实用新型的左视图;Figure 3 is a left side view of the utility model;

图4为本实用新型的定位套筒的结构示意图;Figure 4 is a schematic structural diagram of the positioning sleeve of the present utility model;

图5为本实用新型的固定锁扣的结构示意图;Figure 5 is a schematic structural diagram of the fixed lock buckle of the present utility model;

图6为本实用新型的站板的结构示意图;Figure 6 is a schematic structural diagram of the standing board of the present utility model;

图7为本实用新型的底座的结构示意图。Figure 7 is a schematic structural diagram of the base of the present utility model.

图中:1、滚轮;2、底座;3、定位杆;4、定位尖头;5、定位套筒;6、第一安装槽;7、第二安装槽;8、固定杆;9、固定锁扣;10、长横杆;11、第一安装头;12、短横杆;13、第二安装头;14、立杆;15、站板;16、置物板;17、置物槽;18、螺纹孔;19、安装杆;20、定位块;21、弧形槽;22、滑槽。In the picture: 1. Roller; 2. Base; 3. Positioning rod; 4. Positioning tip; 5. Positioning sleeve; 6. First mounting slot; 7. Second mounting slot; 8. Fixed rod; 9. Fixed Lock; 10. Long crossbar; 11. First mounting head; 12. Short crossbar; 13. Second mounting head; 14. Vertical pole; 15. Stand board; 16. Storage board; 17. Storage slot; 18 , threaded hole; 19, mounting rod; 20, positioning block; 21, arc groove; 22, chute.

具体实施方式Detailed ways

下面将结合本实用新型实施例,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都涉及本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the embodiments of the present utility model. Obviously, the described embodiments are only some of the embodiments of the present utility model, rather than all the embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative efforts fall within the scope of protection of the present utility model.

如图1~图7所示,本实施例提出了一种便于安装的建筑结构脚手架,主要包括滚轮1、底座2、固定杆8、站板15,安装杆19、定位块20、定位杆3、立杆14、置物板16以及支撑机构,底座2设置为长方体结构,滚轮1通过焊接固定于底座2四个边角处,安装杆19通过焊接固定安装于底座2四个边角处,定位块20通过焊接固定连接于底座2四个边角处,定位杆3通过平头带孔销与定位块20转动连接,立杆14一端设有安装套筒,立杆14带有安装套筒一端通过螺栓与安装杆19可拆卸连接,本方案由于底座2设置为长方体结构,长方体结构可以提高整体安装的稳定性,因此安装杆19、定位块20、定位杆3、立杆14都设有4个;As shown in Figures 1 to 7, this embodiment proposes a building structure scaffolding that is easy to install, mainly including rollers 1, a base 2, a fixed rod 8, a standing plate 15, a mounting rod 19, a positioning block 20, and a positioning rod 3 , vertical pole 14, storage plate 16 and support mechanism. The base 2 is set in a rectangular parallelepiped structure. The roller 1 is fixed on the four corners of the base 2 through welding. The mounting rod 19 is fixed on the four corners of the base 2 through welding. Positioning The block 20 is fixedly connected to the four corners of the base 2 through welding. The positioning rod 3 is rotationally connected to the positioning block 20 through a flat-headed hole pin. One end of the vertical rod 14 is provided with a mounting sleeve, and one end of the vertical rod 14 has a mounting sleeve passing through it. The bolts are detachably connected to the installation rod 19. In this plan, the base 2 is set as a rectangular parallelepiped structure. The cuboid structure can improve the stability of the overall installation. Therefore, the installation rod 19, positioning block 20, positioning rod 3, and vertical rod 14 are all equipped with four ;

立杆14上设有第一支撑机构、第二支撑机构以及第三支撑机构,第一支撑机构包括定位套筒5、长横杆10以及短横杆12,定位套筒5设置有4个,4个定位套筒5通过螺栓可拆卸连接于各个立杆14上,定位套筒5上设有用于连接长横杆10的第一安装槽6和用于连接短横杆12的第二安装槽7,长横杆10两端设有用于插设在第一安装槽6的第一安装头11,短横杆12两端设有用于插设在第二安装槽7的第二安装头13,长横杆10两端的第一安装头11直接插入安装于定位套筒5的第一安装槽6,短横杆12两端的第二安装头13直接插入安装于定位套筒5的第二安装槽7,第一支撑机构、第二支撑机构以及第三支撑机构均通过定位套筒5与立杆14可拆卸连接,本实施例中的第二支撑机构、第三支撑机构均与第一支撑机构结构相同,且第一支撑机构、第二支撑机构和第三支撑机构分别沿立杆14轴线与立杆14连接。The vertical pole 14 is provided with a first support mechanism, a second support mechanism and a third support mechanism. The first support mechanism includes a positioning sleeve 5, a long crossbar 10 and a short crossbar 12. There are four positioning sleeves 5. Four positioning sleeves 5 are detachably connected to each vertical pole 14 through bolts. The positioning sleeves 5 are provided with a first installation slot 6 for connecting the long crossbar 10 and a second installation slot for connecting the short crossbar 12. 7. Both ends of the long crossbar 10 are provided with first mounting heads 11 for insertion in the first installation slot 6, and both ends of the short crossbar 12 are provided with second installation heads 13 for insertion in the second installation slot 7. The first mounting heads 11 at both ends of the long crossbar 10 are directly inserted into the first mounting groove 6 installed on the positioning sleeve 5 , and the second mounting heads 13 at both ends of the short crossbar 12 are directly inserted into the second mounting groove installed at the positioning sleeve 5 7. The first support mechanism, the second support mechanism and the third support mechanism are all detachably connected to the vertical pole 14 through the positioning sleeve 5. In this embodiment, the second support mechanism and the third support mechanism are all connected to the first support mechanism. The structures are the same, and the first support mechanism, the second support mechanism and the third support mechanism are respectively connected to the vertical pole 14 along the axis of the vertical pole 14 .

本实施例在第一支撑机构和第二支撑机构之间连接有固定杆8,固定杆8交叉设置且固定杆8通过固定锁扣9与第一支撑机构和第二支撑机构可拆卸连接,站板15两侧设有弧形槽21,站板15通过弧形槽与第三支撑机构可拆卸连接,站板15背面设有滑槽22,置物板16通过滑块与站板15背面的滑槽22滑移连接。In this embodiment, a fixed rod 8 is connected between the first support mechanism and the second support mechanism. The fixed rods 8 are arranged crosswise and are detachably connected to the first support mechanism and the second support mechanism through the fixed lock buckle 9. The station There are arc-shaped grooves 21 on both sides of the board 15. The standing board 15 is detachably connected to the third support mechanism through the arc-shaped groove. The groove 22 is slidingly connected.

底座2底部边角处通过焊接连接有用于运输或移动的滚轮1,大大提高了脚手架的便捷性,可以在还没有安装脚手架时将安装脚手架所需的工具以及部件放置于底座2上通过滚轮1运送到指定位置,也可以在当前位置施工完成后不拆卸脚手架直接收起定位杆3通过滚轮1到指定位置,滚轮1带有自锁功能,脚手架到位之后需要将滚轮1的自锁打开防止滚轮1转动导致脚手架移动,底座2上边角处设有安装杆19,安装立杆14时立杆14带有安装套筒的一端可以直接与安装杆19连接,立杆14安装到位后使用螺栓固定立杆14,立杆14使用螺栓固定可以让安装和后续拆卸更加方便。The bottom corners of the base 2 are connected by welding with rollers 1 for transportation or movement, which greatly improves the convenience of the scaffolding. When the scaffolding has not been installed, the tools and components required for installing the scaffolding can be placed on the base 2 through the rollers 1 Transport to the designated location, or you can directly retract the positioning rod 3 without disassembling the scaffolding after the construction is completed at the current location and move it to the designated location through roller 1. Roller 1 has a self-locking function. After the scaffolding is in place, you need to open the self-locking of roller 1 to prevent the roller. 1 Rotation causes the scaffold to move. There is a mounting pole 19 at the upper corner of the base 2. When installing the pole 14, one end of the pole 14 with a mounting sleeve can be directly connected to the mounting pole 19. After the pole 14 is installed in place, use bolts to fix the pole. The rod 14 and the vertical rod 14 are fixed with bolts to make installation and subsequent disassembly more convenient.

长横杆10两端的第一安装头11为长方体结构可以防止长横杆10安装之后工人在爬上脚手架时因为长横杆10转动而导致跌落受伤。The first mounting heads 11 at both ends of the long crossbar 10 have a rectangular parallelepiped structure, which can prevent workers from falling and being injured due to the rotation of the long crossbar 10 when they climb up the scaffolding after the long crossbar 10 is installed.

短横杆12两端的第二安装头13为长方体结构可以防止短横杆12安装之后工人在爬上脚手架时因为短横杆12转动而导致跌落受伤。The second mounting heads 13 at both ends of the short crossbar 12 have a rectangular parallelepiped structure, which can prevent workers from falling and being injured due to the rotation of the short crossbar 12 when they climb onto the scaffolding after the short crossbar 12 is installed.

由于施工现场需要施工的位置并不为同一高度,因此在若干立杆14上均设有等距离分布的螺纹孔18,可以方便定位套筒5调节高度,以此来调节脚手架安装的高度。Since the construction sites at the construction site are not at the same height, several vertical poles 14 are provided with equidistantly distributed threaded holes 18 to facilitate height adjustment of the positioning sleeve 5, thereby adjusting the height of the scaffolding installation.

定位杆3一端焊接有定位尖头4,焊接定位尖头4可以方便插入地面土壤内进行定位,可以起到很好的支撑作用,如需更换脚手架位置只需将定位杆3转动收起至底座2上即可。One end of the positioning rod 3 is welded with a positioning tip 4. The welded positioning tip 4 can be easily inserted into the ground soil for positioning, and can play a very good supporting role. If you need to change the position of the scaffold, you only need to rotate the positioning rod 3 and retract it to the base. Just go up to 2.

由于施工现场可能会有震动,因此固定杆8两端焊接有固定锁扣9,防止因为震动或者工人误触导致的固定杆8脱落,此方案固定杆8设置有两根,两根固定杆8交叉安装呈X型,固定杆8两端锁扣通过螺栓分别与脚手架两端的短横杆12可拆卸式固定连接。Since there may be vibrations at the construction site, fixed locks 9 are welded to both ends of the fixed rod 8 to prevent the fixed rod 8 from falling off due to vibration or accidentally touched by workers. In this solution, there are two fixed rods 8, and two fixed rods 8 The cross installation is in an X shape, and the locks at both ends of the fixed rod 8 are removably fixedly connected to the short cross bars 12 at both ends of the scaffold through bolts.

站板15背面设有滑道,置物板16通过滑块与站板15做滑移连接,置物板16设置为长方体结构可以方便安装,施工时通常会有较多的工具或者材料,往往需要在脚手架上施工的工人将脚手架的材料用完后爬下脚手架后重新向脚手架上运送材料,或者需要额外一个人员向脚手架上运送材料,因此站板15背面设置有置物板16可以在材料或者工具较多的情况下将置物板16拉出,将材料或者工具放置在置物板16上,以此来减少施工人员运送材料的时间,加快工作效率,置物板16设置有置物槽17可以防止材料或工具放置在植物槽内时由于工人的误触或其他原因导致的工具掉落。There is a slide on the back of the standing board 15. The storage board 16 is slidingly connected to the standing board 15 through the slider. The storage board 16 is set into a rectangular parallelepiped structure for easy installation. There are usually many tools or materials during construction, which often need to be installed. Workers who are constructing on the scaffolding will climb down from the scaffolding after using up the materials on the scaffolding and then transport the materials to the scaffolding again, or an additional person will be needed to transport materials to the scaffolding. Therefore, a storage board 16 is provided on the back of the station board 15 to store materials or tools when there are too many materials. When there are too many, pull out the storage board 16 and place materials or tools on the storage board 16, thereby reducing the time for construction workers to transport materials and speeding up work efficiency. The storage board 16 is provided with a storage slot 17 to prevent materials or tools from being transported. Tools dropped due to accidental touch by workers or other reasons when placed in the plant trough.

具体的,本实施例的安装过程为:提前在底座2焊接上滚轮1、安装杆19以及定位块20,后续可以将剩余安装所需的部件放置在底座2上,利用底座2的滚轮1将脚手架运送的指定位置进行安装,到达指定位置后,首先将滚轮1的自锁打开锁住滚轮1防止安装时底座2移动,将定位杆3通过平头带孔销与底座2的固定块转动连接,将定位杆3焊接有定位尖头4的一端对准地面来固定脚手架防止脚手架在施工时移动,将立杆14带有安装套筒的一端通过螺栓与底座2的安装杆19固定连接,在立杆14上安装支撑机构,支撑机构中的定位套筒5用螺栓固定连接立杆14,将长横杆10与短横杆12分别根据长短安装至定位套筒5的第一安装槽6和第二安装槽7,固定杆8至少安装有两根,固定杆8安装在两个支撑机构之间,交叉安装呈X型,以此来加固脚手架,防止脚手架左右晃动,最后将站板15放置于最上部的支撑机构,置物板16通过滑块与站板15连接,安装完成后即可使用脚手架进行施工。Specifically, the installation process of this embodiment is: weld the roller 1, the mounting rod 19 and the positioning block 20 on the base 2 in advance. Subsequently, the remaining components required for installation can be placed on the base 2, and the roller 1 of the base 2 is used to Install the scaffolding at the designated position for transportation. After arriving at the designated position, first unlock the self-locking wheel 1 to lock the roller 1 to prevent the base 2 from moving during installation. Rotate the positioning rod 3 with the fixed block of the base 2 through a flat-head hole pin. Align the end of the positioning pole 3 with the positioning tip 4 welded to the ground to fix the scaffolding to prevent the scaffolding from moving during construction. The end of the pole 14 with the mounting sleeve is fixedly connected to the mounting pole 19 of the base 2 through bolts. A support mechanism is installed on the rod 14. The positioning sleeve 5 in the support mechanism is fixedly connected to the vertical rod 14 with bolts. The long crossbar 10 and the short crossbar 12 are respectively installed in the first installation slot 6 and the first installation slot 6 of the positioning sleeve 5 according to their length. Two installation slots 7, at least two fixed rods 8 are installed. The fixed rods 8 are installed between the two support mechanisms, and are installed crosswise in an The uppermost support mechanism, the storage board 16 is connected to the standing board 15 through the slider. After the installation is completed, the scaffolding can be used for construction.

以上仅为本实用新型的较佳实施例而已,并不用以限制本实用新型,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above are only preferred embodiments of the present utility model and are not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present utility model shall be included in the present utility model. Within the scope of new protection.

Claims (8)

1.一种便于安装的建筑结构脚手架,包括滚轮(1)、底座(2)、固定杆(8)以及站板(15),所述滚轮(1)与底座(2)固定连接,其特征在于,包括安装杆(19)、定位块(20)、定位杆(3)、立杆(14)、置物板(16)以及支撑机构,所述安装杆(19)固定连接于底座(2),所述定位块(20)固定连接于底座(2),所述定位杆(3)与定位块(20)转动连接,所述立杆(14)一端设有安装套筒,立杆(14)带有安装套筒一端与安装杆(19)可拆卸连接,所述安装杆(19)、定位块(20)、定位杆(3)、立杆(14)均至少设有3个;1. A building structure scaffolding that is easy to install, including rollers (1), a base (2), a fixed rod (8) and a standing board (15). The rollers (1) are fixedly connected to the base (2), and its characteristics It consists of a mounting rod (19), a positioning block (20), a positioning rod (3), a vertical rod (14), a storage plate (16) and a support mechanism. The mounting rod (19) is fixedly connected to the base (2) , the positioning block (20) is fixedly connected to the base (2), the positioning rod (3) is rotationally connected to the positioning block (20), the vertical rod (14) is provided with a mounting sleeve at one end, and the vertical rod (14) ) One end of the installation sleeve is detachably connected to the installation rod (19), and there are at least three installation rods (19), positioning blocks (20), positioning rods (3), and vertical rods (14); 所述立杆(14)上设有第一支撑机构、第二支撑机构以及第三支撑机构,第一支撑机构、第二支撑机构以及第三支撑机构均与立杆(14)可拆卸连接,所述第二支撑机构与第一支撑机构结构相同,所述第三支撑机构与第一支撑机构结构相同,所述第一支撑机构、第二支撑机构和第三支撑机构分别沿立杆(14)轴线方向与立杆(14)连接;The vertical pole (14) is provided with a first support mechanism, a second support mechanism and a third support mechanism. The first support mechanism, the second support mechanism and the third support mechanism are all detachably connected to the vertical pole (14). The second support mechanism has the same structure as the first support mechanism, the third support mechanism has the same structure as the first support mechanism, and the first support mechanism, the second support mechanism and the third support mechanism are respectively along the vertical pole (14 ) The axis direction is connected with the vertical pole (14); 所述第一支撑机构和第二支撑机构之间连接有固定杆(8),所述固定杆(8)交叉设置且固定杆(8)与第一支撑机构和第二支撑机构可拆卸连接,所述站板(15)两侧设有弧形槽(21),所述站板(15)与第三支撑机构可拆卸连接,所述站板(15)背面设有滑槽(22),置物板(16)与所述滑槽(22)滑移连接。A fixed rod (8) is connected between the first support mechanism and the second support mechanism, the fixed rods (8) are arranged crosswise and the fixed rod (8) is detachably connected to the first support mechanism and the second support mechanism, Arc grooves (21) are provided on both sides of the standing plate (15). The standing plate (15) is detachably connected to the third support mechanism. A chute (22) is provided on the back of the standing plate (15). The storage plate (16) is slidingly connected to the chute (22). 2.根据权利要求1所述的一种便于安装的建筑结构脚手架,其特征在于,所述第一支撑机构或第二支撑机构或第三支撑机构包括定位套筒(5)、长横杆(10)以及短横杆(12),所述定位套筒(5)通过螺栓可拆卸连接于立杆(14)上,定位套筒(5)上设有用于连接长横杆(10)的第一安装槽(6)和用于连接短横杆(12)的第二安装槽(7),所述长横杆(10)两端设有用于插设在第一安装槽(6)的第一安装头(11),所述短横杆(12)两端设有用于插设在第二安装槽(7)的第二安装头(13)。2. A building structure scaffolding that is easy to install according to claim 1, characterized in that the first support mechanism or the second support mechanism or the third support mechanism includes a positioning sleeve (5), a long crossbar ( 10) and the short crossbar (12). The positioning sleeve (5) is detachably connected to the vertical pole (14) through bolts. The positioning sleeve (5) is provided with a third hole for connecting the long crossbar (10). An installation slot (6) and a second installation slot (7) for connecting the short crossbar (12). The long crossbar (10) is provided with a third installation slot (6) at both ends. An installation head (11), the two ends of the short crossbar (12) are provided with second installation heads (13) for insertion in the second installation slot (7). 3.根据权利要求1所述的一种便于安装的建筑结构脚手架,其特征在于,各所述立杆(14)上均设有等距离分布的螺纹孔(18)。3. A building structure scaffolding that is easy to install according to claim 1, characterized in that each of the vertical poles (14) is provided with equidistantly distributed threaded holes (18). 4.根据权利要求1所述的一种便于安装的建筑结构脚手架,其特征在于,所述置物板(16)为长方体结构,置物板(16)内部设有置物槽(17)。4. A building structure scaffolding that is easy to install according to claim 1, characterized in that the storage board (16) is a rectangular parallelepiped structure, and a storage slot (17) is provided inside the storage board (16). 5.根据权利要求1所述的一种便于安装的建筑结构脚手架,其特征在于,所述定位杆(3)一端焊接有定位尖头(4)。5. A building structure scaffolding that is easy to install according to claim 1, characterized in that a positioning tip (4) is welded to one end of the positioning rod (3). 6.根据权利要求1所述的一种便于安装的建筑结构脚手架,其特征在于,所述固定杆(8)两端焊接有固定锁扣(9)。6. A building structure scaffolding that is easy to install according to claim 1, characterized in that fixed locks (9) are welded to both ends of the fixed rod (8). 7.根据权利要求2所述的一种便于安装的建筑结构脚手架,其特征在于,所述长横杆(10)两端的第一安装头(11)为长方体结构。7. A building structure scaffolding that is easy to install according to claim 2, characterized in that the first mounting heads (11) at both ends of the long crossbar (10) are of rectangular parallelepiped structure. 8.根据权利要求2所述的一种便于安装的建筑结构脚手架,其特征在于,所述短横杆(12)两端的第二安装头(13)为长方体结构。8. A building structure scaffolding that is easy to install according to claim 2, characterized in that the second installation heads (13) at both ends of the short crossbar (12) are of cuboid structure.
CN202321720581.7U 2023-07-03 2023-07-03 A kind of building structure scaffolding that is easy to install Expired - Fee Related CN220599100U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321720581.7U CN220599100U (en) 2023-07-03 2023-07-03 A kind of building structure scaffolding that is easy to install

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321720581.7U CN220599100U (en) 2023-07-03 2023-07-03 A kind of building structure scaffolding that is easy to install

Publications (1)

Publication Number Publication Date
CN220599100U true CN220599100U (en) 2024-03-15

Family

ID=90164466

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321720581.7U Expired - Fee Related CN220599100U (en) 2023-07-03 2023-07-03 A kind of building structure scaffolding that is easy to install

Country Status (1)

Country Link
CN (1) CN220599100U (en)

Similar Documents

Publication Publication Date Title
CN216690258U (en) Plug-in type scaffold
CN220599100U (en) A kind of building structure scaffolding that is easy to install
CN204492133U (en) A kind of easy insulated column construction tool frame
JP2014034821A (en) Form transfer device
CN220725826U (en) Folding prefabricated wallboard strutting arrangement
CN218894375U (en) Outside upper portion protector of formwork support
CN219471544U (en) A formwork keel structure for building
CN219471543U (en) A building formwork keel structure and a formwork using the structure
CN106760458B (en) Movable multipurpose operation guard and method of use
CN113445538B (en) Cast-in-place multi-cabin pipe gallery formwork structure and construction method thereof
CN219431294U (en) Construction scaffold frame of quick installation
CN115788021A (en) Square steel pipe main keel, disc buckle type steel pipe support frame and building method
CN211736673U (en) Prefabricated assembled type temporary building combined enclosing wall
CN209397897U (en) A kind of Multi-functional indoor scaffold
CN210482970U (en) Extension formula elevartor shaft construction operation protection platform
CN219327290U (en) Face limit operation platform
CN209261192U (en) A portable scaffolding
JPH05505Y2 (en)
CN206591792U (en) A kind of spigot-and-socket scaffold
CN221372834U (en) Steel construction engineering support
CN218668598U (en) Modularization console mode platform of unloading
CN219491671U (en) Foldable PC stair construction operation platform
CN212024005U (en) A concrete loading attachment for outer wall spouts ash
CN220469360U (en) Cantilever frame mounting structure
CN217326529U (en) A mobile platform for precise positioning of openings that can realize simultaneous masonry and lintel construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20240315

CF01 Termination of patent right due to non-payment of annual fee