CN220564062U - A steel corridor construction lifting device - Google Patents
A steel corridor construction lifting device Download PDFInfo
- Publication number
- CN220564062U CN220564062U CN202321959158.2U CN202321959158U CN220564062U CN 220564062 U CN220564062 U CN 220564062U CN 202321959158 U CN202321959158 U CN 202321959158U CN 220564062 U CN220564062 U CN 220564062U
- Authority
- CN
- China
- Prior art keywords
- corridor
- positioning
- fixing frame
- side fixing
- lifting device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本实用新型公开了一种钢连廊施工提升装置,包括四组锚固板,所述锚固板顶部的一侧安装有卷扬机,所述锚固板顶部的另一侧安装有塔架,所述挂环的顶部和卷扬机的外部之间设置有缆索,所述定位轨的一侧设置有稳定上移防晃动结构。该钢连廊施工提升装置通过设置有定位轨、固定板、凹形壳和定位滑轮,使用时,底部托架全部安装完毕,缆索固定在挂环上,即可开始提升工作,定位轨预先安装在建筑的侧面,在提升过程中,定位滑轮紧贴定位轨向上位移,定位轨可以限定连廊上升的轨迹,避免发生摆动,固定板和凹形壳为定位滑轮的安装固定提供了物理支撑,实现了稳定提升防晃动的功能,解决的是装置不具备稳定提升防晃动的功能的问题。
The utility model discloses a lifting device for steel corridor construction, which includes four sets of anchoring plates. A winch is installed on one side of the top of the anchoring plate, and a tower is installed on the other side of the top of the anchoring plate. The hanging ring A cable is provided between the top of the hoist and the outside of the hoist, and a stable upward movement and anti-sway structure is provided on one side of the positioning rail. The steel corridor construction lifting device is equipped with positioning rails, fixed plates, concave shells and positioning pulleys. When used, the bottom brackets are all installed, the cables are fixed on the hanging rings, and the lifting work can be started. The positioning rails are pre-installed. On the side of the building, during the lifting process, the positioning pulley moves upward close to the positioning rail. The positioning rail can limit the ascending trajectory of the corridor and avoid swings. The fixed plate and concave shell provide physical support for the installation and fixation of the positioning pulley. The function of stably lifting and preventing shaking is realized, which solves the problem that the device does not have the function of stably lifting and preventing shaking.
Description
技术领域Technical field
本实用新型涉及提升装置技术领域,具体为一种钢连廊施工提升装置。The utility model relates to the technical field of lifting devices, specifically a lifting device for steel corridor construction.
背景技术Background technique
连廊,原是中国古建的一种形式,即建筑和建筑之间的连接构筑物,随着现代建材强度的不断提升和建筑工艺的不断进步,在原本相互独立的建筑之间构筑钢连廊已经是相对成熟的工艺了。钢连廊一般在地面进行焊接组装,再通过提升装置将其提升至安装位,通过液压设备锚固后再做焊接。Corridor was originally a form of ancient Chinese architecture, that is, a connecting structure between buildings. With the continuous improvement of the strength of modern building materials and the continuous progress of construction technology, steel corridors are constructed between originally independent buildings. It is already a relatively mature process. Steel corridors are generally welded and assembled on the ground, then lifted to the installation position through a lifting device, anchored through hydraulic equipment, and then welded.
当前市面上常见的钢连廊施工提升装置在构造上大多类似,以缆索吊装设备为主,在建筑的顶部安装好塔架等装置,通过卷扬机牵拉缆索,缆索的一端和钢连廊连接,多组设备同时提升,可以使钢连廊水平稳定地上升,在实际使用过程中存在一些功能上的不足,具备一定的改进空间,如在提升过程中,建筑之间的高楼风有一定的几率吹动连廊,使缆索发生小幅度的摆动,后期对接锚固时存在一定的障碍,不具备稳定提升防晃动的功能;其次,在提升到接近安装位后,由于需要精确对接,需要底部的安装人员和顶部的操作人员通过对话设备进行频繁交互确认,对于顶部的操作人员来说,提升或下降的距离较为抽象,不具备直观反映提升距离的功能;除此之外,目前的钢连廊在提升时,由于牵拉受力点多在两侧,连廊中间位置部分受力较大,并且在设置牵拉点时需要频繁测算调整,较为麻烦,不具备底部托举均衡受力的功能。Most of the common steel corridor construction lifting devices currently on the market are similar in structure. They are mainly cable hoisting equipment. Towers and other devices are installed on the top of the building. The cable is pulled by a winch. One end of the cable is connected to the steel corridor. Simultaneous lifting of multiple sets of equipment can make the level of steel corridors rise steadily. However, there are some functional deficiencies during actual use and there is room for improvement. For example, during the lifting process, there is a certain chance of high-rise wind between buildings. Blowing the corridor causes the cable to swing slightly. There are certain obstacles in the later docking and anchoring, and it does not have the function of stable lifting and anti-swaying. Secondly, after lifting to close to the installation position, due to the need for precise docking, the installation at the bottom is required. The personnel and the operators at the top conduct frequent interactive confirmations through dialogue devices. For the operators at the top, the lifting or descending distance is relatively abstract and does not have the function of intuitively reflecting the lifting distance; in addition, the current steel corridor is When lifting, since the pulling force points are mostly on both sides, the middle part of the corridor is subject to greater force, and frequent calculations and adjustments are required when setting the pulling points, which is more troublesome and does not have the function of balancing the force at the bottom of the lift.
现在,提出一种新型的钢连廊施工提升装置解决上述问题。Now, a new type of steel corridor construction lifting device is proposed to solve the above problems.
实用新型内容Utility model content
本实用新型的目的在于提供一种钢连廊施工提升装置,以解决上述背景技术中提出不具备稳定提升防晃动的功能的问题。The purpose of this utility model is to provide a steel corridor construction lifting device to solve the problem in the above-mentioned background technology that it does not have the function of stable lifting and anti-swaying.
为实现上述目的,本实用新型提供如下技术方案:一种钢连廊施工提升装置,包括四组锚固板,所述锚固板顶部的一侧安装有卷扬机,所述锚固板顶部的另一侧安装有塔架,所述锚固板的下方设置有连廊侧边固定架,所述连廊侧边固定架一端的内部设置有多组预留固定槽眼,所述连廊侧边固定架的顶部焊接有两组挂环,所述连廊侧边固定架的两边分别设置有定位轨,所述挂环的顶部和卷扬机的外部之间设置有缆索,所述连廊侧边固定架顶部的两侧分别安装有红外发射器,所述连廊侧边固定架一端的底部横向焊接有连廊底部托架,所述连廊底部托架的顶部和连廊侧边固定架的一端之间固定连接有多组斜向加固杆,所述定位轨的一侧设置有稳定上移防晃动结构。In order to achieve the above purpose, the present utility model provides the following technical solution: a lifting device for steel corridor construction, including four sets of anchor plates. A winch is installed on one side of the top of the anchor plates, and a hoist is installed on the other side of the top of the anchor plates. There is a tower, and a corridor side fixing frame is provided below the anchor plate. A plurality of reserved fixing slots are provided inside one end of the corridor side fixing frame. The top of the corridor side fixing frame is Two sets of hanging rings are welded, and positioning rails are provided on both sides of the corridor side fixing frame. A cable is provided between the top of the hanging ring and the outside of the winch. The two sides of the corridor side fixing frame on the top Infrared emitters are respectively installed on each side. The bottom of one end of the corridor side fixing frame is transversely welded with a corridor bottom bracket. The top of the corridor bottom bracket and one end of the corridor side fixing frame are fixedly connected. There are multiple sets of oblique reinforcement rods, and one side of the positioning rail is provided with a stable upward movement and anti-sway structure.
所述稳定上移防晃动结构包括两组固定板,两组所述固定板分别焊接在连廊侧边固定架一端的两侧,所述固定板的一端固定连接有凹形壳,所述凹形壳的内部活动连接有两组定位滑轮。The stable upward movement and anti-sway structure includes two sets of fixed plates. The two sets of fixed plates are welded to both sides of one end of the corridor side fixing frame. One end of the fixed plate is fixedly connected with a concave shell, and the concave shell is fixedly connected to one end of the fixed plate. There are two sets of positioning pulleys movably connected inside the shell.
优选的,所述固定板关于连廊侧边固定架的垂直中心线对称分布。Preferably, the fixing plates are symmetrically distributed about the vertical centerline of the fixing frame on the side of the corridor.
优选的,所述定位滑轮外圈沟槽的形状尺寸和定位轨一侧外部的形状尺寸相匹配。Preferably, the shape and size of the outer ring groove of the positioning pulley match the shape and size of the outer side of the positioning rail.
优选的,所述定位轨的一端安装有多组红外接收器,所述红外发射器、红外接收器的位置尺寸一一对应。Preferably, multiple sets of infrared receivers are installed at one end of the positioning rail, and the positions and sizes of the infrared transmitters and infrared receivers correspond one to one.
优选的,所述斜向加固杆呈等间距排列。Preferably, the oblique reinforcing rods are arranged at equal intervals.
优选的,所述连廊底部托架的顶部固定连接有多组托梁定位架,所述托梁定位架的内部水平安装有底部托梁,所述连廊侧边固定架、连廊底部托架、斜向加固杆、底部托梁材质相一致。Preferably, the top of the corridor bottom bracket is fixedly connected with multiple sets of joist positioning frames, and the bottom joist is installed horizontally inside the joist positioning frame. The corridor side fixing frames and the corridor bottom bracket are The materials of the frame, diagonal reinforcement rods and bottom joists are consistent.
与现有技术相比,本实用新型的有益效果是:该钢连廊施工提升装置不仅实现了稳定提升防晃动的功能,实现了直观反映提升距离的功能,而且实现了底部托举均衡受力的功能;Compared with the existing technology, the beneficial effects of this utility model are: the steel corridor construction lifting device not only realizes the function of stable lifting and anti-swaying, realizes the function of intuitively reflecting the lifting distance, but also realizes the balanced force of the bottom lifting function;
(1)通过设置有定位轨、固定板、凹形壳和定位滑轮,使用时,钢连廊焊接组装工作在地面完成并通过质检后,将连廊运送至建筑底部,将连廊侧边固定架贴合在连廊的侧边,预留固定槽眼方便加装锚固件进行加固,底部托架全部安装完毕,缆索固定在挂环上,即可开始提升工作,定位轨预先安装在建筑的侧面,在提升过程中,定位滑轮紧贴定位轨向上位移,定位轨可以限定连廊上升的轨迹,避免发生摆动,固定板和凹形壳为定位滑轮的安装固定提供了物理支撑,实现了稳定提升防晃动的功能;(1) By providing positioning rails, fixed plates, concave shells and positioning pulleys, when in use, the welding and assembly work of the steel corridor is completed on the ground and after passing the quality inspection, the corridor is transported to the bottom of the building, and the sides of the corridor are The fixed frame fits on the side of the corridor, and fixed slots are reserved to facilitate the installation of anchors for reinforcement. After all the bottom brackets are installed, the cables are fixed on the hanging rings, and the lifting work can be started. The positioning rails are pre-installed on the building. On the side, during the lifting process, the positioning pulley moves upward close to the positioning rail. The positioning rail can limit the ascending trajectory of the corridor and avoid swinging. The fixed plate and concave shell provide physical support for the installation and fixation of the positioning pulley, achieving Stably improve the anti-shaking function;
(2)通过设置有红外发射器和红外接收器,使用时,随着连廊的不断上升,安装在连廊侧边固定架顶部的红外发射器也在不断上升,每上升一定的距离,对应高度的红外接收器即接收到信号,楼顶的操作者可以通过信号反馈了解提升的高度,在对接位置处单独设置一组或几组红外接收器,顶部操作人员在操作时可以通过信号反馈自行调整,节约和楼下安装人员沟通的时间,提升对接效率,实现了直观反映提升距离的功能;(2) By setting up an infrared transmitter and an infrared receiver, when in use, as the corridor continues to rise, the infrared transmitter installed on the top of the fixed frame on the side of the corridor also continues to rise. Each time it rises a certain distance, the corresponding The infrared receiver at the height receives the signal. The operator on the roof can understand the lifting height through signal feedback. One or more groups of infrared receivers are separately set up at the docking position. The operator on the top can use the signal feedback during operation. Adjustment saves time in communicating with the installers downstairs, improves docking efficiency, and realizes the function of intuitively reflecting the lifting distance;
(3)通过设置有连廊底部托架、斜向加固杆、底部托梁和托梁定位架,使用时,在将连廊侧边固定架固定在连廊端面前,在连廊侧边固定架一端的连廊底部托架上安装好底部托梁,底部托梁直接卡入托梁定位架中,打入锁销即可固定,斜向加固杆可以增加连廊底部托架的结构强度,在提升时多组底部托梁可以托住连廊底部,降低连廊中间位置处的负荷,保证受力均衡,实现了底部托举均衡受力的功能。(3) By installing the corridor bottom bracket, diagonal reinforcing rod, bottom joist and joist positioning frame, when in use, the corridor side fixing frame is fixed in front of the corridor end and fixed on the corridor side. Install the bottom joist on the bottom bracket of the corridor at one end. The bottom joist is directly inserted into the joist positioning frame and can be fixed by driving in the lock pin. The diagonal reinforcement rod can increase the structural strength of the corridor bottom bracket. When lifting, multiple sets of bottom joists can support the bottom of the corridor, reduce the load in the middle of the corridor, ensure balanced force, and realize the function of balancing the force of bottom lifting.
附图说明Description of drawings
图1为本实用新型的正视结构示意图;Figure 1 is a schematic front view of the structure of the present utility model;
图2为本实用新型的连廊侧边固定架俯视结构示意图;Figure 2 is a schematic structural view from above of the corridor side fixing frame of the utility model;
图3为本实用新型的图1中A处局部剖面放大结构示意图;Figure 3 is an enlarged structural schematic diagram of the partial cross-section at point A in Figure 1 of the present invention;
图4为本实用新型的定位轨局部侧视放大结构示意图。Figure 4 is an enlarged structural schematic diagram of a partial side view of the positioning rail of the present invention.
图中:1、锚固板;2、卷扬机;3、塔架;4、缆索;5、定位轨;6、固定板;7、凹形壳;8、定位滑轮;9、连廊侧边固定架;10、预留固定槽眼;11、挂环;12、红外发射器;13、红外接收器;14、连廊底部托架;15、斜向加固杆;16、底部托梁;17、托梁定位架。In the picture: 1. Anchor plate; 2. Hoist; 3. Tower; 4. Cable; 5. Positioning rail; 6. Fixed plate; 7. Concave shell; 8. Positioning pulley; 9. Corridor side fixing frame ; 10. Reserved fixing slots; 11. Hanging ring; 12. Infrared transmitter; 13. Infrared receiver; 14. Corridor bottom bracket; 15. Diagonal reinforcement rod; 16. Bottom joist; 17. Bracket Beam positioning frame.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only part of the embodiments of the present utility model, not all implementations. example. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative efforts fall within the scope of protection of the present utility model.
实施例1:请参阅图1-4,一种钢连廊施工提升装置,包括四组锚固板1,锚固板1顶部的一侧安装有卷扬机2,锚固板1顶部的另一侧安装有塔架3,锚固板1的下方设置有连廊侧边固定架9,连廊侧边固定架9一端的内部设置有多组预留固定槽眼10,连廊侧边固定架9的顶部焊接有两组挂环11,连廊侧边固定架9的两边分别设置有定位轨5,挂环11的顶部和卷扬机2的外部之间设置有缆索4,定位轨5的一侧设置有稳定上移防晃动结构;Embodiment 1: Please refer to Figure 1-4, a lifting device for steel corridor construction, including four sets of anchor plates 1. A winch 2 is installed on one side of the top of the anchor plate 1, and a tower is installed on the other side of the top of the anchor plate 1. Frame 3, a corridor side fixing frame 9 is provided below the anchoring plate 1, a plurality of sets of reserved fixing grooves 10 are provided inside one end of the corridor side fixing frame 9, and the top of the corridor side fixing frame 9 is welded with Two sets of hanging rings 11 are provided with positioning rails 5 on both sides of the corridor side fixing frame 9. A cable 4 is provided between the top of the hanging ring 11 and the outside of the hoist 2. One side of the positioning rail 5 is provided with a stable upward movement prevention device. rocking structure;
请参阅图1-4,一种钢连廊施工提升装置还包括稳定上移防晃动结构,稳定上移防晃动结构包括两组固定板6,两组固定板6分别焊接在连廊侧边固定架9一端的两侧,固定板6的一端固定连接有凹形壳7,凹形壳7的内部活动连接有两组定位滑轮8;Please refer to Figure 1-4. A steel corridor construction lifting device also includes a stable upward movement anti-sway structure. The stable upward movement anti-sway structure includes two sets of fixed plates 6. The two sets of fixed plates 6 are respectively welded to the fixed frames 9 on the side of the corridor. On both sides of one end, one end of the fixed plate 6 is fixedly connected with a concave shell 7, and two sets of positioning pulleys 8 are movably connected inside the concave shell 7;
固定板6关于连廊侧边固定架9的垂直中心线对称分布,定位滑轮8外圈沟槽的形状尺寸和定位轨5一侧外部的形状尺寸相匹配,可以在提升的同时保持稳定不晃动;The fixed plate 6 is symmetrically distributed about the vertical center line of the corridor side fixing frame 9. The shape and size of the outer ring groove of the positioning pulley 8 matches the shape and size of the outer shape and size of one side of the positioning rail 5, which can maintain stability without shaking while being lifted. ;
具体地,如图2和图3所示,定位轨5预先安装在建筑的侧面,在提升过程中,定位滑轮8紧贴定位轨5向上位移,定位轨5可以限定连廊上升的轨迹,避免发生摆动,固定板6和凹形壳7为定位滑轮8的安装固定提供了物理支撑。Specifically, as shown in Figures 2 and 3, the positioning rail 5 is pre-installed on the side of the building. During the lifting process, the positioning pulley 8 is close to the positioning rail 5 and moves upward. The positioning rail 5 can limit the rising trajectory of the corridor and avoid When the swing occurs, the fixed plate 6 and the concave shell 7 provide physical support for the installation and fixation of the positioning pulley 8 .
实施例2:连廊侧边固定架9顶部的两侧分别安装有红外发射器12,定位轨5的一端安装有多组红外接收器13,红外发射器12、红外接收器13的位置尺寸一一对应,可以通过信号反馈帮助顶部操作人员确定提升范围,提升操作精度和效率;Embodiment 2: Infrared transmitters 12 are installed on both sides of the top of the corridor side fixing frame 9 respectively, and multiple sets of infrared receivers 13 are installed on one end of the positioning rail 5. The positions and dimensions of the infrared transmitters 12 and the infrared receivers 13 are the same. One-to-one correspondence can help the top operator determine the lifting range through signal feedback and improve operating accuracy and efficiency;
具体地,如图3和图4所示,红外发射器12每上升一定的距离,对应高度的红外接收器13即接收到信号,楼顶的操作者可以通过信号反馈了解提升的高度,在对接位置处单独设置一组或几组红外接收器13,顶部操作人员在操作时可以通过信号反馈自行调整,节约和楼下安装人员沟通的时间,提升对接效率。Specifically, as shown in Figures 3 and 4, every time the infrared transmitter 12 rises a certain distance, the infrared receiver 13 at the corresponding height receives the signal. The operator on the roof can understand the raised height through signal feedback. One or more groups of infrared receivers 13 are set separately at the location. The top operator can adjust himself through signal feedback during operation, saving time in communicating with the installers downstairs and improving docking efficiency.
实施例3:连廊侧边固定架9一端的底部横向焊接有连廊底部托架14,连廊底部托架14的顶部和连廊侧边固定架9的一端之间固定连接有多组斜向加固杆15,斜向加固杆15呈等间距排列,连廊底部托架14的顶部固定连接有多组托梁定位架17,托梁定位架17的内部水平安装有底部托梁16,连廊侧边固定架9、连廊底部托架14、斜向加固杆15、底部托梁16材质相一致,对连廊底部形成承托,使受力更加均匀稳定;Embodiment 3: The bottom of one end of the corridor side fixing frame 9 is transversely welded with a corridor bottom bracket 14. There are multiple sets of inclined brackets fixedly connected between the top of the corridor bottom bracket 14 and one end of the corridor side fixing frame 9. The diagonal reinforcement rods 15 and the diagonal reinforcement rods 15 are arranged at equal intervals. The tops of the corridor bottom brackets 14 are fixedly connected with multiple sets of joist positioning frames 17. The bottom joists 16 are installed horizontally inside the joist positioning frames 17. The corridor side fixing brackets 9, corridor bottom brackets 14, diagonal reinforcement rods 15, and bottom joists 16 are made of the same material, supporting the bottom of the corridor to make the stress more uniform and stable;
具体地,如图1和图2所示,在连廊侧边固定架9一端的连廊底部托架14上安装好底部托梁16,底部托梁16直接卡入托梁定位架17中,打入锁销即可固定,斜向加固杆15可以增加连廊底部托架14的结构强度,在提升时多组底部托梁16可以托住连廊底部,降低连廊中间位置处的负荷,保证受力均衡。Specifically, as shown in Figures 1 and 2, the bottom joist 16 is installed on the corridor bottom bracket 14 at one end of the corridor side fixing frame 9, and the bottom joist 16 is directly inserted into the joist positioning frame 17, and the bottom joist 16 is directly inserted into the joist positioning frame 17. It can be fixed by inserting the lock pin. The diagonal reinforcing rod 15 can increase the structural strength of the bottom bracket 14 of the corridor. When lifting, multiple sets of bottom joists 16 can support the bottom of the corridor, reduce the load at the middle position of the corridor, and ensure The force is balanced.
工作原理:本实用新型在使用时,首先,钢连廊焊接组装工作在地面完成并通过质检后,将连廊运送至建筑底部,将连廊侧边固定架9贴合在连廊的侧边,预留固定槽眼10方便加装锚固件进行加固,底部托架全部安装完毕,缆索4固定在挂环11上,即可开始提升工作,定位轨5预先安装在建筑的侧面,在提升过程中,定位滑轮8紧贴定位轨5向上位移,定位轨5可以限定连廊上升的轨迹,避免发生摆动,固定板6和凹形壳7为定位滑轮8的安装固定提供了物理支撑。随着连廊的不断上升,安装在连廊侧边固定架9顶部的红外发射器12也在不断上升,每上升一定的距离,对应高度的红外接收器13即接收到信号,楼顶的操作者可以通过信号反馈了解提升的高度,在对接位置处单独设置一组或几组红外接收器13,顶部操作人员在操作时可以通过信号反馈自行调整,节约和楼下安装人员沟通的时间,提升对接效率。在将连廊侧边固定架9固定在连廊端面前,在连廊侧边固定架9一端的连廊底部托架14上安装好底部托梁16,底部托梁16直接卡入托梁定位架17中,打入锁销即可固定,斜向加固杆15可以增加连廊底部托架14的结构强度,在提升时多组底部托梁16可以托住连廊底部,降低连廊中间位置处的负荷,保证受力均衡。Working principle: When the utility model is in use, first, the steel corridor welding and assembly work is completed on the ground and passes the quality inspection, then the corridor is transported to the bottom of the building, and the corridor side fixing frame 9 is attached to the side of the corridor. On the side, fixing grooves 10 are reserved to facilitate the installation of anchors for reinforcement. The bottom brackets are all installed, and the cable 4 is fixed on the hanging ring 11. The lifting work can be started. The positioning rail 5 is pre-installed on the side of the building. During the lifting During the process, the positioning pulley 8 moves upward close to the positioning rail 5. The positioning rail 5 can limit the ascending trajectory of the corridor and avoid swinging. The fixed plate 6 and the concave shell 7 provide physical support for the installation and fixation of the positioning pulley 8. As the corridor continues to rise, the infrared transmitter 12 installed on the top of the fixed frame 9 on the side of the corridor is also rising. Every time it rises a certain distance, the infrared receiver 13 corresponding to the height receives the signal, and the operation on the roof The operator can understand the lifting height through signal feedback, and set up one or more groups of infrared receivers 13 separately at the docking position. The top operator can adjust himself through signal feedback during operation, saving time to communicate with the installer downstairs, and improving the docking efficiency. Before fixing the corridor side fixing frame 9 to the end of the corridor, install the bottom joist 16 on the corridor bottom bracket 14 at one end of the corridor side fixing frame 9, and the bottom joist 16 is directly snapped into the joist positioning frame 17, it can be fixed by driving in the lock pin. The oblique reinforcing rod 15 can increase the structural strength of the bottom bracket 14 of the corridor. When lifting, multiple sets of bottom joists 16 can support the bottom of the corridor and lower the middle position of the corridor. load to ensure balanced force.
对于本领域技术人员而言,显然本实用新型不限于上述示范性实施例的细节,而且在不背离本实用新型的精神或基本特征的情况下,能够以其他的具体形式实现本实用新型。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本实用新型的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本实用新型内。不应将权利要求中的任何附图标记视为限制所涉及的权利要求。It is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and the present invention can be implemented in other specific forms without departing from the spirit or basic characteristics of the present invention. Therefore, from any point of view, the embodiments should be regarded as exemplary and non-restrictive. The scope of the present invention is defined by the appended claims rather than the above description, and it is therefore intended that all claims falling within the rights All changes within the meaning and scope of the required equivalents are included in the present invention. Any reference signs in the claims shall not be construed as limiting the claim in question.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202321959158.2U CN220564062U (en) | 2023-07-25 | 2023-07-25 | A steel corridor construction lifting device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202321959158.2U CN220564062U (en) | 2023-07-25 | 2023-07-25 | A steel corridor construction lifting device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN220564062U true CN220564062U (en) | 2024-03-08 |
Family
ID=90101505
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202321959158.2U Active CN220564062U (en) | 2023-07-25 | 2023-07-25 | A steel corridor construction lifting device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN220564062U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119774434A (en) * | 2025-02-25 | 2025-04-08 | 中国建筑第二工程局有限公司 | A multi-layer steel structure large-span corridor lifting device and installation method |
-
2023
- 2023-07-25 CN CN202321959158.2U patent/CN220564062U/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119774434A (en) * | 2025-02-25 | 2025-04-08 | 中国建筑第二工程局有限公司 | A multi-layer steel structure large-span corridor lifting device and installation method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN220564062U (en) | A steel corridor construction lifting device | |
| CN107673185A (en) | A kind of hanging apparatus and its hanging method of prefabricated assembled concrete Side fascia | |
| CN110453836B (en) | Inclined glass curtain wall installation system and installation method | |
| CN109132843B (en) | The installation method of super-section metal bellows in a kind of vertical shaft | |
| CN207375586U (en) | A kind of hanging apparatus of prefabricated assembled concrete Side fascia | |
| CN209194364U (en) | A kind of Continuous Beam-arch Bridge sunpender bridge floor tensioning equipment | |
| CN110980468A (en) | Indoor construction elevator system and dismounting method | |
| CN220058778U (en) | Wall-riding hanging basket | |
| CN113184683A (en) | Automatic mounting device and method for precast concrete column | |
| CN219031629U (en) | Lifting equipment for indoor plate installation | |
| CN220909073U (en) | Adjustable elevator shaft operation platform | |
| CN220014395U (en) | Can have enough to meet need mounting bracket by intelligent integrated platform system bailey frame of equipping | |
| CN116084678B (en) | A device to replace the rear support and counterweight of the hanging basket | |
| CN118145476A (en) | Box transformer substation lifting sling for wind power operation and maintenance and box changing method | |
| CN211622543U (en) | A hanging basket control device | |
| CN217175641U (en) | An electric hanging basket suspension mechanism | |
| CN211548709U (en) | Simple lifting construction platform | |
| CN107675892A (en) | A kind of glass curtain wall monorail hoisting structure | |
| CN220620997U (en) | Double-hanging-point type hanging basket erection structure | |
| CN115680259A (en) | Assembled hanging basket equipment | |
| CN223060564U (en) | A movable assembled glass railing lifting and installation device | |
| CN223852006U (en) | Full-automatic assembly type construction elevator steel structure back support device | |
| CN217840787U (en) | A frame structure elevator shaft operating platform | |
| CN221343693U (en) | Curtain wall profile installation hanging system | |
| CN224213750U (en) | A skylight mounting and positioning component |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |