CN220554951U - A kind of construction steel bar welding equipment - Google Patents

A kind of construction steel bar welding equipment Download PDF

Info

Publication number
CN220554951U
CN220554951U CN202321433475.0U CN202321433475U CN220554951U CN 220554951 U CN220554951 U CN 220554951U CN 202321433475 U CN202321433475 U CN 202321433475U CN 220554951 U CN220554951 U CN 220554951U
Authority
CN
China
Prior art keywords
rod
groove
extends
rotating shaft
rotating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202321433475.0U
Other languages
Chinese (zh)
Inventor
童爱菊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Jinzhuang Construction Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202321433475.0U priority Critical patent/CN220554951U/en
Application granted granted Critical
Publication of CN220554951U publication Critical patent/CN220554951U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The utility model belongs to the technical field of building construction, in particular to a building reinforcing steel bar welding device, which aims at the existing replacement problem and adopts the following scheme that the welding device comprises a transverse rod, wherein a fixing groove is formed in the bottom of the transverse rod, a fixing rod is slidably arranged in the fixing groove, one end of a welding gun is fixedly arranged at the bottom of the fixing rod, the other end of the welding gun extends out of the fixing groove, grooves are formed in the inner walls of the two sides of the fixing groove, a baffle rod is slidably arranged in the grooves, one end of the baffle rod extends into the grooves, the other end of the baffle rod extends into the fixing groove, and the top of the baffle rod extending into the fixing groove is contacted with the bottom of the fixing rod. According to the utility model, the welding gun is fixedly connected with the cross rod through the fixing rod, so that the welding gun can be replaced by another welding gun when the welding gun stops using, and the working efficiency is greatly improved.

Description

一种建筑钢筋焊接设备A kind of construction steel bar welding equipment

技术领域Technical field

本实用新型涉及建筑施工技术领域,尤其涉及一种建筑钢筋焊接设备。The utility model relates to the technical field of building construction, in particular to a building steel bar welding equipment.

背景技术Background technique

钢筋是指钢筋混凝土用和预应力钢筋混凝土用钢材,其横截面为圆形,有时为带有圆角的方形。包括光圆钢筋、带肋钢筋、扭转钢筋。在建筑施工时,需要将两根短钢筋进行焊接,以满足使用需求。Rebar refers to steel for reinforced concrete and prestressed reinforced concrete. Its cross-section is circular or sometimes square with rounded corners. Including plain round steel bars, ribbed steel bars, and torsion steel bars. During construction, two short steel bars need to be welded to meet usage requirements.

目前,目前建筑施工过程中,需要大量的焊接钢筋作为建筑加固件,然而有些加固件用的钢筋很短,需要将多根钢筋进行焊接作业。At present, during the current building construction process, a large number of welded steel bars are needed as building reinforcements. However, some reinforcements use very short steel bars, and multiple steel bars need to be welded.

公告号为CN112496638A的专利公开了一种建筑钢筋用焊接装置,包括支撑架和限位装置;支撑架包括一对左右对称设置的竖直支撑架;一对竖直支撑架靠近的端面下部成型有水平连接板;一对竖直支撑架的上部分别成型有左右贯穿的圆孔状的旋转穿孔;限位装置包括一对圆环状的支撑环;支撑环旋转设置在旋转穿孔内并且支撑环的旋转中心轴与旋转穿孔的旋转中心轴共线;支撑环旋的内部旋转设置有长方体状的侧支撑座并且侧支撑座的旋转中心轴与旋转穿孔的旋转中心轴垂直;侧支撑座上成型有左右贯穿的供钢筋左右贯穿的限位插孔;限位插孔内设置有钢筋限位装置。The patent with announcement number CN112496638A discloses a welding device for building steel bars, which includes a support frame and a limiting device; the support frame includes a pair of vertical support frames arranged symmetrically on the left and right; the lower parts of the adjacent end surfaces of the pair of vertical support frames are formed with Horizontal connecting plates; the upper parts of a pair of vertical support frames are respectively formed with circular hole-shaped rotary perforations penetrating left and right; the limiting device includes a pair of annular support rings; the support rings are rotatably arranged in the rotary perforations and the support rings are The central axis of rotation is collinear with the central axis of rotation of the rotation perforation; the internal rotation of the support ring is provided with a rectangular parallelepiped-shaped side support seat, and the central axis of rotation of the side support seat is perpendicular to the central axis of rotation of the rotation perforation; the side support seat is formed with There are limit sockets for steel bars to penetrate left and right; a steel bar limit device is provided in the limit socket.

然而,该专利在长时间的焊接后,焊枪因高温可能需要停止使用一段时间,大大的降低了工作效率。However, according to this patent, after long-term welding, the welding gun may need to be stopped for a period of time due to high temperature, which greatly reduces work efficiency.

实用新型内容Utility model content

本实用新型的目的是为了解决现有技术中存在的缺点,而提出的一种建筑钢筋焊接设备。The purpose of this utility model is to propose a construction steel bar welding equipment in order to solve the shortcomings existing in the prior art.

为了实现上述目的,本实用新型采用了如下技术方案:In order to achieve the above purpose, the present utility model adopts the following technical solutions:

一种建筑钢筋焊接设备,包括横杆,所述横杆的底部开设有固定槽,固定槽内滑动安装有固定杆,固定杆的底部固定安装有焊枪的一端,焊枪的另一端延伸至固定槽外,所述固定槽的两侧内壁上均开设有凹槽,凹槽内滑动安装有档杆,档杆的一端延伸至凹槽内,档杆的另一端延伸至固定槽内,档杆延伸至固定槽内的顶部与固定杆的底部相接触。A kind of construction steel bar welding equipment, including a cross bar, a fixed groove is provided at the bottom of the cross bar, a fixed rod is slidably installed in the fixed groove, one end of the welding gun is fixedly installed at the bottom of the fixed rod, and the other end of the welding gun extends to the fixed groove In addition, grooves are provided on the inner walls of both sides of the fixed groove, and a gear rod is slidably installed in the groove. One end of the gear rod extends into the groove, and the other end of the gear rod extends into the fixed groove, and the gear rod extends until the top of the fixing groove contacts the bottom of the fixing rod.

优选的,所述凹槽的底部内壁上开设有滑动孔,滑动孔内滑动安装有滑动杆,滑动杆的一端延伸至凹槽内,滑动杆的另一端延伸至横杆外,滑动杆延伸至凹槽内的一端与档杆的底部固定连接,滑动杆的一侧固定安装有第一弹簧的一端,第一弹簧的另一端与滑动孔的一侧内壁上固定连接。Preferably, a sliding hole is provided on the inner wall of the bottom of the groove, and a sliding rod is slidably installed in the sliding hole. One end of the sliding rod extends into the groove, the other end of the sliding rod extends to the outside of the cross bar, and the sliding rod extends to One end in the groove is fixedly connected to the bottom of the gear rod, one end of the first spring is fixedly installed on one side of the sliding rod, and the other end of the first spring is fixedly connected to the inner wall of one side of the sliding hole.

优选的,所述凹槽的顶部一侧内壁上开设有转动槽,转动槽内转动安装有第一转轴,第一转轴上固定安装有顶杆,顶杆的顶部固定安装有第二弹簧的一端,第二弹簧的另一端与转动槽的顶部内壁上固定连接。Preferably, a rotation groove is provided on the inner wall of one side of the top of the groove, a first rotation shaft is installed in the rotation groove, a push rod is fixedly installed on the first rotation shaft, and one end of the second spring is fixedly installed on the top of the push rod. , the other end of the second spring is fixedly connected to the top inner wall of the rotation groove.

优选的,所述转动槽的顶部内壁上固定安装有支撑杆,支撑杆上转动安装有第二转轴,第二转轴上固定安装有杠杆。Preferably, a support rod is fixedly installed on the top inner wall of the rotation groove, a second rotation shaft is rotationally installed on the support rod, and a lever is fixedly installed on the second rotation shaft.

优选的,所述杠杆的一端转动安装有第三转轴,第三转轴上固定安装有连接杆的一端,连接杆的另一端转动安装有第四转轴,第四转轴与转动杆的顶部固定连接。Preferably, a third rotating shaft is rotatably mounted on one end of the lever, one end of the connecting rod is fixedly mounted on the third rotating shaft, and a fourth rotating shaft is rotatably mounted on the other end of the connecting rod. The fourth rotating shaft is fixedly connected to the top of the rotating rod.

优选的,所述转动槽的一侧内壁上开设有通孔,通孔内转动安装有第五转轴,第五转轴上固定安装有转动杆,转动杆的一端转动安装有第六转轴,第六转轴与杠杆的一端固定连接,所述固定杆的两侧均固定安装有短杆,短杆的顶部与转动杆的底部相接触。Preferably, a through hole is provided on one side of the inner wall of the rotation groove, a fifth rotating shaft is rotatably installed in the through hole, a rotating rod is fixedly installed on the fifth rotating shaft, and a sixth rotating shaft is rotatably installed at one end of the rotating rod. The rotating shaft is fixedly connected to one end of the lever, short rods are fixedly installed on both sides of the fixed rod, and the top of the short rod is in contact with the bottom of the rotating rod.

与现有技术相比,本实用新型的有益效果是:Compared with the existing technology, the beneficial effects of this utility model are:

本实用新型中,所述一种建筑钢筋焊接设备,当需要更换的时候,首先滑动滑动杆,滑动杆带动档杆,档杆收进凹槽内,然后进行更换,更换好之后,固定杆卡进固定槽内,短杆带动转动杆,转动杆带动第六转轴,第六转轴带动杠杆,杠杆带动第三转轴,第三转轴带动连接杆,连接杆带动第四转轴,第四转轴带动顶杆,然后档杆卡住固定杆,从而达到快速更换的目的。In the utility model, when the construction steel bar welding equipment needs to be replaced, the sliding rod is first slid, the sliding rod drives the gear lever, the gear lever is retracted into the groove, and then the replacement is performed. After replacement, the fixed lever is stuck Entering the fixed groove, the short rod drives the rotating rod, the rotating rod drives the sixth rotating axis, the sixth rotating axis drives the lever, the lever drives the third rotating axis, the third rotating axis drives the connecting rod, the connecting rod drives the fourth rotating axis, and the fourth rotating axis drives the ejector rod. , and then the gear lever blocks the fixed lever, thereby achieving the purpose of quick replacement.

本实用新型将焊枪通过固定杆与横杆进行固定连接,可以在焊枪停止使用的时候,更换为另一个焊枪,极大的提高了工作效率。In the utility model, the welding gun is fixedly connected to the cross bar through the fixed rod. When the welding gun stops being used, it can be replaced with another welding gun, which greatly improves the work efficiency.

附图说明Description of drawings

图1为本实用新型提出的一种建筑钢筋焊接设备的正面结构示意图;Figure 1 is a schematic front structural view of a construction steel bar welding equipment proposed by the utility model;

图2为本实用新型提出的一种建筑钢筋焊接设备的A部分结构示意图;Figure 2 is a schematic structural diagram of part A of a construction steel bar welding equipment proposed by the utility model;

图3为本实用新型提出的一种建筑钢筋焊接设备的B部分结构示意图。Figure 3 is a schematic structural diagram of part B of a construction steel bar welding equipment proposed by the utility model.

图中:1横杆、2固定槽、3固定杆、4焊枪、5凹槽、6档杆、7滑动孔、8滑动杆、9第一弹簧、10转动槽、11第一转轴、12顶杆、13第二弹簧、14支撑杆、15第二转轴、16杠杆、17第三转轴、18连接杆、19第四转轴、20通孔、21第五转轴、22转动杆、23第六转轴、24短杆。In the picture: 1 horizontal bar, 2 fixed groove, 3 fixed rod, 4 welding gun, 5 groove, 6 gear rod, 7 sliding hole, 8 sliding rod, 9 first spring, 10 rotating groove, 11 first rotating shaft, 12 top Rod, 13 second spring, 14 support rod, 15 second rotating axis, 16 lever, 17 third rotating axis, 18 connecting rod, 19 fourth rotating axis, 20 through hole, 21 fifth rotating axis, 22 rotating rod, 23 sixth rotating axis , 24 short game.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only part of the embodiments of the present utility model, not all implementations. example.

参照图1-3,一种建筑钢筋焊接设备,包括横杆1,横杆1的底部开设有固定槽2,固定槽2内滑动安装有固定杆3,固定杆3的底部固定安装有焊枪4的一端,焊枪4的另一端延伸至固定槽2外,固定槽2的两侧内壁上均开设有凹槽5,凹槽5内滑动安装有档杆6,档杆6的一端延伸至凹槽5内,档杆6的另一端延伸至固定槽2内,档杆6延伸至固定槽2内的顶部与固定杆3的底部相接触,档杆6用于固定。Referring to Figure 1-3, a construction steel bar welding equipment includes a crossbar 1. A fixing slot 2 is provided at the bottom of the crossbar 1. A fixing rod 3 is slidably installed in the fixing slot 2. A welding gun 4 is fixedly installed at the bottom of the fixing rod 3. One end of the welding gun 4 extends to the outside of the fixed groove 2. Grooves 5 are provided on the inner walls of both sides of the fixed groove 2. A gear rod 6 is slidably installed in the groove 5. One end of the gear rod 6 extends to the groove. 5, the other end of the gear rod 6 extends into the fixed groove 2, and the top of the gear rod 6 extends into the fixed groove 2 and contacts the bottom of the fixed rod 3. The gear rod 6 is used for fixing.

本实用新型中,凹槽5的底部内壁上开设有滑动孔7,滑动孔7内滑动安装有滑动杆8,滑动杆8的一端延伸至凹槽5内,滑动杆8的另一端延伸至横杆1外,滑动杆8延伸至凹槽5内的一端与档杆6的底部固定连接,滑动杆8的一侧固定安装有第一弹簧9的一端,第一弹簧9的另一端与滑动孔7的一侧内壁上固定连接,滑动杆8用于滑动。In the utility model, a sliding hole 7 is provided on the bottom inner wall of the groove 5. A sliding rod 8 is slidably installed in the sliding hole 7. One end of the sliding rod 8 extends into the groove 5, and the other end of the sliding rod 8 extends to the horizontal direction. Outside the rod 1, one end of the sliding rod 8 extends into the groove 5 and is fixedly connected to the bottom of the gear rod 6. One end of the first spring 9 is fixedly installed on one side of the sliding rod 8, and the other end of the first spring 9 is connected to the sliding hole. 7 is fixedly connected to one side of the inner wall, and the sliding rod 8 is used for sliding.

本实用新型中,凹槽5的顶部一侧内壁上开设有转动槽10,转动槽10内转动安装有第一转轴11,第一转轴11上固定安装有顶杆12,顶杆12的顶部固定安装有第二弹簧13的一端,第二弹簧13的另一端与转动槽10的顶部内壁上固定连接,第二弹簧13用于复位。In the present utility model, a rotating groove 10 is provided on the inner wall of the top side of the groove 5. A first rotating shaft 11 is installed in the rotating groove 10. A ejector rod 12 is fixedly installed on the first rotating shaft 11, and the top of the ejector rod 12 is fixed. One end of the second spring 13 is installed, and the other end of the second spring 13 is fixedly connected to the top inner wall of the rotation groove 10. The second spring 13 is used for reset.

本实用新型中,转动槽10的顶部内壁上固定安装有支撑杆14,支撑杆14上转动安装有第二转轴15,第二转轴15上固定安装有杠杆16,第二转轴15用于转动。In the present utility model, a support rod 14 is fixedly installed on the top inner wall of the rotation groove 10, a second rotating shaft 15 is installed on the supporting rod 14, a lever 16 is fixedly installed on the second rotating shaft 15, and the second rotating shaft 15 is used for rotation.

本实用新型中,杠杆16的一端转动安装有第三转轴17,第三转轴17上固定安装有连接杆18的一端,连接杆18的另一端转动安装有第四转轴19,第四转轴19与转动杆22的顶部固定连接,连接杆18用于连接。In the present utility model, a third rotating shaft 17 is rotatably mounted on one end of the lever 16, one end of the connecting rod 18 is fixedly mounted on the third rotating shaft 17, and a fourth rotating shaft 19 is rotatably mounted on the other end of the connecting rod 18. The fourth rotating shaft 19 and The top of the rotating rod 22 is fixedly connected, and the connecting rod 18 is used for connection.

本实用新型中,转动槽10的一侧内壁上开设有通孔20,通孔20内转动安装有第五转轴21,第五转轴21上固定安装有转动杆22,转动杆22的一端转动安装有第六转轴23,第六转轴23与杠杆16的一端固定连接,固定杆3的两侧均固定安装有短杆24,短杆24的顶部与转动杆22的底部相接触,第六转轴23用于转动。In the present utility model, a through hole 20 is provided on one side of the inner wall of the rotating groove 10. A fifth rotating shaft 21 is rotatably installed in the through hole 20. A rotating rod 22 is fixedly installed on the fifth rotating shaft 21, and one end of the rotating rod 22 is rotationally installed. There is a sixth rotating shaft 23. The sixth rotating shaft 23 is fixedly connected to one end of the lever 16. Short rods 24 are fixedly installed on both sides of the fixed rod 3. The top of the short rod 24 is in contact with the bottom of the rotating rod 22. The sixth rotating shaft 23 for turning.

本实用新型中,所述一种建筑钢筋焊接设备,当需要更换的时候,首先滑动滑动杆8,滑动杆8带动档杆6,档杆6收进凹槽5内,然后进行更换,更换好之后,固定杆3卡进固定槽2内,短杆24带动转动杆22,转动杆22带动第六转轴23,第六转轴23带动杠杆16,杠杆16带动第三转轴17,第三转轴17带动连接杆18,连接杆18带动第四转轴19,第四转轴19带动顶杆12,然后档杆6卡住固定杆3,从而达到快速更换的目的。In the utility model, when the construction steel bar welding equipment needs to be replaced, first slide the sliding rod 8, the sliding rod 8 drives the gear lever 6, and the gear lever 6 is retracted into the groove 5, and then replaces it. After that, the fixed rod 3 is stuck into the fixed groove 2, the short rod 24 drives the rotating rod 22, the rotating rod 22 drives the sixth rotating shaft 23, the sixth rotating shaft 23 drives the lever 16, the lever 16 drives the third rotating shaft 17, and the third rotating shaft 17 drives The connecting rod 18 drives the fourth rotating shaft 19, the fourth rotating shaft 19 drives the ejector rod 12, and then the gear rod 6 blocks the fixed rod 3, thereby achieving the purpose of quick replacement.

以上所述,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,根据本实用新型的技术方案及其实用新型构思加以等同替换或改变,都应涵盖在本实用新型的保护范围之内。The above are only preferred specific embodiments of the present utility model, but the protection scope of the present utility model is not limited thereto. Any person familiar with the technical field can, within the technical scope disclosed by the present utility model, implement the present utility model according to the present utility model. Novel technical solutions and utility model concepts, including equivalent substitutions or changes, shall be covered by the protection scope of the present utility model.

Claims (6)

1. The utility model provides a construction steel welding equipment, includes horizontal pole (1), its characterized in that, fixed slot (2) have been seted up to the bottom of horizontal pole (1), and slidable mounting has dead lever (3) in dead lever (2), and the bottom fixed mounting of dead lever (3) has one end of welder (4), and outside the other end of welder (4) extends to dead slot (2), all set up recess (5) on the both sides inner wall of dead slot (2), slidable mounting has shelves pole (6) in recess (5), and in the one end of shelves pole (6) extends to recess (5), the other end of shelves pole (6) extends to in dead slot (2), and the top in shelves pole (6) extends to dead slot (2) contacts with the bottom of dead lever (3).
2. The construction steel bar welding equipment according to claim 1, wherein a sliding hole (7) is formed in the inner wall of the bottom of the groove (5), a sliding rod (8) is slidably installed in the sliding hole (7), one end of the sliding rod (8) extends into the groove (5), the other end of the sliding rod (8) extends out of the cross rod (1), one end of the sliding rod (8) extends into the groove (5) is fixedly connected with the bottom of the baffle rod (6), one side of the sliding rod (8) is fixedly provided with one end of a first spring (9), and the other end of the first spring (9) is fixedly connected with the inner wall of one side of the sliding hole (7).
3. The construction steel bar welding equipment according to claim 1, wherein a rotating groove (10) is formed in the inner wall of one side of the top of the groove (5), a first rotating shaft (11) is rotatably installed in the rotating groove (10), a push rod (12) is fixedly installed on the first rotating shaft (11), one end of a second spring (13) is fixedly installed on the top of the push rod (12), and the other end of the second spring (13) is fixedly connected with the inner wall of the top of the rotating groove (10).
4. A construction steel bar welding apparatus according to claim 3, wherein a supporting rod (14) is fixedly installed on the top inner wall of the rotary groove (10), a second rotary shaft (15) is rotatably installed on the supporting rod (14), and a lever (16) is fixedly installed on the second rotary shaft (15).
5. The construction steel bar welding equipment according to claim 4, wherein one end of the lever (16) is rotatably provided with a third rotating shaft (17), one end of a connecting rod (18) is fixedly arranged on the third rotating shaft (17), the other end of the connecting rod (18) is rotatably provided with a fourth rotating shaft (19), and the fourth rotating shaft (19) is fixedly connected with the top of the rotating rod (22).
6. A construction steel bar welding device according to claim 3, wherein a through hole (20) is formed in an inner wall of one side of the rotary groove (10), a fifth rotary shaft (21) is rotatably mounted in the through hole (20), a rotary rod (22) is fixedly mounted on the fifth rotary shaft (21), a sixth rotary shaft (23) is rotatably mounted at one end of the rotary rod (22), the sixth rotary shaft (23) is fixedly connected with one end of the lever (16), short rods (24) are fixedly mounted at two sides of the fixed rod (3), and the top of each short rod (24) is in contact with the bottom of the rotary rod (22).
CN202321433475.0U 2023-06-07 2023-06-07 A kind of construction steel bar welding equipment Expired - Fee Related CN220554951U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321433475.0U CN220554951U (en) 2023-06-07 2023-06-07 A kind of construction steel bar welding equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321433475.0U CN220554951U (en) 2023-06-07 2023-06-07 A kind of construction steel bar welding equipment

Publications (1)

Publication Number Publication Date
CN220554951U true CN220554951U (en) 2024-03-05

Family

ID=90051518

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321433475.0U Expired - Fee Related CN220554951U (en) 2023-06-07 2023-06-07 A kind of construction steel bar welding equipment

Country Status (1)

Country Link
CN (1) CN220554951U (en)

Similar Documents

Publication Publication Date Title
CN220554951U (en) A kind of construction steel bar welding equipment
CN213646486U (en) Quick positioner of reinforcing bar cage welding for building
CN211816023U (en) Hydraulic engineering slope bearing structure
CN213470031U (en) High efficiency steel reinforcement cage welding set for building
CN209975327U (en) Road structure layer construction steel form strutting arrangement that paves
CN221778770U (en) Prefabricated floor slab connector and prefabricated floor slab assembled floor slab connection structure
CN217967594U (en) Environment-friendly tubular pile mold
CN206397211U (en) A kind of bridge construction deposits protector with steel reinforcement cage
CN216766758U (en) Post-cast strip disassembly-free supporting structure
CN215368758U (en) Environment-friendly and energy-saving building template connecting mechanism for building outer wall
CN213773328U (en) Anti splitting precast concrete tubular pile
CN213175053U (en) Steel pipe pole anti-tilting device
CN221989105U (en) A disassembly device for I-beam of bridge support
CN220583115U (en) Sagger for sintering high-capacity low-cost layered sodium ion battery anode material
CN206591792U (en) A kind of spigot-and-socket scaffold
CN216007820U (en) Assembly type green house building template
CN218323211U (en) An assembled steel structure connection device
CN219451411U (en) Frame device is chosen in construction
CN218843824U (en) A temporary sealing device for reserved holes in building construction
CN219471518U (en) A prefabricated building formwork for construction engineering
CN221664293U (en) Reinforcing bar location structure for construction
CN223281656U (en) Wind-resistant scaffolding for construction
CN210263518U (en) Assembled concrete frame structure of cutting
CN219604945U (en) Building construction strutting arrangement
CN216766768U (en) Molding clamping mechanism for early-dismantling formwork production of post-cast strip

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240328

Address after: 331700 room 108, No. 9, Jiangbian Road, Minhe Town, Jinxian County, Nanchang City, Jiangxi Province

Patentee after: Jiangxi Jinzhuang Construction Engineering Co.,Ltd.

Country or region after: China

Address before: No. 2 Shuita Erxiang, Yaodu District, Linfen City, Shanxi Province, 041000

Patentee before: Tong Aiju

Country or region before: China

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20240305

CF01 Termination of patent right due to non-payment of annual fee