CN220544620U - Electromechanical installation pipeline equipment - Google Patents

Electromechanical installation pipeline equipment Download PDF

Info

Publication number
CN220544620U
CN220544620U CN202321860454.7U CN202321860454U CN220544620U CN 220544620 U CN220544620 U CN 220544620U CN 202321860454 U CN202321860454 U CN 202321860454U CN 220544620 U CN220544620 U CN 220544620U
Authority
CN
China
Prior art keywords
pipeline
bolts
electro
casing
fixedly arranged
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321860454.7U
Other languages
Chinese (zh)
Inventor
周旋
陈浩
聂力
靳秋爽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Feiyu Technology Co ltd
Original Assignee
Wuhan Feiyu Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Feiyu Technology Co ltd filed Critical Wuhan Feiyu Technology Co ltd
Priority to CN202321860454.7U priority Critical patent/CN220544620U/en
Application granted granted Critical
Publication of CN220544620U publication Critical patent/CN220544620U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to the technical field of electromechanical installation and discloses electromechanical installation pipeline equipment, which comprises a shell, wherein a transverse plate is fixedly arranged in the middle of the shell, clamping holes are formed in four corners of the upper end of the shell, a plurality of support columns are equidistantly arranged at the lower end of the shell, lower clamps are fixedly arranged at the upper ends of the support columns, a plurality of threaded holes are formed in the transverse plate at equal intervals, a connecting block is fixedly arranged at the lower ends of a plurality of first bolts, an upper clamp is fixedly arranged at the lower ends of the connecting block, nuts are fixedly arranged at the upper ends of the first bolts, a first spring is fixedly arranged in the lower clamp, a cover plate is detachably arranged at the upper end of the shell, and through holes are formed in four corners of the upper end of the cover plate. According to the device, the problem that the clamp extrudes and deforms the pipeline can be effectively prevented, the equipment can be conveniently detached and installed by workers, and the service life of the device is prolonged.

Description

Electromechanical installation pipeline equipment
Technical Field
The utility model relates to the technical field of electromechanical installation, in particular to electromechanical installation pipeline equipment.
Background
Most of today's businesses have automated machinery and equipment, and the electromechanical installation industry is thus emerging. Installation of equipment, lines and pipelines of common industrial and public and civil construction projects, engineering of power transformation and distribution stations of 35 kilovolts and below, and manufacturing and installation of nonstandard steel components. Electromechanical installation is a relatively large-scale job, some large enterprises migrate, one project has to take place in nearly half a year, and there is a great need for installation technology.
Through retrieving, when the pipeline inside the existing electromechanical installation pipeline equipment is overhauled, the equipment needs to be disassembled integrally, and then the pipeline is overhauled, so that the working strength of workers is certainly increased, and the problem of extrusion deformation of the pipeline is easily caused when the pipeline is fixed. Accordingly, one skilled in the art would provide an electromechanically installed pipeline apparatus that addresses the problems set forth in the background section above.
Disclosure of Invention
The utility model aims to solve the defects in the prior art, and provides an electromechanical pipeline installation device which can effectively prevent the problem that a clamp extrudes and deforms a pipeline, is convenient for workers to detach and install the device, and prolongs the service life of the device.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides an electromechanical installation pipeline equipment, includes the casing, the fixed diaphragm that is provided with in middle part in the casing, clamping holes have all been seted up in casing upper end four corners department, the lower extreme equidistance is provided with a plurality of support columns in the casing, and a plurality of support column upper end is all fixed and is provided with down anchor clamps, a plurality of screw holes have been seted up to the inside equidistance of diaphragm, the rotation of diaphragm internal thread is provided with a plurality of first bolts, a plurality of first bolt lower extreme is all fixed and is provided with the connecting block, a plurality of connecting block lower extreme is all fixed and is provided with anchor clamps, a plurality of first bolt upper end is all fixed and is provided with the nut, a plurality of lower anchor clamps are inside to be fixed and are provided with first spring, the casing upper end can be dismantled and be provided with the apron, the through-hole has all been seted up in apron upper end four corners department, through a plurality of fixture blocks and a plurality of second bolt fixed connection between casing and the apron, four the thread groove has all been seted up to a fixture block lateral wall;
through above-mentioned technical scheme, be convenient for press from both sides tight fixedly to the pipeline, also can avoid simultaneously leading to the pipeline to become flexible because of external cause, carry inconvenient.
Further, a plurality of second springs are fixedly arranged at the upper end of the cover plate, and a baffle is fixedly connected to the upper ends of the second springs;
through above-mentioned technical scheme, and have the object to pound well pipeline equipment, buffer by baffle extrusion second spring, avoided the object to damage pipeline equipment, improved the device's life.
Further, the first bolts are respectively rotated in the corresponding threaded holes;
through the technical scheme, the first bolt is manually rotated, and the first bolt rotates in the threaded hole and moves downwards, so that the upper clamp slowly abuts against the lower clamp.
Further, arc clamping plates are slidably arranged in the lower clamps, and the first springs are respectively connected with the corresponding arc clamping plates;
through above-mentioned technical scheme, pipeline extrusion arc splint, arc splint extrusion first spring, according to the reaction force of first spring, upwards extrusion arc splint make arc splint closely paste mutually with the pipeline, are convenient for press from both sides tightly fixedly to the pipeline, also can avoid simultaneously because of the external cause, lead to the pipeline not hard up transport inconvenient appearance.
Further, rubber pads are fixedly arranged at the upper ends of the arc clamping plates and the lower ends of the upper clamps;
through above-mentioned technical scheme, further effectual problem that prevents arc splint with pipeline extrusion deformation.
Further, the four clamping blocks respectively penetrate through the corresponding through holes and are clamped in the clamping holes;
through above-mentioned technical scheme, by the fixture block joint in the card hole inside that corresponds, be convenient for with apron and casing sealing connection.
Further, the four second bolts penetrate through the shell respectively and are connected inside the thread grooves in a threaded manner;
through above-mentioned technical scheme, be fixed mutually apron and casing by the second bolt, the staff is when overhauling the pipeline of equipment inside, no longer need carry out holistic disassembling with this equipment, only need with the apron tear down can, great reduction staff's working strength.
The utility model has the following beneficial effects:
1. according to the electromechanical pipeline installation equipment, the first bolt is manually rotated, the first bolt rotates in the threaded hole and moves downwards, so that the upper clamp is slowly abutted against the lower clamp, the arc clamping plate is extruded by the pipeline, the first spring is extruded by the arc clamping plate, the arc clamping plate is extruded upwards according to the reaction force of the first spring, the arc clamping plate is tightly abutted against the pipeline, the pipeline is clamped and fixed conveniently, meanwhile, inconvenience in loosening and conveying of the pipeline due to external reasons can be avoided, and rubber pads are arranged on the surfaces of the upper clamp and the lower clamp, so that the problem of extrusion deformation of the pipeline is effectively prevented.
2. According to the electromechanical installation pipeline equipment, the pipeline can be protected through the cover plate, the cover plate is fixedly connected with the shell through the clamping block and the second bolt, when a worker overhauls the pipeline in the equipment, the whole equipment is not required to be disassembled, the cover plate is only required to be disassembled, the working intensity of the worker is greatly reduced, when an object breaks the pipeline equipment, the second spring is extruded by the baffle plate to buffer, the pipeline equipment is prevented from being damaged by the object, and the service life of the device is prolonged.
Drawings
FIG. 1 is a perspective view of an electro-mechanical installation pipeline apparatus according to the present utility model;
FIG. 2 is an elevation view of an electro-mechanically installed pipeline apparatus in accordance with the present utility model;
FIG. 3 is a front cross-sectional view of an electro-mechanically installed pipeline apparatus in accordance with the present utility model;
FIG. 4 is a front cross-sectional view of a lower clamp for an electro-mechanically installed pipeline apparatus in accordance with the present utility model;
fig. 5 is an enlarged view at a in fig. 3.
Legend description:
1. a housing; 2. a cross plate; 3. a clamping hole; 4. a support column; 5. a lower clamp; 6. a threaded hole; 7. a first bolt; 8. a connecting block; 9. a clamp is arranged; 10. a screw cap; 11. a first spring; 12. an arc clamping plate; 13. a rubber pad; 14. a cover plate; 15. a through hole; 16. a clamping block; 17. a thread groove; 18. a second bolt; 19. a second spring; 20. and a baffle.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-5, one embodiment provided by the present utility model is: the electromechanical installation pipeline equipment comprises a shell 1, wherein a transverse plate 2 is fixedly arranged in the middle of the shell 1, clamping holes 3 are formed in four corners of the upper end of the shell 1, a plurality of support columns 4 are equidistantly arranged at the lower end of the shell 1, lower clamps 5 are fixedly arranged at the upper ends of the support columns 4, a plurality of threaded holes 6 are formed in the transverse plate 2 at equal intervals, a plurality of first bolts 7 are rotatably arranged in threads in the transverse plate 2, connecting blocks 8 are fixedly arranged at the lower ends of the first bolts 7, upper clamps 9 are fixedly arranged at the lower ends of the connecting blocks 8, nuts 10 are fixedly arranged at the upper ends of the first bolts 7, first springs 11 are fixedly arranged in the lower clamps 5, a cover plate 14 is detachably arranged at the upper ends of the shell 1, through holes 15 are formed in four corners of the upper ends of the cover plate 14, the shell 1 and the cover plate 14 are fixedly connected through a plurality of clamping blocks 16 and a plurality of second bolts 18, and a threaded groove 17 is formed in one side wall of each of the four clamping blocks 16;
the pipeline clamping device is convenient to clamp and fix the pipeline, and meanwhile, inconvenience in conveying caused by loosening of the pipeline due to external reasons can be avoided.
The apron 14 upper end is fixed to be provided with a plurality of second springs 19, and a plurality of second springs 19 upper end fixedly connected with baffle 20, and has the object to pound well pipeline equipment, is buffered by the extrusion of baffle 20 second spring 19, has avoided the object to damage pipeline equipment, has improved the device's life.
The plurality of first bolts 7 are respectively rotated inside the corresponding threaded holes 6, the first bolts 7 are manually rotated, and the first bolts 7 are rotated inside the threaded holes 6 and move downward, so that the upper clamp 9 is slowly abutted against the lower clamp 5.
The inside arc splint 12 that all slides of anchor clamps 5 under a plurality of, a plurality of first springs 11 are connected with corresponding arc splint 12 respectively, and pipeline extrusion arc splint 12, arc splint 12 extrusion first spring 11, according to the reaction force of first spring 11, upwards extrusion arc splint 12 make arc splint 12 closely paste with the pipeline, are convenient for press from both sides tightly fixedly to the pipeline, also can avoid simultaneously because of the external cause, lead to the pipeline to become flexible to carry inconvenient.
Rubber pads 13 are fixedly arranged at the upper ends of the arc clamping plates 12 and the lower ends of the upper clamps 9, and further the problem that the arc clamping plates 12 squeeze and deform pipelines is effectively prevented.
The four clamping blocks 16 respectively penetrate through the corresponding through holes 15 and are clamped inside the clamping holes 3, and the clamping blocks 16 are clamped inside the corresponding clamping holes 3, so that the cover plate 14 and the shell 1 are conveniently connected in a sealing mode.
Four second bolts 18 run through casing 1 and threaded connection respectively in screw thread groove 17 inside, are fixed cover plate 14 mutually with casing 1 by second bolt 18, and the staff is when overhauling the pipeline of equipment inside, no longer need with this equipment wholly disassemble, only need with cover plate 14 pull down can, great reduction staff's working strength.
Working principle: when the electromechanical installation pipeline equipment is used, through manually rotating the first bolt 7, the first bolt 7 rotates in the threaded hole 6 and moves downwards, the upper clamp 9 is slowly abutted against the lower clamp 5, the arc clamping plate 12 is extruded through the pipeline, the arc clamping plate 12 is extruded by the first spring 11, the arc clamping plate 12 is extruded upwards according to the reaction force of the first spring 11, the arc clamping plate 12 is tightly attached to the pipeline, clamping and fixing of the pipeline are facilitated, meanwhile, inconvenience in loosening and conveying of the pipeline caused by external reasons can be avoided, rubber pads 13 are arranged on the surfaces of the upper clamp 9 and the lower clamp 5, the pipeline can be effectively prevented from being extruded and deformed, the pipeline can be protected through the cover plate 14, the cover plate 14 and the shell 1 are fixedly connected through the clamping blocks 16 and the second bolts 18, when the pipeline inside the equipment is overhauled by workers, the cover plate 14 is not required to be disassembled integrally, the working strength of the workers is greatly reduced, the pipeline equipment is prevented from being buffered by extruding the second spring 19 by the baffle plate 20, and the service life of the pipeline equipment is prolonged.
Finally, it should be noted that: the foregoing description is only illustrative of the preferred embodiments of the present utility model, and although the present utility model has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described, or equivalents may be substituted for elements thereof, and any modifications, equivalents, improvements or changes may be made without departing from the spirit and principles of the present utility model.

Claims (7)

1. An electromechanical installation line device comprising a housing (1), characterized in that: the utility model discloses a clamping device for a concrete pile, including casing (1), connecting block (8), clamping hole (3) have all been seted up to middle part in casing (1), lower extreme equidistance is provided with a plurality of support columns (4) in casing (1), and is a plurality of support column (4) upper end is all fixed and is provided with anchor clamps (5) down, a plurality of screw holes (6) have all been seted up to inside equidistance of diaphragm (2), a plurality of first bolt (7) lower extreme is all fixed and is provided with connecting block (8), a plurality of connecting block (8) lower extreme is all fixed and is provided with anchor clamps (9), diaphragm (2) internal thread rotates and is provided with a plurality of first bolts (7), a plurality of first bolt (7) upper end is all fixed and is provided with nut (10), a plurality of anchor clamps (5) internal fixation are provided with first spring (11) down, casing (1) upper end can be dismantled and be provided with apron (14), through-hole (15) have all been seted up in apron (14) upper end four corners department, set up through a plurality of first bolts (16) and a plurality of second bolts (17) between casing (1) and apron (14) are all fixed slot (17).
2. An electro-mechanically mounted pipeline apparatus as claimed in claim 1, wherein: the upper end of the cover plate (14) is fixedly provided with a plurality of second springs (19), and the upper ends of the second springs (19) are fixedly connected with a baffle plate (20).
3. An electro-mechanically mounted pipeline apparatus as claimed in claim 1, wherein: a plurality of first bolts (7) rotate in corresponding threaded holes (6) respectively.
4. An electro-mechanically mounted pipeline apparatus as claimed in claim 1, wherein: a plurality of arc clamping plates (12) are slidably arranged in the lower clamp (5), and a plurality of first springs (11) are respectively connected with the corresponding arc clamping plates (12).
5. An electro-mechanically mounted pipeline apparatus as claimed in claim 4, wherein: rubber pads (13) are fixedly arranged at the upper ends of the arc clamping plates (12) and the lower ends of the upper clamps (9).
6. An electro-mechanically mounted pipeline apparatus as claimed in claim 1, wherein: the four clamping blocks (16) respectively penetrate through the corresponding through holes (15) and are clamped inside the clamping holes (3).
7. An electro-mechanically mounted pipeline apparatus as claimed in claim 1, wherein: four second bolts (18) penetrate through the shell (1) respectively and are connected inside the thread grooves (17) in a threaded mode.
CN202321860454.7U 2023-07-17 2023-07-17 Electromechanical installation pipeline equipment Active CN220544620U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321860454.7U CN220544620U (en) 2023-07-17 2023-07-17 Electromechanical installation pipeline equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321860454.7U CN220544620U (en) 2023-07-17 2023-07-17 Electromechanical installation pipeline equipment

Publications (1)

Publication Number Publication Date
CN220544620U true CN220544620U (en) 2024-02-27

Family

ID=89967898

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321860454.7U Active CN220544620U (en) 2023-07-17 2023-07-17 Electromechanical installation pipeline equipment

Country Status (1)

Country Link
CN (1) CN220544620U (en)

Similar Documents

Publication Publication Date Title
CN220544620U (en) Electromechanical installation pipeline equipment
CN221031371U (en) Clamping steel pipe for scaffold
CN205583522U (en) Spacer replacing tool
CN221218063U (en) Novel guard plate structure of loom
CN222363579U (en) Water supply and drainage pipe fitting convenient to maintenance and use
CN212062041U (en) U-shaped bracket for composite post insulator
CN116331445A (en) A kind of installation method of ship grille
CN211201129U (en) Wall-attached hanging piece for attached lifting scaffold
CN209925179U (en) Pneumatic diaphragm pump
CN223604282U (en) Tooling for rapidly installing shield body sealing ring
CN223793709U (en) A novel composite material node connection structure
CN223253934U (en) Mounting bracket for shaft and mounting structure thereof
CN222142224U (en) A plum blossom hole type pipe clamp anti-loosening device and pipe clamp device
CN219344719U (en) Coal mine supporting net convenient to splice
CN219707797U (en) Device for preventing flange from deforming
CN221066107U (en) Fixing device for hydraulic wrench during torque beating
CN223386246U (en) Anti-drop device for chute air supply pipe
CN213809347U (en) Flange convenient to disassemble and assemble
CN221646350U (en) A building safety protection frame
CN111462960A (en) U-shaped bracket for composite post insulator
CN223867425U (en) An adjustable steel structure connection device
CN222412681U (en) Ultra-high pier concrete pump pipe mounting structure
CN116464701B (en) A BCL end cap pressure testing and fastening device
CN223579113U (en) Be used for gas pipeline bracket mounting support structure
CN216991651U (en) Large-diameter high-pressure gate valve packing gland extracting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant