- CN220513734U CN220513734U CN202321925882.3U CN202321925882U CN220513734U CN 220513734 U CN220513734 U CN 220513734U CN 202321925882 U CN202321925882 U CN 202321925882U CN 220513734 U CN220513734 U CN 220513734U
- Authority
- CN
- China
- Prior art keywords
- water
- construction
- water outlet
- outlet pipe
- branch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
本申请涉及施工场地降尘的技术领域,公开了一种绿色施工的建筑场地降尘装置,包括施工路面,所述施工路面开挖有沉降井,所述施工路面上设置有抽水组件,所述抽水组件包括抽水泵和集水箱,所述抽水泵安装在集水箱顶端,所述集水箱远离沉降井一侧安装有出水组件,所述出水组件包括总出水管,所述总出水管穿设安装在集水箱上,所述总出水管顶端安装有总出水阀门,所述总出水管两侧分别安装有第一分流出水管和第二分流出水管。本申请通过抽取和使用沉降水对施工场地进行降尘,具有绿色环保和节约水资源等较好的优点。
This application relates to the technical field of dust reduction at construction sites, and discloses a construction site dust reduction device for green construction, which includes a construction road, a settlement well is excavated on the construction road, and a water pumping assembly is provided on the construction road. The water pumping assembly It includes a water pump and a water collection tank. The water pump is installed on the top of the water collection tank. A water outlet assembly is installed on the side of the water collection tank away from the settlement well. The water outlet assembly includes a main water outlet pipe. The main water outlet pipe is installed in the water collection tank. On the water tank, a main water outlet valve is installed on the top of the main water outlet pipe, and a first branch water outlet pipe and a second branch water outlet pipe are installed on both sides of the main water outlet pipe. This application extracts and uses sedimentation water to reduce dust at the construction site, which has the advantages of being green and environmentally friendly and saving water resources.
Description
技术领域Technical field
本申请属于施工场地降尘的技术领域,具体涉及一种绿色施工的建筑场地降尘装置。This application belongs to the technical field of dust reduction at construction sites, and specifically relates to a construction site dust reduction device for green construction.
背景技术Background technique
当前的建筑施工现场由于会产生大量的扬尘,这种大量易漂浮的粉尘等杂质随风四处飞扬,这些灰尘如果不及时处理,会给建筑施工周围环境造成恶劣的影响,导致空气质量降低,从而污染城市空气环境,给工作人员和周围居民的健康带来严重危害。因此施工现场需要采取降尘措施,以减少建筑行业对城市空气环境的污染,目前所采用的降尘措施主要是人工通过水管或者驾驶洒水车在工地上进行洒水,从而达到人工降尘的目的。The current construction site will produce a large amount of dust. This large amount of easily floating dust and other impurities are flying everywhere with the wind. If this dust is not dealt with in time, it will have a bad impact on the environment around the construction construction, leading to a reduction in air quality, thus It pollutes the urban air environment and brings serious harm to the health of staff and surrounding residents. Therefore, dust reduction measures need to be taken at the construction site to reduce the pollution of the urban air environment caused by the construction industry. The current dust reduction measures are mainly to manually spray water through water pipes or drive a sprinkler truck on the construction site to achieve the purpose of artificial dust reduction.
然而,上述现有的降尘措施,水的需求量较大,而建筑场地的取水较为困难。本申请的目的在于设计出通过抽取和使用沉降水对施工场地进行降尘的装置,具体为一种绿色施工的建筑场地降尘装置。However, the above-mentioned existing dust reduction measures require a large amount of water, and it is difficult to obtain water at construction sites. The purpose of this application is to design a device for dust reduction at a construction site by extracting and using sedimentation water, specifically a dust reduction device for a construction site for green construction.
实用新型内容Utility model content
本申请的目的在于提供一种绿色施工的建筑场地降尘装置,用以解决现有技术中存在的上述问题。The purpose of this application is to provide a green construction construction site dust reduction device to solve the above problems existing in the prior art.
为了实现上述目的,本申请采用以下技术方案:一种绿色施工的建筑场地降尘装置,包括施工路面,所述施工路面开挖有沉降井,所述施工路面上设置有抽水组件,所述抽水组件包括抽水泵和集水箱,所述抽水泵安装在集水箱顶端,所述集水箱远离沉降井一侧安装有出水组件,所述出水组件包括总出水管,所述总出水管穿设安装在集水箱上,所述总出水管顶端安装有总出水阀门,所述总出水管两侧分别安装有第一分流出水管和第二分流出水管。In order to achieve the above purpose, this application adopts the following technical solution: a green construction construction site dust reduction device, including a construction road, a settlement well excavated on the construction road, a water pumping assembly provided on the construction road, and the water pumping assembly It includes a water pump and a water collection tank. The water pump is installed on the top of the water collection tank. A water outlet assembly is installed on the side of the water collection tank away from the settlement well. The water outlet assembly includes a main water outlet pipe. The main water outlet pipe is installed in the water collection tank. On the water tank, a main water outlet valve is installed on the top of the main water outlet pipe, and a first branch water outlet pipe and a second branch water outlet pipe are installed on both sides of the main water outlet pipe.
优选的,所述施工路面周围设置有施工围栏,所述第一分流出水管固定在施工围栏内侧。Preferably, a construction fence is provided around the construction road surface, and the first branch water pipe is fixed on the inside of the construction fence.
优选的,所述第一分流出水管在施工围栏顶端安装有喷洒头,所述喷洒头上开设有若干个通孔。Preferably, the first branch outflow pipe is equipped with a sprinkler head at the top of the construction fence, and the sprinkler head is provided with several through holes.
优选的,所述第一分流出水管和第二分流出水管上均安装有分流出水阀门。Preferably, the first branch water outlet pipe and the second branch water outlet pipe are both equipped with branch water outlet valves.
优选的,所述抽水组件还包括抽水管和抽水阀门,所述抽水管和抽水阀门固定在集水箱靠近沉降井一侧。Preferably, the water pumping assembly further includes a water pumping pipe and a water pumping valve, and the water pumping pipe and the water pumping valve are fixed on the side of the water collection tank close to the settlement well.
优选的,所述沉降井顶端设置有井盖,所述井盖中间开设有导向孔。Preferably, a manhole cover is provided at the top of the settlement well, and a guide hole is opened in the middle of the manhole cover.
优选的,所述抽水管一端穿设于井盖中间开设的导向孔固定在沉降井内侧。Preferably, one end of the water pumping pipe is passed through a guide hole opened in the middle of the manhole cover and fixed on the inside of the settlement well.
与现有技术相比,本实用新型的有益效果是:Compared with the existing technology, the beneficial effects of this utility model are:
通过抽水组件和出水组件将沉降井中的地下水抽出并进行利用,从而在达到绿色施工的同时,也能利用地下水对建筑场地进行降尘;The groundwater in the settlement well is pumped out and used through the water pumping component and the water outlet component, so that while achieving green construction, the groundwater can also be used to reduce dust on the construction site;
通过在出水组件的总出水管中安装多个第一分流出水管和第二分流出水管,其中第一分流出水管能够通过喷洒头对施工围栏以及周边进行喷洒降尘,第二分流出水管能够在需要时接通水管,对施工场地内侧需要地方进行喷水降尘;By installing a plurality of first branch water pipes and second branch water pipes in the main water outlet pipe of the water outlet assembly, the first branch water pipes can spray dust on the construction fence and surrounding areas through sprinkler heads, and the second branch water pipes can spray dust on the construction fence and surrounding areas through sprinkler heads. When necessary, connect the water pipes and spray water to reduce dust in the necessary places inside the construction site;
通过在集水箱、总出水管、第一分流出水管和第二分流出水管中分别设置抽水阀门、总出水阀门和分流出水阀门,从而对各个出水口进行开关控制,达到绿色施工,避免水的浪费。By setting a water pumping valve, a main water outlet valve and a branch water outlet valve in the water collecting tank, the main water outlet pipe, the first branch water outlet pipe and the second branch water outlet pipe respectively, the switch control of each water outlet is carried out to achieve green construction and avoid water leakage. of waste.
附图说明Description of drawings
图1为本申请实施例的结构示意图;Figure 1 is a schematic structural diagram of an embodiment of the present application;
图2为本申请实施例中施工路面的结构示意图;Figure 2 is a schematic structural diagram of the road construction in the embodiment of the present application;
图3为本申请实施例中出水组件的结构示意图;Figure 3 is a schematic structural diagram of the water outlet assembly in the embodiment of the present application;
图4为本申请实施例中图3的A部位放大示意图;Figure 4 is an enlarged schematic diagram of part A of Figure 3 in the embodiment of the present application;
图5为本申请实施例中抽水组件的结构示意图。Figure 5 is a schematic structural diagram of the water pumping assembly in the embodiment of the present application.
图中:1、施工路面;2、沉降井;21、井盖;22、导向孔;3、抽水组件;31、抽水泵;32、集水箱;33、抽水管;34、抽水阀门;4、出水组件;41、总出水管;42、总出水阀门;43、第一分流出水管;431、喷洒头;432、通孔;44、第二分流出水管;45、分流出水阀门;5、施工围栏。In the picture: 1. Construction road surface; 2. Settlement well; 21. Manhole cover; 22. Guide hole; 3. Water pumping component; 31. Water pump; 32. Water collecting tank; 33. Water pumping pipe; 34. Water pumping valve; 4. Water outlet Components; 41. Main outlet pipe; 42. Main outlet valve; 43. First branch outlet pipe; 431. Sprinkler head; 432. Through hole; 44. Second branch outlet pipe; 45. Branch outlet valve; 5. Construction fence.
具体实施方式Detailed ways
为了更清楚地说明本申请实施例或现有技术中的技术方案,下面将结合附图和实施例或现有技术的描述对本申请作简单地介绍,显而易见地,下面关于附图结构的描述仅仅是本申请的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。在此需要说明的是,对于这些实施例方式的说明用于帮助理解本申请,但并不构成对本申请的限定。In order to more clearly explain the embodiments of the present application or the technical solutions in the prior art, the present application will be briefly introduced below in conjunction with the accompanying drawings and the description of the embodiments or the prior art. Obviously, the following description of the structure of the drawings is only These are some embodiments of the present application. For those of ordinary skill in the art, other drawings can be obtained based on these drawings without exerting creative efforts. It should be noted here that the description of these embodiments is used to help understand the present application, but does not constitute a limitation of the present application.
参照图1,本申请实施例公开一种绿色施工的建筑场地降尘装置,包括施工路面1,施工路面1开挖有沉降井2,沉降井2在开挖到一定深度后,会储存一定的地下水,施工路面1上设置有抽水组件3,抽水组件3包括抽水泵31和集水箱32,抽水泵31安装在集水箱32顶端,集水箱32远离沉降井2一侧安装有出水组件4,出水组件4的个数可根据需要设置多个,本实施例中设置两个,出水组件4包括总出水管41,通过抽水组件3和出水组件4将沉降井2中的地下水抽出并进行利用,从而在达到绿色施工的同时,也能利用地下水对建筑场地进行降尘,并且在一定程度上避免水的浪费;总出水管41穿设安装在集水箱32上,总出水管41顶端安装有总出水阀门42,总出水管41两侧分别安装有第一分流出水管43和第二分流出水管44,通过在出水组件3的总出水管41中安装多个第一分流出水管43和第二分流出水管44,对施工场地内侧需要地方进行喷水,从而达到降尘目的,其中第二分流出水管44能够在需要时接通水管,对施工场地内侧需要地方进行进一步喷水降尘。Referring to Figure 1, an embodiment of the present application discloses a green construction construction site dust reduction device, including a construction road surface 1. A settlement well 2 is excavated on the construction road surface 1. After the settlement well 2 is excavated to a certain depth, it will store a certain amount of groundwater. , a water pumping assembly 3 is provided on the construction road surface 1. The water pumping assembly 3 includes a water pump 31 and a water collection tank 32. The water pump 31 is installed on the top of the water collection tank 32. A water outlet assembly 4 is installed on the side of the water collection tank 32 away from the settlement well 2. The water outlet assembly The number of 4 can be set as many as needed. In this embodiment, two are set. The water outlet assembly 4 includes a main outlet pipe 41. The groundwater in the settlement well 2 is pumped out and utilized through the water pumping assembly 3 and the water outlet assembly 4, so that in While achieving green construction, groundwater can also be used to reduce dust on the construction site and avoid water waste to a certain extent; the main water outlet pipe 41 is installed on the water collection tank 32, and a main water outlet valve 42 is installed on the top of the main water outlet pipe 41. , a first branch water pipe 43 and a second branch water pipe 44 are respectively installed on both sides of the main water outlet pipe 41. By installing a plurality of first branch water pipes 43 and second branch water pipes in the main water outlet pipe 41 of the water outlet assembly 3 44. Spray water to necessary places inside the construction site to achieve the purpose of dust reduction. The second branch water pipe 44 can be connected to the water pipe when needed to further spray water and dust to necessary places inside the construction site.
参照图2~4,在其中一个实施例中,施工路面1周围设置有施工围栏5,第一分流出水管43固定在施工围栏5内侧;第一分流出水管43在施工围栏5顶端安装有喷洒头431,喷洒头431上开设有若干个通孔432。Referring to Figures 2 to 4, in one embodiment, a construction fence 5 is provided around the construction road 1, and the first branch outflow pipe 43 is fixed on the inside of the construction fence 5; the first branch outflow pipe 43 is installed with a sprinkler on the top of the construction fence 5 The sprinkler head 431 is provided with a plurality of through holes 432.
具体的,第一分流出水管43可根据施工路面1的面积和施工围栏长度进行设置。Specifically, the first branch outflow pipe 43 can be set according to the area of the construction road 1 and the length of the construction fence.
本实施例中,通过将喷洒头431的高度设置在施工围栏5的顶端,从而对建筑施工路面1的周边进行喷水降尘,从而减少扬尘飘出施工场地等现象。In this embodiment, by setting the height of the sprinkler head 431 at the top of the construction fence 5, water is sprayed around the construction road 1 to reduce dust, thereby reducing dust flying out of the construction site.
参照图3,在其中一个实施例中,第一分流出水管43和第二分流出水管44上均安装有分流出水阀门45。Referring to FIG. 3 , in one embodiment, a branch water valve 45 is installed on both the first branch water outlet pipe 43 and the second branch water outlet pipe 44 .
具体的,每个第一分流出水管43和第二分流出水管44均安装一个分流出水阀门45。Specifically, each of the first branch water outlet pipe 43 and the second branch water outlet pipe 44 is equipped with a branch water outlet valve 45 .
本实施例中,分流出水阀门45的设置能够随时控制每个第一分流出水管43和第二分流出水管44的出水,从而避免水的浪费,达到绿色施工。In this embodiment, the arrangement of the branch water outlet valve 45 can control the water outlet of each first branch water outlet pipe 43 and the second branch water outlet pipe 44 at any time, thereby avoiding the waste of water and achieving green construction.
参照图5,在其中一个实施例中,抽水组件3还包括抽水管33和抽水阀门34,抽水管33和抽水阀门34固定在集水箱32靠近沉降井2一侧。Referring to Figure 5, in one embodiment, the water pumping assembly 3 also includes a water pumping pipe 33 and a water pumping valve 34. The water pumping pipe 33 and the water pumping valve 34 are fixed on the side of the water collection tank 32 close to the settlement well 2.
具体的,抽水管33设置为L型,L型一段穿设在集水箱32内侧,另一段设置在沉降井2内侧。Specifically, the water pumping pipe 33 is arranged in an L shape. One section of the L shape is arranged inside the water collection tank 32 and the other section is arranged inside the settling well 2 .
本实施例中,抽水泵31通过抽水管33将沉降井中的地下水抽取到集水箱中,到达备用的状态,在不需要时可通过抽水阀门34进行关闭。In this embodiment, the water pump 31 pumps the groundwater in the settlement well into the water collection tank through the water pipe 33 to reach a standby state, and can be closed by the water pump valve 34 when not needed.
参照图1和图5,在其中一个实施例中,沉降井2顶端设置有井盖21,井盖21中间开设有导向孔22;抽水管33一端穿设于井盖21中间开设的导向孔22固定在沉降井2内侧。Referring to Figures 1 and 5, in one embodiment, a manhole cover 21 is provided at the top of the settlement well 2, and a guide hole 22 is opened in the middle of the manhole cover 21; one end of the water pumping pipe 33 is passed through the guide hole 22 opened in the middle of the manhole cover 21 and is fixed on the settlement well. Inside of well 2.
具体的,井盖21的尺寸要略小于沉降井2的井口尺寸。Specifically, the size of the manhole cover 21 is slightly smaller than the size of the wellhead of the settlement well 2 .
本实施例中,井盖21的设置能够进一步固定抽水管33,同时也能够避免杂物掉落到沉降井2中。In this embodiment, the arrangement of the manhole cover 21 can further fix the water pumping pipe 33 and can also prevent debris from falling into the settlement well 2 .
最后应说明的是:以上所述仅为本申请的优选实施例而已,并不用于限制本申请的保护范围。凡在本申请的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本申请的保护范围之内。Finally, it should be noted that the above descriptions are only preferred embodiments of the present application and are not intended to limit the scope of protection of the present application. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of this application shall be included in the protection scope of this application.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202321925882.3U CN220513734U (en) | 2023-07-21 | 2023-07-21 | Building site dust device of green construction |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202321925882.3U CN220513734U (en) | 2023-07-21 | 2023-07-21 | Building site dust device of green construction |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN220513734U true CN220513734U (en) | 2024-02-23 |
Family
ID=89934138
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202321925882.3U Expired - Fee Related CN220513734U (en) | 2023-07-21 | 2023-07-21 | Building site dust device of green construction |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN220513734U (en) |
-
2023
- 2023-07-21 CN CN202321925882.3U patent/CN220513734U/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204753566U (en) | It presses diverging device to be suitable for leading of vacuum pre -compaction foundation stabilization | |
| CN204662649U (en) | A kind of integral intelligent pumping plant | |
| CN206360050U (en) | A kind of collection at the non-traditional water source in job site is with utilizing device | |
| CN220513734U (en) | Building site dust device of green construction | |
| CN209368830U (en) | A full casing underwater concrete pouring mud collection device | |
| CN204352649U (en) | Construction rainwater-collecting cyclic utilization system | |
| CN211314442U (en) | Potential energy-based high-speed rail bridge hydroelectric generation and rainwater collection irrigation system | |
| CN210969335U (en) | A kind of curing device for concrete component prefabrication field | |
| CN219973415U (en) | A reverse pressure water high-lift siphon drainage device | |
| CN110821737A (en) | Potential energy-based high-speed rail bridge hydroelectric generation and rainwater collection irrigation system | |
| CN216765723U (en) | Low-carbon environment-friendly automatic high-difference drainage device | |
| CN216690127U (en) | A fast drainage device | |
| CN213928613U (en) | A rainwater pipeline gravity potential energy power generation device | |
| CN205296343U (en) | Be applied to waste fitting discharging in workshop | |
| CN214738418U (en) | Automatic retaining equipment of afforestation | |
| CN212279219U (en) | An ecological restoration irrigation device | |
| CN211547778U (en) | Centralized drainage system for water burst of subway station deep foundation pit step-by-step excavation | |
| CN218680775U (en) | A rainwater recycling device using a jet | |
| CN201386282Y (en) | Jet supercharging system for light well-point dewatering system | |
| CN206737108U (en) | A kind of urban underground water drainage pipe net self-stripping system | |
| CN207392366U (en) | Modified sewerage system | |
| CN212202050U (en) | multifunctional shaft | |
| CN2748551Y (en) | Siphon drainage hopper | |
| CN221823857U (en) | Simple tunneling, excavating, ventilating and dedusting system | |
| CN217924037U (en) | Assembled integrated intercepting and lifting well |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20240223 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |