CN220503910U - Pouring device for bridge construction pile foundation construction for drift sand geology - Google Patents

Pouring device for bridge construction pile foundation construction for drift sand geology Download PDF

Info

Publication number
CN220503910U
CN220503910U CN202322003203.3U CN202322003203U CN220503910U CN 220503910 U CN220503910 U CN 220503910U CN 202322003203 U CN202322003203 U CN 202322003203U CN 220503910 U CN220503910 U CN 220503910U
Authority
CN
China
Prior art keywords
pouring
frame
pile foundation
wall
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322003203.3U
Other languages
Chinese (zh)
Inventor
操臣
张会川
苏红星
黄淑港
窦继刚
李凤丽
薛鹏雪
朱俊豪
朱明明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Jiaocheng Urban Construction Engineering Technology Research Institute Co ltd
Original Assignee
Henan Jiaocheng Urban Construction Engineering Technology Research Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Jiaocheng Urban Construction Engineering Technology Research Institute Co ltd filed Critical Henan Jiaocheng Urban Construction Engineering Technology Research Institute Co ltd
Priority to CN202322003203.3U priority Critical patent/CN220503910U/en
Application granted granted Critical
Publication of CN220503910U publication Critical patent/CN220503910U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The application relates to the technical field of bridge construction pile foundation construction, and discloses a bridge construction pile foundation construction is with pouring device for drift sand geology, including pouring the frame, it is connected with the pipe of pouring to pour the frame bottom, it is provided with the roof to pour the frame top, it is provided with stable structure to pour the frame surface. This a pouring device is used in bridge construction pile foundation construction for quicksand geology, the staff inserts the inserted block of bracing piece one end in the slot that the installation piece was seted up, then can fix the inserted block in the slot through the cooperation of set screw and thread groove, and then fix the bracing piece installation in pouring frame one side, play the supporting role to pouring the frame through two sets of bracing pieces, avoid the quicksand stratum to produce certain driving and rock, make the stability of pouring the frame and put can not receive the influence to pour the frame and carry out normal use in the region of quicksand geology.

Description

Pouring device for bridge construction pile foundation construction for drift sand geology
Technical Field
The application relates to the technical field of bridge construction pile foundation construction, in particular to a pouring device for bridge construction pile foundation construction for quicksand geology.
Background
The pouring device is needed to be used for pouring the pile foundation in the bridge construction process so that the bridge is well constructed, the bridge construction which is required according to the topography and the environment at present is required to be constructed on the quicksand ground, the places are not suitable for construction due to the instability of the quicksand geological layer, meanwhile, the pouring device can shake the peripheral quicksand geology if encountering shaking in the suspension process, the stability of placing the pouring device is further influenced, the pile foundation construction progress and the construction effect are reduced, and therefore, the pouring device for constructing the pile foundation for the bridge construction for the quicksand geology is needed.
Disclosure of Invention
To the not enough of prior art, this application provides a pouring device for bridge construction pile foundation construction for drift sand geology, possesses and pours the device and put the stability and be difficult for receiving the advantage of influence, has solved the problem that the device that pours that mentions in the above-mentioned background art puts stability and receive the influence easily.
In order to achieve the above purpose, the present application provides the following technical solutions: the pouring device for the bridge construction pile foundation construction for the quicksand geology comprises a pouring frame, wherein a pouring pipe is connected to the bottom of the pouring frame, a top plate is arranged at the top of the pouring frame, and a stable structure is arranged on the outer surface of the pouring frame;
the utility model discloses a fixing structure, including pouring frame, the firm structure is including setting up in the bracing piece of pouring frame surface, pouring frame one side surface fixedly connected with installation piece, bracing piece one end fixedly connected with inserted block, the installation piece is through slot and the inserted block outer wall grafting cooperation of seting up, the installation piece top is provided with the fixed screw, the installation piece is through first through-hole and the fixed screw surface swing joint of seting up, the fixed screw extends to the screw groove inner wall threaded connection that slot outer wall and inserted block top were seted up.
Preferably, the support rods are provided with two groups, and the two groups of support rods are positioned on the outer surface of the pouring frame and distributed in bilateral symmetry.
Preferably, the inner wall of one side of the pouring frame is fixedly provided with two groups of transverse plates which are vertically symmetrically distributed, the lifting plate is arranged in the pouring frame, a second through hole is formed in the lifting plate, the bottom of the transverse plate is fixedly connected with a sliding rod, and the bottom end of the sliding rod penetrates through the lifting plate and is fixedly connected with the top of the other transverse plate.
When the pouring raw materials enter the pouring frame, upward pushing force can be generated on the lifting plate in the pouring frame, so that the lifting plate moves upwards in the pouring frame, and when a worker observes that the lifting plate moves to the top in the pouring frame through the third through hole, feeding can be stopped, and the situation that the feeding amount is excessive and material leakage occurs is avoided.
Preferably, the roof top is provided with the feeder hopper, the third through-hole has been seted up at the roof top, the feeder hopper bottom is connected with the pan feeding pipe, the pan feeding pipe bottom runs through the roof and extends to the roof bottom.
Pouring raw materials can be poured into the pouring frame through the feeding hopper and the feeding pipe, and the lifting height of the lifting plate can be conveniently observed by workers through the third through holes.
Preferably, the roof bottom is fixed with two equipment pieces that are bilateral symmetry and distribute, pour frame through the equipment groove of seting up and equipment piece surface swing joint, the inside movable groove of seting up of equipment piece, movable groove inside wall fixedly connected with spring, the spring other end fixedly connected with stripper plate, stripper plate keeps away from spring one side outer wall fixedly connected with dead lever, pour the frame and seted up the dead slot at equipment groove lateral wall, the dead lever extends movable groove outer wall and dead slot inner wall swing joint.
Compared with the prior art, the application provides a pouring device for bridge construction pile foundation construction for quicksand geology, possesses following beneficial effect:
1. this a pouring device for bridge construction pile foundation construction for quicksand geology is through being provided with stable structure, specifically is in inserting the slot that the installation piece was offered through inserting the inserted block with bracing piece one end, then can fix the inserted block in the slot through the cooperation of set screw and thread groove, and then fix the bracing piece installation in pouring frame one side, play the supporting role to pouring the frame through two sets of bracing pieces, avoid the quicksand stratum to produce certain drive and rock, make the stability of pouring the frame and put can not receive the influence to pour the frame and carry out normal use in the region of quicksand geology.
2. This a pouring device for bridge construction pile foundation construction for drift sand geology is provided with the lifter plate, specifically can pour pouring raw materials into through feeder hopper and pan feeding pipe and pour the frame inside, when pouring the raw materials and getting into and pour the frame, can produce ascending driving force to the lifter plate of pouring in the frame, makes the lifter plate upwards move in pouring the frame, and then when the staff observed through the third through hole that the lifter plate has moved to pouring the frame interior top, can stop the feeding to prevent that the feed quantity is too much and the condition of leaking the material appears.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the present application;
FIG. 2 is an enlarged view of FIG. 1A of the present application;
FIG. 3 is a schematic view of the internal structure of the pouring frame of the present application;
FIG. 4 is a schematic view of a stabilizing structure of the present application;
fig. 5 is a perspective view of the roof structure of the present application.
Wherein: 1. pouring a frame; 101. a support rod; 102. a mounting block; 103. inserting blocks; 104. a slot; 105. a set screw; 106. a first through hole; 107. a thread groove; 108. a cross plate; 109. a lifting plate; 110. a second through hole; 111. a slide bar; 112. an assembly groove; 113. a fixing groove; 2. pouring a pipe; 3. a top plate; 301. a feed hopper; 302. a third through hole; 303. a feeding pipe; 304. assembling blocks; 305. a movable groove; 306. a spring; 307. an extrusion plate; 308. and a fixing rod.
Detailed Description
The present application is described in further detail below in conjunction with figures 1-5.
The embodiment of the application discloses a pouring device for bridge construction pile foundation construction for quicksand geology.
Referring to fig. 1 and 4, a pouring device for bridge construction pile foundation construction for quicksand geology, including pouring frame 1, pouring frame 1 bottom is connected with and pours pipe 2, it is provided with roof 3 to pour frame 1 top, it is provided with stable structure to pour frame 1 surface, stable structure is including setting up in the bracing piece 101 of pouring frame 1 surface, it is fixedly connected with installation piece 102 to pour frame 1 one side surface, bracing piece 101 one end fixedly connected with inserted block 103, installation piece 102 is through the slot 104 of seting up and the cooperation of inserted block 103 outer wall grafting, installation piece 102 top is provided with fixed screw 105, installation piece 102 is through the first through-hole 106 of seting up and fixed screw 105 surface swing joint, fixed screw 105 extends to the screw groove 107 inner wall threaded connection that slot 104 outer wall and inserted block 103 top were setted up, bracing piece 101 is provided with two sets of bracing pieces, two sets of bracing pieces 101 are located and pour frame 1 outward appearance and are bilateral symmetry distribution.
Through the above technical scheme, the staff inserts the inserted block 103 of bracing piece 101 one end into the slot 104 that installation piece 102 was seted up, then can fix the inserted block 103 in slot 104 through the cooperation of set screw 105 and thread groove 107, and then install bracing piece 101 and fix in pouring frame 1 one side, play the supporting role to pouring frame 1 through two sets of bracing pieces, avoid producing certain drive to rock to the sand flow stratum, make the stability of pouring frame 1 put can not receive the influence, so that pour frame 1 and carry out normal use in the region of sand flow geology.
Referring to fig. 1 and 3, two groups of transverse plates 108 which are vertically symmetrically distributed are fixed on the inner wall of one side of the pouring frame 1, a lifting plate 109 is arranged in the pouring frame 1, a second through hole 110 is formed in the lifting plate 109, a sliding rod 111 is fixedly connected to the bottom of the transverse plate 108, the bottom end of the sliding rod 111 penetrates through the lifting plate 109 and is fixedly connected with the top of the other transverse plate 108, when pouring raw materials enter the pouring frame 1, upward pushing force is generated on the lifting plate 109 in the pouring frame 1, the lifting plate 109 moves upwards in the pouring frame 1, and further when a worker observes that the lifting plate 109 moves to the top in the pouring frame 1 through a third through hole 302, feeding can be stopped, so that the situation of material leakage caused by excessive feeding amount can be prevented.
Referring to fig. 1 and 5, the top of the top plate 3 is provided with a feed hopper 301, the top of the top plate 3 is provided with a third through hole 302, the bottom of the feed hopper 301 is connected with a feed pipe 303, the bottom end of the feed pipe 303 penetrates through the top plate 3 and extends to the bottom of the top plate 3, pouring raw materials can be poured into the pouring frame 1 through the feed hopper 301 and the feed pipe 303, and the operator can observe the ascending height of the lifting plate 109 conveniently through the third through hole 302.
Referring to fig. 1, 2 and 3, two assembly blocks 304 which are symmetrically distributed left and right are fixed at the bottom of the top plate 3, the pouring frame 1 is movably connected with the outer surface of the assembly block 304 through an assembly groove 112 which is formed, a movable groove 305 is formed in the assembly block 304, a spring 306 is fixedly connected to the inner side wall of the movable groove 305, a pressing plate 307 is fixedly connected to the other end of the spring 306, a fixing rod 308 is fixedly connected to the outer wall of the pressing plate 307, which is far away from the spring 306, a fixing groove 113 is formed in the side wall of the assembly groove 112, and the fixing rod 308 extends out of the outer wall of the movable groove 305 and is movably connected with the inner wall of the fixing groove 113.
Through the above technical scheme, the staff presses the fixed rod 308 at one side of the assembly block 304, so that the fixed rod 308 moves into the movable groove 305, then the top plate 3 is placed at the top of the pouring frame 1, the assembly block 304 at the bottom of the top plate 3 enters the inside of the assembly groove 112, then the fixed rod 308 moves into the fixed groove 113 under the elastic action of the spring 306 in the movable groove 305, and the assembly block 304 can be fixed in the assembly groove 112 through the cooperation of the fixed rod 308 and the fixed groove 113, so that the top plate 3 can be fixed at the top of the pouring frame 1.
The implementation principle of the pouring device for bridge construction pile foundation construction for quicksand geology is as follows: the staff inserts the inserted block 103 of bracing piece 101 one end in the slot 104 that installation piece 102 was seted up, then can fix the inserted block 103 in slot 104 through the cooperation of set screw 105 and thread groove 107, and then install the bracing piece 101 and fix in pouring frame 1 one side, play the supporting role to pouring frame 1 through two sets of bracing pieces, avoid producing certain drive to rock to the quicksand stratum, make the stability of pouring frame 1 put can not receive the influence, so that pour frame 1 and carry out normal use in the region of quicksand geology.
Standard parts used in the utility model can be purchased from the market, special-shaped parts can be customized according to the description of the specification and the drawings, the specific connection modes of all parts adopt conventional means such as mature bolts, rivets and welding in the prior art, the machinery, the parts and the equipment adopt conventional types in the prior art, the circuit connection adopts conventional connection modes in the prior art, the details are not described herein, and the structures and principles of the parts known to the skilled in the art are known by the skilled artisan through technical manuals or by conventional experimental methods.
Although embodiments of the present application have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the application, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. A pouring device for bridge construction pile foundation construction for drift sand geology, including pouring frame (1), its characterized in that: the bottom of the pouring frame (1) is connected with a pouring pipe (2), a top plate (3) is arranged at the top of the pouring frame (1), and a stable structure is arranged on the outer surface of the pouring frame (1);
the utility model provides a firm structure is including setting up in bracing piece (101) of pouring frame (1) surface, pour frame (1) one side surface fixedly connected with installation piece (102), bracing piece (101) one end fixedly connected with inserted block (103), installation piece (102) are through slot (104) and inserted block (103) outer wall grafting cooperation of seting up, installation piece (102) top is provided with fixed screw (105), installation piece (102) are through first through-hole (106) and fixed screw (105) surface swing joint of seting up, fixed screw (105) extend to slot (104) outer wall and threaded groove (107) inner wall threaded connection of seting up at inserted block (103) top.
2. The pouring device for construction of bridge construction pile foundation for quicksand geology according to claim 1, wherein: the two groups of support rods (101) are arranged, and the two groups of support rods (101) are located on the outer surface of the pouring frame (1) and distributed in a bilateral symmetry mode.
3. The pouring device for construction of bridge construction pile foundation for quicksand geology according to claim 1, wherein: two groups of transverse plates (108) which are vertically symmetrically distributed are fixed on one side inner wall of the pouring frame (1), lifting plates (109) are arranged in the pouring frame (1), second through holes (110) are formed in the lifting plates (109), sliding rods (111) are fixedly connected to the bottoms of the transverse plates (108), and the bottoms of the sliding rods (111) penetrate through the lifting plates (109) and are fixedly connected with the tops of the other transverse plates (108).
4. The pouring device for construction of bridge construction pile foundation for quicksand geology according to claim 1, wherein: the feeding hopper (301) is arranged at the top of the top plate (3), a third through hole (302) is formed in the top of the top plate (3), a feeding pipe (303) is connected to the bottom of the feeding hopper (301), and the bottom end of the feeding pipe (303) penetrates through the top plate (3) and extends to the bottom of the top plate (3).
5. The pouring device for construction of bridge construction pile foundation for quicksand geology according to claim 1, wherein: the utility model discloses a concrete pouring structure, including roof (3) and fixed frame (1), roof (3) bottom is fixed with two equipment pieces (304) that are bilateral symmetry and distribute, pour frame (1) through equipment groove (112) and equipment piece (304) surface swing joint of seting up, movable groove (305) have been seted up to equipment piece (304) inside, movable groove (305) inside wall fixedly connected with spring (306), spring (306) other end fixedly connected with stripper plate (307), stripper plate (307) are kept away from spring (306) one side outer wall fixedly connected with dead lever (308), pour frame (1) and seted up dead slot (113) at equipment groove (112) lateral wall, dead lever (308) extend movable groove (305) outer wall and dead slot (113) inner wall swing joint.
CN202322003203.3U 2023-07-27 2023-07-27 Pouring device for bridge construction pile foundation construction for drift sand geology Active CN220503910U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322003203.3U CN220503910U (en) 2023-07-27 2023-07-27 Pouring device for bridge construction pile foundation construction for drift sand geology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322003203.3U CN220503910U (en) 2023-07-27 2023-07-27 Pouring device for bridge construction pile foundation construction for drift sand geology

Publications (1)

Publication Number Publication Date
CN220503910U true CN220503910U (en) 2024-02-20

Family

ID=89870581

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322003203.3U Active CN220503910U (en) 2023-07-27 2023-07-27 Pouring device for bridge construction pile foundation construction for drift sand geology

Country Status (1)

Country Link
CN (1) CN220503910U (en)

Similar Documents

Publication Publication Date Title
CN105738216B (en) Model test system and method for tunnel water inrush under high ground stress and high osmotic pressure
CN214696232U (en) Assembled wall body that engineering was used is built in room
CN108930224A (en) Punching stick method bent cap supports regulating system construction method
CN108951659A (en) A kind of foundation pit supporting construction and its construction method based on campshed and inner support
CN216640541U (en) Soft foundation reinforcing structure of inclined stratum around pile
CN220503910U (en) Pouring device for bridge construction pile foundation construction for drift sand geology
CN213653463U (en) Cast-in-place pile concrete vibrating device convenient for concrete floating
CN108930410B (en) Tap system for concrete pouring and concrete pouring tap process
CN220864284U (en) Large-scale interlocking broaching slope protection brick mould
CN207944491U (en) A kind of anchor ingot plate improved adjusting device for the isolator on architecture foundation pile
CN218562291U (en) Corner tamping device for earthwork backfilling
CN112813780B (en) Automatic cement concrete pavement dowel bar laying device
CN213927478U (en) Reinforcing device for concrete pouring
CN212772510U (en) Steel-pipe pile foundation reinforced structure
CN105216095A (en) A kind of concrete prefabricated building block multimode cavity forming machine
CN214995813U (en) Hanging basket system with cantilever base
CN219604323U (en) Verticality control device for underground diaphragm wall
CN221218761U (en) Foundation soil backfilling compaction device for geological drilling
CN209323527U (en) A kind of frame-type double-row pile foundation pit enclosure structure
CN206902707U (en) A kind of good piling machine for building of stability
CN223088402U (en) A compaction machine
CN208363125U (en) A kind of mounting structure of centrifuge ground
CN223330295U (en) Stone dimension changing and changing hanging piece
CN220538691U (en) Prefabricated plate fetal membrane reinforcing apparatus
CN206599736U (en) A kind of wet seam synovial membrane bracket of box beam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant