CN220436156U - A kind of support and hanger for building electromechanical installation - Google Patents

A kind of support and hanger for building electromechanical installation Download PDF

Info

Publication number
CN220436156U
CN220436156U CN202321932907.2U CN202321932907U CN220436156U CN 220436156 U CN220436156 U CN 220436156U CN 202321932907 U CN202321932907 U CN 202321932907U CN 220436156 U CN220436156 U CN 220436156U
Authority
CN
China
Prior art keywords
main
auxiliary
component force
support
force rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202321932907.2U
Other languages
Chinese (zh)
Inventor
请求不公布姓名
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202321932907.2U priority Critical patent/CN220436156U/en
Application granted granted Critical
Publication of CN220436156U publication Critical patent/CN220436156U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model belongs to the technical field of support and hanger frames, in particular to a support and hanger frame for electromechanical installation of a building, which comprises a support and hanger frame body, wherein the support and hanger frame body consists of a first main beam, a second auxiliary beam, a second main beam, a first vertical beam, a second vertical beam, a first main component force rod, a first auxiliary component force rod, a second main component force rod and a second auxiliary component force rod.

Description

一种建筑机电安装的支吊架A kind of support and hanger for building electromechanical installation

技术领域Technical field

本实用新型属于支吊架技术领域,具体涉及一种建筑机电安装的支吊架。The utility model belongs to the technical field of supports and hangers, and specifically relates to a support and hanger for building electromechanical installation.

背景技术Background technique

建筑机电安装的支吊架一般是建筑机电安装时,进行吊装固定使用的支吊架,起到了吊装固定和支撑的作用,应用于各种建筑机电安装场合,目前,现有支吊架通常只能对固定大小的设备进行安装,不方便根据安装需求,适应不同高度与尺寸的建筑机电安装使用。The supports and hangers used in building electromechanical installations are generally used for lifting and fixing when building electromechanical installations. They play the role of hoisting, fixation and support. They are used in various building electromechanical installation situations. At present, existing supports and hangers are usually only It can install equipment of fixed size and is inconvenient to adapt to the mechanical and electrical installation of buildings of different heights and sizes according to the installation requirements.

实用新型内容Utility model content

针对以上问题,本实用新型的目的在于:提供一种建筑机电安装的支吊架,解决上述背景技术中所提出的问题。In view of the above problems, the purpose of this utility model is to provide a support and hanger for building electromechanical installation to solve the problems raised in the above background technology.

为实现以上目的,本实用新型采用的技术方案:一种建筑机电安装的支吊架,包括支吊架本体,所述支吊架本体是由主横梁一、副横梁一、主横梁二、副横梁二、主立梁、副立梁、主分力杆一、副分力杆一、主分力杆二与副分力杆二构成,且各梁体与杆体上皆等距开设有固定孔一若干,所述副横梁一设置于主横梁一内,并与主横梁一活动连接,所述副横梁二设置于主横梁二内,并与主横梁二活动连接,所述副立梁设置于主立梁内,并与主立梁活动连接,所述主分力杆一与主分力杆二皆与主立梁铰连,所述副分力杆一设置于主分力杆一内,而副分力杆二则设置于主分力杆二内,且副分力杆一与主分力杆一活动连接,而副分力杆二则与主分力杆二活动连接,所述副立梁上设置有固定座一、副分力杆一上设置有固定座二、而副分力杆二上则设置有固定座三。In order to achieve the above purpose, the technical solution adopted by this utility model is: a support and hanger for building electromechanical installation, including a support and hanger body. The support and hanger body is composed of a main beam one, an auxiliary beam one, a main beam two, and an auxiliary beam. It consists of beam two, main vertical beam, auxiliary beam, main component rod one, auxiliary component rod one, main component rod two and auxiliary component rod two, and each beam body and rod body are equipped with fixed holes at equal intervals. There are several, the first auxiliary beam is arranged in the main beam 1 and is movably connected with the main beam 1, the auxiliary beam 2 is arranged in the main beam 2 and is movably connected with the main beam 2, the auxiliary vertical beam is arranged in Inside the main vertical beam and movably connected with the main vertical beam, the main force component rod one and the main force component rod two are hinged with the main vertical beam, the auxiliary force component rod one is arranged in the main force component rod one, and the auxiliary force component rod one is The second force component rod is arranged inside the main force component rod two, and the auxiliary force component rod 1 is movably connected with the main force component rod 1, and the auxiliary force component rod 2 is movably connected with the main force component rod 2. The auxiliary force component rod There is a fixing seat 1 on the auxiliary force-component rod 1, a fixing seat 2 on the auxiliary force-component rod 1, and a fixing seat 3 on the auxiliary force-component rod 2.

本实用新型的有益效果为:通过本实用新型具有调节功能,可便于能够根据安装场合与实际需求,适应不同高度与尺寸的建筑机电进行安装使用。The beneficial effects of the utility model are: because the utility model has an adjustment function, it can be easily installed and used to adapt to the installation and use of building mechanical and electrical equipment of different heights and sizes according to the installation occasion and actual needs.

为了对支吊架本体宽度进行调节:In order to adjust the width of the support and hanger body:

作为上述技术方案的进一步改进:所述主横梁一内部两侧皆插设有副横梁一,而主横梁二内部两侧则皆插设有副横梁二。As a further improvement of the above technical solution: the first auxiliary crossbeam is inserted on both sides of the main crossbeam one, and the second auxiliary crossbeam is inserted on both sides of the main crossbeam two.

本改进的有益效果为:通过拉动副横梁一、副横梁二外移,能够对支吊架本体宽度进行调节。The beneficial effect of this improvement is that by pulling the first and second auxiliary beams to move outward, the width of the support and hanger body can be adjusted.

为了对支吊架本体高度进行调节:In order to adjust the height of the support and hanger body:

作为上述技术方案的进一步改进:所述主立梁的数量为两根,两根主立梁分别竖向位于主横梁一两端,且其下端与副横梁一外端相连,而两个主立梁内皆竖向插设有副立梁。As a further improvement of the above technical solution: the number of the main vertical beams is two, the two main vertical beams are vertically located at one and two ends of the main cross beam, and their lower ends are connected to one outer end of the auxiliary cross beam, and the two main vertical beams are There are auxiliary vertical beams inserted vertically in the beams.

本改进的有益效果为:通过拉动副立梁外移,能够对支吊架本体高度进行调节。The beneficial effect of this improvement is that by pulling the auxiliary beam to move outward, the height of the support and hanger body can be adjusted.

为了对分力杆一使用长度进行调节:In order to adjust the length of component rod 1:

作为上述技术方案的进一步改进:所述两根主立梁远离副横梁一的另一端下部皆铰连有主分力杆一,两根主分力杆一内皆插设有副分力杆一。As a further improvement of the above technical solution: the lower parts of the other ends of the two main vertical beams away from the auxiliary beam 1 are hinged with a main force component rod 1, and the two main force component rods 1 are both inserted with a auxiliary force component rod 1 .

本改进的有益效果为:通过拉动副分力杆一外移,能够对分力杆一使用长度进行调节。The beneficial effect of this improvement is that by pulling the auxiliary force component rod 1 to move outward, the length of the auxiliary force component rod 1 can be adjusted.

为了对分力杆二使用长度进行调节:In order to adjust the length of component rod 2:

作为上述技术方案的进一步改进:所述两根主立梁前端与后端下部皆铰连有主分力杆二,四根主分力杆二内皆插设有副分力杆二。As a further improvement of the above technical solution: the front ends and the lower parts of the rear ends of the two main vertical beams are hinged with two main force component rods, and two auxiliary force component rods are inserted into the four main force component rods two.

本改进的有益效果为:通过拉动副分力杆二外移,能够对分力杆二使用长度进行调节。The beneficial effect of this improvement is that by pulling the second auxiliary force component rod to move outward, the length of the second force component rod can be adjusted.

为了便于对支吊架本体进行安装固定:In order to facilitate the installation and fixation of the support and hanger body:

作为上述技术方案的进一步改进:所述固定座一设置于副横梁一顶部,固定座二设置于副分力杆一顶部,而固定座三则设置于副分力杆二顶部,固定座一、固定座二与固定座三上皆开设有固定孔二若干,且固定座二与副分力杆一铰连,而固定座三则与副分力杆二铰连。As a further improvement of the above technical solution: the first fixed seat is arranged on the top of the auxiliary beam, the second fixed seat is arranged on the top of the auxiliary force component rod, and the fixed seat 3 is arranged on the top of the auxiliary force component rod 2. The fixed seat 1, A number of fixing holes 2 are provided on both the fixed base 2 and the fixed base 3, and the fixed base 2 is hinged with the auxiliary force-component rod 1, while the fixed seat 3 is hinged with the auxiliary force-component rod 2.

本改进的有益效果为:通过固定座一、固定座二与固定座三的设立,可便于能够经由紧固件贯穿固定孔二,将固定座一、固定座二与固定座三装订于墙顶上,从而由此完成支吊架本体的安装固定操作。The beneficial effect of this improvement is: through the establishment of the fixing base one, the fixing base two and the fixing base three, it is convenient to fasteners to penetrate the fixing hole two and bind the fixing base one, the fixing base two and the fixing base three to the top of the wall. to complete the installation and fixing operation of the support and hanger body.

为了便于对各梁体与杆体进行位置固定:In order to facilitate the position fixation of each beam and rod:

作为上述技术方案的进一步改进:所述固定孔一中旋接有螺栓。As a further improvement of the above technical solution: a bolt is screwed into one of the fixing holes.

本改进的有益效果为:通过螺栓贯穿主横梁一的固定孔一、旋入副横梁一的固定孔一内后,能够对横梁一长度进行位置固定,当螺栓贯穿主横梁二的固定孔一、旋入副横梁二的固定孔一内后,能够对横梁二长度进行位置固定,当螺栓贯穿副横梁二侧端固定孔一、旋入主立梁与副立梁的固定孔一内后,能够完成横梁二的组合安装操作,以便适应多组建筑机电进行安装使用,当螺栓贯穿主分力杆一的固定孔一、旋入副分力杆一的固定孔一内后,能够对分力杆一长度进行位置固定,当螺栓贯穿主分力杆二的固定孔一、旋入副分力杆二的固定孔一内后,能够对分力杆二长度进行位置固定。The beneficial effect of this improvement is: after the bolt penetrates the fixing hole 1 of the main beam 1 and is screwed into the fixing hole 1 of the auxiliary beam 1, the length of the beam 1 can be fixed in position. When the bolt penetrates the fixing hole 1 of the main beam 2, After screwing into the fixing hole 1 of the auxiliary beam 2, the length of the auxiliary beam 2 can be fixed in position. When the bolt penetrates the fixing hole 1 at the two side ends of the auxiliary beam and screws into the fixing hole 1 of the main upright beam and the auxiliary upright beam, the position of the second beam can be fixed. Complete the combined installation operation of beam two to adapt to the installation and use of multiple sets of building mechanical and electrical equipment. When the bolt penetrates the fixing hole of the main component rod one and is screwed into the fixing hole of the auxiliary component rod one, the component rod can be aligned When the bolt penetrates the fixing hole 1 of the main force component rod 2 and screws into the fixing hole 1 of the auxiliary force component rod 2, the position of the second force component rod 2 can be fixed.

附图说明Description of the drawings

图1为本实用新型的正端结构示意图;Figure 1 is a schematic diagram of the positive terminal structure of the present utility model;

图2为本实用新型的横梁二拆卸结构示意图;Figure 2 is a schematic diagram of the disassembly structure of the second beam of the present utility model;

图3为本实用新型的宽度调节结构示意图;Figure 3 is a schematic diagram of the width adjustment structure of the present utility model;

图4为本实用新型的横梁二结构示意图;Figure 4 is a schematic structural diagram of the second beam of the present utility model;

图中:1、支吊架本体;2、主横梁一;3、副横梁一;4、主横梁二;5、副横梁二;6、主立梁;7、副立梁;8、主分力杆一;9、副分力杆一;10、主分力杆二;11、副分力杆二;12、固定孔一;13、螺栓;14、固定座一;15、固定座二;16、固定座三;17、固定孔二。In the picture: 1. The main body of the support and hanger; 2. The first main beam; 3. The first auxiliary beam; 4. The second main beam; 5. The second auxiliary beam; 6. The main vertical beam; 7. The auxiliary vertical beam; 8. The main branch Force rod one; 9, auxiliary force component rod one; 10, main force component rod two; 11, auxiliary force component rod two; 12, fixing hole one; 13, bolt; 14, fixing seat one; 15, fixing seat two; 16. Fixing seat three; 17. Fixing hole two.

具体实施方式Detailed ways

为了使本领域技术人员更好地理解本实用新型的技术方案,下面结合附图对本实用新型进行详细描述,本部分的描述仅是示范性和解释性,不应对本实用新型的保护范围有任何的限制作用。In order to enable those skilled in the art to better understand the technical solutions of the present utility model, the present utility model is described in detail below in conjunction with the accompanying drawings. The description in this part is only exemplary and explanatory, and should not have any influence on the protection scope of the present utility model. limiting effect.

如图1-4所示,一种建筑机电安装的支吊架,包括支吊架本体1,所述支吊架本体1是由主横梁一2、副横梁一3、主横梁二4、副横梁二5、主立梁6、副立梁7、主分力杆一8、副分力杆一9、主分力杆二10与副分力杆二11构成,且各梁体与杆体上皆等距开设有固定孔一12若干,所述副横梁一3设置于主横梁一2内,并与主横梁一2活动连接,所述副横梁二5设置于主横梁二4内,并与主横梁二4活动连接,所述副立梁7设置于主立梁6内,并与主立梁6活动连接,所述主分力杆一8与主分力杆二10皆与主立梁6铰连,所述副分力杆一9设置于主分力杆一8内,而副分力杆二11则设置于主分力杆二10内,且副分力杆一9与主分力杆一8活动连接,而副分力杆二11则与主分力杆二10活动连接,所述副立梁7上设置有固定座一14、副分力杆一9上设置有固定座二15、而副分力杆二11上则设置有固定座三16,通过本实用新型具有调节功能,可便于能够根据安装场合与实际需求,适应不同高度与尺寸的建筑机电进行安装使用,所述主横梁一2内部两侧皆插设有副横梁一3,而主横梁二4内部两侧则皆插设有副横梁二5,通过拉动副横梁一3、副横梁二5外移,能够对支吊架本体1宽度进行调节,所述主立梁6的数量为两根,两根主立梁6分别竖向位于主横梁一2两端,且其下端与副横梁一3外端相连,而两个主立梁6内皆竖向插设有副立梁7,通过拉动副立梁7外移,能够对支吊架本体1高度进行调节,所述两根主立梁6远离副横梁一3的另一端下部皆铰连有主分力杆一8,两根主分力杆一8内皆插设有副分力杆一9,通过拉动副分力杆一9外移,能够对分力杆一使用长度进行调节,所述两根主立梁6前端与后端下部皆铰连有主分力杆二10,四根主分力杆二10内皆插设有副分力杆二11,通过拉动副分力杆二11外移,能够对分力杆二使用长度进行调节,所述固定座一14设置于副横梁一3顶部,固定座二15设置于副分力杆一9顶部,而固定座三16则设置于副分力杆二11顶部,固定座一14、固定座二15与固定座三16上皆开设有固定孔二17若干,且固定座二15与副分力杆一9铰连,而固定座三16则与副分力杆二11铰连,通过固定座一14、固定座二15与固定座三16的设立,可便于能够经由紧固件贯穿固定孔二17,将固定座一14、固定座二15与固定座三16装订于墙顶上,从而由此完成支吊架本体1的安装固定操作,所述固定孔一12中旋接有螺栓13,通过螺栓13贯穿主横梁一2的固定孔一12、旋入副横梁一3的固定孔一12内后,能够对横梁一长度进行位置固定,当螺栓13贯穿主横梁二4的固定孔一12、旋入副横梁二5的固定孔一12内后,能够对横梁二长度进行位置固定,当螺栓13贯穿副横梁二5侧端固定孔一12、旋入主立梁6与副立梁7的固定孔一12内后,能够完成横梁二的组合安装操作,以便适应多组建筑机电进行安装使用,当螺栓13贯穿主分力杆一8的固定孔一12、旋入副分力杆一9的固定孔一12内后,能够对分力杆一长度进行位置固定,当螺栓13贯穿主分力杆二10的固定孔一12、旋入副分力杆二11的固定孔一12内后,能够对分力杆二长度进行位置固定。As shown in Figures 1-4, a support and hanger for building electromechanical installation includes a support and hanger body 1. The support and hanger body 1 is composed of a main beam 2, an auxiliary beam 3, a main beam 2 4, and an auxiliary beam. Crossbeam two 5, main vertical beam 6, auxiliary vertical beam 7, main component rod 8, auxiliary component rod 19, main component rod 2 10 and auxiliary component rod 2 11, and each beam body and rod body A number of fixed holes 12 are provided at equal intervals. The auxiliary beam 3 is arranged in the main beam 2 and is movably connected with the main beam 2. The auxiliary beam 2 5 is arranged in the main beam 2 and is connected with the main beam 2. The main beam 2 4 is movably connected, the auxiliary beam 7 is arranged in the main beam 6 and is movably connected with the main beam 6 , the main component rod 8 and the main component rod 2 10 are both connected to the main beam 6 6 is hinged, the auxiliary force component rod 9 is set in the main force component rod 8, and the auxiliary force component rod 2 11 is set in the main force component rod 2 10, and the auxiliary force component rod 9 is connected with the main force component rod 10. The force rod one 8 is movably connected, and the auxiliary force component rod 2 11 is movably connected with the main force component rod 2 10. The auxiliary beam 7 is provided with a fixed seat 14, and the auxiliary force component rod 9 is provided with a fixed seat. 2 15. The auxiliary force component rod 2 11 is provided with a fixed seat 3 16. The utility model has an adjustment function, which can be easily installed and used to adapt to the installation and use of building mechanical and electrical equipment of different heights and sizes according to the installation occasion and actual needs. The main beam 2 is inserted with auxiliary beams 3 on both sides, and the main beam 2 4 is inserted with auxiliary beams 2 5 on both sides. By pulling the auxiliary beam 3 and the auxiliary beam 2 5 outward, it is possible to The width of the support and hanger body 1 is adjusted. The number of the main vertical beams 6 is two. The two main vertical beams 6 are vertically located at both ends of the main crossbeam 12, and their lower ends are connected to the outer ends of the auxiliary crossbeam 13. , and the two main vertical beams 6 are vertically inserted with auxiliary vertical beams 7. By pulling the auxiliary vertical beams 7 to move outward, the height of the support and hanger body 1 can be adjusted. The two main vertical beams 6 are far away from the auxiliary vertical beams. The lower part of the other end of the crossbeam 3 is hinged with a main force component rod 8. The two main force component rods 8 are both inserted with auxiliary force component rods 9. By pulling the auxiliary force component rods 19 to move outward, it can The length of the force component rod 1 is adjusted. The front and rear ends of the two main vertical beams 6 are hinged to the main force component rods 2 10 , and the four main force component rods 2 10 are all inserted with auxiliary force components. Rod two 11, by pulling the auxiliary force component rod 2 11 to move outward, the length of the force component rod 2 can be adjusted. The fixed seat 14 is set on the top of the auxiliary beam 13, and the fixed seat 15 is set on the auxiliary force component rod. One 9 top, and the fixed base three 16 is set on the top of the auxiliary force component rod two 11. The fixed base one 14, the fixed base two 15 and the fixed base three 16 are all provided with a number of fixing holes 2 17, and the fixed base two 15 and The auxiliary force component rod one 9 is hinged, and the fixed seat three 16 is hinged with the auxiliary force component rod two 11. The establishment of the fixed seat one 14, the fixed seat two 15 and the fixed seat three 16 can facilitate the fasteners. Through the fixing hole 17, fix the fixing base 14, the fixing base 2 15 and the fixing base 3 16 on the top of the wall, thus completing the installation and fixing operation of the support and hanger body 1. The fixing hole 12 is screwed There are bolts 13. By passing the bolts 13 through the fixing holes 12 of the main crossbeam 12 and screwing into the fixing holes 12 of the auxiliary crossbeam 13, the position of the length of the crossbeam 1 can be fixed. When the bolts 13 penetrate the main crossbeam 24 After the fixing hole 12 is screwed into the fixing hole 12 of the auxiliary crossbeam 25, the length of the crossbeam 2 can be fixed. When the bolt 13 penetrates the side end fixing hole 12 of the auxiliary crossbeam 25, screw it into the main vertical beam 6 and After the fixing hole 12 of the auxiliary vertical beam 7 is inserted, the combined installation operation of the cross beam 2 can be completed to adapt to the installation and use of multiple groups of building mechanical and electrical equipment. When the bolt 13 penetrates the fixing hole 12 of the main component rod 8, screw into the auxiliary beam 2. When the bolt 13 penetrates the fixing hole 12 of the main force component rod 2 10, it is screwed into the fixing hole of the auxiliary force component rod 2 11. After hole one 12 is inside, the length of component rod two can be fixed in position.

本实用新型的工作原理为:当根据安装场合与实际需求,内、外拉动副横梁一3,能够对支吊架本体1使用宽度进行调节,调节完毕后,只需将螺栓13贯穿主横梁一2的固定孔一12、旋入副横梁一3的固定孔一12内后,能够对横梁一长度进行位置固定,当拉动副立梁8内、外移动,能够对支吊架本体2使用高度进行调节,调节完毕后,只需将螺栓13贯穿主立梁6的固定孔一12、旋入副立梁7的固定孔一12内后,能够对立梁长度进行位置固定,当紧固件贯穿固定孔二17将固定座一14装订于墙顶后,能够对支吊架本体1进行初步位置固定,当调整分力杆一与分力杆二使用角度,并拉动副分力杆一9、副分力杆二11内外移动调整其使用长度后,能够在将固定座二15与固定座三16放于合适安装位后,使用紧固件贯穿固定孔二17将固定座二15与固定座三16装订于墙顶上,完成支吊架本体1进一步位置固定操作,从而以便增加支吊架本体1固定使用过程的稳定性,当需对多组建筑机电进行安装操作时,只需拉动副横梁二5调整横梁二使用长度,使其水平置于合适高度的两侧主立梁6之间,然后使用螺栓13贯穿副横梁二5侧端固定孔一12、旋入主立梁6与副立梁7的固定孔一12内,即能够完成横梁二的组合安装操作。The working principle of the utility model is: when the auxiliary beam 1 is pulled inward and outward according to the installation situation and actual needs, the width of the support and hanger body 1 can be adjusted. After the adjustment is completed, only the bolt 13 needs to be penetrated through the main beam 1 After the fixing hole 12 of 2 is screwed into the fixing hole 12 of the auxiliary beam 3, the length of the crossbeam can be fixed. When the auxiliary beam 8 is pulled to move in and out, the height of the support and hanger body 2 can be adjusted. After adjustment, you only need to insert the bolt 13 through the fixing hole 12 of the main upright beam 6 and screw it into the fixing hole 12 of the auxiliary upright beam 7. Then the length of the upright beam can be fixed. When the fastener penetrates After fixing the fixing base 14 to the top of the wall through the fixing holes 17, the support and hanger body 1 can be initially fixed in position. When adjusting the use angles of the force component rods 1 and 2, and pulling the auxiliary force component rods 1, 9, After the auxiliary force component rod 2 11 is moved inward and outward to adjust its length, the fixing base 2 15 and the fixing base 3 16 can be placed in the appropriate installation position, and then fasteners can be used to penetrate the fixing holes 2 17 to secure the fixing base 2 15 and the fixing base 16 Three 16 is stapled on the top of the wall to complete the further position fixing operation of the support and hanger body 1, thereby increasing the stability of the fixing and use process of the support and hanger body 1. When multiple sets of building electromechanical installation operations are required, just pull the pair Adjust the length of cross beam 2 5 so that it is placed horizontally between the main vertical beams 6 on both sides of the appropriate height. Then use bolts 13 to penetrate the side end fixing holes 12 of auxiliary cross beam 2 5 and screw into the main vertical beam 6 and the auxiliary beam. In the fixing hole 12 of the vertical beam 7, the combined installation operation of the cross beam 2 can be completed.

需要说明的是,在本文中,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。It should be noted that, as used herein, the terms "include", "comprises" or any other variation thereof are intended to cover a non-exclusive inclusion, such that a process, method, article or device that includes a series of elements not only includes those elements, It also includes other elements not expressly listed or inherent in the process, method, article or equipment.

本文中应用了具体个例对本实用新型的原理及实施方式进行了阐述,以上实例的说明只是用于帮助理解本实用新型的方法及其核心思想。以上所述仅是本实用新型的优选实施方式,应当指出,由于文字表达的有限性,客观上存在无限的具体结构,对于本技术领域的普通技术人员来说,在不脱离本实用新型原理的前提下,还可以做出若干改进、润饰或变化,也可以将上述技术特征以适当的方式进行组合;这些改进润饰、变化或组合,或未经改进将本实用新型的构思和技术方案直接应用于其它场合的,均应视为本实用新型的保护范围。This article uses specific examples to illustrate the principles and implementation methods of the present invention. The above examples are only used to help understand the method and the core idea of the present invention. The above are only the preferred embodiments of the present utility model. It should be pointed out that due to the limitation of written expressions, there are objectively unlimited specific structures. For those of ordinary skill in the art, without departing from the principles of the present utility model, Under the premise, several improvements, modifications or changes can also be made, or the above technical features can be combined in an appropriate manner; these improvements, modifications or combinations, or the concepts and technical solutions of the present utility model can be directly applied without improvement. In other situations, it should be regarded as the protection scope of the present utility model.

Claims (7)

1. The utility model provides a support and hanger of building electromechanical installation, includes support and hanger body (1), support and hanger body (1) is by main beam one (2), vice crossbeam one (3), main beam two (4), vice crossbeam two (5), main upright roof beam (6), vice upright roof beam (7), main component force pole one (8), vice component force pole one (9), main component force pole two (10) and vice component force pole two (11), and all equidistance has seted up a plurality of fixed orifices one (12) on each roof beam body and the body of rod, its characterized in that: the auxiliary beam I (3) is arranged in the main beam I (2) and is movably connected with the main beam I (2), the auxiliary beam II (5) is arranged in the main beam II (4) and is movably connected with the main beam II (4), the auxiliary vertical beam (7) is arranged in the main vertical beam (6) and is movably connected with the main vertical beam (6), the main component force rod I (8) and the main component force rod II (10) are hinged with the main vertical beam (6), the auxiliary component force rod I (9) is arranged in the main component force rod I (8), the auxiliary component force rod II (11) is arranged in the main component force rod II (10), the auxiliary component force rod I (9) is movably connected with the main component force rod I (8), the auxiliary component force rod II (11) is movably connected with the main component force rod II (10), the auxiliary vertical beam (7) is provided with a fixing seat I (14), the auxiliary component force rod I (9) is hinged with the main vertical beam (6), and the auxiliary component force rod II (11) is provided with a fixing seat III (16).
2. A support and hanger for electro-mechanical installation of a building according to claim 1, wherein: the two sides of the inner part of the first main beam (2) are respectively provided with the second auxiliary beam (3), and the two sides of the inner part of the second main beam (4) are respectively provided with the second auxiliary beam (5).
3. A support and hanger for electro-mechanical installation of a building according to claim 1, wherein: the number of the main vertical beams (6) is two, the two main vertical beams (6) are vertically positioned at two ends of the first main beam (2) respectively, the lower ends of the two main vertical beams are connected with the outer ends of the first auxiliary beam (3), and the auxiliary vertical beams (7) are vertically inserted into the two main vertical beams (6).
4. A support and hanger for electro-mechanical installation of a building according to claim 1, wherein: the lower parts of the other ends of the two main vertical beams (6) far away from the auxiliary beam I (3) are hinged with main component force rods I (8), and auxiliary component force rods I (9) are inserted into the two main component force rods I (8).
5. A support and hanger for electro-mechanical installation of a building according to claim 1, wherein: the front ends and the lower parts of the rear ends of the two main vertical beams (6) are hinged with a second main component force rod (10), and a second auxiliary component force rod (11) is inserted into the second four main component force rods (10).
6. A support and hanger for electro-mechanical installation of a building according to claim 1, wherein: the first fixing seat (14) is arranged at the top of the first auxiliary beam (3), the second fixing seat (15) is arranged at the top of the first auxiliary component force rod (9), the third fixing seat (16) is arranged at the top of the second auxiliary component force rod (11), a plurality of fixing holes (17) are formed in the first fixing seat (14), the second fixing seat (15) and the third fixing seat (16), the second fixing seat (15) is hinged with the first auxiliary component force rod (9), and the third fixing seat (16) is hinged with the second auxiliary component force rod (11).
7. A support and hanger for electro-mechanical installation of a building according to claim 1, wherein: a bolt (13) is screwed in the first fixing hole (12).
CN202321932907.2U 2023-07-21 2023-07-21 A kind of support and hanger for building electromechanical installation Expired - Fee Related CN220436156U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321932907.2U CN220436156U (en) 2023-07-21 2023-07-21 A kind of support and hanger for building electromechanical installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321932907.2U CN220436156U (en) 2023-07-21 2023-07-21 A kind of support and hanger for building electromechanical installation

Publications (1)

Publication Number Publication Date
CN220436156U true CN220436156U (en) 2024-02-02

Family

ID=89694155

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321932907.2U Expired - Fee Related CN220436156U (en) 2023-07-21 2023-07-21 A kind of support and hanger for building electromechanical installation

Country Status (1)

Country Link
CN (1) CN220436156U (en)

Similar Documents

Publication Publication Date Title
CN204715722U (en) A kind of all steel attachment type raise scaffold
CN103422663A (en) Adhesive lifting scaffold
CN220867997U (en) Bridge basin type support installation auxiliary device
CN205747445U (en) The outer machine suspension strut structure of grid basket ceiling type air conditioner
CN220436156U (en) A kind of support and hanger for building electromechanical installation
CN206530078U (en) A kind of support meanss
CN211499713U (en) All-steel attached lifting scaffold
CN217812213U (en) Novel disk buckle type scaffold
CN206530077U (en) A kind of support frame
CN221355031U (en) Vertical waxberry picking steel frame
CN206530052U (en) A kind of combination type supporting device
CN207606779U (en) Outstanding window mounting platform outside
CN208152356U (en) A kind of rack smallpox cell cube system
CN207079953U (en) Edge protection rail structure
CN200992755Y (en) Suspension system of point-supported curtain wall and connection device for suspension ribs
CN215254783U (en) Scalable face limit guard rail suitable for different spans
CN220377812U (en) Adjustable climbing frame fixtures
CN210001414U (en) high-altitude hoisting wall-riding equipment
CN209874436U (en) High-rise scaffold supports fixing device
CN220798153U (en) Photovoltaic support
CN209725466U (en) A kind of air hose four-way bracket with pooling feature being easily installed
CN216212708U (en) Combined transformer rack
CN209129345U (en) Basic support hanging rack of overhanging operation platform
CN221669452U (en) Auxiliary support rod for construction of electromechanical cable bridge frame of building
CN222140892U (en) A green construction noise reduction isolation device with a telescopic structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20240202

CF01 Termination of patent right due to non-payment of annual fee