CN220434177U - Double-lifting-point elevator hoistway construction double-layer platform - Google Patents
Double-lifting-point elevator hoistway construction double-layer platform Download PDFInfo
- Publication number
- CN220434177U CN220434177U CN202321922481.2U CN202321922481U CN220434177U CN 220434177 U CN220434177 U CN 220434177U CN 202321922481 U CN202321922481 U CN 202321922481U CN 220434177 U CN220434177 U CN 220434177U
- Authority
- CN
- China
- Prior art keywords
- double
- fixedly connected
- operation board
- threaded rod
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Cage And Drive Apparatuses For Elevators (AREA)
Abstract
The utility model provides a double-lifting-point elevator shaft construction double-layer platform, which relates to the technical field of elevator shaft construction and comprises a tripod, wherein a first operation plate and a second operation plate are fixedly connected to the top of the tripod, lifting rings are symmetrically and fixedly connected to the top of the first operation plate, auxiliary grooves are symmetrically formed in the top of the second operation plate, and a height adjusting device is arranged at the top of the first operation plate.
Description
Technical Field
The utility model relates to the technical field of elevator hoistway construction, in particular to a double-layer platform for double-lifting-point elevator hoistway construction.
Background
The elevator shaft construction platform is used for realizing synchronous lifting construction of the elevator shaft inner wall concrete templates and floors, has a simple and reasonable structure, is convenient to manufacture, can be lifted synchronously with the floors, omits a large amount of turnover materials such as scaffolds occupied for building the elevator shaft operation platform in the current construction method, adopts a double-layer structure for the current part of elevator shaft construction platform, and can be used for construction operation by upper and lower layers of barrels for facilitating common operation of multiple persons.
The inventor finds in daily work that the distance between the upper and lower operating platforms of the double-layer platform for elevator shaft construction is the same, and the elevator room heights of single-layer floors are different for different buildings due to different designs and households, so that the double-layer platform is inconvenient to use when the double-layer platform is used for constructing the elevator shaft of a part of the buildings.
In order to solve the problem that the double-deck operation platforms are inconvenient to use when the elevator shaft of a part of buildings is constructed because the distance between the upper operation platform and the lower operation platform of the double-deck platform is the same and the elevator of a single floor is different from each other due to the different designs and households of different buildings, the utility model adopts another solving mode by detaching the operation boards at the top and then re-welding according to the height requirement in the prior art.
Disclosure of Invention
The double-lifting-point elevator shaft construction double-layer platform aims to solve the problem that the double-layer construction platform is inconvenient to use when the elevator shaft of a part of buildings is constructed because the distance between the upper and lower operating platforms of the double-layer platform is the same and the elevator of a single floor is different in height due to different designs and households of different buildings.
In order to achieve the above purpose, the present utility model adopts the following technical scheme: the utility model provides a double-deck platform of double-hoisting-point elevator well construction, includes tripod and first operation panel, the top fixedly connected with second operation panel of tripod, the top symmetry fixedly connected with rings of first operation panel, auxiliary tank has been seted up to the top symmetry of second operation panel, the top of first operation panel is provided with height adjusting device, height adjusting device includes four sleeves, four telescopic bottom respectively with the four corners department fixed connection at first operation panel top, telescopic inner wall sliding connection has the threaded rod, four the threaded rod is connected with the second operation panel through just tearing open the device, the top symmetry fixedly connected with bracing piece of first operation panel, the top fixedly connected with backup pad of bracing piece, four the threaded rod is inserted respectively and is established at the inner wall of two backup pads, the surface threaded connection of threaded rod has first screw piece, the bottom of first screw piece and the top butt of backup pad.
The effects achieved by the components are as follows: through setting up sleeve and threaded rod, the threaded rod can stretch out and draw back at telescopic inner wall, and the threaded rod can drive the second operation board at flexible in-process and remove in vertical direction, simultaneously under the effect of first screw piece and backup pad, rotate first screw piece for the bottom of first screw piece and the top butt of backup pad, then can spacing the second operation board, make the unable downwardly moving of second operation board, and then be convenient for adjust the distance between first operation board and the second operation board according to actual need, make construction platform can be adapted to the elevator shaft of different constructions.
Preferably, the surface threaded connection of threaded rod has the second screw piece, the top of second screw piece and the bottom butt of backup pad, the surface of first screw piece and second screw piece all fixedly connected with extension piece.
The effects achieved by the components are as follows: through setting up the second screw piece, rotate the second screw piece for the top and the bottom butt of backup pad of second screw piece, then the second screw piece can be spacing to the second operation panel, makes the unable upward movement of second operation panel, simultaneously through setting up the extension piece, is convenient for rotate first screw piece and second screw piece.
Preferably, one end of the sleeve is fixedly connected with a rubber ring, and the threaded rod is inserted into the inner wall of the rubber ring.
The effects achieved by the components are as follows: through setting up the rubber ring, block second screw piece and telescopic one end, prevent that the two direct collision from causing the damage.
Preferably, one side of the first operation plate is fixedly connected with a pull rod, and one side of the outer surface of the pull rod is fixedly connected with one side of the second operation plate.
The effects achieved by the components are as follows: through setting up the pull rod, the pull rod can be to the downwardly extending of second operation board, and then is convenient for carry out the regulation of position to the second operation board in the low.
Preferably, the easy-to-detach device comprises two mounting plates, one sides of the two mounting plates are fixedly connected with one ends of four threaded rods respectively, and one side of the mounting plate is fixedly connected with one side of the second operation plate through bolts.
The effects achieved by the components are as follows: through setting up the mounting panel, insert the mounting panel with the bolt, rotate the bolt again for the bolt gets into second operation panel inner wall, can fix between second operation panel and the mounting panel, and then fix between threaded rod and the second operation panel.
Preferably, the top of one of the mounting plates is symmetrically and fixedly connected with a clamping block, a clamping groove is symmetrically formed in one side of the top of the second operation plate, and the outer surface of the clamping block is inserted into the inner wall of the clamping groove.
The effects achieved by the components are as follows: through setting up fixture block and draw-in groove, insert the draw-in groove inner wall completely with the fixture block, can fix a position the position of second operation board, be convenient for follow-up installation to the second operation board.
Preferably, the top fixedly connected with auxiliary block of fixture block, the bottom and the second operation board of auxiliary block pass through bolt fixed connection.
The effects achieved by the components are as follows: through setting up the auxiliary block, insert the auxiliary block with the bolt, rotate the bolt again for the bolt gets into the second operation panel inner wall, can fix between second operation panel and the auxiliary block, and then carries out further fixation between mounting panel and the second operation panel, makes overall structure more stable, also is convenient for dismantle the second operation panel simultaneously, and then is convenient for maintain and change the second operation panel.
Compared with the prior art, the utility model has the advantages and positive effects that:
according to the utility model, the sleeve and the threaded rod are arranged, the threaded rod can stretch out and draw back on the inner wall of the sleeve and drive the second operation plate to move in the vertical direction, and meanwhile, the second operation plate can be limited under the action of the first screw hole block and the supporting plate, so that the second operation plate cannot move downwards, the distance between the first operation plate and the second operation plate can be conveniently adjusted according to actual needs, the construction platform can be suitable for elevator shafts of different buildings, and the practicability is effectively improved.
Drawings
FIG. 1 is a schematic perspective view of a main body of the present utility model;
FIG. 2 is a schematic perspective view of a second operation panel according to the present utility model;
FIG. 3 is an enlarged schematic view of the structure of FIG. 2A according to the present utility model;
fig. 4 is an enlarged schematic view of the structure of fig. 2B according to the present utility model.
Legend description: 1. a tripod; 2. a first operation panel; 3. a second operation panel; 4. a hanging ring; 5. an auxiliary groove; 6. a height adjusting device; 61. a sleeve; 62. a threaded rod; 63. a support rod; 64. a support plate; 65. a first screw hole block; 66. a second screw hole block; 67. an extension block; 68. a rubber ring; 69. a pull rod; 7. a device for removing the toilet; 71. a mounting plate; 72. a clamping block; 73. a clamping groove; 74. and an auxiliary block.
Detailed Description
Embodiment 1, referring to fig. 1-3, this embodiment discloses double-deck platform of double-hoisting point elevator well construction, including tripod 1 and first operation board 2, the top fixedly connected with second operation board 3 of tripod 1, the top symmetry fixedly connected with rings 4 of first operation board 2, auxiliary tank 5 has been seted up to the top symmetry of second operation board 3, the top of first operation board 2 is provided with height adjusting device 6, height adjusting device 6 includes four sleeve 61, the bottom of four sleeve 61 respectively with the four corners department fixed connection at first operation board 2 top, sleeve 61's inner wall sliding connection has threaded rod 62, four threaded rod 62 are connected with second operation board 3 through just, the top fixedly connected with backup pad 64 of first operation board 2 is connected with bracing piece 63, four threaded rod 62 insert respectively at the inner wall of two backup pads 64, the surface screw thread of threaded rod 62 is connected with first screw hole piece 65, the top butt of first screw piece 65 and backup pad 64, through setting up sleeve 61 and 62, can not carry out telescopic operation board 3 in the top of second operation board 3 and can make the actual operation board can not carry out the telescopic operation at the top of second operation board 3 in the top of second operation board 3, can not carry out the telescopic operation board 3 in the top 3, can the telescopic operation board is realized at the top 3, and can be adjusted to the top 3.
Referring to fig. 2 and 3, the outer surface of the threaded rod 62 is connected with a second screw hole block 66 in a threaded manner, the top of the second screw hole block 66 is abutted against the bottom of the supporting plate 64, the outer surfaces of the first screw hole block 65 and the second screw hole block 66 are fixedly connected with an extension block 67, the second screw hole block 66 is rotated by arranging the second screw hole block 66, the top of the second screw hole block 66 is abutted against the bottom of the supporting plate 64, and then the second screw hole block 66 can limit the second operating plate 3, so that the second operating plate 3 cannot move upwards, and meanwhile, the first screw hole block 65 and the second screw hole block 66 are convenient to rotate by arranging the extension block 67.
Referring to fig. 2 and 3, one end of the sleeve 61 is fixedly connected with a rubber ring 68, the threaded rod 62 is inserted into the inner wall of the rubber ring 68, and the second screw hole block 66 and one end of the sleeve 61 are blocked by the arrangement of the rubber ring 68, so that damage caused by direct collision of the second screw hole block 66 and the sleeve 61 is prevented; one side of the first operation plate 2 is provided with a pull rod 69, the pull rod 69 is not connected with the first operation plate 2, one side of the outer surface of the pull rod 69 is fixedly connected with one side of the second operation plate 3, and the pull rod 69 can downwards extend the second operation plate 3 through the pull rod 69, so that the position of the second operation plate 3 can be conveniently adjusted at the lower position.
Referring to fig. 2 and 4, the easy-to-detach device 7 includes two mounting plates 71, one sides of the two mounting plates 71 are fixedly connected with one ends of four threaded rods 62 respectively, one side of the mounting plate 71 is fixedly connected with one side of the second operation plate 3 through bolts, the bolts are inserted into the mounting plates 71 by arranging the mounting plates 71, and then the bolts are rotated, so that the bolts enter the inner wall of the second operation plate 3, the second operation plate 3 and the mounting plates 71 can be fixed, and then the threaded rods 62 and the second operation plate 3 are fixed.
Referring to fig. 2 and 4, the top of one mounting plate 71 is symmetrically and fixedly connected with a clamping block 72, one side of the top of the second operation plate 3 is symmetrically provided with a clamping groove 73, the outer surface of the clamping block 72 is inserted into the inner wall of the clamping groove 73, and the clamping block 72 is completely inserted into the inner wall of the clamping groove 73 by arranging the clamping block 72 and the clamping groove 73, so that the position of the second operation plate 3 can be positioned, and the subsequent installation of the second operation plate 3 is facilitated; the top fixedly connected with auxiliary block 74 of fixture block 72, the bottom of auxiliary block 74 passes through bolt fixed connection with second operation board 3, through setting up auxiliary block 74, insert auxiliary block 74 with the bolt, rotate the bolt again for the bolt gets into second operation board 3 inner wall, can fix between second operation board 3 and the auxiliary block 74, and then carries out further fixation between mounting panel 71 and the second operation board 3, make overall structure more stable, also be convenient for dismantle second operation board 3 simultaneously, and then be convenient for maintain and change second operation board 3.
Working principle: when the second operation plate 3 needs to be installed, the clamping block 72 is completely inserted into the inner wall of the clamping groove 73, the position of the second operation plate 3 is positioned, the bolt is inserted into the mounting plate 71, the bolt is rotated, so that the bolt enters the inner wall of the second operation plate 3, the second operation plate 3 and the mounting plate 71 are fixed, the threaded rod 62 and the second operation plate 3 are further fixed, the bolt is inserted into the auxiliary block 74, the bolt is rotated, so that the bolt enters the inner wall of the second operation plate 3, the second operation plate 3 and the auxiliary block 74 can be fixed, the mounting plate 71 and the second operation plate 3 are further fixed, and the whole structure is more stable; when the height of the second operation plate 3 needs to be adjusted, the first screw hole block 65 and the second screw hole block 66 are rotated respectively, so that the first screw hole block 65 and the second screw hole block 66 move in a direction away from the support plate 64 until reaching a limit position, the second operation plate 3 is pushed to move in the vertical direction by the pull rod 69 until reaching a proper height of the second operation plate 3, the first screw hole block 65 is rotated, the bottom of the first screw hole block 65 is abutted with the top of the support plate 64, the second operation plate 3 can be limited, the second operation plate 3 cannot move downwards, the second screw hole block 66 is rotated again, the top of the second screw hole block 66 is abutted with the bottom of the support plate 64, the second operation plate 3 can be limited by the second screw hole block 66, the height of the second operation plate 3 can be fixed by the second operation plate 3 cannot move upwards, and the operation is completed.
Claims (7)
1. Double-deck platform of double-hoisting point elevator well construction, including tripod (1) and first operation board (2), its characterized in that: the utility model provides a tripod, top fixedly connected with second operation board (3) of tripod (1), the top symmetry fixedly connected with rings (4) of first operation board (2), auxiliary tank (5) have been seted up to the top symmetry of second operation board (3), the top of first operation board (2) is provided with height adjusting device (6), height adjusting device (6) include four sleeve (61), four the bottom of sleeve (61) respectively with the four corners department fixed connection at first operation board (2) top, the inner wall sliding connection of sleeve (61) has threaded rod (62), four threaded rod (62) are connected with second operation board (3) through just dismouting device (7), the top symmetry fixedly connected with bracing piece (63) of first operation board (2), the top fixedly connected with backup pad (64) of bracing piece (63), four threaded rod (62) insert respectively and establish the inner wall at two backup pads (64), the surface threaded connection of threaded rod (62) has first piece (65), the bottom of first backup pad (65) and top butt (64).
2. The double-hoisting point elevator hoistway construction double-deck platform of claim 1, wherein: the outer surface threaded connection of threaded rod (62) has second screw piece (66), the top of second screw piece (66) and the bottom butt of backup pad (64), the surface of first screw piece (65) and second screw piece (66) all fixedly connected with extension piece (67).
3. The double-hoisting point elevator hoistway construction double-deck platform of claim 1, wherein: one end of the sleeve (61) is fixedly connected with a rubber ring (68), and the threaded rod (62) is inserted into the inner wall of the rubber ring (68).
4. The double-hoisting point elevator hoistway construction double-deck platform of claim 1, wherein: one side of the first operation plate (2) is provided with a pull rod (69), and one side of the outer surface of the pull rod (69) is fixedly connected with one side of the second operation plate (3).
5. The double-hoisting point elevator hoistway construction double-deck platform of claim 1, wherein: the toilet dismounting device (7) comprises two mounting plates (71), one sides of the two mounting plates (71) are fixedly connected with one ends of four threaded rods (62) respectively, and one side of the mounting plate (71) is fixedly connected with one side of a second operation plate (3) through bolts.
6. The double-hoisting point elevator hoistway construction double-deck platform of claim 5, wherein: clamping blocks (72) are symmetrically and fixedly connected to the top of one mounting plate (71), clamping grooves (73) are symmetrically formed in one side of the top of the second operation plate (3), and the outer surfaces of the clamping blocks (72) are inserted into the inner walls of the clamping grooves (73).
7. The double-hoisting point elevator hoistway construction double-deck platform of claim 6, wherein: the top of fixture block (72) fixedly connected with auxiliary block (74), the bottom of auxiliary block (74) passes through bolt fixed connection with second operation board (3).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202321922481.2U CN220434177U (en) | 2023-07-21 | 2023-07-21 | Double-lifting-point elevator hoistway construction double-layer platform |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202321922481.2U CN220434177U (en) | 2023-07-21 | 2023-07-21 | Double-lifting-point elevator hoistway construction double-layer platform |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN220434177U true CN220434177U (en) | 2024-02-02 |
Family
ID=89696956
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202321922481.2U Active CN220434177U (en) | 2023-07-21 | 2023-07-21 | Double-lifting-point elevator hoistway construction double-layer platform |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN220434177U (en) |
-
2023
- 2023-07-21 CN CN202321922481.2U patent/CN220434177U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| AU2012373801C1 (en) | Early-removal formwork system for concreting of constructions comprising beams, plates and columns | |
| CN110748178B (en) | Auxiliary platform for installing shock insulation support and application method thereof | |
| CN213418443U (en) | Self-climbing type elevator shaft operation platform | |
| CN220434177U (en) | Double-lifting-point elevator hoistway construction double-layer platform | |
| CN213710299U (en) | A combined two-story elevator shaft integrally lifts the diagonal bracing operation platform | |
| CN213683346U (en) | Temporary supporting device for mounting large-span steel beam | |
| CN206189894U (en) | Stable building engineering strutting arrangement | |
| CN114382284A (en) | An elevator shaft formwork system and its operation method | |
| CN107313597A (en) | Modularization ready-package discharging platform for assembled architecture | |
| CN208870416U (en) | One kind exempting from the fixed device of pre-buried overhanging unloading platform | |
| CN217897392U (en) | Be applied to civil engineering construction strutting arrangement convenient to remove | |
| WO1995006177A1 (en) | Liftable scaffold | |
| CN213774398U (en) | Elevator shaft operating platform | |
| CN201040675Y (en) | Special-purpose hanger device for mounting elevator | |
| CN220828023U (en) | Adjustable bracket of elevator shaft operation platform | |
| CN218346751U (en) | Elevator shaft lifting platform for building construction | |
| CN116556646B (en) | A high-altitude working platform for a large high-speed railway station | |
| CN222276164U (en) | Aluminum alloy template mechanism for building floor construction | |
| CN220100634U (en) | Formwork support device for simultaneous construction of sandwich panels and their superstructure panels | |
| CN220978791U (en) | Elevator shaft inner formwork support frame | |
| CN219045295U (en) | Lift shaft lifting type construction platform | |
| CN219670037U (en) | Tower crane fixing auxiliary bracket for prefabricated building construction | |
| CN114704090B (en) | Lifting system for single-side formwork | |
| CN220469360U (en) | Cantilever frame mounting structure | |
| CN215368585U (en) | Scaffold |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |